réunion ph-dt-em1 15 novembre 2011
DESCRIPTION
Réunion PH-DT-EM1 15 novembre 2011. Nouvelles du CERN / département / groupe, stockages matériel PH-DT [Antti] Tour de table [tous]. Nouvelles. - PowerPoint PPT PresentationTRANSCRIPT
Réunion PH-DT-EM115 novembre 2011
• Nouvelles du CERN / département / groupe, stockages matériel PH-DT [Antti]• Tour de table [tous]
Nouvelles • Retirement age. Idea of voluntary increase of retirement age (up to 67) for existing
staff will not be implemented. As of 1/1/2012 newly recruited staff will need to work until 67 in order to have full pension.
• DT personnel:• LD job for DT Mechanical Engineer ‘ALICE’. Contract awarded to Corrado
Gargiulo, INFN Rome. • LD job for DT Engineer, Irradiation Facility. Contract awarded to Federico
Ravotti, PJAS TOTEM. • Opening a new LD position (CP C) for a DT mechanical technician for early
2012. Will be in EM2 section (reinforcing of NA62 and Atlas nSQP projects).
Stockages matériel DT• Vidange / rangement majeur au 162+169 par R. Kristic, B. Cantin, D. Fraissard, T.
Gys, C. David, P. Carrie, D. Piedigrossi, C. Joram. • Liste de lieux de stockages disponible sur site PH-DT :
http://ph-dep-dt.web.cern.ch/ph-dep-dt/Activities/Storage.html