HEALTH CONTROL PLAN // CONTROL NSW RESOURCES REGULATOR Risk control worksheet NSW mining and extractives industry Mine name: Sectio n: Date: Team leader (name/position): Participants (name/position): Hazard and work task/ process: Control measure Explain the decision Yes, how can this be done? No, why can’t this be done? Elimination: Can health hazards be eliminated? Substitution: Can the hazard be substituted for one with a lower health risk?

Upload: others

Post on 22-Jan-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Resources Regulator publication · Web viewAuthor Nicholas Created Date 01/22/2018 20:38:00 Title Resources Regulator publication Subject Publication of the NSW Resources Regulator

HEALTH CONTROL PLAN // CONTROLNSW RESOURCES REGULATOR

Risk control worksheetNSW mining and extractives industryMine name:       Sectio

n:       Date:      

Team leader(name/position):

      Participants(name/position):

     

Hazard and work task/ process:

     

Control measureExplain the decision

Yes, how can this be done? No, why can’t this be done?

Elimination:Can health hazards be eliminated?

           

Substitution:Can the hazard be substituted for one with a lower health risk?

           

Isolation:Can the hazard be isolated from the worker(s) at risk?

           

Page 2: Resources Regulator publication · Web viewAuthor Nicholas Created Date 01/22/2018 20:38:00 Title Resources Regulator publication Subject Publication of the NSW Resources Regulator

HEALTH CONTROL PLAN // CONTROLNSW RESOURCES REGULATOR

Risk control worksheet

Control measure

Explain the decision

Engineering:Can equipment be modified, or can mechanical aids be provided?

           

Administration:Can administrative controls be used such as a signage, job rotation, training or a safe work procedure?

           

Personal protective equipment (PPE):What PPE could be used to reduce risk to health?

           

Management sign-off: Date: