resource efficiency strategy update w08

1
HISILICON SEMICONDUCTOR HUAWEI TECHNOLOGIES CO., LTD. Page 1 2%1%2% 85% 8% 1%0% CS RAB Cong VSRABFailEstabCSCodeCong VSRABFailEstabCSDLCECong VSRABFailEstabCSDLIUBBandCong VSRABFailEstabCSDLPowerCong VSRABFailEstabCSULCECong VSRABFailEstabCSULIUBBandCong VSRABFailEstabCSULPowerCong OBJECTIVE: 1. Improve accessibility & productivity 2. Implement suitable state transition / channel switching strategy consider current network condition. 3. Inter frequency load Balancing. ISSUES DESCRIPTION The resource which is not good utilize make inefficiency resource in the system. Overshooting is one of blocking problem. Wee need to re audit the WPC of blocking and compare with TP analysis to reduce blocking due to overshoot. For site which is not overshoot but have high blocking, we need con-check the parameter. Otherwise the site need to be upgrade or need new site to solving the blocking problem. ACTION PLAN LIST 1. PERFENH_DTCH_FACH_CONG_D2I_SWITCH (plan on W10 2015 at 26 RNC) 2. FACH_DTCH_CONGEST_P2D (plan on W10 2015 at 26 RNC) 3. PERFENH_FACH_CONG_D2IDLE_SWITCH (plan on W10 2015 at 26 RNC) 4. BeF2DTvmThd Threshold (done on w46 2014 at 26 RNC) 5. BeF2HTvmThd Threshold (done on w02 2015 at 26 RNC) 6. BeF2ETvmThd Threshold (done on w02 2015 at 26 RNC) 7. Idle Layering paging (plan on W06 2015 at 25 RNC) 8. FACH 200 user per cell (done on W46&47 2014 at 26 RNC) 9. Load Based Dynamic Adjustment of PCPICH (Plan Rollout on w10 2015) 10. HSDPA 96 Users per Cell (done on 1312 site at oct 2014) 11. DPCH Maximum Power Restriction (plan on w04 for 26 RNC) 12. EFD (done on w51 at 26 RNC) 13. TPC PO Optimization (Done on 26RNC. 20 Jan 2015) TARGET: 1. 3G Blocking reduce >10% 2. Count of cells that have 3G Blocking >0.5% reduce >10% 3. All paging per LAC-RAC below threshold & paging deletion <1% 35% 11% 54% 3G Blocking CS RAB Congestion PS RAB Congestion RRC Congestion 1% 5% 2% 66% 25% 1% 0% RRC Cong VSRRCRejCodeCong VSRRCRejDLCECong VSRRCRejDLIUBBandCon g VSRRCRejDLPowerCong VSRRCRejULCECong VSRRCRejULIUBBandCon g VSRRCRejULPowerCong 6% 2% 18% 37% 12% 8% 18% PS RAB cong VSRABFailEstabPSCodeCo ng VSRABFailEstabPSDLCECo ng VSRABFailEstabPSDLIUBB andCong VSRABFailEstabPSDLPowe rCong VSRABFailEstabPSULCECo ng SoW Resource Efficiency Strategy CURRENT STATUS W08: Congestion improve (reduce) about 5% than last week HSDPA 96 user FACH 200 EFD Inter Freq Balancing FACH Threshold on all RNC Ja

Upload: malariamen

Post on 08-Dec-2015

14 views

Category:

Documents


2 download

DESCRIPTION

Resource Efficiency Strategy

TRANSCRIPT

Page 1: Resource Efficiency Strategy Update w08

HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 1

2% 1% 2%

85%

8%

1% 0%

CS RAB CongVSRABFailEstabCSCodeCong

VSRABFailEstabCSDLCECong

VSRABFailEstabCSDLIUBBandCong

VSRABFailEstabCSDLPowerCong

VSRABFailEstabCSULCECong

VSRABFailEstabCSULIUBBandCong

VSRABFailEstabCSULPowerCong

OBJECTIVE: 1. Improve accessibility & productivity2. Implement suitable state transition / channel switching strategy consider current network condition.3. Inter frequency load Balancing.

ISSUES DESCRIPTIONThe resource which is not good utilize make inefficiency resource in the system. Overshooting is one of blocking problem. Wee need to re audit the WPC of blocking and compare with TP analysis to reduce blocking due to overshoot. For site which is not overshoot but have high blocking, we need con-check the parameter. Otherwise the site need to be upgrade or need new site to solving the blocking problem.

ACTION PLAN LIST1. PERFENH_DTCH_FACH_CONG_D2I_SWITCH (plan on W10 2015 at 26 RNC)2. FACH_DTCH_CONGEST_P2D (plan on W10 2015 at 26 RNC)3. PERFENH_FACH_CONG_D2IDLE_SWITCH (plan on W10 2015 at 26 RNC)4. BeF2DTvmThd Threshold (done on w46 2014 at 26 RNC)5. BeF2HTvmThd Threshold (done on w02 2015 at 26 RNC)6. BeF2ETvmThd Threshold (done on w02 2015 at 26 RNC)7. Idle Layering paging (plan on W06 2015 at 25 RNC)8. FACH 200 user per cell (done on W46&47 2014 at 26 RNC)9. Load Based Dynamic Adjustment of PCPICH (Plan Rollout on w10 2015)10. HSDPA 96 Users per Cell (done on 1312 site at oct 2014)11. DPCH Maximum Power Restriction (plan on w04 for 26 RNC)12. EFD (done on w51 at 26 RNC)13. TPC PO Optimization (Done on 26RNC. 20 Jan 2015)

TARGET:1. 3G Blocking reduce >10%2. Count of cells that have 3G Blocking >0.5% reduce >10%3. All paging per LAC-RAC below threshold & paging deletion <1%

35%

11%

54%

3G Blocking

CS RAB Congestion

PS RAB Congestion

RRC Congestion

1%

5%

2%

66%

25%

1% 0%

RRC CongVSRRCRejCodeCong

VSRRCRejDLCECong

VSRRCRejDLIUBBandCong

VSRRCRejDLPowerCong

VSRRCRejULCECong

VSRRCRejULIUBBandCong

VSRRCRejULPowerCong

6% 2%

18%

37%

12%

8% 18%

PS RAB cong

VSRABFailEstabPSCodeCong

VSRABFailEstabPSDLCECong

VSRABFailEstabPSDLIUB-BandCong

VSRABFailEstabPSDLPowerCong

VSRABFailEstabPSULCECong

VSRABFailEstabPSULIUB-BandCong

VSRABFailEstabPSULPowerCong

SoW Resource Efficiency Strategy

HSDPA 96 userFACH 200

EFD

CURRENT STATUS W08:

Inter Freq Balancing

FACH Threshold Tuning on all RNC Jabo 201

Congestion improve (reduce) about 5% than last week