RESOLUTION 882-13
A RESOLUTION ADOPTING THE SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM FOR THE CITY OF SEDRO-WOOLLEY,
WASHINGTON 2014-2019
WHEREAS, pursuant to the provisions of Chapter 195 of the 1961 Session Laws of the State of Washington, Chapter 83 of the 1967 First Extraordinary Session of Laws of the State of Washington and RCW 35.77.101 , the City Council of the City of Sedro-Woolley shall adopt a comprehensive Six-Year Transportation Improvement Program (TIP), and;
WHEREAS, a public hearing was called by the City Council for the purpose of adopting said comprehensive Six-Year TIP on June 12, 2013, at approximately 7:00 p.rn., at the Sedro-Woolley City Hall, 325 Metcalf Street, Sedro-Woolley, Washington and it appeared that adoption of the Six Year Transportation Program will be good for the public.
NOW THEREFORE .BE IT RESOLVED by the City Council of the City of SedroWoolley that the 2014 - 2019 comprehensive Six Year Transportation Improvement Program of the City of Sedro-Woolley, Washington, as adopted at said public hearing is hereby adopted and approved as the 2014 - 2019 comprehensive Six Year Transportation Improvement Program of said City.
BE IT FURTHER RESOLVED that a copy of this street program, together with a copy of this resolution shall be filed with the Skagit MPO for inclusion in the Regional Six Year Transportation Improvement Program within the next 30 days; together with copies of each with the Washington State Department of Transportation Local Programs Engineer, and the Transportation Improvement Board.
PASSED BY THE CITY COUNCIL AND APPROVED BY THE MAYOR ON THIS 12th DAY OF JUNE, 2013.
ATTEST: APPROVED AS TO FORM:
.... ;r.: WMNftttOt'I Sbte 'f/I Oel)llt'tm«lt of TrMl..-tllffoft
Agency: Sedro Woolley
County: Skagit
MPO/RTPO: SMPO
,, "" 0 ::!. A. PIN/Projacl No. .... « c C. Project TIUo
" % n c D. Road Nome or Number nc
!i 3 E. Bogin & End Tennlnl O"
~ F. Project Description
16 1
Y Inside
SR20/Cook Road Realignment end ExtenslOn Project Schedules B through F
SR20
SR20 MP 64.81 lo SR20 MP 65.17
Complete the SR20/Cook Road Realignment & Extension Project Schedules B. C and D and upgrade the SR20 Stormwator Co"""Yllnca System to acoomodala profect.
Funding
B. STIP ID
G. StnJcture ID
SW02
Six Year Transportation Improvement Program From 2014 to 2019
N Outside
f !!' s.
::0 a .. ~ -I " ::0
~ .. .. 0 3 :E 0 i ..
)> .. c ii £ " "' % " g a ~ .a .. .. .. n i; 0 .. .,, 3 -I 0
~ -I 5. ::!. ;; .. % '< a. ~ ii " a !' j .. ... a. .. .. a.
06/12113 06/12113 01 CG OPS 0.360 CE No TW
Status Phase Phase Start Year (YYYY) Federsl Fund Code Federal Fund• Slate Fund Code State Funds Local Fund• Total Funds
p PE 2014 STP 125,425 0 19,575 145,000
p CN 2014 STP 1,474,825 0 230,175 1,705,000
Total• 1,800,250 0 249,750 1,850,000
Expenditure Schedule
Phaae 1st 2nd 3rd 4th 5th & 8th
PE 145,000 0 0 0 0
CN 1,705,000 0 0 0 0
Totals 1,850,000 0 0 0 0
Report Date: June 06, 2013 Page 1
~ ::r-~su.t· 'I/If/I DeP'lft!Mnt ef TrMt9port.tfott
Agency: Sedro Woolley
County: Skagft
MPO/RTPO: SMPO
... :i 0 :I, A. PIN/Project No. .,, -< c C. Proj•ct Tiii•
" z " c D. Road Name or Number n.=-.
~ E. Begin & l!nd Termini .-o .. :I .. !. ~ F. Project Description
17 2
V Inside
John Liner Road. Reed to Township Bicycle/Pedestrian Improvements Project
John Liner Road
Reed Street lo SR9fTownshlp Slreet
Construct 1 o· shared use path on the north side of John Liner Road from Reed to Township. Including drainage end lttuminatJon.
Funding
B. STIP 10
G. Structure ID
SW08A
Six Year Transportation Improvement Program From 2014 to 2019
N Outside
m
1 :I < a 'fl 0
< ~ ';} " :II
~ .. . 3 :l
I ~ . > . ~ £ :I :II
% " :I. £ .. . a. D. n ! .a . 0 3 ~ 0 ~ c
5- } • z a. ., ... 1 .. "Cl . .. a. i!. !' .. S' .. Q.
06/12/13 06/12/13 28 PSTW 0.370 CE No
Status I Phue I Phase Stllrt Vear (YYVV) I Federal Fund Code Federal Funds Stale Fund Code State Funds Local Funds Tobi Funds
p I ALL I 2014 I 0 SRTS 386.000 58.000 444.000
Totel1 0 386,000 58,000 444,000
Expendllurs Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 50,000 394,000 0 0 0
Totals 50.000 394,000 0 0 0
Report Date: June 06, 2013 Page2
..ia. ::r.: w..tllftttOl'I State Yfl o.p!lf'tment of~
Agency: Sodro Woolley
County: Skagit
MPO/RTI'O: SMPO
.,, ::!. 0 ::!. A. PIN/Project No. .,,
c .:( C. Project Tiiie
"' z nl!: c D. Road N1me or Number
3 E. Begin & End Termini -o . " a = .. ~ F. Project Description
16 3
Cook Road Overlay Project
Cook Road
Crossroads to Wast City Limits
Y Inside
Grind and overlay wilh petromal and •lructure ed)ustments.
Funding
Stetus I Phase I Ph1ae Start Yoar (YYYY) I Federal Fund Code
p I ALL I 2014 I Tot1ls
Expenditure Schedule
Phase 1st 2nd
ALL 500,000 0
Totals 500,000 0
Report Date: June 06, 2013
B. STIP ID
G, Structure ID
SW24
Six Year Transportation Improvement Program From 2014 to 2019
N Outside
3 !l' s. '?; ] a
c: .... " " ~ ..
3 0 3 ~ 0 = . > .. c .. fi ~ " " x "' " g • . Q. Q. 0 n r- ~ 0 .. !I l 3 " ~ 0 ti! ~
c Q. :i' ~
. z ,. Q. a !' • :z 9' .. Q.
06112/13 05 GSW 0.420 CE No
Federal Funds Stale Fund Cod• State Funds Local Funds Total Funds
0 TIS 425,000 75,000 500,000
0 425,000 75,000 500,000
3rd 4th 5th & 6th
0 0 0
0 0 0
Page3
~ :J:~Stlrt& "ff'/I Des-tmeM ef 1"r!~
Agency: Sedro Woolley
County: Skagit
MPO/RTPO: SMPO
.... :>. 0
~ A. PIN/Project No. .,, c C. Project Title " z " c D. Road Nam• or Number o:::: 3 =g E. Begin & End Termini er
.. !!. ~ F. Project D..scrtpUon
16 4
South Township, Waldron to SR20
South Township
W31dron to SR20
Grind and thick overlay with pavement maridngs.
Funding
Slotus I Phase I Phase Start Yoar (YYYYJ I p I ALL I 201 6 I
Expenditure Schedule
Ph H I 1at
ALL 50,000
Totals S0,000
Report Date: June 06, 2013
Y Inside
Federal Fund Code
Totals
2nd
0
0
8 . STlP ID
G. Struelurt ID
SW13
Six Year Transportation Improvement Program From 2014 to 2019
N Outsfde
m 3 " s. ... 0 :a a .. < § ~ " :a
~ .. .. 0 3 ~ 0
i .. > • c ~
;; " ~ % " = - ~ .. a. a. 0 0 r; .a .. 0
3 " i 0 ;< c "g. " ~ .. z a. ~ ;;-. a !' . ...
0. . .. a. 06/12/13 05 CGSTW 0.600 CE No
Feder•! Funds State Fund Code State Funds local Funds Total Funds
0 TlB 42,500 7,500 50,000
0 42,500 7,500 50,000
3rd 4th 5th & 8th
0 0 0
0 0 0
Page4
.-,. ::r.: Weth~ Stat• 'f//(11 O.~of ,.,.,~
Agency: Sedro WooHoy
County: Skagit
MPO/RTPO: SMPO
... i5-~ A. PIN/Project No. ~
c C. Project Tiii• " z
oll c D. Road Narne or Number 3 -o E. Begin & End Termini
E! ., ~ F. Project Description
16 5
Jameson Arterial Extension to SR9
Jameson
SR9 MP 55.45 to Baley Road
Y Inside
Relocate existing secondary arterial to new alignment and with a new roundeboul lnlersection at SR9, including drainage, curb•, blcycle/pedestrtan path, HMA. pavement markings and Illumination.
Funding
B.ST1PID
G. Structure ID
SW01
Six Year Transportation Improvement Program From 2014 to 2019
N Outside
l !l' s. "i 0 a
< ~ ~ " "' ~ .. .. 3 ~ 0 3 ll' ..
> .. c .. ~ ! "' ;: " ct a - .z a. 0. 0 n !; .. 0 3 " ~
0
~ c
.& " ii! ~ • z CL i a !> .. !7 . .. .. CL
06112/13 06112/13 01 CG PST 0.200 CE Yes w
Stalus Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code Slate Funds Local Funds Total Funds
p PE 2015 0 TIB 230,000 76,000 306,000
p RW 2015 0 TIB 460,000 153,000 613,000
p CN 2016 0 TIB 1,684,000 561.000 2,245,000
Tolala 0 2,374,000 790,000 3,154,000
Expendllu"' Schedule
PhoH 1st 2nd 3rd 4th 5th & 8th
PE 203,000 203,000 0 0 0
RW 255,500 255,500 0 0 0
CN 0 2,683,000 0 0 0
Tolals 458,500 3,141,SOO 0 0 D
Report Date: June 06, 2013 Pages
..... ~. Wathlngtoet Stat• ""' Dep11~of~
Agency: Sedro Woolley
County: Skagit
MPO/RTPO: SMPO
.,, :L
! A . PIN/ProJect No. .,, c C. ProJect Tiiie " z
D. Road N1me or Number (')~ c 3 E. Begin & End Termini - o . " .,.
I: !. ~ F. Project Oescrfptlan
16 6
Coak RoadfTraR Road Intersection lmprovemenbl
Cook Road
Trai Road lo Tran Road
ReconslrUc:t lntersGction with lral!lc signal.
Fundln9
Status I Phase I Phaee Start Year Cf'(YY) I p I ALL I 2016 I
Expenditure Schedule
PhlH 1s t
ALL 50.000
Totals 50,000
Report Date: June 06, 2013
Y Inside
Federal Fund Coda
Totals
2nd
340.000
340,000
B. STlP 10
G. Structure ID
SW25
Six Year Transportation Improvement Program From 2014 to 2019
N Outside
m 3 " s. " g rl ~ ~ ~
:a ~
.. ~ 3 ~ D . .. a; ~ g 3. :a x )> .
Q, &. a ,... !. .. .. 0 0 (') .. .a .. 'tJ ~ " ~ &. .& ~ £ 5- ii' z ~ a !'
... .. !T 'tJ
"' Q, . .. • Q,
06112/13 04 CG OPS 0.100 CE No TW
Federal Fund• State Fund Cade Stat• Funds Local Funds Total Funds
0 TIB 292,000 96.000 390,000
0 292,000 98,000 390,000
3rd 4th sth & eth
0 0 0
0 0 0
Page6
..-.. ~. Wnhlngtoet St-.t• .,,., OePllf't.,,.. crf Tnlft~
Agency: Sedru Woolley
County: Skagtt
MPO/RTPO: SMPO
.,, ::!. ~ A. PIN/Pto)1ct No. ... ~ c C. Project Tllle
" z " c D. Road Name or Number ne: 3 Ei E. Begin & End Termini
"' ~ F. Project Descr1ptlon
17 7
Y Inside
Jones/John Liner RR Undercrosslng - SR20 Corridor Project Phase 28
John Liner Road
Sapp Road to Reed Street
Construct new BNSF Railroad Undercros&lng end connect East Jones Road to John Liner Rosd collector arterials, Including raftroad undan:rosslng, drainage, curbs, sidewalks. HMA. pavement marldngs and llumlnedon.
Funding
B. STIP 10
G. Structure ID
SW06
Six Year Transportation Improvement Program From 2014 to 2019
N Oulslde
m
f " <
~ ii" <:: ';} ~ :0
~ ..
" ~ 0 3 e. ..
> . ~ . q .. " :0 :z: - !!: . : Q. ~ !! a n J;" .a 0
~ i 8. ~ c ::!. "9. " i z ~ " .. a !" . "' ., a. .. . 0.
06/12113 01 CGPS 0.100 CE No w
Status I Phue I Phase Start Year (YYYY) I Federal Fund Code Federal Funds St•hl Fund Codo Stale Funds Loci! Funds Total Funds
p I ALL I 2016 I STP 3,000,000 T IB 1,575,000 1,525,000 6,100,000
Talala 3,000,000 1,!>75,000 1,52S,OOO 6,100,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 8th
ALL 1.000.000 5,100,000 0 0 0
Toti ls 1,000,000 5,100,000 0 0 0
Report Date: June 06, 2013 Page 7
~ :Z:~Stat&
"" Des-tm-t of,.,_~ Agency: Sedro Woolley
County: Skagit
MPO/RTPO: SMPO
.,, ;:,. 0
~ A . PIN/Project No. ... c: C. Project Tltlt :I z 0 c: O. Road Name or Number oi::
~ E. Begin & End Termini -o • :I
= !. ~ F. Project OesctipUon
17 8
Jones Rood Arterial Improvements
Jones Road
F&S Grode Road to Sapp Road
Y Inside
Re<:ol\slruct Jones Road to Arterial section Including drainage, curbs, sidewalk, combined blcycle/pedeslrlan path. HMA. pavamenl markings 8fld llumlnatlon.
Funding
Status I Phase I Phase Start Y11r (YYYY) I Fodtrel Fund Cod•
p I AU. I 2017 I Tot1l1
Expenditure Schedule
Ph11e 111 2nd
ALL 450,000 2,550.000
Total1 "50,000 2,550,000
Report Date: June 06, 2013
B. STIP 10
G. Structure ID
SW07
Six Year Transportation Improvement Program From 2014 to 2019
N Outside
'" 3 :I ~ -0 a " a
" < g ~ :I
" ~ .. .. 0 3 ~ 0 3 ..
)> .. c .. ~ !: :I " % :I ii' !: .. ~
a. 0. a 0 r-"' 0
i :I ~ &. ..
~ ~ l .& 5' z '< a !' -0 .. 5' 'i .. a. .. .. "'
06/1211 3 03 CG P ST 0.750 CE No w
Federal Funds State Fund Code State Funds Local Funds Tot1I Funds
0 TIB 2.400,000 600.000 3,000,000
0 2.•00,000 800,000 3,000,000
3rd .th 5th & 9th
0 0 0
0 0 0
Page 8
....... ::7:: Wnhlrltt°" Stele "II Department or Tnin.,,.,.t:atfon
Agency: Sedro Woolley
County: Skagit
MPO/RTPO: SMPO
.... :i. 0 :s. A . PIN/Project No. .,, '< c: C. Project TIHe
" z n~ c 0 . Road Name or Number
3 Ii' 0 E. Bogin & End Termini .,. :: i ~ F. Project DescrlpUon
16 9
SR9 Pedeslnan/Bicyc:fe Safety Improvements
SR9/Township Streel
Y Inside
MP 57 .99 Park Cottage Place to MP 58.30 North City Limits
Construct 6' bicycle lane and e· sidewalk Improvements on the west side of SR9 from Parle Cottage Place ID the North City Limits.
l'undlng
B. STIPID
G. Structure ID
SW03B
Six Year Transportation Improvement Program From 2014 to 2019
N Olllslde
3 !l' ~ .,, 0 ;o 0 .. <
~ -4 " ;o
~ ..
~ 3 ~ 0 ! .
> .. c .. jj " ;o l " e. - !!: . Q. Q. 0 ;a n .... .a .. 0
i :> ~ 8.
.. ~ c
:i. .,,
" ~· '" z "' .il a !' ,, .. 5'
,, Q. . .. .. Q.
08112/13 06/12/13 28 CG OPS 0.310 CE No TW
Status Phase Phose Stolt YHr (YYYY) Fede111l Fund Code Federal Funds State Fund Code State Funds Local Funds Totel Funds
p PE 2015 0 SRTS 69,600 12,300 81 ,900
p CN 2018 0 SRTS 394,500 69,600 464,100
Totals 0 464,100 81,900 548,DDO
Expenditure Schedule
Phue 1st 2nd 3rd 4th 5th & 8th
PE 57,000 249,010 0 0 0
CN 0 464,100 0 0 0
Totals 57,000 713, 110 0 0 0
Report Date: June 06, 2013 Page 9
~ ::r- ~""State 'ff/I o.PMt-t 11rTn1n.,_utloft
Agency: Sedro Wooftey
County: Skagit
MPOIRTPO: SMPO
... :!. 0
Q A. PIN/Project No. .,, " c. Project Tiii• :I z " c D. Road N1m1 or Number oc
-o 3 E. Bogin & End Termini :::i r:r ~ F. Project DescrlpUon .. !!.
16 10
F&S Grade Road
F&S Grade Road
SR20 MP 65.16 to Wes! City Limits/Jones Road
Y Inside
Recons1ruct F&S Grade Road to arterial standards Including drainage, curbs, sidewalk, combined blcycle/pedes1rian peth, HMA, pavement markings and lllumlnallon.
Funding
Status I PhaH I Phase .Start Yew (YYYY) I Fedenl Fund Code
p I ALL I 2018 I Tot.la
Expenditure Schedule
Phuo 1st 2nd
ALL 200,000 1,740,000
Talala 200,000 1,740,000
Report Date: June 06, 2013
B. STIP ID
G. Structure ID
SW09
Six Year Transportation Improvement Program From 2014 to 2019
N Outside
3 !l' "" ~ -: 0 < ~ -I
:I
"' ~ • • 0 3 ~ 0 3 .. ,. .. c .. ~ Ir ~ "' :c :I a - .z .. a. a. 0 0 .-
0 .. l ,,
~ " ~ D " ~ c
Ii z a. "' ~ a !' ,, • 5' a. .. .. . a.
06/12/13 03 CG PST 0.640 CE No w
Federal Funds State Fund Code State Fund1 Locol Funds Total Funds
0 TIB 1,455,000 485,000 1,940,000
0 1,455,000 485,000 1,940,000
3rd 41h 5th & 8th
0 0 0
0 0 0
Page 10
..... Yis WMhMtt°" St.te ·u_, De~of'Tl1wl~
Agency: Sedro Woolley
County: Skagit
MPOIRTPO: SMPO
.... ~ :1 A. PIN/Project No. .,, -:< c C. PrvJ•ct Tiiie
" z n c 0. Road Nam11 or Number Q g. 3 E. Begin & End Tel'ITl lnl .. " <I'
= !!. ~ F. Project Descrtpllon
17 11
Reed Street Recon•tnJc:tion
Reed Street
Feny Street to SR20
Y Inside
Reconstruct street to arterlal standards with new curbs, sldewalks, ADA facllllles, HMA pavement and pavement markings.
Funding
Status I Phu• I Phase Start Year (YYYY) I Federal Fund Code
p I All I 2019 I Total1
Expenditure Schedule
Phase 1st 2nd
All 200,000 1,940,000
Tot•I• 200,000 1,940,000
Report Date: June 06, 2013
B. STIP ID
G. Structun! ID
SW26
Six Year Transportation Improvement Program From 2014 to 2019
N Outside
3 !l' :s. .,, 0 ;o 0 .. <
~ <} " ;o
~ . .. 3 ~ 0 3 !! ..
)> .. " .. q ~ ~ :r &. "' a .. a. 0 0 r; .a .. 0 3 " i &. ~
c .,, " :1 ;; .. z ID ;;-" a. !' .. ~ ., Q. .. . Q.
06/12113 04 COOPS 0.350 CE No TW
Federol Fund• S!a1e Fund Code Slate Funds local Fund• Total Funds
0 TIB 1,605,000 535,000 2,140,000
0 1,605,000 535,000 2,140,000
3rd 4th Slh &6th
0 0 0
0 0 0
Page 11
e. WMhfnotOl'I Stat• Y/I Department or ""-PMt.tloft
Agency: Sedro WooMey
County: Skagit
MPO/RTPO: SMPO
... 5-~ A. PIN/Project No. .,,
c C. Project Tltfe " z ()a c D. Road Name or Number
3 E. Begin & End Termini -o 5§. CJ"
~ F. Project Description
17 14
Y Inside
Patrick Slreet Arterial Project SR20 Corr Pro) Phase 4
Patrick Street
Michael Street lo East Jones Road
New collector arterial wKh drainage, curbs, sidewalks, HMA. pavement markings. rnumlna~on.
Funding
Status I Phue I Ph•H Start Year (VYYYJ I Federal Fund Code
p I ALL I 2017 I Tot.111
Expenditure Schedule
PhHe 1st 2nd
ALL 200,000 1,240,000
Totals 200,000 1,240,000
Report Date: June 06, 2013
B. STIP ID
G. Structure ID
SW20
Six Year Transportation Improvement Program From 2014 to 2019
N Outside
3 !l' s. ,, a ;a 0 .. < § -I " ~ ~
.. 3 0 3 0 . > . c . ~ !: " "' % Q. ::> "' " !: ~ . a. 0 ~ b' r 0 .. .. ,, 3 " ~ " ~ c
"" "' i Ii ... z "' " a !' ,, .. 5'
,, ., Q. .. .. . Q.
06/12/13 01 CG PST 0.220 CE Yes w
Federal FUnd1 State Fund Code Stall Funds Local Funds Total Funds
0 TIS 1,080.000 360,000 1,440.000
0 1,080,000 360,000 1.4-40,000
3rd 4th 5th & 8th
0 0 0
0 0 0
Page 12
..... ::z: w..tlhlfton Stat• 'ff /I De~rtment of TnwtsporiaUott
Agency: 5edro Wooley
County: Sl<agll
lllPO/RTPO: SMPO
... :I.
~ A. PIN/Projecl No. .,, c: C. ProJect Tiiie :s z n c D. Road Name or Number .., ...
3 E. Begin & End Tennlnl Ei tT F. Project DHcriptlon ~
17 15
Y Inside
Frulldalc/N Township Arterial Extension (Portobeno Street)
PortobefloSlreet
SR9/N Township Street to Cascaclia Drive
New conector arterial connect!ng Fru!1dale to SR9/N Township, including drainage, curbs, sklewalkl, HMA, pavement markings and llumlnatlon.
Funding
B. STIP ID
G. Structur. ID
SW21
Six Year Transportation Improvement Program From 2014 to 2019
N Outside
3 !:' "' ~
:JI a 0 .. < ~ -4 :s ~ ~
.. . 0 3 0 c 3 ~ ~
. ~ .. .. ~ :JI ::c " = :s .z .. a. 0 (') ~ 0 . • "Cl 3 :s
~ &. " ~ c :I.
ID .. z ... t;"
.& 1 .. • a. a !' .. 5' • a. 06/12/13 01 CG PST 0.300 CE Yes
w
Status I Pho St I Phu• Sia rt Year (YYYV) I Feder.al Fund Code Fodenl Funds State Fund Code State Funds local Funds Tol•I Funds
p I CN I 2018 I 0 TIB 750,000 250.000 1,000,000
Tota lo 0 750,000 250,000 1,000,000
Expenditure Schedule
Phna 1st 2nd 3rd 4th 5th & 6th
ALL 150,000 850,000 0 0 0
Totals 150,000 850,000 0 0 0
Feder.al Funds State Funds Local Funds Totol Funds
Grand Totels for Sedro Woolley 4,800,250 12,848,600 5,115,150 22.584,000
Report Date: June 06, 2013 Page 13