Page 1: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

1

Page 2: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

June 11, 2020

Travis EnglishTraining & Outreach

Specialist

Resource Adequacy Forum

Page 3: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Antitrust Policy

All WECC meetings are conducted in accordance with the WECC Antitrust Policy and the NERC Antitrust Compliance Guidelines

All participants must comply with the policy and guidelines This meeting is public—confidential or proprietary information

should not be discussed in open session

3

Page 4: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Antitrust Policy

This webinar is being recorded and will be posted publicly By participating, you give your consent for your name, voice, image and

likeness to be included in that recording WECC strives to ensure the information presented today is accurate and

reflects the views of WECC However, all interpretations and positions are subject to change If you have any questions, please contact WECC’s legal counsel

4

Page 5: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Agenda Introduction to the Resource Adequacy Forum

• Vic Howell, Director of Reliability Risk Management

The Importance of a Resource Adequacy Forum

• Jordan White, Vice President of Strategic Engagement & Deputy Counsel

Current WECC Resource Adequacy

• Matt Elkins, Manager, Performance Analysis & Resource Adequacy

Future Resource Adequacy Planning

• Travis English, Training & Outreach Specialist; Matt Elkins, Vic Howell

Open Discussion

5

Page 6: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

June 11, 2020

Vic HowellDirector of Reliability

Risk Management

WECC Resource Adequacy Forum Kick-off

Page 7: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Why are we creating a forum?

Consistent with the “why” of WECC Resource adequacy is an emerging reliability risk Supports WECC’s proposed near-term priority:

• Evaluate Interconnection-wide resource adequacy and performance considering—o Importance of working with resource planners and decision-makerso Benefits of resource diversity (geographical and resource type)o Technology performance during various conditions (e.g., solar during extreme heat)

7

Page 8: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

What is a Forum?

Purpose is to facilitate discussions Does not produce work products Does not report to any committee Does not need to have a charter Meetings are typically open to the public Meetings should have an agenda, but do not need to have minutes

8

Page 9: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Recent Activity at WECC

Finalizing NERC Long-Term Reliability Assessment (LTRA) Participating in NWPP RA initiative Created the MAC RAWG Established a new near-term priority for RA Reporting out to the board next week on RA action item assigned

in March meeting Creating and kicking-off new WECC RA forum

9

Page 10: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Vision for WECC’s Role in RA

Supplement NERC LTRA with “WECC Resource Adequacy assessment”

Expand on RA assessments to include a variety of scenarios Work with entities on their RA assessments Become a hub for RA discussions through new RA Forum

10

Page 11: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

WECC’s Vision for RA Forum

WECC is uniquely positioned to serve as a hub for RA discussions in the West• Wide-area view• Reliability focus• Independence• Partnership

To create an open environment for constructive sharing and learning To have a venue where everyone can be heard and where we can work

together To meet twice a year—spring and fall

11

Page 12: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Today’s Objectives

Kick off the forum Share our vision Talk about why the forum is important Describe what we do at WECC in RA space Get feedback for future forum meetings

12

Page 13: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Contact:

13

Vic HowellDirector of Reliability Risk [email protected]

Page 14: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

June 11, 2020

Jordan WhiteVice President of Strategic

Engagement & Deputy Counsel

The Importance of a Resource Adequacy

Forum

Page 15: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

15

Page 16: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Contact:

16

Jordan WhiteVice President of Strategic Engagement & Deputy [email protected]

Page 17: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

June 11, 2020

Matthew Elkins—Manager, Performance Analysis &

Resource Adequacy

Current WECC Resource Adequacy

Page 18: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Resource Adequacy Process

18

Data Collection and Validation

Model Update and Database

Population

WECC-Wide Zonal Modeling

Compile and Analyze Results with Stakeholder

Input

Report Final Results

Page 19: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Loads and Resources Data Request

19

Annual Data Request• December–March

o Generation Existing and planned Hourly wind, solar

and hydro

o Demand Historic and forecast Historic hourly Forecast peak/energy

o Transmission New and upgrades

Page 20: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

WECC-BA-LSE Coordination

20

Balancing Authority

LSE/Utilities

WECC

State PUC

Consultants

Page 21: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Resource Adequacy Process

21

Data Collection and Validation

Model Update and Database

Population

WECC-Wide Zonal Modeling

Compile and Analyze Results with Stakeholder

Input

Report Final Results

Page 22: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Many Databases

Hourly historical• Demand• Generation

o Hydroo Windo Solar

• Generator outage information (NERC GADS)

Forecast• Demand• Resource portfolio

22

# of Databases:

325

Yikes

Page 23: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Resource Adequacy Process

23

Data Collection and Validation

Model Update and Database

Population

WECC-Wide Zonal Modeling

Compile and Analyze Results with Stakeholder

Input

Report Final Results

Page 24: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

MAVRIC Model

24

Multi-Area Variable Resource Integration Convolution (MAVRIC) model

Multi-Area—Incorporates all balancing authorities in the western interconnection

Variable Resource Integration—Ability to understand the variability around new resources

Convolution—A type of probabilistic study

Page 25: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Model Overview

Expansive Balancing Authority Model• BAs broken into additional zones• Some BAs combined into zones

Major Paths between BAs

25

Page 26: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

MAVRIC Convolution

26

There are many ways to perform probabilistic studies; each have their strengths and weaknesses

Using convolution techniques, Markov-Chain models, and with the ability to use transfers dynamically, MAVRIC can model the overall system reliability while maintaining adequate run-time and computing capabilities

Page 27: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Resource Adequacy Process

27

Data Collection and Validation

Model Update and Database

Population

WECC-Wide Zonal Modeling

Compile and Analyze Results with Stakeholder

Input

Report Final Results

Page 28: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Results from MAVRIC

28

Analysis of the entire system and ability of all load-serving areas to maintain a reliability reserve margin that leaves LOLP for all hours equal to or less than 0.02% is derived

Analysis is then done on any areas where the reliability threshold margin cannot be maintained even after external assistance from excess load-serving areas

Page 29: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Regional Results—Before Transfers

29

0

5,000

10,000

15,000

20,000

25,000

30,000

0% 10% 20% 30%

MWh/million

CAMX NWUS SW RM CAN

0

200

400

600

800

1,000

1,200

0% 10% 20% 30%

LOL(h)

CAMX NWUS SW RM CAN

Frequency Severity

Islanded Basis—No External Assistance Available

Page 30: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Regional Results—After Transfers

30

0

200

400

600

800

1,000

10% 15% 20% 25% 30%

MWh/million

CAMX NWUS

0

5

10

15

20

10% 15% 20% 25% 30%

LOL(h)

CAMX NWUS

Frequency Severity

System Basis—External Assistance Available

Page 31: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Regional Results—Over Time

31

0

5

10

15

20

10% 15% 20% 25% 30%

LOL(h)

2019 2020 2021 2022

0

200

400

600

800

1,000

10% 15% 20% 25% 30%

MWh/million

2019 2020 2021 2022

Frequency Severity

System Basis—External Assistance Available

CAMX

Page 32: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Resource Adequacy Process

32

Data Collection and Validation

Model Update and Database

Population

WECC-Wide Zonal Modeling

Compile and Analyze Results with Stakeholder

Input

Report Final Results

Page 33: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Reporting

33

NERC Assessments• Long-Term Reliability Assessment (LTRA)

o Summer and winter peak-hour assessmento Years 1-10o Reserve margin metrics

• Seasonal Assessments (SRA/WRA)o Operating-year winter and summer peak-houro Reserve margin metrics

• Probabilistic Assessment (ProbA)o 2- and 4-year emphasiso 8760 hourso Loss-of-Load Probability (LOLP) and Expected Unserved Energy (EUE) metrics

Internal special assessments and scenarios GRAF

Page 34: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

NERC Reporting Boundaries

34

The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one Region while associated Transmission Owners and Operators participate in another.

Page 35: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

NERC Assessment Areas

35

Page 36: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

WECC Regions

California/Mexico (CAMX) Canada (CAN) Northwest (NWUS) Rocky Mountains (RM) Southwest (SW)

36

Page 37: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Reliability Assessment Subcommittee

37

NERC Subcommittee• Forum for planning and facilitating NERC assessment• Meets in-person, four to five times a year, many more webinars,

rotates between the U.S. and Canada• Roster of ~50+

o Industry experts, NERC staff, FERC staff, DOE staff, regional and local representatives

Page 38: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Long-Term Reliability Assessment

Focused on peak summer and winter hour for next 10 years

Compares demand to capacity plus transfers

38

Page 39: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Seasonal Assessments

Peak Hour Energy lost due to:

• Forced outages• Extreme conditions

39

Page 40: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Probabilistic Assessment Working Group

40

NERC Work Group• Forum for planning and facilitating

probabilistic analysis and education• Meets in-person, four to five times a year,

many more webinars, rotates between the U.S. and Canada

• Roster of ~50+o Industry experts, NERC staff, FERC staff, DOE

staff, regional and local representatives

Page 41: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Probabilistic Assessment

41

Looks at all hours of the year for the next 10 years

Analyzes a range of possibilities around the expected

Determines where extreme tail risk may occur

Page 42: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Reporting

42

NERC Assessments• Long-Term Reliability Assessment (LTRA)

o Summer and winter peak-hour assessmento Years 1-10o Reserve margin metrics

• Seasonal Assessments (SRA/WRA)o Operating-year winter and summer peak-houro Reserve margin metrics

• Probabilistic Assessment (ProbA)o 2- and 4-year emphasiso 8760 hourso Loss-of-Load Probability (LOLP) and Expected Unserved Energy (EUE) metrics

Internal special assessments and scenarios GRAF

Page 43: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Peak Hour Shifting

43

Page 44: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Change in Threshold Margins

44

Are

a

Gas

Coa

l

Nuc

lear

Geo

ther

mal

Biom

ass

Hyd

ro

Win

d

Sola

r

Fixe

d

Var

iabl

e

Q1

Q2

Q3

Q4

Ann

ual

1 42% 0% 0% 48% 4% 3% 0% 3% 93% 7% 12% 14% 12% 14% 13%

2 56% 18% 0% 15% 0% 1% 5% 5% 89% 11% 9% 12% 10% 9% 10%

3 43% 24% 17% 0% 0% 2% 10% 4% 84% 16% 12% 13% 11% 12% 12%

4 26% 53% 0% 3% 1% 0% 0% 17% 83% 17% 9% 12% 11% 9% 10%

5 38% 41% 0% 0% 1% 4% 15% 0% 80% 20% 18% 18% 12% 15% 16%

6 50% 23% 6% 0% 0% 10% 7% 5% 79% 21% 18% 18% 15% 18% 17%

7 78% 0% 0% 0% 0% 1% 6% 15% 79% 21% 11% 13% 18% 11% 13%

8 50% 22% 3% 0% 2% 16% 5% 3% 76% 24% 16% 21% 23% 17% 19%

9 42% 25% 0% 0% 0% 15% 17% 1% 67% 33% 17% 19% 14% 17% 17%

10 53% 0% 6% 3% 2% 21% 7% 7% 64% 36% 12% 16% 14% 10% 13%

11 13% 44% 0% 0% 0% 26% 18% 0% 57% 43% 22% 22% 15% 16% 19%

12 9% 39% 0% 0% 3% 30% 19% 0% 51% 49% 24% 24% 22% 24% 24%

13 41% 4% 0% 0% 0% 53% 0% 3% 45% 55% 25% 28% 20% 19% 23%

14 15% 9% 2% 0% 1% 58% 15% 0% 27% 73% 23% 29% 21% 17% 23%

Page 45: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Time-of-Day Thresholds

45

Page 46: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

GRAF

46

https://www.wecc.org/ePubs/GenerationResourceAdequacyForecast

Interactive Charts and Maps

Page 47: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Demand

47

Overall – The peak hour demand in the Western Interconnection is expected to grow almost 9% in the next 10 years.

Page 48: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Resource Nameplate

48

Overall –Resource nameplate is expected to grow almost 9% in the next 10 years as well.

Much of that growth will be in variable resources.

Page 49: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Variability in Resources

49

The availability factor of variable resources compared to the availability factor of baseload resources reveals quite a difference, both seasonally and hourly.

With a shift from baseload resources to variable resources, studying all hours of the year will become paramount for resource adequacy.

Page 50: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Resource Adequacy of a Wind Region

50

Lower margins in the morning hours lead to risk in the system. Variability within the hour for both resources and demand leads to a range of possible risk.

Page 51: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Planning Margins in a Wind Region

A planning margin, in this case the threshold margin, is the amount of planning reserves above demand that should be maintained to ensure reliability

Comparing this threshold to the available resources can reveal where the risk is in the system

51

Page 52: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Risk Hours in a Wind Region

Before relying on neighbors for imports, risk in that area can be quantified as the overall number of hours with risk of demand not being served

Called a loss-of-load event

52

Page 53: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Risk Hours After Imports

With enough excess energy available in the system and enough import capability into this area, all potential loss-of-load hours can be satisfied, alleviating the risk

53

Page 54: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Resource Adequacy of a Solar Region

54

In this area, lower margins occur in the evening hours as the solar resource availability drops off faster than the ramp-down of demand from its peak hour. This leads to risk in the system. Variability within the hour for both resources and demand leads to a range of possible risk.

Page 55: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Planning Margins in a Solar Region

A planning margin, in this case the threshold margin, is the amount of planning reserves above demand that should be maintained to ensure reliability

Comparing this threshold to the available resources can reveal where the risk is

55

Page 56: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Risk Hours in a Solar Region

Before relying on neighbors for imports, risk in that area can be quantified as the overall number of hours with risk of demand not being served

Called a loss-of-load event

56

Page 57: Resource Adequacy - WECC · 6/11/2020  · The North American BPS is divided into six RE boundaries. The banded area shows overlap, as some load-serving entities participate in one

Risk Hours After Imports

Unfortunately, consistent with CAISO’s notice, even after import assistance from their neighbors, there are still a few hours in which availability plus imports is less than the planning reserve margin

These hours occur right after peak demand as solar resources fall more sharply than demand subsides