Page 1: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

REVIEWED GROUP INTERIM RESULTSFor the twelve months ended 30 June 2004

PRESENTATION 2004

HARNESSING THE POWER OF THE EARTH

www.kumbaresources.com

Page 2: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

2

CHIEF EXECUTIVE

HARNESSING THE POWER OF THE EARTH

Page 3: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

3

178152

82

207

112 113

FY02 FY03 12M04

1H 2H

KEY FINANCIALS

194.6Headline earnings (cps)

35Interim dividend (cps)

R580mHeadline earnings

R1 101mNet operating profit

R8 454mRevenueHeadline EPS (cps)

385

264

195

Stronger second half

Page 4: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

4

HIGHLIGHTS

Record safety performance

Good progress on HIV / AIDS programme

Solid operating performance from all businesses

Strong US$ commodity prices but

Pleasing safety performance

Page 5: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

5

RAND IMPACT

Continued Rand strength (24% appreciation y-o-y) mitigated by:

Strong sales volumes

Good hedging policy contributing R81m

Business improvementprogramme

Continued impact by strong Rand

4

5

6

7

8

9

10

11

12

13

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

R/US$ AU$/US$

9.01

6.86

(average realised)

2H02 1H03 2H03 1H04 2H04

Page 6: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

6

BUSINESS IMPROVEMENT PROGRAMME

To maintain an attractive return in a prolonged strong rand environment

R800m EBIT contribution

Cost and revenue focus

Shared services optimisation

Programme

Detailed planning - 2004

All improvements implemented during 2005

Full financial benefits in 2006

Crucial in strong Rand environment

Page 7: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

7

EXECUTIVE DIRECTOR OPERATIONS

HARNESSING THE POWER OF THE EARTH

Page 8: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

8

SAFETY & ENVIRONMENT

Safety

Fatalities at all time low

Lost Day Injury Frequency Rate (LDIFR) at record low level

Environment

Environmental management programmes approved for all operations

ISO Certification

4 Business units certified ISO 14001

3 Business units certified OSHAS 18001

All operations by December 2004

Zero tolerance key focus

Fatalities

LDIFR

64

8

4

1

FY00 FY01 FY02 FY03 12M04

3.47 3.133.55

4.59

2.3

FY00 FY01 FY02 FY03 12M04

Page 9: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

9

IRON ORE MARKETS

Strong growth in global blast furnace output

Continued growth in Chinese imports of iron ore (148 Mt last year)

Price increase of 18.6% effective 1 April 2004

Global blast furnace output

Source: AME

0

200

400

600

800

1999 2001 2003 2005f

Mt

EU 15 China Japan Other

Kumba well positioned for blast furnace demand

Page 10: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

10

IRON ORE OPERATIONS

Total production exceeds 30 Mt

New record at Sishen -27.5 Mt

Exports influenced by stock build-up

Strong domestic sales

Continued growth in iron ore output

Total production and exports

8

10

12

14

16

1H02 2H02 1H03 2H03 1H04 2H04

Mt

Export sales Production

Page 11: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

11

0

5

10

15

1H02 2H02 1H03 2H03 1H04 2H04

Mt

Kumba Other

IRON ORE EXPORT CHANNEL

Record tonnage railed of 21.9 Mt

Port expansion on track for completion by end of 2005

Negotiations underway for further 12 Mtpa expansion by 2008

Sishen-Saldanha rail performance

Infrastructure expansion is key to future growth

Page 12: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

12

COAL MARKETS

Total sales to Eskom -14.4 Mt

Record sales to Matimba -13.9 Mt

Strong domestic and international demand

Thermal coal and coke prices (US$/t)

Sources: SA Coal Report, CRU

20

30

40

50

60

70

80

50

150

250

350

450

RBCT thermal coal FOB

Chinese market coke exports

Page 13: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

13

COAL OPERATIONS

Excellent safety results at each coal mine

Total coal production exceeds 19 Mt

Annual record production at Grootegeluk andLeeuwpan

Production volumes

5

6

7

8

9

10

1H02 2H02 1H03 2H03 1H04 2H04

Mt

Grootegeluk LeeuwpanTshikondeni

Solid operating performance at all mines

Page 14: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

14

HEAVY MINERALS MARKETS

Signs of recovery in pigment market

Zircon, rutile and pig-iron in strong demand

Titania slag market over-supplied

First sales of slag and pig-iron

Good sales of synthetic rutile

Zircon and pigment prices (US$/t)

Source: TZMI

360

380

400

420

440

460

480

Q4

01

Q2

02

Q4

02

Q2

03

Q4

03

1000

1200

1400

1600

1800

Zircon Pigment

Page 15: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

15

Excellent synthetic rutile and pigment production at Tiwest

Good growth in slag and pig-iron production from SA operations

Planned shut of furnace 2 for improvements and repair

Heavy minerals production

Good growth in production of key products

HEAVY MINERALS OPERATIONS

0

10

20

30

40

50

60

70

80kt

1H 2H

Page 16: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

16

ZINC MARKETS

US$ zinc price recovery

Depressed Rand price

Low treatment charges prevail

Zinc metal price

Source: LME

Challenging market conditions persist

700

800

900

1000

1100

1200

1H022H02 1H03 2H031H04 2H04

US$/t

5000

6000

7000

8000

9000

10000R/t

Page 17: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

17

BASE METALS OPERATING RESULTS

Sustained record production at Rosh Pinah

Chifeng refinery expansion on schedule

Zincor metal production affected by concentrate quality

Zn metal

(kt)

Zn conc.

(kt)37 38 37

54 5467

1H02 2H02 1H03 2H03 1H04 2H04

Rosh Pinah

54 51 58 57 55 52

10 22

1H02 2H02 1H03 2H03 1H04 2H04

Zincor Chifeng

Refinery in China contributes to zinc metal output

Page 18: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

18

INDUSTRIAL MINERALS

Dolomite sales

(Mt)

FeSi production

(t)Good production levels maintained

Solid financial contribution

0.66 0.650.67 0.65 0.66 0.67

1H02 2H02 1H03 2H03 1H04 2H04

19182415

2647 2671 28112703

1H02 2H02 1H03 2H03 1H04 2H04

Page 19: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

19

EXECUTIVE DIRECTOR FINANCE

HARNESSING THE POWER OF THE EARTH

Page 20: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

20

REVENUE

22)8921 087Base Metals

13)7 4698 454Total

29)312275

4021 189

Heavy Minerals - Ticor SA- Ticor Ltd

9.016.86R/US$ exchange rate realised

(80)408Other

12)7887Industrial Minerals

7)1 6381 747Coal

(7)4 2343 934Iron Ore

% ChangeFY0312M04R million

Page 21: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

21

EBIT / MARGIN

(9)(45)Base Metals

7)1 744)1 865)Total EBITDA

(in Rand) (%)Rm)(%)Rm)

16

27

814

17

21

13

23

6

18

17

97)24)38)

(25)75)

Heavy Minerals - Ticor SA- Ticor Ltd

1 101)

93)

20)

310)

673)

12M04

(7)1 189)Total EBIT

(46)Other

(5)21)Industrial Minerals

11)279)Coal

(24)882)Iron Ore

% ChangeFY03

Page 22: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

22

EBIT COMPARISON

R million

Production cost

Sales growth and cost focus

1101251189 (67)192169(166)

262

975 (1082)

(240)(156)

1168

FY

03 E

BIT

Sal

es

Pric

e

Exc

hang

e ra

te

Infla

tion

Vol

ume

Dis

trib

utio

n co

st

Tic

or L

td

Cos

t sa

ving

s

Goo

dwill

"Cor

e" E

BIT

Non

-rec

urrin

g ite

ms

12M

04 E

BIT

Page 23: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

23

CURRENCY IMPACT

Adjusted for:

(809)Price increases

-)189)Non-recurring items

-)(122)Asset disposals

17)17)Comparable EBIT margin

1 262)1514)Comparable EBIT

1 162)Realised exchange rate impact

73)(7)Unrealised translation loss/(gain)

1 189)1 101)EBIT

FY0312M04R million

Rand appreciation reduces margin

Page 24: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

24

EARNINGS

(26)718)528)Attributable earnings

(27)242)177)Attributable earnings per share (cents)

(23)Minority interest

(23)718)551)Profit after taxation

(10)(229)(253)Taxation

2)(29)Equity (loss)/income

(10)(244)(268)Net financing cost

(7)1 189)1 101)EBIT

% ChangeFY0312M04R million

Total dividend for the period 55 cps

Page 25: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

25

HEADLINE EARNINGS

66)33)Goodwill and exceptionals

-)24)Closure cost

(2)(103)Net surplus on asset disposals

2)98)Impairment charges

297)298)Average number of shares in issue (million)

(26)264)195)Headline earnings per share (cents)

(26)784)580)Headline earnings

Post tax adjustments:

(26)718)528)Attributable earnings

% ChangeFY0312M04R million

HEPS 195 cps

Page 26: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

26

CASHFLOW

(559)-)Net impact of Ticor Ltd consolidation

-)133)Share issue

44)208)Asset disposals

2 374)2 252)Closing net debt

(1 231)122)(Increase)/decrease in net debt

(110)36)Non cashflow movements

(264)(314)Other capital expenditure

(1 122)(759)New capacity

Net cash used in investing activities

780818)Net cashflow from operating activities

1 143)2 374)Opening net debt

FY0312M04R million

Positive operational cashflow

Page 27: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

27

RATIOS

3936Net debt / equity (%)

1511Return on equity - attributable income (%)

7.17.0EBITDA (times)

4.94.1EBIT (times)

Net financing cost cover

2825EBITDA (%)

2217EBIT (%)

Margin excluding captive arrangements

FY0312M04

Solid financial metrics

Page 28: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

28

CHIEF EXECUTIVE

HARNESSING THE POWER OF THE EARTH

Page 29: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

29

STRATEGY

EmpowermentMPRDA - effective 1 May 2004 - Kumba well placed to conformCoordinating with Anglo on empowerment ownership process

Iron ore growthHope DownsNorthern Cape expansion projects

Coal growthInyanda Coal JVLeeuwpan expansionGrootegeluk market coke project

Heavy minerals: FairbreezeLonger term potential

Iron ore Faleme (Senegal)

Heavy minerals Toliara Sands (Madagascar)Coking coal - Moranbah South (Australia)

Robust project pipeline

Page 30: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

30

OUTLOOK

Positive factors

Strong commodity markets

Sustained excellent operating performance

Business improvement initiatives

BUT: Rand strength and volatility poses major risk to the resource sector

Strain on cash flow from operations

Impact on new projects

Therefore, if the Rand stays at recent levels, we are unlikely to improve on earnings

Page 31: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

HARNESSING THE POWER OF THE EARTH

www.kumbaresources.com

Page 32: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

32

Page 33: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

33

REVENUE CONTRIBUTION

FY0312M04

56%

1%1%12%

8%

22%

46%

21%

19%

13% 1%

Iron oreCoalHeavy mineralsBase metalsIndustrial mineralsOther

Page 34: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

34

EBIT CONTRIBUTION

FY0312M04

59%

8%2%

4%

27%

Iron oreCoalHeavy mineralsBase metalsIndustrial mineralsOther

71%

2%5%

22%

Page 35: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

35

IRON ORE PHYSICAL INFORMATION

Production volumes Sales volumes

02468

10121416

1H02 2H02 1H03 2H03 1H04 2H04

Mt

Sishen Thabazimbi

02468

10121416

1H02 2H02 1H03 2H03 1H04 2H04

Mt

Exports Local

Page 36: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

36

COAL PHYSICAL INFORMATION

Production volumes Sales volumes

0

2

4

6

8

10

1H02 2H02 1H03 2H03 1H04 2H04

Mt

Eskom Domestic Export

0

2

4

6

8

10

1H02 2H02 1H03 2H03 1H04 2H04

Mt

Thermal Coal Coking Coal

Other

Page 37: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

37

HEAVY MINERALS INFORMATION

Production volumes Sales volumes

0

100

200

300

400

500

Ticor SA Ticor Ltd

0

20

40

60

80

100

Ticor SA Ticor Ltd

Page 38: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

38

DEPRECIATION PER SEGMENT

216Corporate

644

6

45

191

148

248

12M04

532

6

41

92

137

235

FY03

Total

Industrial Minerals

Base Metals

Heavy Minerals

Coal

Iron Ore

R million

Page 39: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

39

CAPITAL EXPENDITURE

199274Group (other)

1 3861 073

923485Ticor SA

Expansion

264314Sustaining and environmental

FY0312M04R million

Page 40: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

40

DEBT STRUCTURE

1 0232007630)Ticor Ltd

472

2 252)Net debt

(1 238)Cash and cash equivalents

3 4903 490)Total debt

626After 20072 188-)Short term

3 490)

5562006921 126)Ticor SA project finance

81320053191 734)Corporate

2004Long term

Maturity profileUndrawnDrawnR million

Page 41: REVIEWED GROUP INTERIM RESULTS PRESENTATION 2004 · REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 ... Iron Ore 3 9344 234 (7) R million 12M04FY03% Change

41

PROJECT CAPITAL EXPENDITURE

R91m2005Leeuwpan expansion

US$950m2010Faleme

R516m2007Fairbreeze

R344m2005Grootegeluk market coke project

R186m2007Inyanda Coal JV (50%)

R2.0bn2005Sishen South

R2.4bn 2007Sishen Expansion Project (SEP)

AU$1.7bn2007Hope Downs

Estimated capital cost

Implementation date (start)

Project