R ONUNGA 1 of 13 January 2016 CURRICULUM VITAE Proposed Positon : Civil Engineer/Water Supply and Waste Water Expert Name of Staff : Reuben Juma Onunga Date of Birth : 1980 Nationality : Kenyan Education: The University of Nairobi. Bachelor of Science Degree in Civil Engineering, 2005. On-going thesis for Master of Science Degree in Civil Engineering (Environmental Health Engineering) at the University of Nairobi. Membership of Professional Associations: Approved and invited by ERB to present Registration Report (Report Preparation on-going) Registered Graduate Engineer, Engineers Registration Board (ERB), Kenya - member number B.4370; Graduate Member, Institution of Engineers of Kenya (IEK), member number G.3235. Other Training Experienced in FIDIC and World Bank Conditions of Contract; Computer literate (AutoCAD, Bentley WaterCAD V8i and SewerCAD V8i, LISCAD, EPANET, and Microsoft Office suite including Microsoft Project). Core Training on Health Safety and Environment (HSE), Ardan Risk and Support Services Ltd. Basic Incidence Investigation Training Tullow Oil Kenya BV. Appointed Person for Lifting Operations Using Mobile Cranes (BS 7121, PUWER and LOLER), Main Port Training, UK. Experience spans work as Consultant, Contractor, Manufacturer and Supplier of engineering products (bio- digesters). Summary of Water and waste modelling experience: I have knowledge and experience on optimisation of hydraulic analyses using Bentley WaterGEMS® with GIS integration. I also have knowledge and experience on water distribution model building using geospatial data, facilities data, operational data and demand data, model calibration and simulation and establishment of District Metered Areas (DMAs). I have carried out water distribution network modelling both by Epanet and Bentley Water CAD software, including a few survey software for pipeline route data generation such as Lis CAD on projects in 5 towns water supply in Lesotho, 5 towns water supply under High Grand Falls Project (Bura and Garsen Cluster), Juba town and 7 state capitals in South Sudan. On waste water collection network modelling, I have extensive knowledge and experience on SewerCAD v8i computer model software which is an extremely powerful program for the design and analysis of gravity flow and pressure flow through pipe networks and pumping stations and can be run in AutoCAD mode, giving all the power of AutoCAD’s capabilities, or in Stand-Alone mode utilizing its own graphical interface. The most amazing experience I have had with the sewer network modelling software is on its simulation, results presentation and reporting platform. I have carried out sewer network modelling for Nairobi City under Samez and Mott MacDonald to verify effect of water network model during drought conditions, Kabarnet Town, Portland Cement Staff Residence, Siaya and Bondo Towns, 7 State Capitals South Sudan and Ol- kalau. Countries of Work Experience: Kenya, Tanzania, Lesotho, Rwanda, Malawi, Ethiopia and Southern Sudan Waste water treatment magazine subscription and visit/tour experience: South Africa and UAE Languages: Speaking Reading Writing English Excellent Excellent Excellent Kiswahili Good Good Good French Fair Good Fair

Upload: reuben-onunga

Post on 16-Jan-2017

65 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Reuben Onunga - CV October 2016

R ONUNGA 1 of 13 January 2016

CURRICULUM VITAE

Proposed Positon : Civil Engineer/Water Supply and Waste Water Expert

Name of Staff : Reuben Juma Onunga

Date of Birth : 1980

Nationality : Kenyan

Education: The University of Nairobi. Bachelor of Science Degree in Civil Engineering, 2005. On-going thesis for Master of Science Degree in Civil Engineering (Environmental Health Engineering) at the University of Nairobi.

Membership of Professional Associations: Approved and invited by ERB to present Registration Report (Report Preparation on-going) Registered Graduate Engineer, Engineers Registration Board (ERB), Kenya - member number B.4370; Graduate Member, Institution of Engineers of Kenya (IEK), member number G.3235.

Other Training Experienced in FIDIC and World Bank Conditions of Contract; Computer literate (AutoCAD, Bentley WaterCAD V8i and SewerCAD V8i, LISCAD, EPANET, and Microsoft Office suite including Microsoft Project). Core Training on Health Safety and Environment (HSE), Ardan Risk and Support Services Ltd. Basic Incidence Investigation Training – Tullow Oil Kenya BV. Appointed Person for Lifting Operations Using Mobile Cranes (BS 7121, PUWER and LOLER), Main Port Training, UK. Experience spans work as Consultant, Contractor, Manufacturer and Supplier of engineering products (bio-digesters).

Summary of Water and waste modelling experience: I have knowledge and experience on optimisation of hydraulic analyses using Bentley WaterGEMS® with GIS integration. I also have knowledge and experience on water distribution model building using geospatial data, facilities data, operational data and demand data, model calibration and simulation and establishment of District Metered Areas (DMAs). I have carried out water distribution network modelling both by Epanet and Bentley Water CAD software, including a few survey software for pipeline route data generation such as Lis CAD on projects in 5 towns water supply in Lesotho, 5 towns water supply under High Grand Falls Project (Bura and Garsen Cluster), Juba town and 7 state capitals in South Sudan. On waste water collection network modelling, I have extensive knowledge and experience on SewerCAD v8i computer model software which is an extremely powerful program for the design and analysis of gravity flow and pressure flow through pipe networks and pumping stations and can be run in AutoCAD mode, giving all the power of AutoCAD’s capabilities, or in Stand-Alone mode utilizing its own graphical interface. The most amazing experience I have had with the sewer network modelling software is on its simulation, results presentation and reporting platform. I have carried out sewer network modelling for Nairobi City under Samez and Mott MacDonald to verify effect of water network model during drought conditions, Kabarnet Town, Portland Cement Staff Residence, Siaya and Bondo Towns, 7 State Capitals South Sudan and Ol-kalau.

Countries of Work Experience: Kenya, Tanzania, Lesotho, Rwanda, Malawi, Ethiopia and Southern Sudan

Waste water treatment magazine subscription and visit/tour experience: South Africa and UAE

Languages: Speaking Reading Writing English Excellent Excellent Excellent Kiswahili Good Good Good French Fair Good Fair

Page 2: Reuben Onunga - CV October 2016

R ONUNGA 2 of 13 October 2016

Employment Record:

1. From: Sept 2016 to-date – Civil Engineer/Water and Waste water Expert/Deputy Team Leader

Employer: COWI/SAMEZ Joint Venture P.O. BOX 72398-00800 Hurligham, Nairobi, NRB

Positions Held: Project Engineer/Water and Waste Water Expert.

2. From: Sept 2014 to-Sept 2016 – Civil Engineer/Water and Waste water Expert.

Employer: SMEC International (Pty) Ltd P.O. BOX 14094-00800 Westlands, NRB

Positions Held: Project Engineer/Water and Waste Water Expert.

3. From: Dec 2013 to Aug 2014 – Civil Engineer/Water and Waste water Expert.

Employer: Nature Systems Kenya Ltd P.O. BOX 48-00200 Karen, NRB

Positions Held: Technical Manager/Water Supply and Waste Water Expert.

4. From: March 2013 to Nov 2013 – Civil Engineer/Water and Waste water Expert.

Employer: Ardan/Nature Systems Kenya Ltd P.O. BOX 48-00200 Karen, NRB

Positions Held: Civil Engineer Ardan/Head Engineer Nature Systems Kenya Ltd.

5. From: September 2012 to February 2013 – Civil Engineer/Water and Waste water Expert.

Positions Held: Civil Engineer /Water and Wastewater Expert/Individual Consultant to SMEC

International Pty and Batiment Engineering Associates.

6. From: July 2012 to September 2012

Employer: Design MasterPlan Limited (Engineering Consultants) P.O. BOX 58438-00200 NRB

Positions Held: Senior Civil Engineer/Water and Sanitation Expert/HoD

7. From: August 2011 to June 2012

Employer: REMKA Engineering Construction/Consultancy Limited (owned) P.O. BOX 2191 -00100 NRB

Positions Held: Managing Director/Water and Sanitation Engineer and Individual Consultant to Samez

and Mott Macdonald JV, Samez Engineering Consultants, Benchmark Engineering Consultants,

Batiment Engineering Consultants and Technofab Engineering Ltd.

8. From: October 2005 to August 2011

Employer: GIBB Africa Limited P.O. BOX 30020-00100 NRB

Positions Held: Graduate Engineer/ Assistant Engineer (Design), Deputy Resident Engineer/ Resident Engineer/Design Engineer (Projects Supervision)

9. From: 2004-2005

Employer: Ministry of Roads, Public Works and Housing, Kenya/ University of Nairobi (Civil and Construction Engineering Department)

Positions Held: Student Engineer (Training)

Work Undertaken that Best Illustrates Capability

Name of assignment of project: Consultancy Services for Integrated Sanitation Management Plan for Nairobi and Selected Satellite Towns (Limuru, Karuri, Kiambu, Kikuyu, Ngong, Ongata Rongai, Mavoko (Athi River, Kitengela and Mlolongo).

Year: October 2016 – to date

Location: Kenya

Client: Athi Water Services Board

Main project features:

To identify the most appropriate sanitation services for all populated and greenfield urban areas by evaluating different sanitation options

Prepare an Investment Programme for Immediate Urgent Works (IUWP) for 2016-2020, including preliminary and detailed design and tender documents for the rehabilitation of existing sewers and sewage treatment plants

Page 3: Reuben Onunga - CV October 2016

R ONUNGA 3 of 13 October 2016

To prepare a phased investment programme for the construction of new trunk sewers and secondary sewer networks over a twenty-five-year planning period

To prepare a phased investment programme for providing new, and for increasing the capacity of existing, wastewater treatment facilities over a twenty-five-year planning period

To carry out industrial effluent surveys in Nairobi and the Satellite Towns and to review the current pollution control strategies for industrial discharges

To review the feasibility study report prepared by AWSB and recommend a treated effluent and sludge disposal/reuse strategy for the effluent from Dandora WWTP in Nairobi

To review septic sludge management from on-site facilities and recommend adequate septic sludge management schemes and required investments and changes to the regulatory framework at national and county level

To prepare different options for financing the Integrated Sanitation Management Plans

Positions held: Waste Water Engineer/Hydraulic Modeller/Deputy Team Leader

Activities performed:

Task T0: Project management and Stakeholder Consultation

Immediate Urgent Works

Task T1: Review of previous studies and data collection

Task T2: Urgent works for existing wastewater facilities

Medium and Long-term Works

Task T5: Urban planning and wastewater flow prediction

Task T6: Sewer network analysis

Task T7: Wastewater treatment requirements and effluent sludge disposal / reuse

Task T8: Sewerage investment programme

Task T9: Preliminary design report for medium term works and phased investment schedule

Task T10: Conceptual design of long term works

Task T11: Preliminary environmental and social impact assessment and RAP for the medium term

investment works

Integrated Sanitation Management Plan Task T13: Sewerage Strategy and Staging Plan Task T14: Verification of the Preferred Sewerage Development Strategy Task T15: Economic and Financial Analysis

Main Project Deliverables

› Inception Report

› Report on Condition Surveys and Environmental Audit of Existing Facilities

› Immediate Urgent Works Programme Report

› Immediate Urgent Works Programme Tender Documents

› Sewerage Development Strategic Framework

› Assessment of Institutional Framework and Review of Sewerage Management Arrangement

› Report on Results of the Sewerage Network Analysis

› Preliminary Design Report for Stage I Works including the Phased Investment Schedule for Sewers and Wastewater Treatment

› Preliminary Environmental Impact Assessment Report for Interventions / Projects included under the Preliminary Design Report

› Integrated Sanitation Management Plan Report

› Management Reports: (i) Bi-monthly Progress Reports, and (ii) End of Assignment proceedings

Name of assignment of project: Kenya Informal Settlements Improvement Project, Machakos County

Year: December 2014 – to date

Location: Kenya

Client: KISIP/Ministry of Lands Housing and Urban Development

Page 4: Reuben Onunga - CV October 2016

R ONUNGA 4 of 13 October 2016

Main project features:

Design Review for Water Supply and Sanitation

Supervision of Physical Works (Roads, Flood Lighting and Water Supply and Sanitation)

Contract Administration

Positions held: Resident Engineer/Water Supply and Sanitation Expert

Activities performed: Inception Report, Detailed Design Review, Project Technical and Financial Appraisal, Construction supervision, Reporting and General Contract Administration, and Preparation of Operation and Maintenance Manuals

Name of assignment of project: Tullow Social Investment Water Supply Project, Kisumu County

Year: September 2014 – November 2014

Location: Kenya

Client: Tullow Oil Kenya BV

Main project features:

Feasibility studies

Design of community water supply systems in Kisumu County

Preparation of tender documents and construction supervision

Positions held: Water Supply and Sanitation Expert

Activities performed: Feasibility studies, Design, drawings, reporting, bill of quantities, tendering, construction supervision and operation and maintenance manuals

Name of Assignment or Project: Installation of package domestic waste water treatment plants for

Tullow Oil Kenya BV in Northern Kenya namely: Twiga South 1 (35m3/day), Ngamia 1 (60m3/day),

Etuko (30m3/day), Ekales (30m3/day) and Agete (30m3/day) and design and construction of borehole water supply to oil drilling rig sites.

Year: March 2013 – to date

Location: Republic of Kenya

Client: Tullow Oil Kenya BV.

Main Project features:

Design and installation of septic tanks;

Design and installation of balancing tanks;

Design and installation of bio-reactors;

Design and installation of clarifiers;

Design and installation of chlorine contact tanks;

Design and construction of eco plantation with nyme and cordial trees using drip irrigation for disposal of treated effluent;

Design and construction of 20km DN 75 and 90 HDPE clean water supply pipeline.

Position Held: Responsibility of Water Transmission and Waste Water Treatment Design and Installation.

Output of Activities Being Performed: Detailed Design, fabrication and construction drawings, design reports, bill of quantities, quotations, construction supervision, as built drawings and O&M manuals.

Name of Assignment or Project: Water Resources Assessment, Feasibility Studies, Survey, Detailed

Design and Tender Documentation for 4 towns (State Capitals) in Southern Sudan namely: Bor

(Jonglei State), Rumbek (Lake State), Bentiu (Unity State) and Kuajok (Warrap State).

Year: September 2012 – February 2013

Page 5: Reuben Onunga - CV October 2016

R ONUNGA 5 of 13 October 2016

Location: Republic of Southern Sudan

Client: Ministry of Water Resources and Irrigation (MWR&I)

Main Project features:

Bor (Jonglei State), population 100,000 persons

Design of Surface water treatment works 15,000m3/day;

Design of Surface water Intake Works 15,000m3/day;

Design of Treated Water Rising Mains DN 600 to DN700;

Design of storage reservoirs 2,500m3 to 5000m3;

Design of distribution lines and analysis of distribution network;

Design of on site sanitation facilities;

Design of Wastewater Stabiliation ponds 7000m3/day;

Design of constructed wetlands;

Design of sanitary landfill sites and corresponding O&M equipment 20 year design horizon.

Rumbek (Lake State), population 70,534 persons

Design of Wellfield with 14 boreholes capacity 15,000m3/day;

Design of collector station at the wellfield and corresponding treatment facilities.

Design of Treated Water Rising Mains DN 600 to DN700;

Design of storage reservoirs 2,500m3 to 5000m3;

Design of distribution lines and analysis of distribution network;

Design of on site sanitation facilities;

Design of Wastewater Stabiliation ponds 7000m3/day;

Design of constructed wetlands;

Design of sanitary landfill sites and corresponding O&M equipment 20 year design horizon.

Bentiu and Rubkona (Unity State), population 95,000 persons

Design of Surface water treatment works 15,000m3/day;

Design of Surface water Intake Works 15,000m3/day;

Design of Treated Water Rising Mains DN 600 to DN700;

Design of storage reservoirs 2,500m3 to 5000m3;

Design of distribution lines and analysis of distribution network;

Design of on site sanitation facilities;

Design of Wastewater Stabiliation ponds 7000m3/day;

Design of constructed wetlands;

Design of sanitary landfill sites and corresponding O&M equipment 20 year design horizon.

Kuajok (Warrap State), population 60,000 persons

Design of Wellfield with 7 boreholes capacity 7,500m3/day;

Design of collector station at the wellfield and corresponding treatment facilities.

Design of Treated Water Rising Mains DN 300 to DN400;

Design of storage reservoirs 2,500m3 to 5000m3;

Design of distribution lines and analysis of distribution network;

Design of on site sanitation facilities;

Design of Wastewater Stabiliation ponds 3,000m3/day;

Design of constructed wetlands;

Design of sanitary landfill sites and corresponding O&M equipment 20 year design horizon.

Position Held: Responsibility of Water and Sewerage Detailed Design and Tender Documentation

Output of Activities Being Performed: Detailed designs, Tender drawings, reporting, other tender documents preparation namely bill of quantities, conditions of contract and specifications both for red book and yellow book contracts.

Name of Assignment or Project: Survey, Detailed Design, Tender Documentation and Tender

Evaluation of Siaya and Bondo Water Supply and Sanitation Project

Year: July 2012 – September 2012

Page 6: Reuben Onunga - CV October 2016

R ONUNGA 6 of 13 October 2016

Location: Kenya

Client: Lake Victoria South Water Services Board (LVSWSB)

Main Project features:

Rehabilitation of Sidindi Malanga Water Supply Intake Works;

Replacement of 280m long DN 450 raw water main;

Construction of 10,915m3/day new water treatment plant and Augmentation of existing 7,310m3/day WTP at Sidindi Malanga Intake;

Provision and installation of 5No. Hydro turbines complete with pumping units (Q=145m3/hr H=126m) including 2No. electrical standby units;

Laying of parallel DN 450 steel rising main 3.57km long to Nyamninia tank;

Laying of DN 450/350 steel transmission main from Nyamninia tank to Siaya and Bondo towns (46km);

Construction of 1No 1000m3 and 2No 3000m3 storage tanks at Ngiya, Gobei and Sinaga;

Laying of 48km DN 315/160 uPVC distribution pipelines in Siaya and Bondo towns;

Laying 20km precast concrete sewer pipes;

Construction of waste stabilization ponds consisting of exhauster tanker discharge bay, inlet works, 2No anaerobic ponds, 1No facultative pond, 1No maturation pond and associated civil works including utility building, access roads, security fence, drainage works and associated site water supply and sewerage works for each of the two towns (Siaya and Bondo).

Position Held: Responsibility of Water and Sewerage Design and Tender Documentation and Evaluation of Bids

Output of Activities Being Performed: Detailed design, reporting, tender documents preparation, and tender evaluation and recommendation for award.

Name of Assignment or Project: Various Water Supply and Sewerage Design and Construction Projects including:

Nairobi City Sewerage Network Modeling. -Network modeling and analysis of Nairobi city sewer system using Bentley SewerCAD V8i

Kabarnet Town Detailed Sewerage Design. -Detailed design and preparation of tender documents for sewage collection and treatment, with treatment capacity of 3,000m3/day.

Grand Falls Project.

-Detailed design and tender documentation for Bura Tana and Garsen Cluster water supply

project, with intake on River Tana and supplying four towns including Ngao, Golbanti, Garsen and

Tarassa). Output included detailed design, drawings and tender documents for floating pontoon intake works, water treatment plant and pumping station, transmission lines and storage tanks.

Civil Works for Diamond Ocean Resort. -Detailed design and preparation of quantities for sewerage collection and package treatment system.

Detailed Design of Ol Kalau Sewerage System. - Detailed design and preparation of tender documents for sewage collection and treatment, with treatment capacity of 3,000m3/day.

Civil works Manager for Allana Potash, Ethiopia on behalf of Ardan Ltd for construction of infrastructure for Solution Mining of Potash in Dallol, the Danakil Depression, Northern Ethiopia.

Year: August 2011 to June 2012

Location: Kenya and Ethiopia

Position Held: Managing Director/Civil Engineer/Water and Sewerage Design/Consultant to Samez and Mott Macdonald JV, Samez Engineering Consultants, Benchmark Engineering Consultants, Batiment Engineering Consultants and Technofab Engineering Ltd.

Name of Assignment or Project: Construction of Dandora Sewage Treatment Plant Works and Reconstruction of Ngong River Trunk Sewers Project

Page 7: Reuben Onunga - CV October 2016

R ONUNGA 7 of 13 October 2016

Year: October 2009 – August 2011

Location: Kenya

Client: Athi Water Services Board (AWSB)

Main Project features:

Replacement of 4.6 km length of 675mm, 750mm and 825mm diameter S&S jointed precast concrete pipes;

Rehabilitation of 24km Ngong River trunk sewers (DN 915 and 1200) including unblocking, cleaning, repairing and replacement of damaged short sections, reconstruction of collapsed aerial crossings, exposing and raising buried manholes, transfer of laterals from the non-operational Ngong River Trunk Sewer Phase I to the Southern Outfall within Mukuru slums and Kayole Estate, replacement of top slabs and manhole covers;

Desludging of existing facultative and maturation ponds series 7 & 8 at the Dandora Sewage Treatment Plant, including removal and disposal of approximately 430,000 m3 of sludge;

Preparation and maintenance of sludge holding lagoons

Construction of six anaerobic ponds prior to series 1 & 2 and series 7 & 8 each dimensions 120m by 90m by 4.5 m deep including earthworks of approximately 200,000m3.

Construction of associated reinforced concrete works of approximately 3,000m3 for wave erosion protection slabs, inlet and outlet channels, drainage chambers, access ramps, inlet and outlet chambers, drainage platforms and ancillary 3No penstocks 1400mm by 100mm and 1 No. 1000mm by 1000mm;

Modification to existing flow division flumes;

Site storm water drainage works including cleaning of existing 2.5km long storm water drainage channel and

Supply of operation and maintenance equipment.

Position Held: Deputy Resident Engineer

Output of Activities Being Performed: Deputy Resident Engineer for the works supervision contract; in charge of the sewer rehabilitation works including reconnaissance and confirmation of sewer route survey, costing and reporting; in charge of site safety and environment protection issues and assisting the Resident Engineer in overall site supervision and contract management.

Name of Assignment or Project: Construction of Gatharaini Trunk Sewers Project (Tender Evaluation and Recommendation for Award and Preparation of Contract Documents).

Year: 2009

Location: Kenya

Client: Athi Water Services Board (AWSB)

Main Project features:

Construction of approximately 49Km of precast concrete sewers of various sizes ranging from 300 to 1200mm;

Construction of 1.4Km box culvert (1400 x 1400mm), manholes and other auxiliary works;

The works site consisted of Ruai, Gatharaini South and North; Clay works and Ruaraka;

Position Held: Civil Engineer

Output of Activities Being Performed:

Undertook the Tender Evaluation and Recommendation for Award and Preparation of Contract Documents for the above project.

Name of Assignment or Project: ESIA for Extension of Olkaria Phase 1 & 4 & New Olkaria Domes

(Phase 5) Project

Year: 2009

Page 8: Reuben Onunga - CV October 2016

R ONUNGA 8 of 13 October 2016

Location: Kenya

Client: Kenya Electricity Generation Company (KenGen)

Main Project features:

ESIA

Position Held: Civil Engineer

Output of Activities Being Performed:

Undertook a desk study for purposes of the ESIA in line with the projects terms of reference.

Outlined all the civil works scope and carried out data collection for the project’s civil components;

Participated in the consultative meetings on the project issues with the Client and the affected community;

Participated in preparation of draft and final reports and relevant figures/drawings for the ESIA and advised on the assessment of all civil works components.

Name of Assignment or Project: Shinyanga Water Supply & Sewerage Project

Year: 2009

Location: Tanzania

Client: Shinyanga Urban Water Supply & Sewerage Authority (SHUWASA

Main Project features:

Detailed Engineering Design, Preparation of Tender Documents of the Sewerage System and Water Supply Network Expansion for Shinyanga Municipality and Detailed Engineering Design, Tender Document Preparation for Water Supply for Maswa and Kishapu Townships, Kahama and Ushirombo

Position Held: Assistant Design Engineer

Output of Activities Being Performed:

Participated in water demand data collection;

Participated in preliminary designs, production of drawings and cost estimates;

Involved in the on-going detailed designs and preparation of tender documents.

Name of Assignment or Project: Sasumua Dam Rehabilitation

Project, Kenya (AFD funded). Works value 2 billion KShs.

Year: 2009

Location: Kenya

Client: Athi Water Services Board (AWSB)

Main Project features: Sasumua Dam has the following characteristics:

Constructed: 1957;

Location: 75km north of Nairobi;

Catchment area = 110km2;

Type: 30metre high embankment dam with riprap face;

Spillway capacity = 450m3/sec;

Water storage = 15Mm3;

Treatment plant capacity = 65,000m3/day. The spillway had failed and the entire dam, spillway and draw-off works required rehabilitation, as it is a strategic water source for the City of Nairobi. Scope of Works:

Demolition of existing concrete slabs forming the spillway channel;

Excavation of soil within the damaged spillway basin to bedrock (25m of delicate soft soil excavation);

Page 9: Reuben Onunga - CV October 2016

R ONUNGA 9 of 13 October 2016

Pouring of mass concrete so as to provide a sub horizontal platform to found the new concrete spillway blocks and walls, basin, downstream weir, chute and ski jump;

Restoration of a diaphragm wall in the soil foundation upstream of the rehabilitated structures;

Rehabilitation of the dam by rip rap protection improvement, crest levelling and adaptation of existing emergency structures including closure of the temporary channel by an earth fill dam and partial removal of the cofferdam;

Restoration of existing instrumentation system, with additional installation of new instruments in the dam and the spillway and rehabilitation of left bank access road.

Positions Held: Acting Resident Engineer

Output of Activities Being Performed:

The Acting Resident Engineer on the supervision and contract management for the Rehabilitation of Sasumua Dam Project and instrumentation of three dams viz Sasumua, Ruiru and Thika Dams.

Name of Assignment or Project: Kahama–Shinyanga Water Supply Project, Customer Connection to the New Distribution System, Tanzania.

Year: 2009

Location: Tanzania

Client: Shinyanga Water Supply & Sewerage Authority (SHUWASA)

Main Project features:

Service connections, metering and procurement of billing software and operation and maintenance tools;

2,400 customer connections in Shinyanga municipality;

2,400 customer connections in Kahama town.

Positions Held: Resident Engineer

Output of Activities Being Performed:

Resident Engineer for supervision of the works which were being executed by two Tanzanian Contractors, contract management and Client liaison for the projects.

Name of Assignment or Project: Emergency Rehabilitation Works in Juba, Water Supply and Sanitation Design and Supervision, Southern Sudan (MDTF Funded). Works value US$20million

Year: 2008 - 2009

Location: Southern Sudan

Client: Government of Southern Sudan (GoSS)

Main Project features:

Water supply serving existing population of 250,000. Rehabilitation of intake on River Nile, existing treatment plant (7,000m3/day capacity), pumping mains, supply and installation of package water treatment plants, new reinforced concrete water tower, supply and laying of distribution pipe work and remaking service connections;

Assessing of water sources needs (options including boreholes, rivers, lakes and drains) – 2010 forecast population 750,000 with water demand of 56,250m3/day, pipe network modelling and water supply design throughout the city;

Design and construction of 4,750m DN300 steel pipeline EN 10224-L235-323.9x3.2 with fusion bonded epoxy coating and lining and push-fit joints, EN 805 design pressure DP 6.3 bar, maximum design pressure MDPc 7.6 bar;

Undertaking leak detection and repairs and provision of 2,045 customer service connections

Provision of solid waste collection bays, handling facilities, and a sanitary landfill site;

Provision of a modern abattoir complete with all electromechanical equipment;

Provision of on-site sanitation, handling facilities and sewage treatment works and other miscellaneous works;

Page 10: Reuben Onunga - CV October 2016

R ONUNGA 10 of 13 October 2016

Assessment of institutional capacity and needs.

Positions Held: Assistant Engineer/Assistant Resident Engineer/ Acting Resident Engineer

Output of Activities Being Performed:

Assistant Resident Engineer and Acting Resident Engineer for supervision of the works, contract management, Client liaison and capacity building for GoSS seconded Engineers;

Assistant Engineer during design stage involved in: design and quantities for the solid waste collection bays, operations buildings, security fences and guardhouses for the solid waste management component, overall arithmetic checks, Contractor’s staff proposals, organisation and mobilization reviews during tender evaluation and compilation of the contract documents.

Name of Assignment or Project: Sasumua Dam Emergency Measures (SDEM), Kenya

Year: 2007-2008

Location: Kenya

Client: Athi Water Services Board (AWSB)

Main Project features:

Construction of about 15m high earth fill cofferdam with a secant bored pile wall curtain;

Construction of an emergency earth spillway channel with a cyclopean and classic concrete weir dimensioned for an out flow of between 200 and 400m3/sec, 70 to 100m wide, corresponding to a routed flood with return period of between 200 years and 5000 years;

Demolition of part of the damaged reinforced concrete spillway and use of the broken blocks on the cyclopean concrete weir and the spillway channel inflow and outflow section’s stone pitching.

Positions Held: Construction Supervisor/Assistant Resident Engineer/Acting Resident Engineer

Output of Activities Being Performed:

Construction Supervisor and Assistant Resident Engineer for the supervision and contract management of the emergency works.

Supervision of material testing, inspections and approvals, construction, measurements, daily reporting, surveying for setting out and monitoring levels and slopes, photographic records, preparation of site meetings minutes, assigned correspondences, certification of payments and preparation of project completion reports.

Name of Assignment or Project: 9 Towns Emergency Works Programme Southern Sudan, Design and Tender Documentation for Water & sewerage projects, Southern Sudan

Year: 2006

Location: Southern Sudan

Client: Government of Southern Sudan (GoSS)

Main Project features:

Design and tendering for works in the following towns: Juba, Wau, Aweil, Bentiu, Rumbek, Bor, Torit, Malakal, and Yambio;

Rehabilitation of existing intakes and treatment plant, network modeling and re-design of water supply network with provision of additional storage;

Provision of solid waste collection facilities and construction of a sanitary landfill site;

Provision of emergency water supply works;

Provision of sewage treatment facility, on-site sanitation, public toilets and other miscellaneous works;

Assessment of water sources needs (options including boreholes) – 2010 forecast populations;

Assessment of institutional capacity and needs.

Positions Held: Assistant Engineer/Graduate Engineer

Output of Activities Being Performed:

Detailed design of conventional sewers and the low cost, slow velocity, small bore sewer systems for the nine towns, with tender documentation to CESMM 3 standard.

Water reticulation analysis for the Juba extended works, for the population of at least 200,000 persons with an average daily water demand of 10,000 m3. The analysis was done using the 500 pipe capacity

Page 11: Reuben Onunga - CV October 2016

R ONUNGA 11 of 13 October 2016

water CAD software;

Site layout development for the 20,000m3 ground circular RC reservoir and the 250m3 pressure water tower for the above water supply scheme.

Name of Assignment or Project: Feasibility study and preliminary design of water supply and

sanitation systems for five towns, Lesotho (BADEA Funded)

Year: 2006

Location: Lesotho

Client: Water Supply and Sanitation Authority (WASA)

Main Project features:

Feasibility studies for the expansion of water supply and sanitation services in the towns of Butha Buthe, Hlotse, Mohale's Hoek, Mafeteng and Quacha's Nek;

Preparing a project memorandum to secure donor funding for project implementation;

Preparing tender documents for the expansion of water treatment facilities in Butha Buthe.

Positions Held: Assistant Engineer/Graduate Engineer

Output of Activities Being Performed:

Water-CAD analysis for the water supply networks for the 5 towns in Lesotho, namely Butha Buthe, Hlotse, Mafeteng, Mohale’s Hoek, and Qacha’s Nek;

Sewer reticulation designs for the five towns, and siting of wastewater stabilization ponds for each of the 5-towns;

Preparation of bill of quantities for water supply transmission and distribution, to SABS 1200 standards for purposes of preparation of the draft tender documents for the water supply and sanitation for the above towns.

Name of Assignment or Project: Design and Supervision of Construction of Small-scale Irrigation

Schemes (Horticulture & Food Crops Development Project), Malawi

Year: 2006

Location: Malawi

Client: Ministry of Irrigation and Water development

Main Project features:

Field activities including:- water resources assessment, topographical survey, land use and agricultural capacity assessment, participatory irrigation design;

Preliminary designs;

Detailed designs and preparation of tender documents;

Pre-feasibility report and stakeholder workshop;

Assisting the Client during tendering period;

Construction supervision of 22 schemes.

Positions Held: Assistant Engineer/Graduate Engineer

Output of Activities Being Performed:

Detailed design of 5-circular reinforced concrete water storage tanks, each of capacity 800m3, for the schemes of Mpatsanjoka and Katumba in Malawi;

Design and arrangement of 16no. Boreholes and intake pipe systems, corresponding transmission lines and tank inlet, outlet, overflow and scour pipe and other fitting systems, with tender documentation to CESMM 3 standard.

Name of Assignment or Project: 11 Towns Infrastructure Masterplan, Southern Sudan

Year: 2005-2006

Page 12: Reuben Onunga - CV October 2016

R ONUNGA 12 of 13 October 2016

Location: Southern Sudan

Client: Government of Southern Sudan

Main Project features:

The implementation, planning and logistics for the entire project;

Development of the available satellite imagery into layered mapping;

Carrying out the fieldwork and preparing inventories of the “status quo” for infrastructure;

Determining the infrastructure requirements of the urgent short-term situation and for future planning, including water supply, sanitation, power supply, roads, drainage and transportation.

Positions Held: Assistant Engineer/Graduate Engineer

Output of Activities Being Performed:

Processing of water and sanitation status data gathered from the field and preparation of “status quo” reports;

Review of emergency infrastructure works reports for the water and sanitation component, prepared by other Engineers for the following towns of Southern Sudan: Bor, Aweil, Rumbek, Yambio, and Kapoeta.

Preliminary design of wastewater stabilization ponds, supervision of preparation of the design drawings and preliminary cost estimates for the emergency works.

Name of Assignment or Project: Redevelopment of Tana Power Station, Kenya

Year: 2006

Location: Kenya

Client: Kengen

Main Project features:

Rehabilitation of Tana power station, studies, design and supervision.

Positions Held: Assistant Engineer/Graduate Engineer

Output of Activities Being Performed:

Preparation of take offs and bill of quantities for the Redevelopment of Tana power station for the following items: powerhouse, sub-station, access roads, wing walls, drainage and septic tanks, for purposes of preparation of Engineer’s estimates.

Name of Assignment or Project: Mid Term Review and Investment Plan for NWSIRP, Athi Water Services Board, Kenya

Year: 2006

Location: Kenya

Client: Athi Water Services Board

Main Project features:

Review of Nairobi Water and Sewerage Institutional Restructuring Project;

Water resources and sanitation assessments;

Identification of Investment priorities for potential funding for the various water schemes;

Project documents review;

Identification of water expansion schemes for the various areas within AWSB’s areas of jurisdiction (Machakos, Kitui, Namanga, Ruiru, Kiambu, Thika, Mavoko, Kajiado, Rongai etc).

Positions Held: Assistant Engineer/Graduate Engineer

Output of Activities Being Performed:

Page 13: Reuben Onunga - CV October 2016

R ONUNGA 13 of 13 October 2016

Establishment of the omitted levels and chainages for a 98km water pipeline profile, for purposes of water supply pipe design for the Mid Term Review for the Athi Water Services Board, for their Investment Plan;

Review of various documents including, Nairobi satellite towns water and sewerage infrastructure rehabilitation project - feasibility report and Thika sewerage masterplan, for purposes of a mid term review for the Athi Water Services Board’s (AWSB), Investment Plan.

Name of Assignment or Project: Various/Others

Year: 2004-2005

Location: Kenya

Client: Various

Main Project features:

Proposed House for Mr. & Mrs. Mumina at Hardy Estate, Karen - detailed design of the septic tank and percolation trench for the on-site disposal of wastewater within the household plot at Hardy;

Proposals and Expressions of Interest - several water supply and sanitation, irrigation and environment works for GIBB Africa Ltd;

Bearing Capacities and Expansive pressures of black cotton soils, Eastland - Nairobi, Kenya - site work and laboratory testing of black cottons soils in Umoja and Tena Estates;

Kisian-Bondo Road, Resident Engineer’s Office – Ministry of Roads, Public Works and Housing,

Kenya - internship

Positions Held: Assistant Engineer/Graduate Engineer/Student Engineer

Output of Activities Being Performed:

Performed a standard percolation test on the Hardy Estate, Karen site and did a detailed design of the septic tank and leaching trench;

Preparation of expressions of interest and compilation of proposals, for several projects in water supply and sanitation, irrigation and environment;

Site work and laboratory testing of black cottons soils in Umoja and Tena Estates and successfully submitted a report on the same for the award of degree in the department of Civil Engineering at the University of Nairobi;

During internship, involved in works measurements for the Resident Engineer’s office and broadly survey in field, material testing at the Kisumu Ministry of Roads, Public Works and Housing’s Laboratory, for soils, concrete, and bitumen. Other tasks included: material stabilization inspection, culvert construction inspection, earthworks site inspection, road surfacing inspection and field density tests on compacted road layers.

Certification:

I, the undersigned, certify that to the best of my knowledge and belief, these CV correctly describes myself, my qualifications and my experience. I understand that any wilful misstatement described herein may lead to my disqualification or dismissal, if engaged

11/10/2016 ________________________________________________ Date: __________________ Signature of staff member Day/Month/Year