REVISED EUREKA 2020 STRATEGIC ROADMAP
“Towards being a leading European platform for international
industrial R&D&I cooperation, fostering competitiveness, growth
and job creation.”
Endorsed by the Ministerial Conference in Madrid, 30 June 2017
Brussels, 5 June 2017 8th draft – Final version
MC
Madrid (Spain)
30 June 2017
EUREKA doc. MC35-06
1 Revised EUREKA SRM 2014-2020 - 8th
draft – FINAL VERSION
EXECUTIVE SUMMARY The EUREKA Strategic Roadmap 2014 – 2020 (SRM)1 is a key element in EUREKA’s governance system
developed under the Norwegian Chairmanship (2013-2014) for the period from June 2014 until July
2020. It is a document based on consensus amongst EUREKA members, providing strategic direction
on overall priorities, action fields and objectives for EUREKA. Roadmap will be
The EUREKA SRM needs to be reviewed at mid-term with regard to the described scope and
priorities, and evaluated against its objectives. For that reason, one of the major priorities during the
Spanish EUREKA Chairmanship (2016-2017) was to review the EUREKA SRM 2014-2020 to ensure
continued relevance, a strong strategic governance and political continuity over the coming period of
2017‐2020.
The Executive Group, under the Spanish Chair led by the HLG chairman Mr Francisco Marin,
undertook the mid-term review of the SRM. In line with the outcomes of the SRM Review Report2,
and taking into account the recent developments and changes of the R&D&I landscape in Europe,
this revised document focuses on the re-adjusted strategic orientations of the Network and offers a
vision for EUREKA to be a leading European platform for international industrial R&D&I cooperation,
fostering competitiveness, growth and job creation.
The SRM puts forward four strategic priorities, illustrating the direction in which EUREKA wants to
develop in the future, and ten action fields that underpin EUREKA’s vision and strategic priorities.
The SRM commits all EUREKA members at all levels within EUREKA (MC, HLG, NPC) and strives to
achieve maximum impact by engaging all relevant stakeholders and partners of EUREKA in the
actions needed to achieve the strategic goals. EUREKA’s instruments, notably Network projects,
Eurostars, Clusters, Umbrellas and E!nnoVest, will be fully mobilised to deliver on the goals of
EUREKA’s strategy.
The revision of the EUREKA SRM 2014-2020 was approved during the 5th HLG meeting (Madrid, 29
June 2017). Subsequently, the XXVIII Ministerial Conference (Madrid, 30 June 2017) formally adopted
the revision of the EUREKA Strategic Roadmap 2014-2020 and looked forward to its implementation
under the upcoming chairmanships.
1 EUREKA Strategic Roadmap 2014-2020 was approved by the HLG in Bergen on 19 June 2014: EUREKA Doc HLG3222
2 EUREKA Strategic Roadmap 2014-2020 Review Report was approved by the HLG in Bilbao on 19 October 2016: EUREKA
Doc HLG3508
2 Revised EUREKA SRM 2014-2020 - 8th
draft – FINAL VERSION
REVISED EUREKA 2020 SRM: VISION AND STRATEGIC OBJECTIVES The EUREKA mission is to stimulate growth and job creation in Europe by supporting business-driven
international research, development and innovation in an increasingly globalized economy. This
mission is achieved through a well-established intergovernmental network of more than 40
participating countries, facilitating the international coordination of national innovation
programmes.
The revised EUREKA Strategic Roadmap offers a vision for EUREKA to be: “A leading European
platform for international industrial R&D&I cooperation, fostering competitiveness, growth and
job creation.”
To reach this vision by 2020, EUREKA has set four strategic objectives:
To provide a clear added value to industry, with business-driven instruments, a suitable
access to public funding and high quality communication and evaluation.
To become a preferred initiative for national funding bodies, aiming to extend national
priorities and R&D&I funding programmes to an international dimension.
To become a preferred platform for industrial R&D&I cooperation between Europe and other
parts of the world.
To contribute to the completion of the European Research Area for its innovation part,
reaching synergies between EUREKA instruments and other relevant instruments.
Ten horizontal and vertical action fields have been developed to achieve EUREKA’s vision and
catalyse progress towards the objectives set out above:
HORIZONTAL ACTION FIELDS
Action field 1: EUREKA in the European innovation policy
Action field 2: Smart globalization
Action field 3: Lean governance
Action field 4: Proactive engagement with the innovation community
Action field 5: Comprehensive evaluation and impact assessment
VERTICAL ACTION FIELDS
Action field 6: EUREKA 2.0: Revitalising EUREKA Network projects
Action field 7: EUREKA Clusters: stronger and more visible
Action field 8: Eurostars implementation and continuation beyond 2020
Action field 9: E!nnoVest: boosting investment and business readiness
Action field 10: EUREKA Umbrellas: the future
Vertical actions are typically the business outputs, the products or the services that EUREKA Network
is responsible for. These vertical actions can occur across a range of different topics and may or may
not influence each other. Horizontal actions cut across all of the vertical actions in the sense that
they are applied across all of the different products or services. They typically enable the actions to
be performed or the outputs of these actions to be measured.
3 Revised EUREKA SRM 2014-2020 - 8th
draft – FINAL VERSION
In order to achieve its mission and vision, some current action fields need reengineering, some need
upscaling and some new actions may be required. Only with such a dynamic, open and strategic
approach, can the EUREKA Network secure the position and existence of its instruments in the
increasingly complex innovation ecosystem.
With the purpose to ensure operational and strategic continuity of EUREKA, the Strategic Roadmap
(SRM) will provide guidance to subsequent Chairmanships of EUREKA in the development of their
priorities. Thus, this revised EUREKA 2020 Strategic Roadmap will be implemented by the EUREKA
network, led by the consecutive Chairmanships and supported by the EUREKA Secretariat. The
Roadmap will be monitored on an annual basis and evaluated at mid-term and completion. The
Roadmap is an evolving document that will be revised following the recommendations of a mid-term
assessment.
4 Revised EUREKA SRM 2014-2020 - 8th
draft – FINAL VERSION
HORIZONTAL ACTIONS FIELDS
ACTION FIELD 1: EUREKA IN THE EUROPEAN INNOVATION POLICY
KPI 1: HLG assessment of the development of EUREKA’s position and status in the ERA
KPI 2: EUREKA explicitly identified as a relevant stakeholder in European Innovation policies
KPI 3: EUREKA and its instruments secured a unique and complementary position in the European
innovation landscape (9th Framework Programme and EIC)
Today, the integration of innovation within the ERA has been identified as one of the key challenges,
as growth and job creation remain key objectives for the EU. As a well-established enabling structure
for international cooperation with its different instruments and its bottom-up approach, EUREKA has
substantial experience and is making a strong impact on European industry by supporting innovative
business-oriented projects. EUREKA therefore is a natural contributor with respect to the innovation-
related aspects of the European Research Area (ERA).
To ensure that EUREKA becomes a leading ERA innovation stakeholder contributing to growth and job
creation for the benefit of European industry, the measures described in the ‘EUREKA in the ERA’
Strategy must be implemented.
Develop new methods of cooperation with the European Union and establish synergies with EU
R&D&I instruments and networks
EUREKA will explore new ways of cooperation with European Commission, European Parliament and
Council in order to support the further development of the European innovation landscape, and
more specifically the cooperation with the future European Innovation Council (EIC). As being a
platform to foster dialogue with various countries, innovation experts and stakeholders at national
level, EUREKA network should cooperate with the EC more extensively in order to create cohesive
and strong common actions. Two levels of cooperation are foreseen:
At political level, the EC-EUREKA working group have helped to highlight different areas for
cooperation between EUREKA and EC in the past. Now it is up to the ‘ERA-HLG, an informal
ERA-group on ‘industrial innovation’ issues and composed of all EUREKA HLRs, to pave the
way for future cooperation.
At operational level, it is crucial that the instruments offered within the European innovation
support system create synergy and added value. There is a need to establish a
complementary innovation support system that meets the future needs of industry. In order
to avoid duplication, EUREKA, with its Network projects, Clusters, Eurostars and E!nnoVest,
should constantly work, as a general rule, on complementarities with the H2020 and future
Framework Programme.
o The updated EUREKA 2.0 must find its place in the complexity of the European funding
landscape, to bring its distinct added value to potential project applicants on one side,
and to NFBs, ministries, and the European Commission on the other side.
o Eurostars, Network and Cluster projects will need to reach smart synergies with relevant
EU-level initiatives that provide services and funding to SMEs (SME instrument in H2020,
5 Revised EUREKA SRM 2014-2020 - 8th
draft – FINAL VERSION
COSME, EEN), or other instruments that are similar by their public-public partnership
nature (Articles 185 and 187, ERA-NET Cofunds, KICs, PPPs) or that can provide some
alternative funding sources (EU Structural Funds, venture funds).
Enhance EUREKA’s presence as innovation stakeholder in the ERA
EUREKA will be further developed as a platform for innovation policy dialogue and stakeholder
involvement, in view to develop closer synergies among ERA stakeholders (EC, NFBs, TAFTIE, EARTO,
UEAPME,…) and contribute to R&D&I policymaking through analysis and debate. Nevertheless, in
order to contribute to innovation policy at European level it is essential to also enhance the policy
role of EUREKA at national level. EUREKA needs to ensure the political support and financial
commitment in EUREKA countries, and enhance the relations with other networks at national level
(e.g. such as EEN and NCPs) through complementary activities.
The key actions to be implemented by 2020 are illustrated in the table below
A) Develop new methods of cooperating with the European Commission and establish synergies with EU
R&D&I instruments and networks
Key Actions Timeframe Responsible
A1) Support the functioning of the ERA-HLG Continuous Chair, HLG, ESE
A2) Continue the strategic dialogue with the EC in order to contribute to a better coordination of existing European R&D&I instruments
Continuous Chair, HLG, ESE
A3) Continue the strategic dialogue with the EC in order to support the further development of the European innovation landscape and EIC and to ensure EUREKA programmes are well-aligned and complementary
End 2017 Chair, HLG, ESE
A4) EUREKA and EC should together find ways to fully exploit the potential that GlobalStars has to offer
Mid 2018 Chair, HLG, ESE
A5) Establish and implement synergies between the EUREKA instruments and other relevant EU programmes and initiatives
Continuous Chair, HLG, ESE
B) Enhance EUREKA’s presence as innovation stakeholder in the ERA
Key Actions Timeframe Responsible
B1) Cooperation with innovation stakeholders, SME advocates, ERAC and ERA related groups, and ERA research stakeholders
Continuous Chair, ESE
B2) Contribute to ERA policies for the innovation side with EUREKA position papers and/or joint declarations with relevant stakeholders
Continuous Chair, HLG, NPC,
ESE
B3) Organise conferences to promote EUREKA’ added value and participate in relevant events at EU, national and local level
Continuous ESE, NPC
B4) Enhance the cooperation with other networks at national level through complementary activities
Continuous Chair, HLG, NPC,
ESE
6 Revised EUREKA SRM 2014-2020 - 8th
draft – FINAL VERSION
ACTION FIELD 2: SMART GLOBALISATION
KPI 4: Proportion of EUREKA projects involving at least one non-full member state (Partner countries or Associated countries or GlobalStars third country participants or third country entities) KPI 5: Number of Globalstars calls KPI 6: Number of endorsed Globalstars projects KPI 7: Public funding committed to Globalstars projects KPI 8: Number of different EUREKA countries using GlobalStars
In today’s global economy, openness to international cooperation is becoming increasingly
important. The industry, and especially the SMEs, in Europe and the associated member countries
need to access new and emerging markets. The innovation process and the value chains in many
technological and market areas extend beyond the boundaries of the current EUREKA network,
indicating a future role for EUREKA as a platform for global industrial R&D&I cooperation. Currently
there are three ways to establish cooperation with countries which are not EUREKA Full-Members:
EUREKA can invite non-full member countries to join EUREKA as Associated countries for a
limited period. Under the so called "Partner country" status, some Associated countries
could be recognized as permanent and strategic partners within EUREKA.
On a project-to-project level, project participants from two or more EUREKA countries can
invite organisations from non-EUREKA countries to take part in their
EUREKA/Cluster/Eurostars projects.
Recently, there is a new possibility to launch flexible GlobalStars calls according to the
bottom-up principle supporting project collaboration between at least 1 organisation from a
EUREKA Full-Member, Partner or Associated country and 1 organisation from a third country
(the 1+1 rule).
A new EUREKA internationalization strategy has been developed during the Spanish Chairmanship
which clearly defines the future role of EUREKA as a lean and flexible platform for global industrial
R&D&I cooperation. In the following period, EUREKA needs to start with the implementation of this
strategy.
Increase engagement with non-European countries
EUREKA will face challenges resulting from the increasingly global scenario by including a new status
for Partner countries and improving the renewal conditions for associated ones, following prudence
and efficiency criteria.
Under the so called ‘Partner country’ status, some Associated countries will be recognized as
permanent and strategic partners within EUREKA. This permanent nature results in benefits for
European companies which count with a stable cooperation framework when designing their
medium and large-term innovation strategies.
Based on the experience gained during previous chairmanships, potential partners or new associated
countries shall be evaluated, improving at the same time, where possible, the cooperation with the
present associated countries: South Korea, Canada, South Africa and Chile.
7 Revised EUREKA SRM 2014-2020 - 8th
draft – FINAL VERSION
Facilitate project-to-project collaboration with third countries
This approach is extremely flexible, but is not followed up by an administrative cooperation between
the involved countries. EUREKA needs to review whether the rules and instruments that already exist
are sufficient when engaging with non-EUREKA countries.
EUREKA will define a number of practical approaches for facilitating targeted R&D&I cooperation
with third countries. EUREKA countries have well developed collaboration and access to relevant
contacts all around the world. For this approach to be fully operational there is a need to set-up a
database of contact points for industrial R&D funding in other economies.
Systematic use of Globalstars as a EUREKA instrument for cooperation with third countries During the Swedish Chair, EUREKA set up a revised toolbox for collaboration with third countries
called GlobalStars. EUREKA developed this flexible approach for global cooperation based on the
principles of "variable geometry". If a group of EUREKA countries wants to establish a limited
cooperation with a region or a country outside EUREKA, EUREKA is able to facilitate this work with
standardized tools based on the experience gained in EUREKA Network projects, EUREKA Clusters
and Eurostars (i.e. the PAM, Cluster calls methodology or Eurostars synchronized application and
evaluation). The key words for Globalstars are flexibility and voluntariness, but with the common
trade mark of EUREKA. Once the pilot joint calls with Chile and Argentina have been evaluated,
Globalstars will be reinforced launching new Globalstars calls with the current participating countries
and extending this collaboration scheme to other potential candidates all around the world.
The key actions to be implemented by 2020 are illustrated in the table below
A) Increase engagement with non-European countries
Key Actions Timeframe Responsible
A1) Provide continuous support to EUREKA Partner and Associated Countries at all levels
Continuous ESE
A2) Based on existing criteria and on the mapping of potential Associated countries carried out during previous chairmanships, evaluate potential new Partner and Associated EUREKA countries
2017 Chair, HLG, ESE
A3) Based on the above, consider to engage with new Partner or Associated EUREKA Countries
Mid 2018 Chair, HLG, ESE
A4) Continue the dialogue with the Strategic Forum for International S&T Cooperation (SFIC) and other relevant bodies
Continuous Chair, HLG, ESE
B) Facilitate project-to-project collaboration with third countries
Key Actions Timeframe Responsible
B1) Review whether the rules and instruments that already exist are sufficient when engaging with non-EUREKA countries
2018 NPC, ESE
B2) Create a database on contact points for industrial R&D funding in other economies
2018 Chair, HLG, NPC
ESE
C) Systematic use of Globalstars as a EUREKA instrument for cooperation with third countries
Key Actions Timeframe Responsible
C1) Set up new GlobalStars pilot calls with current participating or other potential candidates
2018 Chair, NPC,
Clusters, ESE
8 Revised EUREKA SRM 2014-2020 - 8th
draft – FINAL VERSION
C2) Perform an assessment of the experiences made with GlobalStars calls and the application of the 1+1 project participation rule in that context. After the assessment, make necessary amendments to the Globalstars Guidelines.
Mid 2019 Chair, NPC
C3) Review and redefine the international cooperation mandate of the EUREKA Secretariat
Mid 2018 Chair
ACTION FILED 3: LEAN GOVERNANCE
KPI 9: HLG self-assessment of the development of lean governance
KPI 10: Number of countries with significant activity level
The governance structure of EUREKA was set up under a different situation for the network. When
EUREKA started, it comprised 18 members while today, due to continuous growth over years,
EUREKA includes 41 members, 4 associated countries and 2 National Information Points. In 30+
years, EUREKA has developed a number of initiatives that facilitate international cooperation. On top
of that, through Eurostars, the EUREKA Secretariat has the additional responsibilities that come with
managing the financing of the programme. This success of EUREKA has, on the other hand, led to
some challenges to manage all new initiatives in an efficient manner. And further growth is to be
expected. Times of austerity also make it necessary to reduce complexity, increase efficiency and
reduce unnecessary costs. The Swedish Chair tackled this issue by setting up a dedicated HLG
working group (Lean Governance) that reviewed the governance model of EUREKA and proposed
recommendations for improvement through a new ‘EUREKA Regulatory Corpus’.
Decide and implement a revised governance model
Under the concept Upgrade EUREKA, the Network developed several recommendations of the Lean
Governance working group published in June 2016. Prioritised activities should continue in the
coming years to implement and complement the work done.
Secure future chairmanships
Furthermore, the system of chairing EUREKA by a member country on a voluntary basis has been
called to question since it became more and more difficult to find volunteers. One or more other
options should be developed so an alternative could be quickly available if necessary.
The EUREKA Secretariat as a service provider to the EUREKA Network
Flexible requirements, variable demand and elements that require additional manpower or cost are
fundamental to the concept of EUREKA 2.0. A review needs to be undertaken in order to clarify the
role of the ESE as service provider and how it may better achieve its aim of supporting the Network.
Such a revision shall be built on the following principles: (1) Transforming the ESE into a lean
organization; (2) Developing services for the EUREKA initiative; and (3) Managing economically
sustainable organisation.
9 Revised EUREKA SRM 2014-2020 - 8th
draft – FINAL VERSION
Encouraging participation in EUREKA projects
Active involvement of the EUREKA network is a prerequisite for reaching the overall objective of
becoming a leading international platform for national programmes. In that context, it is essential to
ensure the political support and financial commitment in EUREKA countries. Initially EUREKA will
consider relevant indicators to identify low activity countries. In order to do this, first it is needed to
develop a system to monitor country performance. Based on the results of this performance
monitoring system and the values of the relevant indicators, EUREKA will define mitigation actions
needed to improve country activity. Additional measures to help the network to function better
should be taken into account.
The key actions to be implemented by 2020 are illustrated in the table below
A) Decide and implement a revised governance model
Key Actions Timeframe Responsible
A1) Prioritize and implement the recommendations of the Lean Governance working group
Mid 2018 Chair, HLG
B) Secure future chairmanships
Key Actions Timeframe Responsible
B1) Establish and adopt the procedures for the future EUREKA Chairmanship End 2017 Chair
C) Review and clarify the role of the ESE as service provider to the EUREKA network
Key Actions Timeframe Responsible
C1) Review and clarify the role of the ESE as a support to the Chair and the Network
2018 Chair
C2) Review and clarify the role of the ESE as a programme implementing body (Eurostars-2 and 3) and facilitator (Clusters, Umbrellas, Network projects, EUREKA 2.0, E!nnoVest)
2018
Chair
C3) Explore the potential for the EUREKA Secretariat to improve its role as a service provider for the Network
Mid 2018 Chair, HLG, NPC, ESE
D) Encouraging participation in EUREKA projects
Key Actions Timeframe Responsible
D1) Perform annual project forecast and funding information exercises Continuous Chair, ESE
D2) Define objective indicators for a continuous monitoring system of countries’ performance
Mid 2018 Chair, HLG, NPC, ESE
D3) Define structure and content of the country profile report needed to address those cases with low performance
Mid 2018 Chair, HLG, NPC, ESE
D4) Define, in collaboration with not-so-active countries, the mitigation actions and the relaunch plan needed to foster their participation
Continuous Chair, ESE
D5) Find ways for better involvement of industry to maintain the responsiveness of EUREKA services
Continuous Chair, ESE
10 Revised EUREKA SRM 2014-2020 - 8th
draft – FINAL VERSION
ACTION FIELD 4: PROACTIVE ENGAGEMENT WITH THE INNOVATION COMMUNITY
KPI 11: Number of new companies participating in EUREKA instruments
KPI 12: Increase the number of joint activities with relevant stakeholders at national and European
level
The communication of EUREKA remains paramount to increasing its visibility and promoting its
added value. If EUREKA wants to establish itself as a major player in international R&D&I
cooperation, it needs to engage the whole innovation community. In order to reach its target
audience, EUREKA needs to position all EUREKA instruments and activities under the EUREKA
‘corporate’ brand and better place them in the international and national innovation landscape.
Reposition and sustain EUREKA at the core of the innovation systems
EUREKA has developed a number of initiatives that facilitate international R&D&I cooperation, foster
competitiveness, growth and job creation. Nevertheless, it is essential that EUREKA evaluates the
strength of its brand image and the pertinence of its messages. The Communications Strategy 2015 –
2020 provides key messages for each type of target audience and a number of communications
instruments. It aims to:
Support the strategic priorities by positioning EUREKA as a major player and key innovation policy platform in the European Research Area.
Capitalize on EUREKA’s main strengths (business oriented/bottom-up, international
launchpad, administratively-light and more than 30 years of experience), to better
differentiate EUREKA from other programmes.
Support the network in both a centralised and decentralised manner by creating significant
economies of scale, by providing simple yet innovative communications tools that can be
easily exploited by all nodes of the network.
Magnify the work of each node of the network through enhanced and strategic coordination.
Future communication activities will be tailor made for our key target audiences using the unique
selling points and key messages for each audience segment based on the communication strategy.
These target audiences make up the EUREKA innovation community. The key audiences defined in
the communication strategy are the following: (a) past project participants, (b) current project
participants, (c) potential (future) project participants, (d) public funding decision makers (member
countries) at national and sub-national level, (e) public funding decision makers (non-member
countries), (f) private investment sources, (g) multipliers (partners, media, opinion formers) and (h)
place-based innovation stakeholders.
The increased visibility, presence and recognition of EUREKA at all levels of its value chain (from
Ministries to end-users) are essential for the future positioning of EUREKA in the increasingly
complex ecosystem in which it operates.
11 Revised EUREKA SRM 2014-2020 - 8th
draft – FINAL VERSION
Promote EUREKA as a platform for global industrial R&D&I cooperation
In order to become a platform for global industrial R&D&I cooperation, promotional activities will be
essential inside and outside the EUREKA network.
The key actions to be implemented by 2020 are illustrated in the table below
A) Reposition and sustain EUREKA at the core of the innovation systems
Key Actions Timeframe Responsible
A1) Review the rationale of EUREKA instruments and how they complement the ERA in order to clarify their unique selling point
End 2017 Network, ESE
A2) Review the definition, relevance and usage of the EUREKA label Mid 2018 Network, ESE
A3) Develop branding and identity for all EUREKA instruments. End 2017 ESE, NPC
A4) Develop specific communication packages for each target group based on their needs and ways to reach them
Mid 2018 ESE, NPC
A5) Establishing evidence-based added-value messaging to Governments and SMEs
2018 ESE, NPC
A6) Promote EUREKA instruments, relevant calls and funding opportunities Continuous ESE, NPC
A7) Promote EUREKA instruments within the national innovation systems Continuous HLG, NPC
B) Promote EUREKA as a platform for global industrial R&D&I cooperation
Key Actions Timeframe Responsible
B1) Participate in regional/global outreach events to promote EUREKA as a platform for R&D&I cooperation with Europe
Continuous Chair, ESE,
NPC
B2) Promote EUREKA as the tool for industrial R&D&I cooperation between Europe and other parts of the world, motivating programme managers (NFBs) and industry to consider EUREKA as the means to exploit funds earmarked for international cooperation
Continuous Chair, ESE,
NPC
B3) Organise the EUREKA Innovation Award Continuous Chair, ESE
B4) Organise EUREKA Innovation Week Continuous Chair, ESE
B5) Address target groups on European and global level to check knowledge and perception of EUREKA
Biennially ESE
12 Revised EUREKA SRM 2014-2020 - 8th
draft – FINAL VERSION
ACTION FIELD 5: COMPREHENSIVE EVALUATION AND IMPACT ASSESSMENT
KPI 13: Response rate to the project follow-up reports
KPI 14: Strategic evaluation plan of EUREKA developed
Measuring the impact of EUREKA and its portfolio is of major importance to demonstrate its positive
effects on the European economy and integration; to convince policy makers of EUREKA’s added
value, to support and facilitate any adjustment of the objectives and directions of EUREKA’s strategy,
and to attract new interest from companies, experts and stakeholders.
Deliver effective evaluation of EUREKA instruments
The first step to evaluate any public policy is to define as precisely as possible the logic of the
intervention, that is, the relationship between actions carried out and objectives pursued. Indicators
allocated to those objectives will be assessed by means of evaluation studies, following different
methodologies.
Taking advantage of state-of-the-art evaluation practices developed at leading universities, an
evaluation programme should be set up in partnership with private and or public experts. This
programme should be built upon the continuous evaluation system put in place by EUREKA over 20
years, which has created a workable dataset of European companies benefiting from R&D grants,
and also on recent econometric studies of EUREKA at EU level and at national level.
Furthermore, an accessible portfolio of engaging examples of impact (qualitative analysis), which
clearly demonstrate relevance and importance of EUREKA should be a priority.
Develop a EUREKA impact assessment platform
Data availability is an essential aspect for impact assessment and, at this respect, several data
sources should be considered: administrative data managed by the EUREKA Secretariat; data
generated by National Offices (mainly focused on funding procedures) and data on similar companies
non-participating in EUREKA projects. Coordination and interconnectivity between the three sources
are necessary to provide complete EUREKA data set for sound impacts assessments.
It is essential to establish close cooperation among national offices and relevant organisations
involved in impact assessment in order to stimulate the generation of national impact studies.
Furthermore, EUREKA should participate in relevant actions with focus on policy development and
evaluation, and incorporate impact assessment and evaluation aspects into evidence based decision
making.
Monitor and evaluate the implementation of the Strategic Roadmap
At the end of each calendar year, the Key Performance Indicators (KPIs) will report on the
implementation of the EUREKA Strategic Roadmap. An evaluation of the whole Roadmap will be
made upon completion, following the example of the mid-term and ex-post evaluation of the
Eurostars programme.
13 Revised EUREKA SRM 2014-2020 - 8th
draft – FINAL VERSION
The key actions to be implemented by 2020 are illustrated in the table below
A) Deliver effective evaluation of EUREKA instruments
Key Actions Timeframe Responsible
A1) Develop a strategic evaluation plan of EUREKA, to be integrated in to the decision-making processes
2019 Chair, HLG, ESE
A2) Define the logic of the intervention of EUREKA instruments, their objectives and indicators
End 2017 Chair, ESE, NPC
A3) Establish a robust evaluation programme in partnership with private and/or public organisations, building on the EUREKA system of continuous evaluation
Mid 2018 ESE, NPC
A4) Produce annual portfolio analyses and project trends, including country specific data, to position and benchmark EUREKA activities
Annually ESE
A5) Create accessible portfolio of engaging examples of EUREKA’s impact (qualitative analysis)
2018 ESE
B) Develop the EUREKA impact assessment platform
Key Actions Timeframe Responsible
B1) Continue the mandate of the Impact Assessment working group Continuous Chair, ESE
B1) Review the existing data collection process of the EUREKA monitoring system, in order to increase the response rate and the quality of the data
Mid 2018 ESE, NPC
B2) Launching a pilot action with countries willing to build a complete data base including non-participating companies (control group)
Mid 2018 Chair, ESE, NPC
B3) Ensure close cooperation with relevant organisations involved with impact assessment through informal working groups or ad-hoc meetings
Continuous Chair, HLG,ESE
B4) Participate in relevant actions with focus on policy development and evaluation, and incorporate impact assessment and evaluation aspects into evidence based decision making
Continuous Chair, ESE,
NFBs
C) Monitor and evaluate the implementation of the Strategic Roadmap
Key Actions Timeframe Responsible
C1) Follow-up the KPIs to monitor the implementation of the EUREKA Strategic Roadmap
Continuous ESE
C2) Organize the revision of the SRM 2014-2020 upon completion. This evaluation will be the basis for the forthcoming SRM
Mid 2019 Chair, ESE
14 Revised EUREKA SRM 2014-2020 - 8th
draft – FINAL VERSION
VERTICAL ACTIONS FIELDS
ACTION FIELD 6: EUREKA 2.0: REVITALISING EUREKA NETWORK PROJECTS
KPI 15: Number of endorsed EUREKA Network projects
KPI 16: Number of EUREKA bilateral/multilateral calls
KPI 17: Public funding committed and allocated to EUREKA Network projects
In order to remain significant into the next decade, EUREKA has developed the idea EUREKA 2.0. The
concept of EUREKA 2.0 is to provide NFBs from EUREKA participating countries and third countries
with a platform to set up joint calls for R&D&I international cooperation projects that are highly
specific to their needs. EUREKA 2.0 allows the easy set-up of ad-hoc calls between several countries
using customized service modules provided by the EUREKA Secretariat.
Ensuring standards and quality
The EUREKA label should stand for quality and excellence of projects and procedures as well as a
platform for the promotion of project results at international level. In this respect, it is needed a
review on the type of EUREKA Network projects that are pursued as well as the definition of the
unique selling points of this instrument compared to the rest of EUREKA instruments and other
international initiatives.
The granting of the EUREKA label to a project should be clearly connected to common quality
standards:
for both implementation of the methodology and processes,
for thresholds of a project’s excellence.
With this goal a review of the existing procedures of the Network projects has been done, including
the definition of EUREKA 2.0 concept.
The concept will exploit the assets of EUREKA (a European network with 30 years of experience,
ability to manage joint calls, experienced and expert staff, economies of scale) to provide NFBs with
bespoke programme management solutions.
Scalable, repeatable, changeable; each aspect of the programme can be configured to meet
the customer needs.
Choose options around promotion, submission of applications, data storage, evaluation
procedures (including selection and contracting of experts), communication management
and statistical analysis.
Select different monitoring services including multiannual monitoring, processing of changes
to projects and consortia, and impact data collection.
Using its highly skilled and flexible in-house expertise that may not be immediately available within
the NFBs, EUREKA 2.0 will see the ESE deliver advanced services on an ad-hoc basis.
15 Revised EUREKA SRM 2014-2020 - 8th
draft – FINAL VERSION
The chosen options are combined to create a unique call management process, perfectly tailored to
the customer.
The key actions to be implemented by 2020 are illustrated in the table below
A) Ensuring standards and quality
Key Actions Timeframe Responsible
A1) Implement the updated Procedure for EUREKA Networks projects Mid 2018 NPC, ESE
A2) Implement EUREKA 2.0 guidelines End 2018 NPC, ESE
A3) Deliver a modular IT system which allows remote collaborative working on programme and project management
End 2018 ESE
A4) Test EUREKA 2.0 with pilots of structured actions in close collaboration with committed NFBs
Mid 2019 NPC, ESE
A5) Evaluate the results of the first pilots End 2019 ESE, Chair
A6) Optimise EUREKA 2.0 based on the experience of the pilots. Include new functionalities if needed
Mid 2020 NPC, ESE
A7) Provide clear and updated information of the funding conditions and commitment in each country on yearly basis
Continuous NPC
16 Revised EUREKA SRM 2014-2020 - 8th
draft – FINAL VERSION
ACTION FIELD 7: EUREKA CLUSTERS: STRONGER AND MORE VISIBLE
KPI 18: Number of endorsed EUREKA Cluster projects
KPI 19: Public funding allocated to EUREKA Clusters projects
EUREKA Clusters3 are generating innovative projects together with major European industry, SMEs
and research organisations. As instrument facilitating collaboration in the European Research Area
(ERA) and beyond, Clusters bring together the fragmented national sources of public funding for
international innovation cooperation.
Foster support to Clusters
EUREKA Clusters bring together the best talent and capability from across the EUREKA countries. In
order to establish EUREKA as a premier innovation catalyst in Europe, EUREKA needs to reposition
and redefine Clusters as an instrument for innovation in 2018 and beyond. For that reason, the
EUREKA Clusters will develop and implement an ‘InterCluster’ strategy.
Furthermore, EUREKA Clusters need to establish stronger industry and public authority relationships
through Cluster Boards. EUREKA network, national public funding actors as well as ministries
involved hold a key role in supporting these initiatives – be it existing ones or proposed new ones
which are very welcome. One form of support is a clear commitment, including a funding
perspective, to Clusters. Another form of support is to ensure the flow of information between HLRs,
NPCs, the EUREKA Secretariat and the Clusters, including relevant data delivered from the Clusters
databases.
Increase visibility of EUREKA Clusters at the European level
EUREKA Clusters are invaluable, and very flexible, tools for National Governments to pursue their
national innovation goals with countries with complementary objectives, both within and outside the
European Union. Besides National and other European level programmes, they are an essential part
of the set of complementary funding instruments to be available to industry and National
Government. Due to the increasing complexity of the European funding landscape, it is important
that Clusters are clearly visible, have an acknowledged place in the ERA and better demonstrate their
distinct added value to potential project applicants on one side, and to national funding bodies
ministries, and the European Commission on the other. This will be crucial to the positioning and
clear visibility in the European landscape to continue the relevant and efficient cooperation of
Clusters with other pan-European and EU-level mechanisms.
Raise awareness of EUREKA Clusters within the EUREKA network
The role of EUREKA Clusters should be better recognised and supported. To achieve this, dialogue is
essential: between Cluster representatives, with HLRs and NPCs, but also with national contacts from
3 Adopting an industry-driven approach, and thanks to their long-term vision, Clusters are key instruments in sustaining and
improving European competitiveness. They represent 70% of the total EUREKA financing.
17 Revised EUREKA SRM 2014-2020 - 8th
draft – FINAL VERSION
public authorities such as public funding agencies that are involved in the functioning and funding of
Clusters.
The key actions to be implemented by 2020 are illustrated in the table below
A) Foster support to Clusters
Key Actions Timeframe Responsible
A1) Develop and implement an ‘InterCluster’ strategy 2018 Clusters, Chair, HLG, NPC, ESE
A2) Define expectations of industry and public authorities for Clusters 2018 Chair, HLG, NPC,
ESE, Clusters
A3) Ensure the commitment of member countries to Clusters, expressed through clear funding perspectives until 2020
2018 HLG
A4) Based on the above, propose any relevant action to increase support to Clusters
2018 Clusters
A5) Ensure an efficient intranet shared document management system for information sharing among Clusters
2018 ESE, Clusters
A6) Demonstrate clear Cluster benefits through the continuous monitoring of results of the Clusters projects
Continuous Clusters, ESE
A7) Support establishing EUREKA’s new industrial initiatives 2017 Clusters, Chair
B) Increase visibility of EUREKA Clusters at the European level
Key Actions Timeframe Responsible
B1) Develop and implement an InterCluster Strategic Marketing Plan and a Communications strategy
2018 Clusters, ESE
B2) Promote Clusters to Horizon 2020 National Contact Points Continuous ESE, Clusters
B3) Facilitate the creation of Clusters for the future, in dialogue with NFBs, Chair and relevant policy makers. Industry to take an active role in promoting their case.
Continuous Chair, HLRs,
Clusters
C) Raise awareness on EUREKA Clusters within the EUREKA network
Key Actions Timeframe Responsible
C1) Continue to raise awareness on Clusters across the Network towards new project officers and NPCs
Continuous ESE
C2) Create a report of Clusters performance for HLG and PAs Annually Clusters, ESE
18 Revised EUREKA SRM 2014-2020 - 8th
draft – FINAL VERSION
ACTION FIELD 8: EUROSTARS IMPLEMENTATION AND CONTINUATION BEYOND 2020
KPI 20: Delivery of Eurostars task force mid-term report recommendations KPI 21: Number of endorsed Eurostars projects KPI 22: Public funding committed and allocated to Eurostars projects KPI 23: Proportion of top-50 ranked projects funded KPI 24: Proportion of projects above quality threshold that are funded KPI 25: Time-to-contract KPI 26: Common financial viability methodology KPI 27: Roadmap for getting Eurostars-3 through the legislative process
Eurostars-2 has wide European and international visibility, critical mass and is a role model in terms
of international best practice in relation to efficient programme management at all levels. The vision
of the member countries of EUREKA is that Eurostars-2 continues to be the R&D support programme
of choice for R&D-performing SMEs in Horizon 2020. To ensure its continuation beyond 2020, a
number of specific improvements to be realised by 2020 have been identified by the Eurostars
Taskforce in their Eurostars-2 mid-term evaluation report4 that will increase the scope of Eurostars
results:
Balanced participation of all countries;
Increased commitment of some countries;
Better promotion of the programme;
Decreased administrative burden;
Objective impact assessment.
Proving itself as a high quality programme, it serves as a model for further industry-oriented
innovation programmes. Given the needs of European growth-seeking R&D-performing SMEs, it is of
utmost importance that an easily accessible programme like Eurostars continues to play a key role in
European R&D&I support to SMEs, inside the coming 9th Framework Programme.
Deliver a lean administration with a short time to contract
Based on the General Implementing Guidelines5 endorsed in Ankara in June 2013, the critical
objective of Eurostars-2 will be to implement progressive milestones that will make Eurostars faster,
leaner and stronger. These milestones, included in the bilateral agreement between the NFBs and
ESE, are mainly targeting a lean administration with an average time-to-contract of seven months or
shorter for all project participants and the funding of the top-50 projects and 50-75% of the projects
above threshold on the ranking list.
Deliver progress towards harmonisation
The other objective for Eurostars-2 is to improve the synchronisation between national research
funding programmes to strengthen the programme. This is one central goal towards the realisation
of the ERA by participating countries. Based on the General Implementing Guidelines, the crucial
4 EUREKA doc. 3565, HLG4, Malaga
5 EUREKA doc. 3126, HLG3, Ankara
19 Revised EUREKA SRM 2014-2020 - 8th
draft – FINAL VERSION
progressive milestones to be implemented in this field are to set up a common reporting system and
to define a common financial viability methodology.
Positioning Eurostars in FP9 For the success of the scheme and avoidance of duplication, it is desirable that Eurostars finds its
unique place in FP9. Eurostars should preferably continue to benefit from funding and other support
supplied by the European Union, as an enhanced Eurostars-3 program, capable of creating the
necessary conditions for more sustainable growth of the R&D-performing SMEs based on new
markets opportunity by opening calls to third countries.
The key actions to be implemented by 2020 are illustrated in the table below
A) Deliver a lean administration with a short time to contract
Key Actions Timeframe Responsible
A1) Achieve an efficient virtual common pot to fund the top 50 projects and 50/75% of projects above threshold using the defined toolbox
Continuous Eurostars NFBs, ESE
A2) Improve the NFBs regulations and procedures in view to have a short time to contract (average 7 months and preferably faster)
Continuous Eurostars NFBs, ESE
A3) Stimulate an increased and a more balanced participation across Eurostars participating countries
Continuous NFBs, HLRs
B) Deliver progress towards harmonisation
Key Actions Timeframe Responsible
B1) Finalise a common financial viability methodology Mid 2018 Eurostars NFBs, ESE
B2) Finalise a common reporting system and implement a new common monitoring methodology
Mid 2018 Eurostars NFBs, ESE
B3) Evaluate and optimise Eurostars processes on a continual basis to ensure continued relevance for customers and stakeholders
Continuous ESE, Eurostars
NFBs
C) Positioning Eurostars in FP 9
Key Actions Timeframe Responsible
C1) Develop suggestion on how Eurostars could look like beyond 2020 and produce EUREKA’s proposal for Eurostars-3, including novel approaches such as third country involvement, to initiate dialogue with the EC
Mid 2018 Network
C2) Secure commitment from member countries for a continuation of Eurostars beyond 2020
2018 Chair, HLG,
NFB, NPC, ESE
C3) Secure political support for Eurostars-3 at European Parliament and European Commission
Continuous Network, HLR,
ESE
20 Revised EUREKA SRM 2014-2020 - 8th
draft – FINAL VERSION
ACTION FIELD 9: E!NNOVEST: WHERE INNOVATION MEET CAPITAL
KPI 28: Number of companies registering to participate in the programme
KPI 29: Number of experts and investors in the programme
KPI 30: Number of investments generated by the companies participating in the programme’s
flagship event
KPI 31: Cooperation established with the EC for a joint investment readiness programme
EUREKA has a large pool of innovative SMEs that has received grants from the NFBs for their R&D
activities. Recognizing that the investment and business readiness of innovative SMEs seeking capital
needs to be improved in order to foster more investments, EUREKA set-up a new investment
readiness programme that aims to boost the investment awareness and investment and business
readiness amongst the innovative SMEs in the EUREKA ecosystem, promote these companies
towards the investment community and actively facilitate investment matching of those companies
that are investor and business ready. In order to further develop E!nnoVest as a tool to complement
public finance offered by EUREKA countries, EUREKA will bring E!nnoVest to the next level and
develop additional follow-up services to support the companies.
Explore strategic synergies
EUREKA and European Commission should continue a strategic dialogue in order to support the
further development of the programme, identify smart synergies with the similar initiatives at EU
level and avoid duplications.
Scale-up the programme
Even though it was agreed that E!nnoVest is a permanent programme of EUREKA, much more needs
to be done to make it truly part of the EUREKA instrument portfolio. EUREKA will explore the
possibilities to scale-up the programme with additional mentoring and training activities according to
needs of the companies. With the aim to increase the profitability of the companies and up-skill the
entrepreneurs knowledge in one or more specific areas of commercial and business preparation, the
new E!nnoVest activities should increase the likelihood of companies long-term sustainability,
rendering it more attractive to its customer base and to potential investors.
The key actions to be implemented by 2020 are illustrated in the table below
A) Explore strategic synergies
Key Actions Timeframe Responsible
A1) Analyse the complementarities between the similar initiatives at EU and national level (Invest Horizon and stage 3 of the H2020 SME Instrument, national and regional programmes and initiatives
2018 Chair, ESE
A2) Establish a strategic dialogue and cooperation with the European Commission and European Investment Bank in order to support the further development of E!nnoVest programme
2018 ESE, Chair
21 Revised EUREKA SRM 2014-2020 - 8th
draft – FINAL VERSION
A3) In order to facilitate the access of SMEs to Venture Capital public and private markets, explore the possibility of joint programme between the EC and EUREKA
2018 Network, ESE
B) Fully integrate E!nnoVest in the EUREKA’s portfolio
Key Actions Timeframe Responsible
B1) Ensure that E!nnoVest meets the needs of its target group by formalising the multi-annual work plan with secured financial support for 2018 and beyond, while exploring the possibility of internalising the implementation of some operational activities within the ESE
2018 ESE, Chair
B2) Evaluate the success of the programme 2019 Network, ESE
ACTION FIELD 10: EUREKA UMBRELLAS: THE FUTURE
KPI 32: The Network has decided on the future of Umbrellas as a EUREKA instrument
Umbrellas are thematic and collaborative EUREKA tools generating EUREKA, Eurostars and
complementary international projects serving as pools of cross-border SME, industry and research
centres’ service networks. Being originally strong structures to catalyse the generation of network
projects, its performance is decreasing in the last years. In view of these circumstances, it seems
appropriate to thoroughly review its role within the EUREKA instrument portfolio.
Defining the future of Umbrellas
Based on the results achieved so far, EUREKA Network will review their role and decide on their
future within the EUREKA instrument portfolio.
The key actions to be implemented by 2020 are illustrated in the table below
A) Defining the future of Umbrellas
Key Actions Timeframe Responsible
A1) Evaluate the results and added value of Umbrellas End 2017 Chair, ESE, Umbrellas
A2) Based on this assessment, make concrete proposals and an action plan for the future of Umbrellas
2018 Chair ESE, Umbrellas
22 Revised EUREKA SRM 2014-2020 - 8th
draft – FINAL VERSION
ANNEXES
Annex 1: KEY PERFORMANCE INDICATORS AND TARGETS PER ACTION FIELD
ACTION FIELD 1: EUREKA IN THE EUROPEAN INNOVATION POLICY
KPI 1: HLG assessment of the development of EUREKA’s position and status in the ERA Target: 80% satisfaction according to a survey Measuring period: Second half of 2019
KPI 2: EUREKA explicitly identified as a relevant stakeholder in European Innovation policies Target: EUREKA included in key European innovation policy documents Measuring period: Second half of 2019
KPI 3: EUREKA and its instruments secured a unique and complementary position in the European innovation landscape (9th Framework Programme and EIC) Target: Yes Measuring period: Second half of 2019
ACTION FIELD 2: SMART GLOBALIZATION
KPI 4: Proportion of EUREKA projects involving at least one non-full member state (Partner countries or Associated countries or GlobalStars third country participants or third country entities) Target: 20% - 25% by the end of 2019 Measuring period: Second half of 2019
KPI 5: Number of Globalstars calls Target: Average of 3 calls per calendar year Measuring period: 2017-2019
KPI 6: Number of endorsed Globalstars projects Target: Average of 20 projects per calendar year Measuring period: 2017-2019
23 Revised EUREKA SRM 2014-2020 - 8th
draft – FINAL VERSION
KPI 7: Public funding committed to Globalstars projects Target: Average of 20 million EUR per calendar year Measuring period: 2017-2019
KPI 8: Number of different EUREKA countries using GlobalStars Target: At least 10 countries involved in more than one call Measuring period: By 2020
ACTION FIELD 3: LEAN GOVERNANCE
KPI 9: HLG self-assessment of the development of lean governance Target: 80% satisfaction according to a survey Measuring period: Second half of 2019
KPI 10: Number of countries with significant activity level Target: Reduce the number of ‘low activity’ countries by one per calendar year Measuring period: 2017-2019
ACTION FIELD 4: PROACTIVE ENGAGEMENT WITH THE INNOVATION COMMUNITY
KPI 11: Number of new companies participating in EUREKA instruments Target: Average year-on-year increase of 10% by 2020 (reference year = 2016) Measuring period: Annually (2017-2019)
KPI 12: Increase the number of joint activities* with relevant stakeholders at national and European level Target: 10% increase by 2020 Measuring period: Second half of 2019 * Activities organised by the ESE or Network members with active participation of non-EUREKA stakeholders.
24 Revised EUREKA SRM 2014-2020 - 8th
draft – FINAL VERSION
ACTION FIELD 5: COMPREHENSIVE EVALUATION AND IMPACT ASSESSMENT
KPI 13: Response rate to the project follow-up reports Target: 90% final reports, 50% 1st MIR, 35% 2nd MIR, 25% 3rd MIR Measuring period: 2019
KPI 14: Strategic evaluation plan of EUREKA developed Target: Yes Measuring period: 2019
ACTION FIELD 6: EUREKA 2.0: REVITALISING EUREKA NETWORK PROJECTS
KPI 15: Number of endorsed EUREKA Network projects Target: Average year-on-year increase of 5% by 2020 (reference year = 2016) Measuring period: 2017-2019
KPI 16: Number of EUREKA bilateral/multilateral calls Target: Min 10 per year Measuring period: Annually (2017-2019)
KPI 17: Public funding committed and allocated to EUREKA Network projects Target: Average year on-year-increase of 5% by 2020 (reference year = 2016) Measuring period: 2017 - 2019
ACTION FIELD 7: EUREKA CLUSTERS: STRONGER AND MORE VISIBLE
KPI 18: Number of endorsed EUREKA Cluster projects Target: Average year-on-year increase of 5% by 2020 (reference year = 2016) Measuring period: 2017-2019
KPI 19: Public funding allocated to EUREKA Clusters projects Target: Average year-on-year increase of 5% by 2020 (reference year = 2016) Measuring period: 2017-2019
25 Revised EUREKA SRM 2014-2020 - 8th
draft – FINAL VERSION
ACTION FIELD 8: EUROSTARS IMPLEMENTATION AND CONTINUATION BEYOND 2020
KPI 20: Delivery of Eurostars task force mid-term report recommendations Target: Yes Measuring period: Second half 2019
KPI 21: Number of endorsed Eurostars projects Target: Average year-on-year increase of 5% by 2020 (reference year = 2016) Measuring period: 2017-2019
KPI 22: Public funding committed and allocated to Eurostars projects Target: Average year-on-year increase of 5% by 2020 (reference year = 2016) Measuring period: 2017-2019
KPI 23: Proportion of top-50 ranked projects funded Target: 100 % Measuring period: Per cut-off
KPI 24: Proportion of projects above quality threshold that are funded Target: Min 50 – 75% of the projects above the threshold Measuring period: Per cut-off
KPI 25: Time-to-contract Target: Time-to-contract of 7 months or shorter on average by cut-off Measuring period: Per cut-off
KPI 26: Common financial viability methodology Target: In use by end of Horizon 2020 Measuring period: Per cut-off
KPI 27: Roadmap for getting Eurostars-3 through the legislative process Target: 2018 Measuring period: Quarterly, up to end of 2018
26 Revised EUREKA SRM 2014-2020 - 8th
draft – FINAL VERSION
ACTION FIELD 9: E!NNOVEST: BOOSTING INVESTMENT AND BUSINESS READINESS
KPI 28: Number of companies registering to participate in the programme Target: Average year-on-year increase of 15% by 2020 Measuring period: 2017-2019
KPI 29: Number of experts and investors in the programme Target: Experts – more than 30; Investors – more than 50 per programme cycle Measuring period: 2017-2019
KPI 30: Number of investments generated by the companies participating in the programme’s flagship event Target: 10% of companies closed investment deal per programme cycle Measuring period: 2017-2019
KPI 31: Cooperation established with the EC for a joint investment readiness programme Target: Yes Measuring period: Second half of 2019
ACTION FIELD 10: EUREKA UMBRELLAS: THE FUTURE
KPI 32: The Network has decided on the future of Umbrellas as a EUREKA instrument Target: Decision about the future of Umbrellas taken and action plan Measuring period: 2017-2018
Annex 2: EUREKA SRM Review Report
EUREKA 2020
STRATEGIC ROADMAP
REVIEW REPORT
Brussels, 20 October 2016
Version 7
1
TABLE OF CONTENTS
INTRODUCTION ............................................................................................................................ 2
1 TRENDS AND CHALLENGES IN THE GLOBAL AND EUROPEAN ENVIRONMENT
OF EUREKA ............................................................................................................................. 3
2 EUREKA’s OVERALL ACHIEVEMENTS (July 2014 – June 2016) ................................. 5
3 EUREKA’S PROGRESS BY SRM ACTIONS ...................................................................... 7
3.1 Action field 1: EUREKA projects 2.0: an attractive and flexible tool for NFBs ............ 7
3.2 Action field 2: EUREKA Clusters & Umbrellas: strong and more visible ................... 10
3.3 Action field 3: Eurostars-2 Implementation: faster and leaner ..................................... 12
3.4 Action field 4: Smart Globalisation............................................................................... 15
3.5 Action field 5: Lean Governance .................................................................................. 18
3.6 Action field 6: Efficient communication ....................................................................... 21
3.7 Action field 7: Comprehensive impact assessment ....................................................... 24
3.8 ERA related activities in the SRM 2014-2020 .............................................................. 27
4 CONCLUSIONS ...................................................................................................................... 29
APPENDIX .........................................................................................................................................
LIST OF TABLES
Table 1: Action 1 - Overview of the achievements .................................................................................. 9
Table 2: Action 2 - Overview of the achievements ................................................................................ 11
Table 3: Action 3: Overview of the achievements ................................................................................. 14
Table 4: Action 4 - Overview of the achievements ................................................................................ 17
Table 5: Action 5 - Overview of the achievements ................................................................................ 20
Table 6: Action 6 - Overview of the achievements ................................................................................ 23
Table 7: Action 7 - Overview of the achievements ................................................................................ 26
2
INTRODUCTION
The EUREKA Strategic Roadmap 2014-2020 (SRM)1 is a key element in EUREKA’s governance
system. It is a document based on consensus amongst EUREKA members, providing strategic
direction on overall priorities, action fields and objectives of EUREKA. With the purpose to ensure
operational and strategic continuity of EUREKA, the SRM provides guidance to subsequent
Chairmanships of EUREKA in the development of their priorities. Nevertheless, the EUREKA SRM
is being implemented by the whole EUREKA Network, led by the consecutive Chairmanships and
supported by the EUREKA Secretariat.
The current, second EUREKA Strategic Roadmap was developed under the Norwegian Chairmanship
(2013-2014) for the period from June 2014 until July 2020. As defined in the EUREKA SRM, it is an
evolving document that needs to be reviewed every two years with regards to the described scope and
priorities, and evaluated against its objectives.
For that reason, one of the major priorities during the Spanish EUREKA Chairmanship is to review
the EUREKA SRM to ensure a strong strategic governance and political continuity over the coming
period of 2017-2020. In order to adjust the strategic directions for the initiative, it is necessary to
assess what has been achieved and delivered by the Network in the last two years in the framework of
the SRM.
According to the procedures, the review needs to be performed by a taskforce set-up by the HLG and
led by the HLG Chairman. In order to avoid further increase in number of working groups the Spanish
Chairmanship had proposed that the EG shall undertake the mid-term review of the SRM led by the
HLG chairman Mr Francisco Marin.
The first step in the revision of the EUREKA SRM is the SRM Review Report which is summarizing
the achievements and gives an overview about the progress made in the certain SRM action fields.
The review report also includes the analysis about the changes in the global and European
environment of EUREKA between 2014 and 2016. Further on, the revised SRM will be prepared by
taking into account the outcomes of the Review Report and it will focus on the readjusted strategic
orientations of the Network for the period of 2017-2020.
1 EUREKA Strategic Roadmap 2014-2020 was approved by the HLG in Bergen on 19 June 2014: EUREKA
Doc HLG3222
3
1 TRENDS AND CHALLENGES IN THE GLOBAL AND EUROPEAN
ENVIRONMENT OF EUREKA
With its decentralised network, EUREKA offers a unique research and development and innovation
platform that connects European companies with the rest of the world, strengthening the international
dimension of the European Research Area and helping European industry to increase its
competitiveness in the global market. Over 38 billion Euros of public-private investment has been
mobilized to support more than 6.400 projects. Undoubtedly, EUREKA has been a driving force of
innovation in Europe.
The question of what drives economic development is the focus of debate at all policy levels. In a
world characterised by rapid change and a significant probability of major upsets, attempting to look
ahead is as difficult as it is necessary. Globally, societies are continually seeking ways to stimulate
economic growth and this pursuit has gained new impetus following the recent financial and
economic crisis. Nevertheless, several trends relevant for EUREKA can be identified. The financial
crisis of 2008 and 2009 significantly reduced economic output in many developed countries,
particularly in Europe. While its continuing impacts are apparent in less optimistic long-term
economic projections for Europe, virtually all mainstream outlook studies foresee economic
expansion globally in the coming decades as Asia's huge populations continue their shift to Western
patterns of production and consumption.
Economic and social megatrends are driving the ever-faster pace of technological development and
market adoption. Ongoing economic growth, in particular in Asia and other developing regions, will
support greater R&D around the world. The growing middle class in the emerging economies of an
increasingly multipolar world will bring new and larger markets for innovative products2.
New economic growth and employment in Europe can no longer be solely achieved by expanding the
existing economic and technological basis, but must be founded upon a fundamental reorientation
towards greater economic, social and environmental sustainability. It is crucial that ‘Europe’ positions
itself as a global research and innovation player to allow European industry to compete with the
World’s largest economies and its emerging ones and lead the race to produce the goods and services
our future society will require.
Technological innovation and worker education and skills are playing a central role in increasing
productivity. A revolution in technologies and their applications transforms societies in almost every
aspect. The shifts in technological paradigms that once were separated by centuries or millennia are
now occurring within a single lifetime. Today, research and development around the world is
accelerating – in particular for nanotechnologies, biotechnology and information and computer
technology. Moreover, the integration of techniques and knowledge across these three areas as well as
closely related ones is speeding up the pace of discovery. The new products and innovations emerging
from this 'NBIC cluster' can increase resource efficiency and support the shift to low-carbon
economies. In this process, technological change may transform energy, manufacturing, health care
2 European Environment Agency, Assessment of global megatrends – an update, Global megatrend 5:
Continued economic growth?, 2015.
4
and many other sectors over the coming decades. Along with the opportunities, accelerating change
will also create new risks for society, for health and for the environment. Institutional and policy
innovations will be needed to minimise the emerging risks and promote technological change that
supports public goals3.
Clearly, innovation is central to Europe’s ability to generate economic growth in the coming years.
However, Europe does not yet have a world class scheme to support the very best innovation.
Excessive fragmentation, bureaucracy and a confusing range of overlapping schemes hinder
entrepreneurship and innovation in Europe, and limit the chances of bright ideas reaching a global
market. Furthermore, insufficient coordination and inadequate exploitation of synergies between
funding sources lead to sub-optimal economic impact. There is a clear demand from the users for a
simpler and more coherent European innovation support landscape. At the same time, the room for
manoeuvre of European governments is limited by tightening public budgets and inadequate access to
finance. Additionally, member states seem reluctant to put more funds towards dedicated EU
instruments to the detriment of national schemes.
A solution to this could be the idea of EU Research Commissioner Carlos Moedas. Namely, the
Commissioner plans to establish a European Innovation Council, a cohesive and strong common
action to support the development of Europe’s outstanding science into market-leading products and
services. The new Council is expected to trial next year, with a fully-fledged version expected to be
established in 2021 - the start of the next EU budget cycle.
Faced with this situation, European stakeholders involved in policy design and implementation are
becoming increasingly aware that a better understanding of the innovation process is needed to launch
effective policies, actions and instruments. Which is the real impact of public policies on firms´
performance; which new challenges are not properly covered by the existing instruments. A
continuous and robust impact assessment strategy could contribute to answer such questions and make
public intervention more effective.
EUREKA needs to keep adapting its orientation and instruments to the changing framework
conditions in European innovation policy and make its case as a strong pillar in the ERA. Due to the
increasing complexity of the European funding landscape, it is important that EUREKA instruments
are clearly visible, have an acknowledged place in the ERA and better show their distinct added value
to potential project applicants and SMEs on one side, and to national funding agencies, Ministries,
and the EC on the other side. The changing innovation landscape calls for more partnership within
Europe and with non-European countries.
As a conclusion, the objectives of the current SRM are still relevant and fully justified, and the work
in all the action fields should be implemented as foreseen.
3 European Environment Agency, Assessment of global megatrends – an update, Global megatrend 4:
Accelerating technological change, 2015.
5
2 EUREKA’S OVERALL ACHIEVEMENTS (JULY 2014 – JUNE 2016)
EUREKA Strategic Roadmap 2014 – 2020 (SRM) was developed under the Norwegian Chairmanship
(2013-2014) for the period from July 2014 until June 2020. It offers a vision for EUREKA to be a
leading European platform for transnational industrial R&D&I cooperation, fostering
competitiveness, growth and job creation. To reach this vision by 2020, the SRM puts forward four
strategic objectives illustrating the direction in which EUREKA wants to develop in the future:
Objective 1: To provide a clear added value to industry, with business driven instruments, a
suitable access to public funding and state-of-the-art communication and evaluation;
Objective 2: To become a preferred initiative for public funding agencies, aiming to extend
national priorities and R&D&I funding programmes to a transnational dimension;
Objective 3: To become a preferred platform for industrial R&D&I cooperation between Europe
and other parts of the world;
Objective 4: To contribute to the completion of the European Research Area for its innovation
part, reaching smart synergies between EUREKA instruments and other relevant instruments.
To implement EUREKA’s vision and its four strategic objectives, seven action fields have been
defined:
Action field 1: EUREKA projects 2.0: an attractive and flexible tool for public funding agencies;
Action field 2: EUREKA Clusters & Umbrellas: stronger and more visible;
Action field 3: Eurostars-2 implementation: faster and leaner;
Action field 4: Smart globalization;
Action field 5: Lean governance;
Action field 6: Efficient communication;
Action field 7: Comprehensive impact assessment.
Switzerland (July 2014 – June 2015) was the first country chairing the network after the SRM’s
endorsement. After Switzerland, Sweden took over the EUREKA Chairmanship (July 2015 – June
2016) and developed its priorities with consideration to the EUREKA SRM. As of 1 July 2016, Spain
took over the EUREKA Chairmanship with priority to analyse EUREKA’s performance and impact in
the past two years.
In the period from July 2014 to June 2016, the main achievements driven by the Swiss and Swedish
Chairmanships are:
1. The concept of EUREKA 2.0 has been successfully developed and a pilot call (EUREKA Turbo)
is under preparation.
2. EUREKA set-up a new EUREKA instrument called E!nnoVest which became a permanent
programme in June 2016.
3. Two new EUREKA Clusters has been set-up (PENTA and Metallurgy Europe) and another two
are currently under discussion.
6
4. Eurostars-2 is reaching its target group - R&D-performing SMEs and other SMEs, and the
Network is fulfilling the EC´s requirements.
5. Expanding EUREKA’s global appeal by welcoming additional associated members (Canada &
South Africa) and looking to establish targeted cooperation through specific actions.
6. The third instrument for international cooperation has been developed under the name
GlobalStars. The GlobalStars implementation guidelines have been developed for a trial period
of 3 years and a first GlobalStars call with Chile has been put into practice.
7. A detailed review of the governance model of EUREKA was conducted. A report proposing
recommendations for improvement was developed and this will now being put into practice.
8. ‘EUREKA in the ERA’ strategy has been developed and detailed Implementation plan of the
strategy has been elaborated.
Detailed information on the complete set of achievements in the period from July 2014 to June 2016
and expected actions per action field are presented in Section 3. Additionally, Action field 1, 2, 3 and
6 all foresee overlapping and complementary activities related to the development of synergies within
the European Research Area and Horizon 2020 instruments. For that reason, all ERA related activities
are presented in a separate section and they are not elaborated in detail under each specific action
field.
7
3 EUREKA’S PROGRESS BY SRM ACTIONS
Detailed information on the complete set of actions, EUREKA’s achievements in the period from July
2014 to June 2016 and expected actions in the period from July 2016 to June 2020 are laid down in
the following sections.
3.1 Action field 1: EUREKA projects 2.0: an attractive and flexible tool for NFBs
The objective of Action 1 is to develop an updated EUREKA tool (EUREKA 2.0) to tackle the
decline in the number of EUREKA Network projects, by offering a unique international cooperation
platform for countries aiming to move national priorities and funding programmes to a transnational
dimension.
Action field 1 - ACHIEVEMENTS
By sending a survey to NFBs the ESE identified the interest in developing EUREKA 2.0, a unique
tool for organizing joint calls and activities.
The concept of EUREKA 2.0 service modules was approved by the EUREKA HLG in June 2016
based on a thorough assessment of the NFBs needs and building upon EUREKA assets (a European
network with 30 years of experience, ability to manage joint calls, critical mass which means lower
implementation costs for NFBs, etc.).
The ESE together with the Chair and the network explored the options to distinguish EUREKA from
other transnational networks and programmes. As such, the Network rebranded ‘EUREKA Individual
projects’ into ‘EUREKA Network projects’. Further on, the new EUREKA common terminology and
procedures has been endorsed in June 2016.
In 2015 the ESE and the Swiss Chair started concrete actions to facilitate the successful transition of
EUREKA projects to the ‘go-to-market’ phase by implementing the new pilot programme called
EUREKA High-Tech Investment Programme (EUREKA HTIP). The programme aims to increase the
investment awareness and readiness of EUREKA innovative companies, promote these companies
towards the investment community and actively facilitate investment matching with experienced
investors. Following excellent preliminary results, the Network, led by the Swedish Chair decided to
support the continuation of the programme under its new name: EUREKA InnoVest programme
(E!nnoVest). The 2nd edition of the programme was officially launched in January 2016. In June
2016, the Network decided that E!nnoVest should be a permanent programme of EUREKA4.
Detailed information on the complete set of achievements under Actions 1 in the period from July
2014 to June 2016 is presented in Table 1.
4 E!nnoVest, as a permanent programme of EUREKA, was approved by the HLG in Stockholm on 22 June
2016: EUREKA Doc HLGNPC42
8
Action field 1 - EXPECTED ACTIONS
In the following period the expected actions regarding EUREKA 2.0 are:
To implement and launch tailored service modules and combinations for a range of different
programme requirements and customers;
Develop the IT system & guidelines for the services modules;
Develop branding/communications guidelines for the new instruments and EUREKA 2.0
modules;
Identify the potential pilots to use the new EUREKA 2.0 services modules;
Organisation of pilots with the most interested NFBs: Collaboration with Investment Fund
Denmark on EUREKA Expert Module & EUREKA Turbo pilot call;
Evaluate the results of the first pilots.
In the following period the expected actions to further increase the value of the EUREKA label are:
Implement the new EUREKA common terminology and procedures;
Increase the profile of EUREKA Network projects;
Secure additional sources of funding and the continuity of E!nnoVest beyond 2017;
Identify potential synergies with the similar programmes run by the EC.
9
Table 1: Action 1 - Overview of the achievements
10
3.2 Action field 2: EUREKA Clusters & Umbrellas: strong and more visible
The objective of Action 2 is to support EUREKA Clusters and Umbrellas. Initiated by Europe's
industry, EUREKA Clusters are long-term and strategically significant initiatives. They aim to
develop generic technologies of key importance for European competitiveness. Umbrellas are
thematic networks, created as bottom-up initiatives by member countries and industry to promote and
organise partnering for the generation of EUREKA projects.
Action field 2 - ACHIEVEMENTS
The EUREKA Network, NFBs as well as Ministries involved hold a key role in supporting Clusters.
To foster their support, the ESE identified the commitment and funding perspectives of member
countries to Clusters. A new working group has been setup to revise and combine all the previous
documents related to Cluster Guidelines and Monitoring. The Network approved the new Cluster
Guidelines in June 20165.
The flow of information between Clusters & Umbrellas and HLRs & NPCs is ensured through the
InterCluster group and the InterCluster spokesperson. The ESE and the Chair have become permanent
invitees to attend the InterCluster meetings and the Clusters (industry) ‘voice’ is becoming more and
more prominent in EUREKA through participation in the EG and HLG/NPC meetings.
Further on, the Chair and the ESE supported the promotion of Clusters and Umbrellas in a number of
relevant events through different actions (EUREKA Academy 2015, EUREKA Innovation Week in
Basel and Stockholm, Cluster mission to Canada, Smart cities agreement, etc.). The operational tool
for Cluster data exchange with the ESE database has been put in place.
The new EUREKA Cluster Metallurgy Europe applied for the ‘definitive EUREKA label’ in June
2015. The new PENTA Cluster was approved in June 2015 and officially launched in December
2015.
Detailed information on the complete set of achievements under Action 2 in the period from July
2014 to June 2016 is presented in Table 2.
Action field 2 - EXPECTED ACTIONS
In the following period the expected actions in fostering support to EUREKA Clusters & Umbrellas
are:
Ensure the commitment of the member countries with the Clusters, expressed through clear
funding perspectives until 2020.
Support establishing new industrial initiatives;
Set-up an ad hoc working group to elaborate clear common basis for the Clusters;
Evaluate the added value of Umbrellas;
Based on assessment, make a concrete proposal for shaping the future of Umbrellas;
Ensure an efficient intranet shared document management system for information sharing
amongst Clusters & Umbrellas;
Continue to raise awareness on Clusters and Umbrellas across the Network.
5 Cluster guidelines were approved by the HLG in Stockholm on 22 June 2016: EUREKA Doc HLGNPC45
11
Table 2: Action 2 - Overview of the achievements
12
3.3 Action field 3: Eurostars-2 Implementation: faster and leaner
Eurostars-2 aims to unlock the full potential of R&D-performing SMEs as engines of European
innovation and growth. The objective of Action 3 is to implement progressive milestones that will
make Eurostars faster, leaner and stronger, deliver progress towards harmonisation and develop smart
synergies with ERA and Horizon 2020 instruments.
Action field 3 - ACHIEVEMENTS
In 2015, the ESE, as ‘Dedicated Implementation Structure’ for Eurostars-2, implemented its
obligations deriving from the ‘Eurostars-2 Decision’ and the Delegation Agreement, in particular with
respect to the establishment of Bilateral Agreements with NFBs of each Participating State and
Partner Countries, the implementation of the Ethics screening of project applications and the
implementation of the recommendations deriving from the ex-ante assessment.
The implementation of Eurostars-2 required the careful merging of Horizon 2020 regulations and
EUREKA’s own rules. This was successfully realised through close collaboration between the
European Commission, the ESE and EUREKA members.
Progress towards the implementation of the programme milestones was closely monitored through
regular National Implementation Group (NIG) meetings involving the NFBs representatives. The
budget dedicated by Eurostars-2 Participating States and Partner Countries to successful project
participants reflected their potential funding weight with regards to a balanced funding and the agreed
targets for project funding.
Two expert working groups - on common financial viability and on common reporting system - were
set up under the frame of the NIG. Their role is to develop a common financial viability methodology
and a common reporting system, to be accepted by the NFBs represented in the NIG by mid-2017.
One of the key challenges was to increase the visibility of Eurostars, specifically to R&D-performing
SMEs wishing to enter into cross-border research collaboration, and especially for SMEs with no
prior international experience. For that reason, the ESE organised activities that aimed at increasing
the number and quality of the applications received (new Eurostars public website, national
roadshows, webinar on Eurostars-2, spotlight success stories, close cooperation with EEN in
organizing matchmaking events, etc.).
Most importantly, Eurostars-2 reached its target group - R&D-performing SMEs and other SMEs,
with 3,492 being part of consortia applying for Eurostars-2 funding. This number represents 71 % of
all participants involved.
Detailed information on the complete set of achievements under Actions 3 in the period from July
2014 to June 2016 is presented in Table 3.
13
Action field 3 - EXPECTED ACTIONS
In the following period the expected actions related to delivering a lean administration with a short
time to contract are:
Continuous assistance to potential applicants and participants;
Further development and optimization of the user-friendly on-line submission system;
Continuous communication on the programme;
Improve Eurostars-2 visibility and position it in the ERA landscape;
Stimulate a more balanced participation across Eurostars participating countries;
Develop a funding synchronisation tool;
Improving the NFBs regulations and procedures through concete actions during EAGs and
NIGs;
Ensure an efficient shared document management system.
In the following period the expected actions related to delivering progress toward harmonisation are:
Organise an annual National Implementation Group (NIG) meeting to finalise a common
financial viability methodology;
Implement a new common monitoring methodology.
In the following period it will be necessary to support the Eurostars-2 mid-term evaluation with the
setup of a taskforce that would interact with the mandated EC expert group. The outcome of the mid-
term evaluation would be useful for EUREKA members when discussing improvements to be made to
Eurostars-2 for the upcoming period (2018-2020) and for future Joint Programmes beyond 2020.
Finally, budget allocated to Eurostars-2 by Participating States and Partner Countries should be
further increased in order to cover the anticipated demand which has yet to be realised.
14
Table 3: Action 3: Overview of the achievements
15
3.4 Action field 4: Smart Globalisation
The innovation process and value chains in many fields extend beyond the boundaries of the current
EUREKA network. Taking advantage of the opportunity of the increased international dimension that
characterizes world affairs, EUREKA’s ambition is to provide industry with the most suitable
conditions to cooperate safely, reliably and effectively with partners outside the EUREKA member
countries.
Action field 4 - ACHIEVEMENTS
South Korea, Canada and South Africa have become associated members in recent years. The
EUREKA Network explored the consequences of an enlarged network for its structure and
governance and updated the rights and responsibilities for associated countries. Based on the existing
criteria and on the mapping of countries that could provide additional value through closer
cooperation, the Network also evaluated potential countries for associated (Argentina, Chile and
Singapore).
In order to strengthen EUREKA’s position as a global facilitator of R&D&I, the Swedish Chair
initiated the Smart Globalisation working group. One of the tasks of this group was to create a toolbox
for the setup of multilateral calls between EUREKA countries, including the associated countries, and
countries outside the network. This toolbox has been given the working name GlobalStars.
The Implementing Guidelines for GlobalStars were approved in June 20166. In addition to the
association and simple project cooperation, GlobalStars is the third instrument for EUREKA’s global
international cooperation. It will allow EUREKA countries to cooperate with third countries through
targeted calls. This cooperation includes the possibility to decide on a case-by-case basis on the
exceptional use of the 1+1 project participation rule. This possibility has been granted for a three year
trial period concluding in June 2019.
Chile has been the first country selected for a pilot call within GlobalStars as part of its association
process. Namely, in March 2015 Chile officially asked to be associated to EUREKA. In order to gain
experience on the mutual benefits of a possible future association of Chile to EUREKA, in the HLG
meeting in Geneva, the HLG approved the launch of a Global Stars pilot call between committed
EUREKA member states and Chile. This call included the exceptional 1+1 participation rule.
Furthermore, the HLG approved the report on the mutual benefits of a potential association of Chile to
EUREKA and in June 2016, the HLG approved the launch of the official evaluation process and fact
finding mission to Chile.
In June 2015 Argentina sent an official letter requesting to become associated to EUREKA. The
Network has answered in a cautious way due to the fact that an association of Chile was under in
discussion and the development of EUREKA’s Internationalization strategy was yet to be concluded.
Argentina has confirmed its interest to join EUREKA as an associated country on several occasions.
In June 2016 Argentina also expressed its interest in participating in a GlobalStars call.
6 GlobalStars Implementing guidelines were approved by the HLG in Stockholm on 22 June 2016: EUREKA
Doc HLGNPC35
16
Finally, in order to become a platform for global industrial R&D&I cooperation, promotional
activities were key in promoting EUREKA both inside and outside the network. Outside of the
Network, EUREKA was promoted at various international events, and in cooperation with DG RTD
(presentation of EUREKA in Strategic Forum for International S&T Cooperation – SFIC and in
international conferences in India, Vietnam, Kazakhstan, Brazil and Argentina, joining the STS forum
as a member). Within Network, the Chair and the ESE promoted EUREKA as the tool for industrial
R&D&I cooperation between Europe and other parts of the world (NFB conferences, EUREKA
Innovation Weeks, EUREKA Korea Days, etc.).
Detailed information on the complete set of achievements under Actions 4 in the period from July
2014 to June 2016 is presented in Table 4.
Action field 4 - EXPECTED ACTIONS
In the following period the expected actions related to enhancing engagement with associated and
non-EUREKA countries are:
Provide continuous support to EUREKA Associated Countries at all levels (instruments,
programme participation and promotion, data analysis etc.);
Prepare the association process of Chile (Fact Finding Mission, Report to HLG, etc.);
Assess the possible association of Argentina;
Continue the dialogue with SFIC through participation in their working group meetings and
contributing to the development of the SFIC toolbox for international cooperation;
Set up new pilot calls to test the new international cooperation tool, GlobalStars;
Set up the new toolbox, with IT Tool & Guidelines;
Perform an assessment on the experiences made with GlobalStars calls and the application of
the 1+1 project participation rule in that context;
After the assessment, make necessary amendments to the GlobalStars Guidelines and to the
Hannover declaration if needed;
Review and refine the international cooperation mandate of the EUREKA Secretariat;
To clearly define this future role of EUREKA as a platform for global industrial R&D&I
cooperation, a coherent EUREKA internationalization strategy needs to be developed;
Implementation of the EUREKA International Cooperation Strategy.
In the following period the expected actions related to promotion of EUREKA as a platform for
global industrial RDI cooperation are:
Continue promoting the three instruments of EUREKA’s global international cooperation
approach;
Strengthen cooperation with international partners and promote international cooperation
towards Clusters and Umbrellas;
Identify and actively participate in targeted events to mobilize participation in EUREKA
projects;
Mobilize EUREKA member countries and EU Science Counsellors to promote EUREKA in
third countries;
Promote the GlobalStars calls through all communications channels;
Continue to organise the globalisation aspect of the EUREKA Innovation Days.
17
Table 4: Action 4 - Overview of the achievements
18
3.5 Action field 5: Lean Governance
In the 30 years of its history, EUREKA has proved to be an efficient, low-cost initiative devoted to
facilitate market-driven research and innovation in Europe. This indisputable success and growth of
EUREKA has on the other hand, led to some difficulties which did not occur in the beginning. The
objective of this action is to improve the governance of the EUREKA initiative.
Action field 5 - ACHIEVEMENTS
The EUREKA Strategic Roadmap 2014-2020 identifies ‘Lean Governance’ as one of the key action
fields to achieve EUREKA’s renewed vison. For that reason, ‘Lean Governance’ was one of the main
priorities of the Swedish Chairmanship. The Swedish Chair therefore set up an HLG working group –
the Lean Governance working group (LGWG) - to deal with the matters defined in the Strategic
Roadmap.
The task of the working group was to review the governance model of EUREKA and to propose
recommendations for improvement. The working group’s aim has been to utilize and coordinate the
network’s experiences and ideas on five central issues (the Overall governance system, Introduction
of a Financial & Audit Committee, Future chairmanships, Improvement of meetings, the Role of
Industry). The goal of this governance review was to achieve a more appropriate organisational
structure that reduces complexity and cost, promotes greater efficiency and transparency and can deal
with a significantly bigger network which might also cover further growth.
The major outcome of the work is a Final Report including a set of proposals for the improvement of
the EUREKA governance (June 2016)7. In addition, the LGWG made preparations to establish a
Financial & Audit Committee as per the Ex-Ante Assessment and to consolidate the legal documents
of EUREKA.
The Final Report includes (as annexes) some draft documents (a Charter of the EUREKA Financial &
Audit Committee, a revision of the Statutes of the Association and a proposal for the consolidation of
constitutional documents of EUREKA which have been revised and merged into a single document)
that need further development before adoption.
Detailed information on the complete set of achievements under Actions 5 in the period from July
2014 to June 2016 is presented in Table 5.
Action field 5 - EXPECTED ACTIONS
In the following period the expected actions related to the revised governance model are:
Rank the recommendations of the Lean Governance working group by priority;
Start with the implementation of the prioritised recommendations;
7 Lean Governance Working Group final report was approved by the HLG in Stockholm on 22 June 2015:
EUREKA Doc HLGNPC36
19
Finalise and approve the following documents: EUREKA consolidated document, Statutes
EUREKA AISBL consolidated text, HLR appointment letter, Rule of delegation from MC to
HLG, the Charter of the EUREKA Financial & Audit Committee;
Set-up of the Financial Committee.
In the following period the expected actions related to securing future chairmanships are:
Establish and adopt the ‘procedures for the future EUREKA Chairmanship’.
In the following period the expected actions related to the role of the ESE are:
Explore the orientation of the ESE towards being a service provider, if related to EUREKA
instruments;
Address the issue of late payments of EUREKA member country;
Explore the possibility of more seconded experts to work at the ESE.
In the following period the expected actions related to better functioning of the Network are:
Decide on EUREKA functioning (relationship between political groups & association groups) to
avoid duplication of agendas;
Develop an action plan to foster participation of not so active members and organise a visit to
those EUREKA countries.
20
Table 5: Action 5 - Overview of the achievements
21
3.6 Action field 6: Efficient communication
The objective of this action is to support the communication of EUREKA, paramount to increase its
visibility and promote its added value.
Action field 6 - ACHIEVEMENTS
The public profile and the outreach of the EUREKA Network rose significantly in the past two years.
The new Strategic Roadmap set ambitious communications objectives while EUREKA’s new slogan,
‘Innovation across borders’ and the revised corporate image guidelines successfully added value to all
EUREKA’s communications activities which were significantly intensified. A number of activities
were undertaken aiming to inform the innovation community, national and international media,
policymakers, as well as the general public, of EUREKA and its instruments’ achievements and
impact during this period.
Based on the Strategic Roadmap’s communication objectives, a new Communications Strategy8 and
its guide, Passport to the Communications Strategy, were completed and approved by the EUREKA
Network with the aim to deliver effective promotion of EUREKA instruments to the target audience
and promote EUREKA as an effective innovation policy platform. Furthermore, a separate
communications strategy for Eurostars-2 has been defined.
In 2015, updated, user-friendly EUREKA and Eurostars public websites had helped reach a larger
audience and bring new participants to EUREKA’s instruments.
To deliver lasting value, EUREKA events were the occasion to pilot ongoing initiatives and to present
the new ones. These initiatives go beyond a one-off event, and are designed to identify and build a
community around target actions, and produce pertinent content for an appropriate follow-up
communication. A number of information days at European, national and local level were organised
to promote EUREKA instruments, calls and funding opportunities, and Network-wide activities to
large audiences.
Increased efforts were made to strengthen EUREKA’s image both in Europe and abroad. This
included the production of a EUREKA corporate video featured also by Euronews, the publication of
the 30 year anniversary report and innovation impact report as well as a number of press
announcements and numerous success stories.
In 2015, EUREKA became an official associated member of the European Enterprise Network (EEN),
thus taking advantage of a number of benefits which will add value to the network’s activities.
EUREKA Network members now have access to the EEN’s partner search tool and intranet, where
companies looking for partners and events can be promoted, accessing the different fora.
8 EUREKA Communications Strategy 2015-2020 was approved in Lugano on 1 July 2015: EUREKA Doc
HLGNPC33
22
EUREKA was also further developed as a platform for innovation policy dialogue by cooperating
with the relevant stakeholders in view to develop closer synergies (EBN, TAFTIE, EARTO, Science
Europe, ERRIN, COST, K4I, etc.).
Lastly, the ESE Communication team launched two new communication and support actions:
webinars and Eurostars Roadshows to better promote and ultimately increase the applications and
SME interest in the Eurostars programme.
Detailed information on the complete set of achievements under Actions 6 in the period from July
2014 to June 2016 is presented in Table 6.
Action field 6 - EXPECTED ACTIONS
In the following period the expected actions to deliver effective promotion of EUREKA instruments
to the target audience are:
Launch the new EUREKA print magazine;
Revise and update corporate guidelines for all instruments;
Finalise the editorial guidelines;
Finalise EUREKA Clusters brochure.
In the following period the expected actions to develop and promote the EUREKA innovation policy
platform are:
Further develop joint activities with relevant stakeholders;
Active participation to the European Business Summit and European Innovation Summit;
Actively promote EUREKA to EU institutions, highlighting synergies and cooperation
possibilities;
Continue to organise EUREKA Innovation Weeks.
23
Table 6: Action 6 - Overview of the achievements
24
3.7 Action field 7: Comprehensive impact assessment
Measuring the impact of EUREKA’s project portfolio is of key importance to demonstrate its positive
effect on the European economy, to convince policy makers of EUREKA’s added value and to
support any adjustment of the objectives and directions of EUREKA’s strategy.
Action field 7 - ACHIEVEMENTS
The need for a comprehensive impact assessment is outlined in the EUREKA Strategic Roadmap
2014-2020. While regular econometric impact assessment is envisaged for Eurostars (see the
Budapest Document), it is important that the most up-to-date and robust methods are also used to
assess the benefits for participants in other EUREKA instruments. For that reason, the ESE is carrying
out the EUREKA Network Projects & Clusters projects Impact Assessment.
The study will investigate the benefits accrued by participants in EUREKA Network Projects
(including Umbrellas) and Clusters projects in the period 2001-2015, focusing on outcomes and
impacts in terms of international collaboration and networks, as well as innovative outputs measured
by IPR and other key indicators of firm performance. Where possible, it will assess the performance
of EUREKA in comparison with relevant national programmes, in order to better identify EUREKA’s
added value. The final report will be aimed at policymakers, national funding bodies and other partner
organisations, and will include sections covering (inter alia) the following topics: Best practices
overview; Impact figures for key variables for the participating countries; Integrated results of
Eurostars “Final Evaluation” and other impact reports; Framework for future evaluation of EUREKA
programmes.
17 EUREKA member countries, in addition to the Clusters, are participating in the study, with
contributions in terms of finance and/or expertise. The Impact Assessment Working Group (IA WG –
made up of experts from six countries and the Clusters) is steering the study, which is being carried
out by a consortium consisting of Prognos AG, Joanneum Research and ULB. The first phase has
been completed, and an inception report (detailing the research framework) was delivered on 15 July
2016.
The Final and Market Impact Reports, used to monitor the impact of EUREKA at project and
participant level, have been revised. The forms have been made shorter and easier to analyse.
Moreover, the new forms will be implemented on the MyEUREKA online system.
Furthermore, the close cooperation with relevant organisations involved in Impact Assessment was
established (exchange of impact data with DG RTD and academics).
At the end of each calendar year, the EUREKA Annual Report has been produced by the ESE,
summarizing the achievements of the whole Network in the previous year. Continuous data analysis
and reporting for the network meetings and on demand was provided by the ESE.
Detailed information on the complete set of achievements under Action 7 in the period from July
2014 to June 2016 is presented in Table 7.
25
Action field 7 - EXPECTED ACTIONS
In the following period the expected actions to deliver effective evaluation of EUREKA Instruments
are:
Carry out an comprehensive Impact Assessment of EUREKA Network projects and Clusters
projects;
Review existing Evaluation and Monitoring Framework based on recent methodologies;
Design and implement new project monitoring forms;
Investigate the expansion of ESE data by subscribing to relevant databases;
Continuation of the ‘Impact Assessment’ working group;
Continue to identify best practices;
Again set-up the forecast of EUREKA instruments’ projects activities;
Prepare and present portfolio analysis and project trends, benchmarking and positioning
EUREKA activities within ERA where possible;
Produce regional analysis of EUREKA portfolio.
In the following period the expected actions to develop the EUERKA Impact Assessment platform
are:
Continue to organise regular contact with relevant organisations (EC, OECD etc.)
In the following period the expected actions to monitor and evaluate the implementation of the SRM
are:
Propose new visualisation of data and infographics for Annual Report and platform presentations;
Make the mid-term review of the EUREKA SRM;
Make the review of the EUREKA SRM upon completion.
26
Table 7: Action 7 - Overview of the achievements
27
3.8 ERA related activities in the SRM 2014-2020
Action field 1, 2, 3 and 6 all foresee overlapping and complementary activities related to the
development of synergies within the European Research Area (ERA) and Horizon 2020 Instruments.
For that reason, all ERA related activities are presented in a separate section and they are not
elaborated in details under each specific action filed.
The objective of these activities is to contribute to the completion of the ERA for its innovation part,
reaching smart synergies between EUREKA instruments and other relevant instruments.
ACHIEVEMENTS
Under the leadership of the EUREKA Swiss Chairmanship, a dedicated working group on EUREKA
in the ERA was established in July 2014. Its main objective was to produce a EUREKA strategy
within the ERA. In 2014, the ERA working group performed a mapping of all ERA policies,
instruments and partners, organised interviews with key ERA stakeholders and issued a position paper
on the next ERA Roadmap. The final ‘EUREKA in the ERA’ strategy9 was endorsed by the HLG in
June 2015. The strategy identifies four main strategic objectives to further strengthen EUREKA’s role
in the ERA: Towards increasing the innovation side of cross-border cooperation, Towards facilitating
international cooperation, Towards support for effective national innovation systems and Towards
contributing to ERA policies on innovation. The new strategy complemented the new ERA Roadmap,
shaped by EU Member States, endorsed by the EU Council at the same time.
To ensure that EUREKA becomes a leading ERA innovation stakeholder contributing to growth and
job creation for the benefit of European industry, the Swedish EUREKA Chair decided to continue the
work started under the Swiss Chair by establishing the 'EUREKA in European Innovation Policy'
working group. The EUREKA HLG mandated the working group to enable the network to contribute
its full potential in developing the Implementation plan of ‘EUREKA in the ERA' strategy. The final
version of the Implementation plan was created as a separate document to facilitate the
implementation of the strategy by the whole network. It defines the activities until 2020 and, if
implemented, should establish EUREKA as a major proactive stakeholder at European level. It also
indicates responsibilities, a proposed time-line and identifies particular deliverables which will allow
the measurment the steps towards the ultimate goals. The final version of the Implementation plan
was endorsed in June 2016.10
The Implementation plan of ‘EUREKA in ERA’ strategy will have to be followed-up over the coming
years. For that reason, the Swedish Chair proposed to establish an informal ERA-group on ‘industrial
innovation’ issues named ERA-HLG which would be composed of EUREKA HLRs.
On 16 February 2016, the EC launched a Call for Ideas on a European Innovation Council to gather
stakeholders’ views on disruptive, market-creating innovation, gaps in the current innovation support
9 ‘EUREKA in the ERA’ strategy was approved in Lugano on 1 July 2015: EUREKA Doc HLGNPC32
10 Implementation plan of the ‘EUREKA in the ERA’ strategy was approved in Stockholm on 22 July 2016:
EUREKA Doc HLGNPC32
28
landscape, and the potential remit of a European Innovation Council (EIC). The Swedish EUREKA
Chair and EUREKA Clusters submitted input to the EC’s Call for Ideas on 29 April 2016. Pooling
national resources, further simplification, increased involvement of industry and a global ‘outward
looking vision’ are some of the key ideas put forward in their input.
Cooperation with the EC occupied the central place in the strategy of EUREKA. The working group
EC-EUREKA, proposed by Commissioner Moedas, was set-up with the main objective of facilitating
interactions between EUREKA and the European Commission, taking into consideration the
complementarities of the two organizations. The working group is composed of representatives of the
EUREKA Secretariat, the EUREKA Troika and representatives of DG RTD and the WG meetings
have helped highlight different areas for enhanced cooperation in European Innovation Policy.
EXPECTED ACTIONS
In the following period the expected actions to contribute to the completion of the ERA are:
EUREKA needs to explore new ways of cooperation with EC
Continue the strategic dialogue with the EC in order to support the further development of the
EIC and obtain an important role within it;
Follow-up the Implementation plan of the ‘EUREKA in the ERA’ strategy;
Set-up fully functioning ERA-HLG, an informal ERA-group on ‘industrial innovation‘ issues
composed of all EUREKA HLRs;
Identify the topic of interest for EUREKA and send an input to the EC;
Identify the potential areas of cooperation with other EU level initiatives and propose the key
actions for cooperation;
Continue to establish smart synergies between EUREKA Instruments and EU level initiatives
(EEN, ERA NETs, ERRIN, ETPs, KICs, PPPs (incl. JTIs), Structural Funds);
Continue the cooperation with innovation stakeholders and SME advocates (TAFTIE, EARTO,
UEAPME, BUSINESSEUROPE, EUROCHAMBRES, EBN...);
Organise conferences to promote EUREKA’s added value and participate in relevant events at
EU, national, regional and local level.
29
4 CONCLUSIONS
Since July 2014, the 7 action fields of the SRM 2014-2020 are in their implementation phase. Based
on the analysis of the activities from July 2014 to June 2016, the summary of the main actions that
need to be tackled by the upcoming Chairmanships and the whole EUREKA Network are presented
below:
1. Launch tailored EUREKA 2.0 services modules and identify the potential pilots;
2. Evaluate the added value of Umbrellas and make a concrete proposal for shaping the future of
Umbrellas;
3. Set up new GlobalStars pilot calls, perform an assessment on the experiences made with
GlobalStars calls and made necessary amendments if needed;
4. Develop the EUREKA Internationalization strategy;
5. Continue the strategic dialogue with the EC to better coordinate existing European R&D&I
instruments;
6. Support the further development of the European Innovation Council and obtain an important role
within it;
7. Develop branding/communications guidelines for the new EUREKA instruments;
8. Finalise the Impact Assessment study of EUREKA Network Projects and Clusters project;
9. Develop the EUREKA SRM 2014-2020 mid-term review;
10. Support Eurostars-2 mid-term review and implementation of its conclusions;
11. Define EUREKA’s post 2020 strategy and activities.
27
APPENDIX
i
LIST OF APPENDICES
Appendix 1: List of acronyms ..........................................................................................................1
Appendix 2: Mandate for the review of the EUREKA SRM 2014-2020 .........................................2
1
Appendix 1: List of acronyms
Article 185
Article 185 of the Treaty on the Functioning of the European Union enables
the EU to participate in research programmes undertaken jointly by several
Member States, including participation in the structures created for the
execution of national programmes.
BUSINESSEUROPE Represents European business at European level
COST European cooperation in science and technology
EARTO European association of research and technology organisations
EBAN Association representing the interest of early stage investors across Europe
EBN The European Business and Innovation Centre Network
EEN Enterprise Europe Network
EIC European Innovation Council
EIP European Innovation Partnerships
EIT European Institute of Innovation and Technology
ERA European Research Area
ERAC European Research Area Committee
ETP European Technology Platform
EU European Union
EUROCHAMBRES The Association of European Chambers of Commerce and Industry
Horizon 2020 The EU Framework Programme for Research and Innovation
IAWG Impact Assessment working group
INCO-NET FP7 funded coordination and support action supporting bi-regional dialogues
JTI Joint Technology Initiative
JPI Joint Programming Initiative
LGWG Lean Governance working group
NFB National Funding Body
NIG National Implementation Group
R&D&I Research, Development and Innovation
RTO Research and Technology Organisation
Science Europe Association of European Research Funding Organisations (RFO) and
Research Performing Organisations (RPO)
SFIC Strategic Forum for International Cooperation
TAFTIE The European association of leading national innovation agencies
SRM EUREKA Strategic Roadmap 2014-2020
UEAPME European association of craft, small and medium-sized enterprises
2
Appendix 2: Mandate for the review of the EUREKA SRM 2014-2020
1. Background information The EUREKA SRM is a key element in EUREKA’s governance system. It is a document based on consensus amongst EUREKA members, providing strategic direction on overall priorities, action fields and strategic objectives of EUREKA. With the purpose to ensure operational and strategic continuity of EUREKA, the SRM provides guidance to subsequent Chairmanships of EUREKA in the development of their priorities. Nevertheless, the EUREKA SRM is being implemented by the whole EUREKA Network, led by the consecutive Chairmanships and supported by the EUREKA Secretariat. In its history, EUREKA developed two Strategic Roadmaps. The first EUREKA Strategic Roadmap was developed under the German Chairmanship (2009-2010) for the period from June 2010 until July 2014. It was revised under the Hungarian Chairmanship and endorsed during the EUREKA Ministerial Conference in Budapest in June 2012. The current, second EUREKA Strategic Roadmap was developed under the Norwegian Chairmanship (2013-2014) for the period from June 2014 until July 2020. It offers a vision for EUREKA to be a leading European platform for transnational industrial R&D&I cooperation, fostering competitiveness, growth and job creation. To reach this vision by 2020, the SRM puts forward four strategic objectives11 illustrating the direction in which EUREKA wants to develop in the future. To implement EUREKA’s vision and its four strategic objectives, seven action fields have been defined12.
2. The objectives of the Spanish Chairmanship
As defined in the EUREKA SRM, the SRM is an evolving document and it needs to be reviewed every two years with regard to the described scope and priorities, and evaluated against its objectives. EUREKA SRM 2014-2020 was endorsed in June 2014. For that reason, one of the major priorities during the Spanish EUREKA Chairmanship is to review the EUREKA SRM to ensure a strong strategic governance and political continuity over the coming period of 2017‐2020. According to the procedures, the review needs to be performed by a taskforce set-up by the HLG and led by the HLG Chairman. In order to avoid further increase in number of working groups the Spanish Chairmanship proposes that the EG shall undertake the mid-term review of the SRM led by the HLG chairman Mr Francisco Marin.
11
EUREKA has set four strategic objectives: (1) To provide a clear added value to industry, with business driven instruments, a suitable access to public funding and state-of-the-art communication and evaluation; (2) To become a preferred initiative for public funding agencies, aiming to extend national priorities and R&D&I funding programmes to a transnational dimension; (3) To become a preferred platform for industrial R&D&I cooperation between Europe and other parts of the world; (4) To contribute to the completion of the European Research Area for its innovation part, reaching smart synergies between EUREKA instruments and other relevant instruments. 12
SRM action fields: Action 1: EUREKA projects 2.0: an attractive and flexible tool for public funding agencies; Action 2:
EUREKA Clusters & Umbrellas: stronger and more visible; Action 3: Eurostars-2 implementation: faster and leaner; Action 4: Smart globalization; Action 5: Lean governance; Action 6: Efficient communication; Action 7: Comprehensive impact assessment.
3
3. The activities of the Spanish Chairmanship
In order to adjust the strategic directions, it will be necessary to assess what has been achieved and delivered by the Network in the last two years in the framework of the SRM. For that reason, a Review Report will need to be prepared summarizing the achievements and giving an overview about the progress made in the different action fields. The report will also include an analysis about the changes in the global and European environment of EUREKA between 2014 and 2016. The revised SRM will be prepared by taking into account the outcomes of the Review Report and it will focus on the readjusted strategic orientations of the Network for the period of 2017-2020. Further on, the revision of the EUREKA SRM 2017-2020 will be discussed in the HLG & EG meetings and the consolidated draft will be forwarded for further discussion in the 3rd HLG meeting (9 March 2017) so it could be approved during the 4th HLG meeting (Madrid, 29 June 2017) and subsequently endorsed during the EUREKA Ministerial Conference (Madrid, 30 June 2017) as part of the Ministerial Communiqué.
4. The revision process of the EUREKA SRM 2014-2020 The Spanish Chair proposes the following steps to be taken during the Spanish Chairmanship (2016 – 2017):
Event When Results
1. EG 1 5-6 July 2016 Madrid, Spain
The Chair presents the draft mandate
2. Circulation of mandate for written approval
13 July 2016 Deadline: 27/07/2016
Mandate approved
3. EG 2 7-8 September 2016 First discussions on the Review report, its scope and structure
4.
Review report + Analysis about the changes in the global & European environment
Beginning of October 2016
Review report and analysis drafted by the Chair and supported by the ESE
5. HLG 1 20 October 2016
Bilbao, Spain
Review report approved by HLRs
Scope and structure of the revised version of the SRM agreed
6. EG 3 22-23 November 2016
Brussels, Belgium Vision and priorities agreed; detailed discussion on Action Fields
7. First draft of the revised SRM
December 2016 Drafted by the Chair and supported by the ESE
8. Circulation of the draft among the EG members
December/January 2016 Written comments to the first draft of the revised SRM
9. HLG 2 17-18 January 2017 Brussels, Belgium
Discussions about the draft of the revised SRM
10. Second draft of the revised SRM
End of January 2017 Drafted by the Chair and supported by the ESE
4
Event When Results
11. EG 4 7-8 February 2016 Brussels, Belgium
Discussion about the second draft of the revised SRM discussed
12. HLG 3 9 March 2017 Seville, Spain
The consolidated draft discussed and agrees on proposed timeline leading up to the endorsement at MC
13. Written consultation of the HLG and the EUREKA Clusters
March/April 2017 Comments included for draft that will be presented to the EG members
14. Draft content for the MC
April 2014 The Chair supported by the ESE will prepare a draft content for the MC
15. EG 5 9-10 May 2017
Brussels, Belgium Discussion on the final version of the revised SRM and content for the MC
16. Written procedures for approval
Beginning of June 2014 HLG members give their general approval and submit further comments
17. HLG 4 29 June 2017 Madrid, Spain
HLG adopts the revised SRM 2014-2020 and recommends it to the ministers responsible for EUREKA for endorsement
18. MC 30 June 2017 Madrid, Spain
Ministers responsible for EUREKA endorse the revised SRM 2014-2020, annexed to the Ministerial Communiqué