    Resource Reconciliation AutomationProject

  • 8/3/2019 Resource Reconciliation Automation Project_Final

    2/18

    Copyright 2008 Accenture All Rights Reserved.

    Contents

    22

    Roles and Responsibilities

    Project Charter

    Flow Chart (As Is)

    Data collection

    5 Why Analysis

    Solutions Identification

    Implementation Plan

    Process Map (To Be)

    Control Plan

    Key learning's from this Project

    Benefits

    Sign off

  • 8/3/2019 Resource Reconciliation Automation Project_Final

    3/18

  • 8/3/2019 Resource Reconciliation Automation Project_Final

    4/18

    Copyright 2008 Accenture All Rights Reserved. 4

    Project Charter

    Problem Definition:

    Resource Reconciliation report is a highly manual report which involves extracting and pooling source data from severalfeeder reports into the Reconciliation template, performing reconciliation and highlighting action points. The entireactivity consumes approximately 3 hours per week if done manually and is prone to human error.

    To reduce the amount of time spent in preparing the report by atleast 50% (i.e. to 1.5 hours from the existing 3 hours) bySept. 2011

    Improvement Goal:

    Current Baseline:

    3 hours per week

    Project Scope :

    AstraZeneca PMO Team

    Solution implemented can also be used for otherprojects wherever reconciliation is required

    Define Measure Analyze Improve Control

    Business Case:Resource Reconciliation is a weekly reconciliation report generated to ensure that only Active resources have access toAstraZeneca systems and resources. The report highlights inaccuracies in the management control resource list andverifies who has rolled on/off and needs adding/taking off the:

    Project server (PWA) Distribution lists

    SharePoint Organization charts WBC Codes

    Each tab uses the resource list to check against access to the above mentioned.

  • 8/3/2019 Resource Reconciliation Automation Project_Final

    5/18

    Copyright 2008 Accenture All Rights Reserved.

    Process Map (As Is)

    5

    Extract Feeder Reports

    Define Measure Analyze Improve Control

    Prepare ReconciliationTemplate

    Load Current WeeksData

    Perform Reconciliation

    IdentifyAction Points

    Start

    Stop

  • 8/3/2019 Resource Reconciliation Automation Project_Final

    6/18

    Copyright 2008 Accenture All Rights Reserved.

    Detailed Flow Chart (As Is) Contd.

    6

    Define Measure Analyze Improve Control Resourceconciliation As-Is

  • 8/3/2019 Resource Reconciliation Automation Project_Final

    7/18

    Copyright 2008 Accenture All Rights Reserved.

    Data collection

    7

    Define Measure Analyze Improve Control

    S. No Measure Name Units

    1. Time consumed in report

    preparation

    Hours:Minutes:Seconds

  • 8/3/2019 Resource Reconciliation Automation Project_Final

    8/18

    5 Why Analysis

    5-Why AnalysisToo much time consumed in

    report generation

    Highly manual drivenWhy ?

    Why ?

    Root Cause Identified

    Define Measure Analyze Improve Control

    Report involves pooling data from multipleresources into the template followed by

    Reconciliation

    Highly Manual intensive Report involves pooling datafrom multiple resources into the template followed by

    Reconciliation per certain specific rules.

  • 8/3/2019 Resource Reconciliation Automation Project_Final

    9/18

    Copyright 2008 Accenture All Rights Reserved.

    Solutions Identification

    9

    SL No Issues Solution Identified Solution Implemented Remarks

    Quality check of the report

    by peer/supervisor

    Introduction of QC

    mechanisms into the manual

    report

    Complete Report automation

    follow ed by QC by peer /

    supervisor

    3

    Highly cumbersome as it

    involves incorporating data

    from several feeder reports

    into the f inal template

    Automatic uploading of data

    from the feeder reports into

    the final reconciliation

    template

    Automatic uploading of data

    from the feeder reports into

    the final reconciliation

    template

    Issue Resolved

    through

    automation

    Improve ef ficiency through

    practice over a period oftime.

    Perform a step by step

    study to ascertain the best

    sequence of events in

    report generation w hich

    w ould produce the report in

    minimum amount of time

    Complete Report automation

    follow ed by QC by peer /

    supervisor

    Issue Resolved

    through

    automation

    Increased chance of errors

    as the report is produced

    manually

    Complete Report automation

    follow ed by QC by peer /

    supervisor

    Issue Resolved

    through

    automation

    Highly time consuming -

    approximately 3 hours per

    w eek spent in report

    generation.

    Complete Report automation

    follow ed by QC by peer /

    supervisor

    Issue Resolved

    through

    automation

    1

    2

    4

    Highly Manual process

    Complete Report automation

    follow ed by QC by peer /

    supervisor

    Complete Report automation

    follow ed by QC by peer /

    supervisor

    Define Measure Analyze Improve Control

  • 8/3/2019 Resource Reconciliation Automation Project_Final

    10/18

    Copyright 2008 Accenture All Rights Reserved.

    Implementation Plan

    1010

    SL

    NoIssues

    Solution

    IdentifiedDetailed Activity Intended Outcome Owner

    Date of

    Completion

    Insert

    ArtifactsRemarks

    1 Highly Manual process

    Automation

    Achieved - Issue has

    been resolved

    Raminder

    Singh

    Chadha

    Aug 29th, 2011 Resolved

    2

    Increased chance of

    errors as the report is

    produced manually

    Automation

    Achieved - Issue has

    been resolved

    Raminder

    Singh

    Chadha

    Aug 29th, 2011 Resolved

    3

    Highly cumbersome as

    it involves

    incorporating data

    from several feeder

    reports into the final

    template

    Automation

    Achieved - Issue has

    been resolved

    Raminder

    Singh

    Chadha

    Aug 29th, 2011 Resolved

    4

    Highly time consuming -

    approximately 3 hours

    per week spent in

    report generation.

    Automation

    Achieved - Issue has

    been resolved

    Raminder

    Singh

    Chadha

    Aug 29th, 2011 Resolved

    Complete

    Report

    automation

    followed by QC

    by peer /

    supervisor

    The Report involves extracting updated

    information on currently active resources

    in AstraZeneca from Project Server,

    Sharepoint and Distribution Lists. These

    are then pooled into the Main

    Reconciliation spreadsheet and cross

    checked with the last week's data onactive resources. If a new resource is

    found, which is otherwise absent in last

    week's list, these are searched in the New

    Joiner Tracker and if found there, is

    labelled as a New Joinee and added to

    the respective systems (Project

    Server/Sharepoint / Distribution Lists).

    On the flip side, if a resource is found in

    the last week's list, that is otherwise

    absent on the current week's resource list,

    it is searched in the Roll Off tracker for a

    possible roll off. If this resource appearsin the Roll off Tracker, It is confirmed that

    the resource has rolled off, its status and

    roll off date is updated and removed from

    the respective systems (Project Server /

    Sharepoint / Distribution Lists). This

    process continues till all the resources

    have been checked and verified.

    Define Measure Analyze Improve Control

  • 8/3/2019 Resource Reconciliation Automation Project_Final

    11/18

    Copyright 2008 Accenture All Rights Reserved.

    Process Map (To Be)

    11

    Define Measure Analyze Improve Control

    Extract Feeder Reports

    Prepare ReconciliationTemplate

    Load Current WeeksData

    Perform Reconciliation

    IdentifyAction Points

    Start

    Stop Automated

    Manual

    Load Data Macro

    PerformReconciliation Macro

  • 8/3/2019 Resource Reconciliation Automation Project_Final

    12/18

    Copyright 2008 Accenture All Rights Reserved.

    To-be Process Map Contd.

    12

    Define Measure Analyze Improve ControlResource

    Automated Report

  • 8/3/2019 Resource Reconciliation Automation Project_Final

    13/18

    Copyright 2008 Accenture All Rights Reserved.

    Control Plan

    Sl No Solution Control Measures Remarks

    1 Report Automation

    Macro (automation code) has been password protected to prevent

    unauthorized change of code and thereby prevent accidental

    damange to the automated template

    Achieved

    Cell Locking mechanisms have been implemented in cells

    containing formulae (and wherever else necessary) to prevent

    accidental modification of the code.

    Achieved

    Quality check practise by peer has been put in place to ensure

    that the report produced by the macro is free of any discrepancies.Achieved

    13

    Define Measure Analyze Improve Control

  • 8/3/2019 Resource Reconciliation Automation Project_Final

    14/18

    Copyright 2008 Accenture All Rights Reserved.

    Key learning's from this Project

    Technology Benefits

    # Client

    Business

    Domain /Industry Engagement Project TeamSize Hardware Software

    ProblemScenario /

    OptimizationScenario /Improvement

    Scenario

    EffectivePractices Tangible Intangible

    1 AstraZeneca

    LifeSciences

    AstraZenecaPMO

    EERP 7NormalDesktopsystem

    MS Office ,VBA,

    ProjectServer,Sharepoint,DistributionLists server

    Problem :Highly manualand timeconsumingprocess withsignificant riskof manual error

    Solution:Implementationof automationto significantlysame time andhuman effortthereby alsoreducing therisk of humanerror.

    1. Use ofpasswordprotection topreventaccidentalchange ofmacro code

    2. Incorporationof cell lockingmechanismsfor cellscontainingformulae toprevent themfrom beingmodified by themacro /manually.

    2.5 hourssaved on aweeklybasis.

    1.Reductionin humaneffort2.Increasedaccuracy in

    reportgeneration.3. The timesaved cannow beutilized inother value

    addedactivitiesfor theproject

    14

    Define Measure Analyze Improve Control

  • 8/3/2019 Resource Reconciliation Automation Project_Final

    15/18

    Copyright 2008 Accenture All Rights Reserved.

    Benefits

    1515

    Define Measure Analyze Improve Control

  • 8/3/2019 Resource Reconciliation Automation Project_Final

    16/18

    Copyright 2008 Accenture All Rights Reserved.

    Benefits (Contd.)

    1616

    Define Measure Analyze Improve Control

    Avg. Time Spent Per Week = 3:06:53

    Before Improvement

    After Improvement

    Avg. Time Spent Per Week = 0:31:47

    Avg. Time Savings Per Week = 2:35:06

    Overall Efficiency Improvement = 83%

    Resource

    onciliation Time L

  • 8/3/2019 Resource Reconciliation Automation Project_Final

    17/18

    Copyright 2008 Accenture All Rights Reserved.

    Benefits (Contd.)

    17

    Tangible BenefitsTotal Hours saved per week = 2.5 hours (more than the initial estimated target of 1.5 hr)

    Overall Efficiency Achieved = 83%

    Annual Hourly Savings = 2.5 X 4 (weeks per month) X 12 (months) = 120 Hours

    peryearAnnual Cost Savings = 120 Hours X $15 / hour (SSE LCR) = $1800

    (or Rs. 84,294/ - considering an exchange rate of 46.83 per $)

    Intangible Benefits (soft savings) Reduction in human effort

    Increased accuracy in report generation Time saved can now be utilized in other value added activities for the project.

    The solution implemented can be re-used for similar reconciliation requirements in otherprojects.

    Note : Annual benefit can be derived out of saving opportunity costs (eg., reducing lead time, productivity savings etc., in addition to harddollar savingsCost should include salary cost, overhead cost, indirect cost , opportunity cost, etc.

    17

    Define Measure Analyze Improve Control

  • 8/3/2019 Resource Reconciliation Automation Project_Final

    18/18

    Metrics for July, Aug & Sept00

    Baseline

    Project Owner : Raminder SinghChadha New Owner : Jagruthi Priya

    I am aware of improvements brought about by the projectControl plan is completely Documented and Communicated

    I understand the corrective action plan

    I understand and take responsibility from here on

    I will report Progress on this Process/ Sub Process regularly

    23/11/2011

    (date)

    Raminder SinghChadha

    Project Champion : Core Process Owner :

    Signature & Date

    Project Hand-off Sheet

    BB Sign Off :

    Sign off