review of rabi preparedness and progress 1. eastern district in different agro climatic zones in u.p
TRANSCRIPT
Review of Rabi Preparedness and progress
1
Eastern District in different Agro Climatic Zones in U.P.
3
Assessment of Production: Kharif 2012
SN Crops Kharif 2012 Kharif 2012 (Eastern UP)
Prodn. Productivity Prodn. Productivity
Lakh M.T. Qtl/ha. Lakh M.T. Qtl/ha
1 Rice 145.58 24.48 74.36 23.38
2 Maize 13.4 17.34 3.57 12.66
3 Jowar 2.18 11.12 0.55 11.47
4 Bajra 16.33 19.35 1.37 13.66
5 Millets 0.10 10.00 0.07 9.09
6 Urd 4.50 7.50 0.24 5.86
7 Moong 0.46 5.54 0.01 4.25
Foodgrain 182.55 20.96 80.17 21.96
9 Oilseed 2.06 1.89 0.22 7.7
3
• Eastern UP contributes 44% food grains in state during kharif.
4
TARGET : RABI 2012-13
Crops
2012-132012 -13 (Eastern UP)
Tentative
Area Production Area Production
(Lac ha.) (Lac MT.) (Lac ha.) (Lac MT.)
Wheat 97.39 332.11 34.09 116.24Barley 1.63 3.93 0.57 1.38Maize 5.5 0.16 1.93 0.06
Cereals 99.52 336.2 34.83 117.67Pulses 14.96 18.49 5.24 6.47
Food Grains 114.48 354.69 40.07 124.14Oil Seeds 6.71 8.06 2.35 2.82
Total 121.19 362.75 42.42 126.96
Eastern UP shares 35% food grains to UP during Rabi
5
Crops Targeted
Productivity (Qtls/ha)
2012-13 2012-13
Eastern UP (T)
Wheat 34.1034.10 34.1034.10
Barley 24.0924.09 24.0924.09
Rabi Maize 31.5731.57 31.5731.57
Gram 10.0210.02 10.0210.02
Pea 13.2613.26 13.2613.26
Lentil 8.678.67 8.678.67
Arhar 9.729.72 9.729.72
Rapseed/mustard 12.3612.36 12.3612.36
Linseed 4.844.84 4.844.84
Productivity Targets of Rabi 12-13
6
Seed
Seed availability ensured.
Crops
Seed Distribution Seed Replacement Rate (%)
( in qtls)Rabi Rabi Rabi Rabi
2012-132012-13
(Eastern UP)2011-12
2012-13 (Eastern UP) T
Wheat 3990000 1197000 41 41Barley 33300 9990 20.01 20.01Rabi Maize 79650 23895 50.86 50.86
Gram 123200 36960 20 20Pea 110700 33210 27 27Lentil 42375 12713 15 15Rai / Sarson 21612 6484 65 65
Toria 12171 3651 78 78Linseed 1890 567 20 20
Total 4414898 1324469 40.66 40.66
6
7
( in Lakh M.T.)
Fertilizer
ItemRabi 2012-13
UP Eastern UP
Urea 34.00 11.04
D.A.P. 9.15 3.14
M.O.P. 2.50 8.75
N.P.K. 6.00 2.22
S.S.P. 1.75 1.18
Total 53.40 26.33
7
Eastern UP cosumes 49% fertilizer
8
Crop Loan
Item Unit
Rabi
12-13
Target
Crop LoanUP Crore Rs. 25242.5525242.55
Eastern UP Crore Rs. 5638.385638.38
(Rs in Crores)
K C C• KCC distribution is being taken up on saturation approach. • Against the target of 64.5 lakh 27.30 lakh application forms
submitted to banks.
8
• Eastern UP utilize 22% crop loan.
• 100% seed treatment . • Promotion of Bio-pesticides/Bio-agents.
Plant ProtectionSN. Item Unit Rabi 2012-13 Rabi 2012-13
Eastern UP T
1. Seed Treatment % 100 100
2. Weed control Lakh ha 40 15
3. Farmer Field School (IPM) No. 321 101
4. Farmers Trained No. 9630 4000
5. Chemical Pesticides( T.G.) MT 5497 1900
6. Storage grain bin distribution No. 54000 22000
7. Distribution of P.P. Equipments No. 57600 24300
8. Bio-Pesticide Production in IPM Lab. Kg
No.
LE
211700
34595
770000
70566
11531
256666
9
10
Mechanization
Item 2012-13
UP Eastern UP
Rotavator 9617 2479
Zerotill 2933 703
Seed Drill 5616 1689
Impact of project on productivityImpact of project on productivity
Base Year Base Year productivity Scenarioproductivity Scenario
2009-102009-10
Area (Lakh ha)Production (Lakh MT)
Productivity (Q/ha)
RiceRiceEastern UPEastern UP 29.8629.86 54.7654.76 20.0220.02
Other than Eastern UPOther than Eastern UP 26.1826.18 57.6657.66 22.0222.02
WheatWheatEastern UPEastern UP 34.5534.55 87.53 87.53 25.33 25.33
Other than Eastern UPOther than Eastern UP 62.1262.12 187.64187.64 30.2030.20
Project Year Project Year productivity Scenarioproductivity Scenario
2010-112010-11
Area (Lakh ha)
Production (Lakh MT)
Productivity
(Q/ha)
% enhancement in
Pvty
RiceRiceEastern UPEastern UP 30.2730.27 65.19 65.19 21.54 21.54 7.597.59
Other than Eastern UPOther than Eastern UP 26.0426.04 54.1854.18 20.8020.80 (-)5.5(-)5.5
WheatWheatEastern UPEastern UP 34.84 34.84 98.70 98.70 28.33 28.33 11.8411.84
Other than Eastern UPOther than Eastern UP 61.5261.52 201.30201.30 32.7232.72 8.348.34
Project Year Project Year productivity Scenarioproductivity Scenario
2011-122011-12
Area (Lakh
ha)
Production (Lakh
MT)
Productivity
(Q/ha)
% enhancement in Productivity
Over base year
RiceRiceEastern UPEastern UP 31.8131.81 74.3674.36 23.3823.38 16.7816.78
Other than Eastern Other than Eastern UPUP 27.4227.42 65.2665.26 23.8023.80 9.939.93
WheatWheatEastern UPEastern UP 34.3834.38 104.45104.45 30.3930.39 19.8919.89
Other than Eastern Other than Eastern UPUP 60.6260.62 213.24213.24 35.1835.18 16.4916.49
Impact of project on productivityImpact of project on productivity
1 ALLAHABAD 15 MAHRAJGANJ
2 KAUSHAMBI 16 DEORIA
3 PRATAPGARH 17 KUSHINAGAR
4 VARANASI 18 BASTI
5 CHANDAULI 19 SIDDHARTHA NAGAR
6 GHAZIPUR 20 ST.KABIR NAGAR
7 JAUNPUR 21 FAIZABAD
8 MIRZAPUR 22 AMBEDKAR NAGAR
9 SONBHADRA 23 SULTANPUR
10 ST.RAVIDAS NAGAR 24 AMETHI
11 AZAMGARH 25 GONDA
12 MAU 26 BALRAMPUR
13 BALLIA 27 BAHRAICH
14 GORAKHPUR 28 SHRAVASTI
District of Eastern UPDistrict of Eastern UP
13
District under different Agro-Climatic Zones
Sl. No.Agro-
climatic zones
Revenue Divisions Districts
1 Eastern Plain (15 )
1-Allahabad (3) Allahabad, Kaushambi, Pratapgarh2-Mirzapur (1) St. Ravidas Nagar3-Varanasi (4) Varanasi, Chandauli, Ghazipur,
Jaunpur4-Azamgarh (3) Azamgarh, Mau, Ballia5-Faizabad (4) Faizabad, Ambedkar Nagar,
Sultanpur, CSJM Nagar2 North
Eastern Plain (11)
6-Gorakhpur (4) Gorakhpur, Maharajganj, Deoria, Kushi Nagar
7-Basti (3) Basti, Siddharth Nagar, Sant Kabir Nagar
8-Devipatan (4) Gonda, Balrampur, Bahraich, Shravasti
3 Vindhyan region (2)
2-Mirzapur (2) Mirzapur, Sonbhadra14
Strategy of BGREI project 2012-13 Balanced use of fertilizers based on Soil test.
Enhancement in irrigated area by shallow boring and supply of pump sets for extraction of water from new bores and other water bodies
Vigorous promotion for growing nursery at the earliest possible date to ensure timely transplanting.
Adoption of Direct seeding Rice as well as SRI Technique on a large scale.
Application of Gypsum to the extent of 25% area in partially reclaimed sodic lands (Up land & Shallow water lands) falling under sodicity affected districts
The short duration varieties for Rice coupled with heat tolerance should be promoted under extremely late condition.
Enhancement of Seed Replacement Ratio (SRR) up to 33%.
Timely availability of high quality inputs including seed and fertilizers etc. Hand holding Approach through involvement of Progressive farmer and Extension worker for coordination in land preparation, sowing and planting of crops.
Technical backstopping by KVK’s of the districts to bridge the knowledge gap. Water use efficiency will be increased by use o irrigation water conveyance
(HDPE/PVC) pipe in the area irrigation water access is difficult 15
Sl No.
Activity Unit
Physical
Financial
Target Achiev. Target Achiev.
1 Demonstration No. 2164 2164 61.930 52.266
2 Seed distribution Qtl. 2197.87 1735.55 18.032 12.353
(i) High Yielding Variety Qtl. 1728.36 1206.04 8.642 5.738
(ii) Hybrid Rice Qtl. 469.51 416.51 9.390 6.615
3Agricultural Implements No. 506 509 151.800 152.700
4 Capacity Building 1650 1974 29.700 29.848
5 Gypsum distribution Tonnes 5050 4622.4 25.250 24.700
6Micronutrients distribution ha. 61000 57494.5 305.001 287.473
Total 639.563 604.558
Physical and Financial Progress during the year Physical and Financial Progress during the year 2010-112010-11
16
Physical and Financial Progress during the year Physical and Financial Progress during the year 2010-112010-11
Sl No.
Activity Unit
Physical Financial
Target Achiev. Target Achiev.
Component - Wheat
1 Demonstration No. 839 839 16.78 15.070
2 Sprinkler Set No. 732 786 54.90 56.92
3 Seed Distribution Qtl. 47443 65692 237.215 329.710
4 Bio- Fertilizer Kg. 4625 2895 4.625 3.014
5 Agricultural Implement
(i) Rotavator No. 1168 1437 350.400 431.100
(ii) Zero till/ Seed drill No. 727 657 109.050 98.220
(iii)Custom hire service by Zero till/ Seed drill ha. 7519 7034 90.228 82.531
Total Rs 549.678 611.851
6 Capacity Building No. 1650 1769 29.700 29.700
7 Incentive for line sowing ha. 14800 13138 74.000 63.040
8Incentive for Green Manuring with Dhaincha ha. 14320 14320 286.400 274.586
Total 1298.298 1421.831
17
Physical and Financial Progress during the year Physical and Financial Progress during the year 2010-112010-11
Sl No.
Activity UnitPhysical Financial
Target Achiev. Target Achiev.
Component - Rabi Maize (For Ballia, Deoria, Kushinagar, Faizabad, Sultanpur, Gonda, & Bahraich only)
1 Demonstration No. 180 206 7.200 11.515
2 Micro Nutrient ha. 2000 580 10.000 4.250
3 Seed Distribution Qtl. 10 10 0.120 0.120
4 Bio- Fertilizer Kg. 375 13 0.375 0.051
5 Capacity Building No. 250 296 5.900 5.895
Total 38.595 32.245
18
Physical and Financial Progress during the year Physical and Financial Progress during the year 2010-112010-11
Sl No. Activity UnitPhysical Financial
Target Achiev. Target Achiev.
Component - Sugarcane
1Inter cropping with Sugarcane+Urd/moong ha. 23640 19499
591.000 542.357
2Inter cropping with Sugarcane+ Lentil ha. 3585.5 4229.4 179.275 159.285
3Distribution of Ridge maker/ Planter No. 46 44 9.200 4.544
4 Capacity Building No. 250 293 5.900 5.585
Total 836.055 755.1514
Component - Enhancing Irrigation potential
1 Shallow boring No. 17143 17142 1200.000 1200.000
2 Pump set distribution No. 17143 17008 1714.300 1700.800
Total 2914.300 2900.800
Time Bareed cheque 11.836
Grand Total Rs 5726.811 5726.42219
Physical and Financial Progress during the year 2011-12Physical and Financial Progress during the year 2011-12
Sl. No.
Activity Unit
Target as approved by SLSC
Achivement Made
Physical (ha./No.)
Financial Physical (ha./No.)
Financial
Paddy (Rice) Demonstration
(i) Upland Rice ha. 5000 395.600 5000 304.567
(ii) Shallow Water Rice ha. 3000 237.360 3000 150.940
(iii) Medium Water Rice ha. 3000 236.910 3550 190.543
(iv) Deep Water Rice ha. 3000 217.710 3000 156.503
(v) High Yielding Varieties ha. 5000 342.600 5000 288.643
(vi) Hybrid Rice ha. 8000 625.440 7450 467.410
Sub Total ha. 27000 2055.620 27000 1558.606
Wheat
(i) Block Demonstration ha. 22000 880.000 23487.5 825.814
(ii) Proper Placement of Seed and Fertilizer (Line Sowing including monitoring)
ha. 165000 1200.000 156555 955.572
(iii) Zero Till/ Seed drill No. 755 113.250 773 123.890
Sub Total ha. 2193.250 1905.27620
Physical and Financial Progress during the year 2011-12Physical and Financial Progress during the year 2011-12
Sl. No. Activity Unit
Target as approved by SLSC
Achivement Made
Physical (ha./No.)
Financial Physical (ha./No.)
Financial
Assets building activities
(i) Shallow tubewells (Boring)
No. 24427 1799.890 19081 1184.610
(ii) Pumpsets No. 10286 1028.600 8748 860.743Sub Total 2828.490 2045.353
Site Specific Activities
(i) Bio fertilizer Kg. 196354 188.500 195463 166.351(ii) PVC or High Density
Polyethylene (HDPE) Pipe
No. 20970 1300.140 9641 737.590
Sub Total 1488.640 903.941
Grand Total ` 8566.000 6413.176Amount released - 6756.82
Unallotted - 182.74
Net Amount Available for Expenditure - 6574.080Amount Spent - 6413.176% of Expenditure - 97.55
21
Proposal for 2012-13
Sl no
Main component
Item UnitRate
`/ha or No.
Physical (ha.)
Financial
1 Rice
Block Demo
Upland Rice Unit 7912.0 10000 791.200
Shallow Water Rice Unit 7912.0 8000 632.960
Medium Water Rice Unit 7897.0 8000 631.760
Deep Water Rice Unit 7257.0 5000 362.850
HYV Rice Unit 6852.0 30000 2055.600
Hybrid Rice Unit 7817.0 10000 781.700
Total 71000 5256.070
2 WheatWheat (Block Demo) Unit 4000.0 65000 2600.000
22
Proposal for 2012-13
Sl no
Main component
Item UnitRate
`/ha or No.
Physical (ha.)
Financial
3Asset
Building
Boring No 7000.0 23766 1663.620
Pumpset No 10000.0 7479 747.900
Distribution of zero till/seed drill No 15000.0 2067 310.050
Total 2721.570
4Site Specific
Activities
HDPE/ PVC pipe No 2500.0 23766 594.150
Gypsum @ 2MT/ha Tonne 6000.0 4500 270.000
Drum Seeder/Marker No 4000.0 525 21.000
Hand holding of last year Demonstration ha 2650.0 27000 715.500
Line sowing ha 700.0 72672 508.7040
Total 2109.354
Grand Total 12686.99423
Physical and Financial Progress during the year 2012-13Physical and Financial Progress during the year 2012-13
Sl no Item Unit
Target as approved by SLSC
Achievement Made
Physical (ha./No.)
Financial Physical (ha./No.)
Financial
1 Rice Block Demo
(i) Upland Rice Unit 10000 791.200 8801.1 48.121
(ii) Shallow Water Rice Unit 8000 632.960 7365 51.526
(iii) Medium Water Rice Unit 8000 631.760 10000 81.820
(iv) Deep Water Rice Unit 5000 362.850 2000 12.800
(v) HYV Rice Unit 30000 2055.600 29296.95 219.138
(vi) Hybrid Rice Unit 10000 781.700 9739 119.936
Total 71000 5256.070 67202.30 533.340
2 Wheat (Block Demo) Unit 65000 2600.000 0.00 0.00
3 Asset Building
(i) Boring No 23766 1663.620 5466 268.80
(ii) Pumpset No 7479 747.900 803.00 80.20
(iii) Distribution of zero till/seed drill No 2067 310.050 12.00 1.80
Total 2721.570 350.80024
Physical and Financial Progress during the year 2012-13Physical and Financial Progress during the year 2012-13
Sl no Item Unit
Target as approved by SLSC
Achivement Made
Physical (ha./No.)
Financial Physical (ha./No.)
Financial
4 Site Specific Activities
(i) HDPE/ PVC pipe No 23766 594.150 540 13.50
(ii) Gypsum @ 2MT/ha Tonne 4500 270.000 0 0
(iii) Drum Seeder/Marker No 525 21.000 32 1.26
(iv) Hand holding of last year Demonstration ha 27000 715.500 23830 0.00
(v) Line sowing ha 72672 508.7040 0 0
Total 2109.354 14.757
Grand Total 12686.994 898.897
Amount Allotted against saving of 2011-12 2156.440
Amount Spent - 898.897
% of Expenditure - 41.6825
District wise Progress of Rice block demonstrations
Sl No. District
Upland Rice ( ` 7912/ Demo/ha.)
Shallow Water Rice ( ` 7912/
Demo/ha.)
Medium Water Rice ( ` 7897/
Demo/ha.)
Target Achiev Target Achiev Target Achiev
1 ALLAHABAD 1000 1000 1000 1000
2 KAUSHAMBI 2000 2000 1000 1000 1000 1000
3 PRATAPGARH 1000 1000 1000 1000 1000 1000
4 VARANASI 1000 1000 1000 1000
5 CHANDAULI 1000 1000 1000 1000
7 JAUNPUR 2000 2000 1000 1000
10 ST.RAVIDAS NAG. 1000 1000 1000 1000 1000 1000
15 MAHRAJGANJ
17 KUSHINAGAR 2000
20 ST.KABIR NAGAR 2000 1720
21 FAIZABAD 1000 542.85 1000 845.25 1000 1000
22 AMBEDKAR NAGAR 1000 258.25 1000 800
Total 10000 8801.1 8000 7365 8000 1000026
Sl No. DistrictDeep Water Rice ( ` 7257/ Demo/ha.)
High Yielding Varieties ( ` 6852/
Demo/ha.)
Hybrid Rice ( ` 7817/ Demo/ha.)
Total
Target Achiev Target Achiev Target Achiev Target Achiev
1 ALLAHABAD 4000 4000 1000 1000 7000 7000
2 KAUSHAMBI 1000 1000 5000 5000
3 PRATAPGARH 3000 3000 1000 1000 7000 7000
4 VARANASI 1000 1000 1000 1000 4000 4000
5 CHANDAULI 3000 3000 1000 1000 6000 6000
7 JAUNPUR 3000 3000 1000 1000 7000 7000
10 ST.RAVIDAS NAG. 1000 1000 1000 1000 5000 5000
15 MAHRAJGANJ 2000 2000 3000 3000 1000 1000 6000 6000
17 KUSHINAGAR 3000 0 3000 4000 6000 6000
20 ST.KABIR NAGAR 2000 1990 1000 990 5000 4700
21 FAIZABAD 3000 1872.2 1000 749 7000 5009.3
22 AMBEDKAR NAG. 3000 2434.75 1000 1000 6000 4493
Total 5000 2000 30000 29297 10000 9739 71000 67202
District wise Progress of Rice block demonstrations
27
Coverage of Paddy Demonstrations under different mode and number of beneficiaries
Sl No
DistrictsTotal
Target SRIDirect
sowingTranspla
ntingTotal
AchievNo. of Block
No. of Village
No. of Benefic
1 ALLAHABAD 7000 50 25 6925 7000 7 90 8043
2 KAUSHAMBI 5000 0 2400 2600 5000 18 69 5982
3 PRATAPGARH 7000 0 0 7000 7000 34 110 8439
4 VARANASI 4000 410 29 3561 4000 4 172 6702
5 CHANDAULI 6000 0 0 6000 6000 22 43 4755
6 JAUNPUR 7000 2000 1450 3550 7000 29 526 10255
7ST.RAVIDAS NAG. 5000 0 0 5000 5000 6 78 7234
8 MAHRAJGANJ 6000 0 0 6000 6000 20 166 8987
9 KUSHINAGAR 6000 0 38 5962 6000 7 114 10966
10 ST.KABIR NAG. 5000 476 120 4104 4700 9 166 7530
11 FAIZABAD 7000 757 1250 3002.4 5009.4 22 103 8455
12 AMBEDKAR NA. 6000 68.2 440 3984.8 4493 17 189 5157
Total 71000 3761.2 5752 57689.2 67202.4 195 1826 9250528
Target and achievement of Wheat demonstrations during 2011-12
Sl
No.
District
Demonstration ( ` 4000/ Demo/ha.)
Physical Financial
Target Achi. Target Achi.
1 ALLAHABAD 3000 3000 120.00 100.40
2 CHANDAULI 2000 2500 80.00 99.31
3 GHAZIPUR 3000 3112.5 120.00 116.67
4 MIRZAPUR 7000 7500 280.00 234.93
5 SONBHADRA 5000 5375 200.00 199.68
6 ST.RAVIDAS NAGAR 2000 2000 80.00 74.83
Total 22000 23487.5 880.00 825.81 29
Preparedness of Components
Sl no
Main component
Item UnitPhysical (ha.)
Preparedness
1 WheatWheat (Block Demo) Unit 65000 Seed requirement tied up
3 Asset Building
Boring No 23766 Being Done
Pumpset No 7479 Being Arranged
Distribution of zero till/seed drill No 2067
Distribution being ensured through UP Agro
4Site Specific
Activities
HDPE/ PVC pipe No 23766 Tied up
Gypsum @ 2MT/ha Tonne 4500 Being arranged
Hand holding of last year Demonstration ha 27000 Being done
Line sowing ha 72672 Will be done
30
• Seeds of Notified hybrid paddy varieties is available in small quantity. Therefore release of more and more hybrid varieties of paddy should be ensured.
• Rice millers hesitate in buying hybrid rice due to breakage more than permissible limits. Hence farmers do not get proper price of hybrid paddy.
• Due to smaller holdings (95% small and marginal farmers) insufficient availability of farm credit. Joint Liability Group should be formed on large scale to provide credit facility.
• Eastern UP is severely affected by floods and water logging. Therefore stress tolerant varieties needs to be develop on massive scale.
• Eastern UP is major rice producing areas and contributes nearly 75 Lakh tons. Therefore, IRRI may be requested to set up a research centre to develop new varieties of rice and its agricultural practices, in this area.
• Eastern UP is facing problem of floods by the rivers which originate from Nepal. A joint work plan to mitigate this problem at Government of India level should be initiated.
Issues
31
32
Rabi Preparedness
33
View of rice block View of rice block demonstrations demonstrations
2011-122011-12
34
Dr. Shivendra Singh (State Consultant, NFSM, Lucknow) & SDAEO Sorao
monitoring the paddy field at Kaudihar, Districts-Allahabad
35
A view of Upland Rice, under BGREIA view of Upland Rice, under BGREIVillage-Myohar, Block-Kausambi, District- KausambiVillage-Myohar, Block-Kausambi, District- Kausambi
36
Joint Director Sugarcane Government of India inspecting field of Farmer-Chandrika Singh:
Shallow water Rice (BPT-5204) Village- Pagra, Block-Hata, Districts-Kushinagar
37
38
lar dchj uxj lekIrA view of Swarna Sub-1 in Village- Turkwaliya, A view of Swarna Sub-1 in Village- Turkwaliya, Block- Haisar Bazar, District- Sant Kabir NagarBlock- Haisar Bazar, District- Sant Kabir Nagar
39
View of Wheat block View of Wheat block demonstrations demonstrations
2011-122011-12
40
Visual Journey
fodkl[k.M& ejng ds xzke&bUnkSj esa d`"kd Jh t; ewjr ds [ksr ij ykbu ls cksvkbZ ds i’pkr Qly dk fujh{k.k djrs Mk0 jke izrki flag d`f"k
Kku dsUnz xkthiqjA41
xzke&ykyxat] fodkl[k.M&ykyxat tuin&fetkZiqjA
42
xsgWw [k.M izn’kZu xzke&fgukSrh] fodkl[k.M&jkcVZ~l xat]
tuin&lksuHknz A43
44
Sl. No.
Activities UnitRabi
12-13
Rabi 12-13
Eastern UP
1. Apni Mitti Pahchane Lakh samples
2. Bio-fertilizer Lakh packets
3. Soil Health Cards Lakh
Soil Health
44