research performance progress report (rppr) nih's & nsf's implementation of the rppr...

31
RESEARCH PERFORMANCE PROGRESS REPORT (RPPR) NIH's & NSF's Implementation of the RPPR Presented By: Nadira Clarke: [email protected] David Gillich: [email protected] Office of Grant and Contract Administration March 11, 2013

Upload: marshall-watkins

Post on 28-Dec-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

RESEARCH PERFORMANCE PROGRESS REPORT (RPPR)RESEARCH PERFORMANCE PROGRESS REPORT (RPPR)

NIH's & NSF's Implementation of the RPPR

Presented By:

Nadira Clarke: [email protected]

David Gillich: [email protected]

Office of Grant and Contract Administration

March 11, 2013

AgendaAgenda

2

• Background• NIH RPPR

– Components– Guidelines– GCA Procedures– Demo– Progress Report Additional Materials (PRAM)– Resources

• NSF RPPR– Guidelines– Demo– Progress Report Additional Materials (PRAM)– Resources

BackgroundBackground

• National Science and Technology Council (NSTC) Initiative– Create consistency across federal agencies in administering

their research awards.– Facilitate the development of a common electronic solution for

collecting the information. – Replace current reporting formats.– Does not change the performance reporting requirements in 2

CFR part 215 (OMB Circular A–110)

OMB Circular, Cost Principles for Educational Institutions 2 CFR, Part 215 http://www.whitehouse.gov/sites/default/files/omb/assets/omb/fedreg/2005/083105_a21.pdf

NIH RPPR: ComponentsNIH RPPR: Components

• Collects the following categories of information:– Standard Cover Page– Mandatory Component (Accomplishments)– Optional Components (Agency Specific)

• Agencies will utilize standard instructions developed for each category, but may also provide additional program-specific instructions necessary to clarify requirement for a particular program

Important Note: Adhere to Agency Specific Instructions

NIH RPPR: GuidelinesNIH RPPR: Guidelines

– DHHS - NIH and Other Public Health Service (PHS) Agencies

– Dept of Human Svc (DHS)

– Dept of Correction (DOC)

– Dept of Defense (DOD)

– Dept of Energy (DOE

– National Institute of Justice/Office of Justice Programs

– DoEd/Institute of Education Sciences

– Dept of Justice (DOJ)

– Office of Justice Programs

– Environmental Protection Agency (EPA)

– National Aeronautics and Space Administration (NASA)

– Natl Endowment for the Humanities (NEH)

– NSF

– US Drug Administration (USDA)

– Forest Service

– Natl Institute of Food and Agriculture (NIFA)

PHS Agencies and NSF are implementing now.

National Institutes of Health Research Performance Progress Report

National Institutes of Health Research Performance Progress Report

Effective NOW; expanding 4/18/13

NIH RPPR: GuidelinesNIH RPPR: Guidelines

• Replaces:– the Public Health Service (PHS) Non-competing

Continuation Progress Report (PHS 2590) and – the Ruth L. Kirschstein National Research Service Award

Individual Fellowship Progress Report for Continuation Support (PHS 416-9).

NIH RPPR: GuidelinesNIH RPPR: Guidelines

• Similarities eSNAP vs. RPRR– Describes progress, study results, the

significance of the findings, and any significant changes.

– Pre-populates information from NIH systems.– MyNCBI publications list displayed.– Detailed budget not required.– NIH policy requirements requested.

NIH RPPR: GuidelinesNIH RPPR: Guidelines

• Differences eSNAP vs. RPRR– Separate screens for reporting components.– Non-SNAP awards budget component is a SF424(R&R)

Budget.– Uses checkbox, text box, PDF, or selecting “Nothing to

Report.” – Required information for all foreign collaborations.– Effort rounded to nearest whole person month.– Location required for competitive revisions/administrative

supplements associated with the award.– Public Access compliance status displayed– Other support required only if changed from prior reports– Link to Notice of Award– Streamlined ClinicalTrials.gov reporting information

NIH RPPR: GuidelinesNIH RPPR: Guidelines

RPPRs Required

NIH RPPR: GuidelinesNIH RPPR: Guidelines

• Status of NON-SNAP Applications– NIH is currently working on the implementation of the

RPPR for non-SNAP awards– Paper PHS 2590 must be used for progress reports for

awards that require annual budgets, e.g.,:– Training (T) awards, – most multi-project awards

• P01• P30 • P50

NIH RPPR:GuidelinesNIH RPPR:Guidelines

• Due Dates are the same as today– Available in the eRA Commons Status system– Available in the eRA Quick Queries system. – Automatic email notifications sent to the PD/PI prior to

due date. • SNAP - 45 days prior to the start of the next budget

period• Fellowships - two months prior to the start of the

next budget period. • Notice of Award (NoA) May indicate a different due

date which supersedes the above dates. Grantees should consult the NoA to determine when SNAP procedures apply.

NIH RPPR:GuidelinesNIH RPPR:Guidelines

• RPPR StructuresA. Cover PageB. AccomplishmentsC. ProductsD. ParticipantsE. ImpactF.ChangesG.Special (NIH) Reporting RequirementsH. Budget – SF424 (R&R) forms

NIH RPPR: GuidelinesNIH RPPR: Guidelines

• RPRR Features– Report Data Entry

• Text boxes • PDF files• Nothing to Report/Not applicable• No Change

– Special Characters• Data fields and text entry boxes only support ASCII

characters: Greek letters, mathematical equations, images, and so-called “rich” text (including bold, italic, underline, superscript, subscript, strikethrough, etc.) are not permitted.

NIH RPPR: GuidelinesNIH RPPR: Guidelines

• RPPR Features– Data or Text Box, and PDF Size Limits

• Limit text responses to no more than one page, or approximately 2,800 characters.

– Text boxes contain a limit of no more than 8,000 characters (3 pages)

– PDF file attachments do not have page limits, but may not be more than 6 megabytes (6MB).

• PDF attachments utilized only to provide considerable detail

– PIs are encouraged to be concise and avoid unnecessary detail.

NIH RPPR GuidelinesNIH RPPR Guidelines

• RPPR Features– PDF Attachments and File Names – PDF files can be attached to the appropriate component

in the progress report. • PDF’s used to preserve document formatting. • PDF attachments must be submitted as individual

files.

– eRA systems cannot support “Bundling” or “Portfolio” features at this time.

• PDF paginated discouraged. • Descriptive file names - 50 characters or less - no

special characters.

NIH RPPR: GuidelinesNIH RPPR: Guidelines

• RPPR Features– Style – Use English and avoid jargon.

• Abbreviations and language that may not be known to the broader scientific community should be avoided unless clearly defined.

– Internet Web site addresses (URLs) should not be used unless provided under C.2

GCA ProcedureGCA Procedure

Proposal Development (PD)

– Create RPPR in Commons

– Create child record and route to PI, department and GCA

– Submit thru Commons

Non-Proposal Development (PD)

– Create RPPR in Commons

– Submit fully signed TranSum to GCA

– Submit thru Commons

eRA COMMONS - DemoeRA COMMONS - Demo

http://grants.nih.gov/grants/rppr/rppr_screen_shots.pdf

NIH RPPR Guidelines - PRAM NIH RPPR Guidelines - PRAM

NIH RPPR: PRAM NIH RPPR: PRAM

• Non-compliant RPPR– Typically, missing its publications information.– Alert email generated to PI and GCA– Link opened automatically when RPPR Access PRAM link

from Status Screen• Allows for text entry of 2,000 characters

– Route and submit functionality are identical to functionality for RPPR

– Certification text when forwarding or submitting

• Must be submitted by SO or PD/PI with submit authority

NIH RPPR: RemindersNIH RPPR: Reminders

• Progress reports are required to continue support of a PHS grant for each budget year within a competitive segment.

• RPPR is not used for submitting a Final Progress Report.• Data either entered directly into text boxes or uploaded as PDF

files.

• Text exceeding 8,000 characters is cut to 8,000 when using the cut and paste feature.

• PDF file uploads (attachments) do not have page limits, but may not be more than 6 megabytes (6MB).

• Remember to click SAVE button, system does not autosave.

• Publications must be entered through MyNCBI, which will filter in RPPR

• PDF attachment s may include non-ASCII characters, “rich” text, or images.  Text boxes may not.

• Progress Report Additional Materials (PRAM) is required if non-complaint publications are submitted in the RPPR.

NIH RPPR: ResourcesNIH RPPR: Resources

• RPPR Data Dictionary.– http://www.nsf.gov/bfa/dias/policy/rppr/data_dictionary_guide_aug12.pdf – http://www.nsf.gov/bfa/dias/policy/rppr/data_dictionary_aug12.pdf

• NIH– Yale MyNCBI help– Questions or need help complying with the NIH Public Access Policy, Pease

contact Denise Hersey at the Cushing/Whitney Medical Library http://guides.library.yale.edu/nihpolicy

– My NCBI – How To Youtube video• http://www.youtube.com/watch?v=ks46w3mNAQE

– NIH RPPR Page• http://grants.nih.gov/grants/rppr/index.htm

– To determine which progress reports are due• http://era.nih.gov/commons/quick_queries/index.cfm#progress

– System issues or comments• eRA Help Desk

– Content questions or comments• E-mail [email protected]

– RPPR Screenshots• http://grants.nih.gov/grants/rppr/rppr_screen_shots.pdf

– Non-SNAP Report updates• NIH Guide for Grants and Contracts.

National Science FoundationResearch Performance Progress Report

National Science FoundationResearch Performance Progress Report

Effective 3/18/13

NSF RPPR:Guidelines NSF RPPR:Guidelines

Similarities

• Submitted through FastLane

• Submitted by PI’s• Demographic information

required for all significant participants

• Late submission of reports will result in delay of award modifications

• Project requests for not only PI but also any co-PI’s associated with that PI.

Differences

• Research.gov• Project reporting dashboard• Structured collection of data• Rich text editor• PDF upload to support

images, charts, and other complex graphics

• Improved citation search through Thomson Web of Science

• Special reporting requirements are controlled by solicitation

• PI no longer provides demographic information about significant participants

NSF RPPR:Guidelines NSF RPPR:Guidelines

• Due dates are the same as today:– RPPR - 90 days before the budget period (reporting

period) end date, unless specified in notice of award– Final Project Reports are due at 12:00 am EST the day

after the final award expiration date.

NSF RPPR:Guidelines NSF RPPR:Guidelines

• RPRR Structure– Mandatory Category:

• Accomplishments: What was done? What was learned?

– Optional Categories:• Products: What has the project produced?• Participants & Other Collaborating Organizations:

Who has been involved?• Impact: What is the impact of the project? How has it

contributed?• Changes/Problems• Special Reporting Requirements (where applicable)• Appendix 1: Demographic Information for Significant

Contributors

NSH RPPR: PRAMNSH RPPR: PRAM

• Reminders– FastLane login will grant access to Research.gov – Data is either entered directly into text boxes or

uploaded as PDF files – PDF file size limited to:

• 5MB for Products and Accomplishments section

• 10MB for the Special Requirements section– Demographic information on project participants no

longer collected in reports. Separate email generated to individuals.

– Project participants as well, so their information is automatically pre-populated

– System provides pre-populated information that must be verified.

– Reports contain a progress indicator field, used to demonstrate level of report completion.

NSF: RESOURCESNSF: RESOURCES

• RPPR Data Dictionary.– http://www.nsf.gov/bfa/dias/policy/rppr/

data_dictionary_guide_aug12.pdf – http://www.nsf.gov/bfa/dias/policy/rppr/

data_dictionary_aug12.pdf

• NSF– Research.gov Help Desk NSF RPPR Page

• http://www.research.gov/research-portal/appmanager/base/desktop?_nfpb=true&_pageLabel=research_page_n_about_por

[email protected] or 1-800-381-1532– Step by step guidance

• http://www.research.gov/common/attachment/Desktop/NSF_RGov_RPPR_ScreenshotsandInstructions_102412.pdf

– FQA’s•

http://www.research.gov/common/attachment/Desktop/RPPRFAQs12313.pdf

33

Questions

Contact: Nadira Clarke: [email protected] David Gillich: [email protected]