retractable techniques in fibre optic infrastructures Öner Özemre – telecom sales regional...

17
Retractable Techniques in fibre optic infrastructures Öner Özemre – Telecom Sales Regional Manager TLC 19 th – 20 th April 2012

Upload: arthur-cox

Post on 18-Jan-2016

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Retractable Techniques in fibre optic infrastructures Öner Özemre – Telecom Sales Regional Manager TLC 19 th – 20 th April 2012

Retractable Techniques in fibre optic infrastructures

Öner Özemre – Telecom Sales Regional Manager TLC

19th – 20th April 2012

Page 2: Retractable Techniques in fibre optic infrastructures Öner Özemre – Telecom Sales Regional Manager TLC 19 th – 20 th April 2012

2CASPIAN Telecom – Istambul | 19th – 20th April 2012

The Installer dream….

Page 3: Retractable Techniques in fibre optic infrastructures Öner Özemre – Telecom Sales Regional Manager TLC 19 th – 20 th April 2012

3CASPIAN Telecom – Istambul | 19th – 20th April 2012

(Typical 20 m) Step 2On the subscriber’s floor pull back the

selected fibre module

Step 1On a higher floor cut

the selected fibre module

Optical LineTermination

The Stripping Tool has been designed to safely cut the windows on the Riser Cable.

If used properly, it cannot damage the fibre units.

2nd window cut: “extraction

window”

1st window cut: “pick window”

The basic principle

Page 4: Retractable Techniques in fibre optic infrastructures Öner Özemre – Telecom Sales Regional Manager TLC 19 th – 20 th April 2012

4CASPIAN Telecom – Istambul | 19th – 20th April 2012

5 Easy Steps

LAY the RetractaCable from Distribution Point along the Homes.

OPEN the RetractaCable in front of the homes to connect.

CUT the desired fibre module in the first next (from DP) opened cable spot.

PULL the cut fibre module out (retract), in case the length is > 50 meter a tool can be used for retracting, storage and pushing or blowing.

PUSH and/or BLOW the retracted fibre module through a drop duct up to the home.

1 LAY

2 OPEN

5 PUSH/BLOW

3 CUT

4 PULL

The basic principle

Page 5: Retractable Techniques in fibre optic infrastructures Öner Özemre – Telecom Sales Regional Manager TLC 19 th – 20 th April 2012

5CASPIAN Telecom – Istambul | 19th – 20th April 2012

Cutting tools to perform a window cut to access the modules

Specific tools

Page 6: Retractable Techniques in fibre optic infrastructures Öner Özemre – Telecom Sales Regional Manager TLC 19 th – 20 th April 2012

6CASPIAN Telecom – Istambul | 19th – 20th April 2012

Picking tool to cut the module inside the cable at 1.5m

from the jacket window

Specific tools

Page 7: Retractable Techniques in fibre optic infrastructures Öner Özemre – Telecom Sales Regional Manager TLC 19 th – 20 th April 2012

7CASPIAN Telecom – Istambul | 19th – 20th April 2012

The basic principle

Two ways to extract fibre modules

• Cut the fibre module one home further and splice the fibres in the home.

• Cut the fibre module 1.5m from the home and splice the fibres at the tap-off point

Page 8: Retractable Techniques in fibre optic infrastructures Öner Özemre – Telecom Sales Regional Manager TLC 19 th – 20 th April 2012

8CASPIAN Telecom – Istambul | 19th – 20th April 2012

Designed for Indoor and OSP

Reduction of 15 to 30% on installation time

Extremely Compact (i.e. 720fo cable with 16mm O.D.)

No cable loop, very small closures, prefab. manholes

Ideal for installation in existing / new duct infrastructures

or in soft soil.

The simplicity of the concept reduces the need for skilled

labour

Extremely efficient in both brownfield & greenfield sites

G.657A2/B2 fibres

Retractable solutions

Page 9: Retractable Techniques in fibre optic infrastructures Öner Özemre – Telecom Sales Regional Manager TLC 19 th – 20 th April 2012

9CASPIAN Telecom – Istambul | 19th – 20th April 2012

Riser layout Drop layout Termination layout

Splices Protection within of the corrugated tube

Application : Indoor duct

Page 10: Retractable Techniques in fibre optic infrastructures Öner Özemre – Telecom Sales Regional Manager TLC 19 th – 20 th April 2012

10CASPIAN Telecom – Istambul | 19th – 20th April 2012

Application : Indoor generic

Page 11: Retractable Techniques in fibre optic infrastructures Öner Özemre – Telecom Sales Regional Manager TLC 19 th – 20 th April 2012

11CASPIAN Telecom – Istambul | 19th – 20th April 2012

SRO : Sub Optical Splitter

1:16 Clamar street

Buildings to serve

Manhole

Application : Underground Duct

Page 12: Retractable Techniques in fibre optic infrastructures Öner Özemre – Telecom Sales Regional Manager TLC 19 th – 20 th April 2012

12CASPIAN Telecom – Istambul | 19th – 20th April 2012

Application : Underground Duct

Page 13: Retractable Techniques in fibre optic infrastructures Öner Özemre – Telecom Sales Regional Manager TLC 19 th – 20 th April 2012

13CASPIAN Telecom – Istambul | 19th – 20th April 2012

Application : Underground Duct

Page 14: Retractable Techniques in fibre optic infrastructures Öner Özemre – Telecom Sales Regional Manager TLC 19 th – 20 th April 2012

14CASPIAN Telecom – Istambul | 19th – 20th April 2012

At each splicing box, the selected modules are cut to be retracted over 1.5m and spliced to a drop cable for branching.

A

B

CD

Aerial splicing box

Drop cable for branching

Application : Aerial

Page 15: Retractable Techniques in fibre optic infrastructures Öner Özemre – Telecom Sales Regional Manager TLC 19 th – 20 th April 2012

15CASPIAN Telecom – Istambul | 19th – 20th April 2012

Application : Aerial

Page 16: Retractable Techniques in fibre optic infrastructures Öner Özemre – Telecom Sales Regional Manager TLC 19 th – 20 th April 2012

16CASPIAN Telecom – Istambul | 19th – 20th April 2012

Application : Direct Buried

Page 17: Retractable Techniques in fibre optic infrastructures Öner Özemre – Telecom Sales Regional Manager TLC 19 th – 20 th April 2012