NATIONAL ASSEMBLY FOR WRITTEN REPLY RESPONSES TO QUESTIONS RAISED DURING THE SCOA BRIEFING ON THE SPECIAL ADJUSTMENTS IN VOTE 41 (DEPARTMENT OF WATER AND SANITATION) CONVENED ON 16 JULY 2020 Contents 1. Report on Mount Ayliff project ............................................................................................. 1 2. Infrastructure projects and COVID-19 interventions ............................................................ 2 3. Human resources................................................................................................................ 8 4. Finance and expenditure matters .......................................................................................11 5. Investigations .....................................................................................................................14 6. Planning .............................................................................................................................15 7. Regulation..........................................................................................................................17

Upload: others

Post on 02-Feb-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • NATIONAL ASSEMBLY

    FOR WRITTEN REPLY

    RESPONSES TO QUESTIONS RAISED DURING THE SCOA BRIEFING

    ON THE SPECIAL ADJUSTMENTS IN VOTE 41 (DEPARTMENT OF

    WATER AND SANITATION) CONVENED ON 16 JULY 2020

    Contents

    1. Report on Mount Ayliff project ............................................................................................. 1

    2. Infrastructure projects and COVID-19 interventions ............................................................ 2

    3. Human resources ................................................................................................................ 8

    4. Finance and expenditure matters .......................................................................................11

    5. Investigations .....................................................................................................................14

    6. Planning .............................................................................................................................15

    7. Regulation ..........................................................................................................................17

    http://www.dwa.gov.za/

  • RESPONSES TO QUESTIONS RAISED DURING THE SCOA BRIEFING ON THE SPECIAL ADJUSTMENTS IN VOTE 41 (DEPARTMENT OF WATER AND SANITATION) CONVENED ON 16 JULY 2020

    1 | P a g e

    RESPONSES TO QUESTIONS RAISED DURING THE SCOA BRIEFING ON THE SPECIAL

    ADJUSTMENTS IN VOTE 41 (DEPARTMENT OF WATER AND SANITATION) CONVENED

    ON 16 JULY 2020

    Questions:

    1. Report on Mount Ayliff project

    For the last 4 years we went for oversight visit in Mt Ayliff – we saw corruption alive.

    Contract was R300k – you saved R166k and we realised there was corruption. We want

    detailed information on the matter. To date no report has been received from the

    department.

    Reply:

    The Nongwadla Water Scheme (WS) is in Alfred Nzo District Municipality and services Ngqane

    Village in Ward 16 of Ntabankulu Local Municipality. The project serves 216 people living in 43

    households. The project was implemented under the Municipal Water Infrastructure Grant

    (MWIG) during the 2013/14 financial year.

    The aim of the project was to refurbish an existing scheme that was no longer functional due to a

    broken spring protection. The Nongwadla Scheme was constructed by the O R Tambo District

    Municipality well before the Ntabankulu and Mbizana Local Municipality areas were demarcated

    to fall under the Alfred Nzo District Municipality in 2011 local Government Elections. The scheme

    was identified and considered as one of the low hanging fruits since the spring that was utilised

    as a source still had water though it was leaking at the time. The estimated project cost was

    R300 000 at the time of registration and business plan approval. However, the extent of damage

    to the existing infrastructure and repairs required to refurbish the spring and effect reticulation

    could not be quantified prior to the approval of the business plan. The Alfred Nzo District

    Municipality then registered a project under the Municipal Water Infrastructure Grant (MWIG),

    administered by the Department of Water and Sanitation (DWS).

    The Nongwandla WS project scope entailed development of the spring protection, recapturing of

    a spring eye and connecting to the existing system, rudimentary draw-offs (A stand tap was

    provided next to spring for the communities next to the spring) and construction of scour valve.

    The budget allocated to the project was R300 000 and the expenditure, in accordance with the

    scope of work done was R 133 238.30. A savings of R166 761.70 was shifted and spent on other

    projects.

    The Standing Committee on Appropriations visited the Nongwadla Project on 03 February 2015

    for their oversight work, almost a year after the project was completed. This visit was preceded

    by the visit by the Department of Water and Sanitation officials on 28 January 2015 who found

  • RESPONSES TO QUESTIONS RAISED DURING THE SCOA BRIEFING ON THE SPECIAL ADJUSTMENTS IN VOTE 41 (DEPARTMENT OF WATER AND SANITATION) CONVENED ON 16 JULY 2020

    2 | P a g e

    that there was erosion that had occurred and exposed a pipe below the spring protection which

    the Alfred Nzo DM was sensitized to attend to. When the Committee visited the area on 03

    February 2015, fresh concrete work was observed at the site. The fresh concrete work had been

    done, not as part of the project scope, but done by the Alfred Nzo DM to ensure that the exposed

    pipeline was covered.

    The full reports on the Nongwadla Scheme in Mount Ayliff is included as Annexures 1(a) 1(b)

    and 1(c)

    2. Infrastructure projects and COVID-19 interventions

    2.1 Water tankers on ground delivered but not delivered which was paid for

    Reply:

    The Department, with the assistance of the responsible Water Services Authorities took

    responsibility to monitor tanker services implemented as part of the COVID operations. In

    total about 10 Ml/d were carted by road totalling to 823 Ml/d (up until 12 July). There were

    truck break downs due to the challenging terrains to be navigated, vandalism, and other

    reasons reported as to why some tanks were not refilled in time, A but a concerted effort is

    underway to address these shortcomings up until 31 August when Phase 1 of th is

    intervention comes to an end.

    2.2 Process followed to award contract to Rand Water

    Reply:

    Rand Water as an entity of the DWS was appointed as per the Section 41 of the Water

    Services Act.

    2.3 What progress has been made by DWS with achievement of NDP targets and to

    what extent can COVID19 derail those targets?

    Reply:

    With the reprioritisation of grant funding to fund the COVID intervention, there are Regional

    Bulk Infrastructure Grant projects that were impacted upon in terms of curtailment of budget.

    There are no new projects planned to be started in the RBIG space for 2020/21, thus would

    the impact be limited to existing projects. The list of projects is attached as Annexure 2.

    2.4 Price charged per tank

  • RESPONSES TO QUESTIONS RAISED DURING THE SCOA BRIEFING ON THE SPECIAL ADJUSTMENTS IN VOTE 41 (DEPARTMENT OF WATER AND SANITATION) CONVENED ON 16 JULY 2020

    3 | P a g e

    Reply:

    The average cost per tank, including the stand construction or steel platform and plumbing

    is as follows:

    Tank size Average cost per tank

    2500 litre R6 436.85

    2700 litre R 7 158.69

    5000 litre R 9 854.15

    10000litre R 17 561.00

    2.5 Long-term plans to supply water to the unserved communities?

    Reply:

    COVID-19 Water and Sanitation Intervention Phase 2 will see most of these tanks be

    converted into rudimentary water supply schemes, connected to boreholes, springs or

    existing water mains, where possible. This will be a more sustainable form of water supply

    with the eventual goal of providing formalised water service as it is to form part of the

    Municipalities’ Water Services Development Plans.

    2.6 Are the tanks decontaminated regularly to prevent health problems?

    Reply:

    The Scientific Services of Rand Water fulfilled the duties of water quality monitoring

    oversight, whilst water quality management in municipalities is primarily responsible for the

    day to day assurance of SANS 241 compliance as the tanks are filled with water obtained

    from water treatment works managed by the municipalities that are Water Service

    Authorities (WSA).

    2.7 Provide list of companied awarded contracts to deliver water tanks and the

    value of contracts

    Reply:

    Please refer to Annexure 3 for the list of service providers and value of contracts.

  • RESPONSES TO QUESTIONS RAISED DURING THE SCOA BRIEFING ON THE SPECIAL ADJUSTMENTS IN VOTE 41 (DEPARTMENT OF WATER AND SANITATION) CONVENED ON 16 JULY 2020

    4 | P a g e

    2.8 Progress on the implementation of the Vaal River System Intervention Project

    Reply:

    DWS appointed the Ekurhuleni Water Care Company (ERWAT) for a period of 1 year to

    assist with the rehabilitation of the environmental damage caused by the compromised

    sewer systems in the area. This intervention’s successes to-date can be measured as:

    • 92% of 27.4km of sewer lines cleaned;

    • 50 tons of rubble removed from these lines;

    • Inflow into the Sebokeng WWTW increased from 18 Ml/d to 120 Ml/d;

    • Inflow into Rietspruit WWTW increased from 19 Ml/d to 43 Ml/d.

    There is still significant work to be done and the Departmental Construction unit is currently

    scoping the remainder of the work required for in-house capacity to be used to complete the

    project. The South African National Defence Force exited the project on 31 January 2020 and

    is no longer assisting with this intervention.

    2.9 Progress on Umzimvubu Project

    Reply:

    The Department of Water and Sanitation’s internal Construction Unit took site at Ntabelanga

    to commence with the advance infrastructure work (Roads and Offices), whilst the main

    Dam Construction funding model is being finalised with the assistance of National Treasury.

    The project also forms part of the Presidential Sustainable Infrastructure Development

    Symposium (SIDS).

    2.10 Progress on the Bucket Eradication Programme and associated challenges

    Reply:

    The Department has appointed its internal Construction Unit to undertake the construction of

    associated Bulk Infrastructure Services in Free State for the Bucket Eradication Projects (BEP)

    in Setsoto Local Municipality, Gift of the Givers in Nketoane Local Municipality and Tokologo Local

    Municipality. Further progress includes:

    In Ficksburg, 2 pumpstations will be built and excavations are completed for both and

    awaiting the award of national tenders.

    In Arlington, Dealesville, Reitz and Petrus Steyn, comprehensive infrastructure analysis of

    the existing completed infrastructure was completed to guide the implementation of the new

    bulk services. Soil testing and excavations were completed for the above new infrastructure

    services.

    In the Senekal Project, work on 2 pump stations is in progress with excavations completed,

    inlet works completed at PS 1 and some 1 348m of 5653m of gravity main lines completed.

  • RESPONSES TO QUESTIONS RAISED DURING THE SCOA BRIEFING ON THE SPECIAL ADJUSTMENTS IN VOTE 41 (DEPARTMENT OF WATER AND SANITATION) CONVENED ON 16 JULY 2020

    5 | P a g e

    In Clocolan, 2 pumpstation are being constructed with excavations for the sump in progress

    and 1 702m of 7221m of gravity main completed.

    In the Northern Cape, 4 projects in Tsantsabane LM and Siyancuma LM are making good

    progress as follows:

    In the Northern Cape, there are four remaining projects to complete and progress is as follows:

    1) Maranteng (100% Completed),

    2) Postdene (70% completed),

    3) Griekwastad (92% completed of toilets flushing and 50% completed with the construction of

    the pump station)

    4) In Campbell, a new alternative sanitation solution (low flush toilet system) will be

    implemented in partnership with the Water Research Commission due to planning and budget

    constraints experienced by the municipality.

    The backlogs for the project relate to procurement of materials on national tender and Works

    Quotations (WQ’s) below R500 000,00. The latter quotations in some cases are rendered

    unsuccessful as bids received are non-responsive due to:

    Prices for required materials being very expensive

    Bids not being received on some tenders for supply and delivery of materials or an insufficient

    number of bids being received for competitive evaluation and award

    All efforts are being made to ensure that the project challenges are resolved to ensure that the

    project remains on course for completion at the end of the 2020/21 financial year.

    2.11 Progress on the Bizana Water Scheme in the Eastern Cape

    Reply:

    The Department of Water and Sanitation (DWS) implemented a bulk water supply project around

    Bizana to augment the bulk water supply within the Mbizana LM including the town of Bizana

    which is located in the Alfred Nzo District Municipality in the Eastern Cape. The project aimed to

    develop a new water resource, increase the capacity of the water treatment works and to improve

    the bulk water distribution to the region. The project was initiated by the O.R Tambo District

    Municipality in February 2008, in its capacity as Water Services Authority (WSA) who appointed

    Umgeni Water as an Implementing Agent (IA) for this scheme. This appointment was for the

    planning, design, and construction of the bulk water supply components of the scheme, to be

    undertaken in a phased manner over a number of years, based on priorities within the area and

    the availability of funding. The project was planned to be implemented over 3 (three) phases. The

    project is a bulk and reticulation water supply regional scheme to service a total current population

    of 106 281 and a design population of 132 851, over a 30 year design horizon and is approved

    for R353 073 471.00. The project will supply water to Wards 4,5,6,7,24,26,27 in the Mbizana Local

    Municipality. Please refer to Annexure 4, for additional information regarding this project.

  • RESPONSES TO QUESTIONS RAISED DURING THE SCOA BRIEFING ON THE SPECIAL ADJUSTMENTS IN VOTE 41 (DEPARTMENT OF WATER AND SANITATION) CONVENED ON 16 JULY 2020

    6 | P a g e

    2.12 When will the DWS resolve the challenges with water supply in Qwaqwa?

    Water is available at the Sterkfontein Dam and other dams which can be used

    as sources of water.

    Reply:

    Long term plans solutions have been identified identified through a feasibility study in the area to

    address water challenges in the Maluti-A- Phofung Local Municipality, including Qwaqwa. The

    Water and Sanitation Department has appointed Sedibeng Water as an implementing agent for

    the Sterkfontein-Qwaqwa Regional Bulk Water Supply Scheme to be funded through the

    Regional Bulk Water Infrastructure Grant. The primary focus of this project is the sustainable

    supply and augmentation of potable water to the greater Harrismith (Tshiame-Mokgholokweng)

    and QwaQwa (including Kestell/Tlhlong) areas, including the rural communities of Diyatalawa and

    Mokgholokweng.

    The augmentation of the bulk water supply in the Phuthaditjhaba Region is included under this

    project and in particular the urgent supply of drinking water to areas that have experienced critical

    drinking water supply shortages during the recent droughts. Investigation of the Geohydrology of

    the Phuthaditjhaba Region for the drilling of boreholes to supply water is ongoing to determine

    suitable locations for the drilling & testing of borehole sites.

    The completed components of the Regional Bulk Water Scheme are as indicated in the table

    below:

    Projects Description of the

    projects

    Year

    completed

    Estimated

    project value

    Benefiting

    population

    Sterkfontein

    WTW

    (Phase 1)

    The construction of

    Phase 1 of the

    Sterkfontein WTW with a

    capacity of 10Mℓ/day.

    2013 R75,300,000 Phuthaditjhaba

    (54,661)

    Kestell (1,109)

    Tlholong (7,160)

    Harrismith (27,869)

    Escol reservoir Construction of a 3,0Mℓ

    concrete reservoir at

    Escol to provide a

    balancing storage facility

    for the gravity supply to

    the northern areas of

    QwaQwa and

    Kestell/Thlolong.

    2012 R10,000,000 Phuthaditjhaba

    (54,661)

    Kestell (1,109)

    Tlholong (7,160)

    Escol pipeline Installation of a rising

    main from Sterkfontein

    Dam to Escol reservoir.

    2012 R35,520,000 Phuthaditjhaba

    (54,661)

    Kestell (1,109) Tlholong (7,160)

  • RESPONSES TO QUESTIONS RAISED DURING THE SCOA BRIEFING ON THE SPECIAL ADJUSTMENTS IN VOTE 41 (DEPARTMENT OF WATER AND SANITATION) CONVENED ON 16 JULY 2020

    7 | P a g e

    Projects Description of the

    projects

    Year

    completed

    Estimated

    project value

    Benefiting

    population

    Rising main to

    Escol reservoir

    The installation of a

    gravity main from Escol

    reservoir to storage

    facilities in the northern

    water supply region of

    QwaQwa and the

    provision of additional

    storage capacity within

    the northern water supply

    regions.

    2013 R72,800,000 Phuthaditjhaba

    (54,661)

    Kestell (1,109)

    Tlholong (7,160)

    Construction of

    a new raw water

    abstraction

    facility at

    Sterkfontein

    Dam

    The completion of

    Sterkfontein WTW, the

    upgrading and provision

    of the QwaQwa Rural

    Bulk Water Supply,

    installation of a new rising

    main from Sterkfontein

    WTW to Tshiame (IDZ -

    Industrial Development

    Zone), the Internal

    QwaQwa Distribution

    Connections and the

    construction of a new

    reservoir at Qholaqhwe.

    2015 R26,570,000 Phuthaditjhaba

    (54,661)

    Kestell (1,109)

    Tlholong (7,160)

    Harrismith (27,869)

    Makwane

    Scheme

    New gravity main from

    Metsi Matsho Dam to

    Makwane WTW

    Upgrading of Makwane

    WTW to 10 Ml/day

    Bulk distribution pipelines

    (Matshekgeng and

    Phahameng East).

    2017 R81,000,000 Makwane (18,550)

    Bulk

    interconne

    ction

    pipeline:

    Uniqwa –

    Central

    Qwaqwa

    connection

    Uniqwa – Central

    Qwaqwa connection:

    Installation of 500Ø uPVC

    pipe, Construction of the

    connection chambers,

    refurbishment of the

    existing chambers and

    connection to existing

    services.

    2019 R7,864,802 Phuthaditjhaba

    (54,661)

  • RESPONSES TO QUESTIONS RAISED DURING THE SCOA BRIEFING ON THE SPECIAL ADJUSTMENTS IN VOTE 41 (DEPARTMENT OF WATER AND SANITATION) CONVENED ON 16 JULY 2020

    8 | P a g e

    3. Human resources

    3.1 What measures are in place to deal vacancies in the Department?

    Reply:

    Since the start of 2019, a total of 490 posts have been advertised and are in various stages

    of filling. The posts that have been advertised are critical posts that were identified, as well

    as posts that have become vacant as a result of natural attrition. However, the advent of

    COVID19 has had an adverse impact on the department’s ability to conduct both recruitment

    and selection processes over the past 4 months. The selection processes for those posts

    that have already been advertised will be conducted through virtual (MS Teams) interviews.

    3.2 What is the challenge with funding funded vacant positions?

    Reply:

    With a moratorium on the filling of posts that was introduced during the 5th Administration,

    as well as a structure review process that was initiated at the beginning of the 6 th term, the

    Department is managing the backlog of posts that are vacant; posts that have been identified

    as being critical; as well as posts that have become vacant as a result of natural attrition.

    Since March 2020, COVID-19 has had an adverse impact on the Department’s ability to fill

    posts that have been advertised. Plans are currently being developed to resume selection

    processes through alternative means; e.g. selection through virtual platforms.

    3.3 How many of the vacancies are for critical skills to ensure frontline services

    are delivered?

    Reply:

    A total of 377 posts have been identified as being critical (including both support- and core

    functions). Out of the 377 posts, 198 posts fall within the core business Branches of the

    Department which deliver frontline services.

    3.4 The major skills deficiency is project management in SA. Does the DWS

    agree? If yes, what is being done about it?

    Reply:

    The prevailing economic slowdown has resulted in the over-supply of high value technical

    skills in the fields of civil engineering, construction project management and quantity

    surveying. The slump in the construction market and the collapse of engineering firms has

    created a skills surplus. Even before the current situation set hold, there were enough skills

  • RESPONSES TO QUESTIONS RAISED DURING THE SCOA BRIEFING ON THE SPECIAL ADJUSTMENTS IN VOTE 41 (DEPARTMENT OF WATER AND SANITATION) CONVENED ON 16 JULY 2020

    9 | P a g e

    in the market; the challenge has always been the inability of government to attract and retain

    these skills. The DPSA salary scale, including the Occupation Specific Dispensation (OSD)

    is not competitive enough to attract and retain high value skills. Construction project

    managers for large projects are paid above the OSD and the level 1-16 DPSA scales.

    Furthermore the PMDS reward system is also not geared towards retaining high value skills.

    Therefore, the challenge is not the scarcity of skills, but rather the public sector remuneration

    regime which falls short when compared to the market.

    3.5 What critical skills do you need to efficiently provide water to our people?

    Reply:

    The following critical skills as determined within the Department’s Integrated HR Plan, are

    required for the Department to provide water:

    Critical management skills:

    Strategic Capability and Leadership

    Financial Management

    People Management and Empowerment

    Change Management

    Programme and Project Management

    Critical technical skills:

    Policy implementation.

    Trade-related specific technical skills:

    Engineering and related design.

    Water science

    Ground water development

    Monitoring and evaluation

    Water resource sampling

    Water use technology

    Dam design

    Water measurement and distribution.

    Water use technologies.

    Species identification.

    Engineering and related design.

    Flood hydrology.

    Hydra training.

    Hydrographical survey (TAS).

    Legalistic understanding of the water sector.

    The technical and professional skills are required in the following occupational categories:

  • RESPONSES TO QUESTIONS RAISED DURING THE SCOA BRIEFING ON THE SPECIAL ADJUSTMENTS IN VOTE 41 (DEPARTMENT OF WATER AND SANITATION) CONVENED ON 16 JULY 2020

    10 | P a g e

    Artisans in various areas.

    Chemical and physical science technicians.

    Scientists.

    Engineering (including technicians) civil, mechanical, electrical and construction.

    3.6 Unemployment is high and there are many graduates who are looking for jobs.

    DWS to indicate timeframes on when vacancies will be filled. Also indicate how

    many of the vacancies those are for critical skills such as engineers and

    technicians and what is impact on the functionality of the Department?

    Reply:

    Through the Department’s Learning Academy Programme, a significant number of

    Candidate Engineers, Scientists and Technicians are employed additional to the

    establishment on fixed-term contracts and are in the process of moving towards obtaining

    professional registration. Some of them have recently obtained registration. A decision was

    taken in the beginning of 2020 to advertise entry level professional posts (engineers,

    scientists, etc.) internally in the department only. This initiative provides them with an

    opportunity to obtain permanent employment and serves as a return on investment for the

    funds that the Department has invested in their development. The Department currently

    employs a total of 191 Candidate Engineers, -Scientists and related -Technicians within the

    aforementioned development programme.

    The Learning Academy has proven to be a very successful initiative whereby the required

    professional and technical skills are being developed for the sector in ensuring a long term

    solution to address current and future skills requirements. It needs to, however, be noted

    that a number of professional Engineers and Scientists in the senior levels with extensive

    experience (i.e. Chief engineers) are nearing retirement. The supply of Candidates into entry

    level positions is currently sufficient, but due to the occupational make-up of the

    Occupational Specific Dispensation (OSD), such professionals take a significant number of

    years to progress to the “Chief Level”.

    3.7 Explanation on why the aCFO has been acting for a period of 2 years

    Reply:

    The post was advertised in November 2018 and shortlisting was conducted in March 2019.

    It was decided to re-advertise the post in April 2019 since no suitable candidates were found.

    Subsequent to a directive by the Minister that the organisational structure should be

    reviewed, the filling of the CFO post has been placed on hold due to amendments in the

    responsibilities of the CFO position as well as reporting lines within the Branch. The

    structure review has since been signed off by the Minister which places the Department in

    a position to proceed in filling the post.

  • RESPONSES TO QUESTIONS RAISED DURING THE SCOA BRIEFING ON THE SPECIAL ADJUSTMENTS IN VOTE 41 (DEPARTMENT OF WATER AND SANITATION) CONVENED ON 16 JULY 2020

    11 | P a g e

    4. Finance and expenditure matters

    4.1 What are the reasons for the 8% under spending?

    Reply:

    Under spending is attributable the following:

    Compensation of Employees - Under spending was due to vacant posts during the

    greater part of the financial year across all the sub-programmes of the four programmes

    within the department. Organisational Operational Arrangements and the organogram of the

    Department are being streamlined and Programme Managers are working closely with Human

    Resources to fast track the filling of critical vacancies in line with the baseline allocation.

    Goods and Services -The under- performance is attributable to delayed spending on

    planned activities and projects which were mostly at procurement and implementation

    planning stages during the greater part of the financial year across all the sub-

    programmes of the four Programmes. Expenditure is driven by planned functions related

    activities, approval of Terms of Reference (ToR), procurement activities (DBAC) and

    project implementation plans.)

    Payment for Capital Assets (RBIG and WSIG) - The under-performance is due to the

    delays in finalising planning process (Feasibility Study/Implementation Readiness

    Study); adequate capacity within the provinces to do proper oversight and monitoring of

    the projects; slow progress on the Bucket Eradication Programme, external factors such

    as Community protests; late kick-start of procurement implementation by the

    Implementing Agents, delays for provision of co-funding by the municipalities; and

    litigation.

    The Department will ensure continuous monitoring and evaluation of the implementation of

    projects by the appointed Implementing Agents, speedy resolution of disputed invoices and

    contractual disputes, fast tracking of certification and verification of all work done in order to

    process invoices, accelerating the implementation of Emergency Drought Relief interventions and

    rollout and completion of the remaining Bucket Eradication Projects.

    4.2 Whether the DWS has centralised procurement?

    Reply:

    The centralised procurement of Goods and Services is undertaken at Head Office for bids

    above R500 000.00. In terms of the delegations, all procurement less than R500 000 is

    procured at the regional office (Proto CMA, Operational Cluster and Construction Sites and is

    done through the quotations process. All three bid committees are constituted and

    Departmental Bid Adjudication Committee for goods and service has been appointed for the

    period of 12 Months including the Infrastructure Departmental Bid Adjudication Committee.

  • RESPONSES TO QUESTIONS RAISED DURING THE SCOA BRIEFING ON THE SPECIAL ADJUSTMENTS IN VOTE 41 (DEPARTMENT OF WATER AND SANITATION) CONVENED ON 16 JULY 2020

    12 | P a g e

    4.3 How is DWS responding to the call to invest in the acceleration of infrastructure

    considering the ongoing under-performance by DWS?

    Reply:

    COVID-19 has affected the procurement of most infrastructure projects even those which

    the department is funding through Regional Bulk Infrastructure (RBIG) and Water Services

    Infrastructure Grant (WSIG). The department has constituted departmental bid committee

    two bid committees as follows:

    Departmental bid committee for goods and services

    Infrastructure departmental bid committee for all department infrastructure project

    4.4 Are there on-going legal disputes against the department? Are there small

    businesses involved?

    Reply:

    There are 14 ongoing legal disputes which involve various companies doing business with

    the department. There are three disputes involving small businesses which are not yet litigious.

    The nature of the disputes includes the following:

    Failure of businesses companies to deliver agreed deliverables,

    The department being required to pay invoices where it is not liable in law,

    Invoices for services which have not been rendered.

    4.5 How many of the black, women, and youth and disabilities owned companies

    are getting work from the department?

    Reply:

    The Department’s procurement targets are 15% for Qualifying Small Enterprises (QSE) an

    enterprise with turnover from 0 to R50 million per and 15% for Exempted Micro Enterprises (EME)

    is enterprise with turnover from 0 to R10 Million. As per procurement targets, most enterprises

    doing business with the department are EME and QSE. The percentage expenditure on QSEs is

    14% and EME is 33% respectively, based on the system report generated by the SAP System

    and the application of the prescribed method of calculation as per technical indicator descriptor.

    Purchase Order Created for the 4th quarter 2019/2020 for Exempted Micro Enterprise

    amounted to R 35 455 439,18 and Qualifying Small Enterprise amounted to R 14 937 458,30

    targets for Second quarter divide by the number of Purchase of order created in 4th quarter

    2019/2020

    Purchase Order created for 4th quarter 2019/2020 with value of R 39 465 161, 24 were for

    the service providers above the Small and Medium Enterprises and Micro (SMME) status and

    R17 152 796, 12 were from service providers whom the information in terms of QSE and EME

    status is not available on central supplier database (CSD) R 188 776, 14.

  • RESPONSES TO QUESTIONS RAISED DURING THE SCOA BRIEFING ON THE SPECIAL ADJUSTMENTS IN VOTE 41 (DEPARTMENT OF WATER AND SANITATION) CONVENED ON 16 JULY 2020

    13 | P a g e

    4.6 30 days payment of invoices

    Reply:

    The 137 outstanding invoices not paid are attributed mainly to:

    Operation and Maintenance done by the Lepelle Northern Water wherein the validation

    and confirmation of work done by the Implementing Agency is underway;

    War on Leaks outstanding invoices due to the budgetary constraints.

    Budget reprioritisation is being done to absorb the expense in the current budget allocation.

  • RESPONSES TO QUESTIONS RAISED DURING THE SCOA BRIEFING ON THE SPECIAL ADJUSTMENTS IN VOTE 41 (DEPARTMENT OF WATER AND SANITATION) CONVENED ON 16 JULY 2020

    14 | P a g e

    5. Investigations

    5.1 Are there any cases of corruption where legal steps have been taken against

    involved officials?

    Reply:

    Please see attached the Forensic Audit Cases (as Annexure 4). The document is a

    reflection of the disciplinary action instituted for the period 2012 -2020. It contains a

    summary of the disciplinary action instituted as well as the details of these cases (including

    case numbers and amounts involved in each case being investigated).

    5.2 Submit details about ongoing investigations into malfeasance?

    Reply:

    During the 2019/2020 financial year: 67 cases were received by Internal Audit and the status

    is as follows (Both hotline cases and cases that were reported internally):

    The investigations of 42 cases have been completed;

    The investigations of 10 cases are in progress; and

    15 cases have not been investigated yet.

    5.3 Where cases have been lodged with the SAPS DWS to provide case numbers

    and the amounts involved in each case being investigated

    Reply:

    Please see table below for relevant cases and case numbers in this regard:

    No Description of case Recovered Recoverable SAPS case number

    1 Investigation into the alleged irregular appointment of personnel and the alleged fraudulent use of official flight tickets to undertake private trips

    27 106.00 27 106.00 -

    2 Investigation into the alleged inflation of invoices at CD: Construction Management (Levubu)

    10 000.00 46 650.00 Makhado CAS 97/12/2016

  • RESPONSES TO QUESTIONS RAISED DURING THE SCOA BRIEFING ON THE SPECIAL ADJUSTMENTS IN VOTE 41 (DEPARTMENT OF WATER AND SANITATION) CONVENED ON 16 JULY 2020

    15 | P a g e

    No Description of case Recovered Recoverable SAPS case number

    3 Investigation into the payment that was erroneously paid to a service provider for contract WQ4893

    320 501.41 320 501.41 Pretoria CAS 460/2/2016

    4 Investigation into the fraudulent purchase requisitions and purchase orders that were created at Construction North

    622 463.94 622 463.94 Tzaneen CAS 209/2/2017

    5 Investigation into the alleged procurement irregularities by the Works Civil Superintended at Construction North (3/6/3/2/1/1718/04)

    13 391.65 13 391.65 -

    6 Investigation into the suspended fraudulent roadworthy certificate

    3 420.24 3 420.24 -

    Total 996 883.24 1 033 533.24

    6. Planning

    6.1 World Economic Forum stated that next challenge would be water– what has

    DWS done to ensure they deal with this problem?

    Reply:

    DWS works with sector partners to address water security to develop and continuously

    update water resource development and management plans for the country in consultation

    with other co-basin states. The Department undertakes various planning studies over 25-year

    horizons, to ensure water security for the country. Such studies include (i) Water Availability

    Assessment Studies (WAAS), which generate base input information for water resource

    development and management; (ii) long term water resource reconciliation planning studies for

    large and small demand centres, and (iii) catchment-based studies. These planning studies

    culminate in strategies that address water needs for the country. The plans continuously

    monitored and updated every 3 to 5 years to ensure that they remain current and relevant.

    The outputs of the studies inform the National Water Resource Strategy (NWRS), the instrument

    by which the minister gives effect to the National Water Act, as well as the master plans that

    emanate from the NWRS. The studies are available on the DWS website, at

    http://www6.dwa.gov.za/iwrp/projects.aspx, and the National Water and Sanitation Master Plan

    (NW&SMP) is available at http://www.dwa.gov.za. The plans contain strategies to contain

    http://www6.dwa.gov.za/iwrp/projects.aspxhttp://www.dwa.gov.za/

  • RESPONSES TO QUESTIONS RAISED DURING THE SCOA BRIEFING ON THE SPECIAL ADJUSTMENTS IN VOTE 41 (DEPARTMENT OF WATER AND SANITATION) CONVENED ON 16 JULY 2020

    16 | P a g e

    water use demand, and how to optimize water use on an annual basis. Other elements of

    the strategies include:

    (i) preventing and reducing pollution of water resources;

    (ii) expanding the water resources by exploring groundwater, surface water

    developments, and desalination of impaired waters among others;

    (iii) re-use of water,

    (iv) transfer of water within the country from water rich basins to the drier areas; and

    (v) transfer of water from other countries.

    With respect to water transfers from other countries, DWS has explored extending the

    geographical reach to access water for South Africa far beyond the country’s borders. The

    options explored range from transfer of water into South Africa, to distribution of water-

    intensive sectors like energy and food production to water rich areas. The department

    launched the Water and Sanitation Master Plan and this plan seeks to streamline all water

    and sanitation related projects as this is a sector-wide plan.

    6.2 China identified Water desalination as one of the interventions. Petro SA

    invested in this in Mosselbay – why has the DWS not invested in long term

    sustainable water provision initiatives?

    Reply:

    Desalination of sea water or any impaired water features as one of the option for securing

    new fresh water sources for the country. While desalination can supply an unlimited quantity

    of high-quality, fully assured fresh water, at a predictable price, it is but one of other options, of

    which the appropriateness for a demand centre must be assessed against other strategies as

    discussed above. A desalination plant was built in 2017 in Richards Bay as part of drought

    relief measures in the area. The City of Cape Town has implemented four units with 40 Ml

    capacity in response to the drought experienced in 2015/16 to 2017/18 period.

    6.3 What measures are in place to support municipalities to ensure projects are

    delivered according to specifications and within budget?

    Reply:

    The department's support includes the provision of frameworks for water service development

    planning (WSDP) project planning feasibility study guidelines, water service infrastructure

    development technical guidelines and technical report as well as actual project assessment for

    all water services funding streams). Both DWS and CoGTA as National departments have a

    responsibility to support municipal performance regarding water services development, However

    DWS has its own challenges in as far as the implementation of the National competence thus

    cannot reach each and every municipal project.

  • RESPONSES TO QUESTIONS RAISED DURING THE SCOA BRIEFING ON THE SPECIAL ADJUSTMENTS IN VOTE 41 (DEPARTMENT OF WATER AND SANITATION) CONVENED ON 16 JULY 2020

    17 | P a g e

    COGTA also has a mandate to support municipalities to ensure compliance as it also funds water

    projects and has oversight responsibility on WSA municipalities.

    7. Regulation

    7.1 Impact of COVID -19 on the operations of entities including staff:

    7.1.1 Number of COVID cases in each Water Board and when?

    7.1.2 Whether buildings of offices were closed and period of closure

    7.1.3 What has the effect of COVID on business continuity

    7.1.4 Debt owed to Water Boards – how much has been lost due to COVID19

    Reply:

    Please refer to (Annexure 5) as attached hereto for information on the impact of COVID-19

    on the Water Boards.

    7.2 Regarding the pollution of the Vaal River System – is the ‘polluter pays’ principle

    being implemented?

    Reply:

    A project to implement the Waste Discharge Charge System (WDCS) was initiated in October

    2011 and came to an end in December 2013. The WDCS is based on the polluter-pays principle

    and aims to promote the sustainable development and efficient use of water resources and create

    financial incentives for dischargers to reduce waste and use water resources in a more optimal

    way.

    The project was implemented in three pilot areas namely, Upper Vaal, Upper Olifants and

    Crocodile West-Marico. A situational analysis of pilot areas and drafting of the WDCS Strategy

    were completed as part of the project. The setting of tariffs and the implementation of the WDCS

    was not completed as part of the project. In the 2019/2020 financial year the Department re-

    initiated the project and appointed a Project Steering Committee as well as a Technical Task

    Team to conduct a gap analysis. Due to financial constraints all this work was done internally

    without any consultants. The purpose of the gap analysis was to assess the work previously done

    in terms of WDCS in the three priority catchments, what is required to implement WDCS

    successfully and where the Department currently is in terms of readiness for implementation.

    National Rollout is projected from 2023 – 2025.

  • RESPONSES TO QUESTIONS RAISED DURING THE SCOA BRIEFING ON THE SPECIAL ADJUSTMENTS IN VOTE 41 (DEPARTMENT OF WATER AND SANITATION) CONVENED ON 16 JULY 2020

    18 | P a g e

    7.3 What is the role of mines in polluting rivers?

    Reply:

    Mining-related pollution impacts on the Vaal River System arise largely through mine waste

    facilities or discharge of waste water into the water resources. These activities constitute

    water uses in terms of the National Water Act, 1998 and/ or the National Environmental

    Management Act, 1998, for which mines are required to have the relevant environmental

    authorisations. The management of mine waste water and mine waste facilities is generally

    compliant with authorisation conditions, with interventions such as recirculation of waste

    water, re-use of water and treatment prior to discharge ensuring that potential pollution

    impacts from mines are mitigated. As a strategic response to high-risk mining-related

    pollution:

    DWS has implemented the Witwatersrand Acid Mine Drainage project

    DWS is working closely with the mining sector to ensure the realisation of interventions

    that will address pollution impacts whilst mines are active, and promote sustainable post -

    mining water management; and

    Latent water resources impacts after mines have closed may be remedied through the

    Financial Provision Regulations

    Furthermore, the department has established the Anti-Pollution Task Team (APTT) was

    established in 2019. The APPT focuses its efforts on identifying high-risk pollution activities,

    integrating the national and provincial/ local government structure regulatory functions, and

    executing a response that seeks to hold the polluter accountable so that remedial action

    can be taken. The Department has about 974 facilities registered as discharging waste or

    wastewater across all sectors in the Upper Vaal. The following enforcement actions, as

    indicated Annexure 6, have been taken against water users discharging waste or wastewater in

    the Upper Vaal since 2014/15.

    Notices of intention to issue a directive = 140

    Directives = 21

    Criminal Cases = 4

    Civil Cases =10 interdicts

    It must be noted that a majority of industries discharge into the municipal sewer network and not

    directly into the resource. Waste or wastewater discharged in the upper parts of the Vaal finds

    its way into the Vaal Dam, hence the focus on Upper Vaal. The main sources of pollution

    remain the wastewater treatment works and mines. The Department has monitored over 240 of

    the 561 authorized mines for compliance with their water use entitlements since 2014/15

    nationally. Of these, 159 mines recorded a compliance level below 50% in terms of the conditions

    in their authorizations. While dealing with authorized but non-compliant mines, there is a recorded

    152 unauthorized mines that the Department is also dealing with. The summary of actions taken

    against mines since 2014/15 is indicated in (Annexure 7):

  • RESPONSES TO QUESTIONS RAISED DURING THE SCOA BRIEFING ON THE SPECIAL ADJUSTMENTS IN VOTE 41 (DEPARTMENT OF WATER AND SANITATION) CONVENED ON 16 JULY 2020

    19 | P a g e

    Audits conducted = 240

    Investigations conducted = 121

    Notices = 98

    Directives = 28

    Criminal Cases = 1

    Civil Cases = 1