requisition for supp ly of energy - karnataka · 2020. 5. 6. · format-i mangalore electricity...

15
Format-I MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED (Wholly owned Government of Karnataka Undertaking) REQUISITION FOR SUPPLY OF ENERGY UNDER ELECTRICITY ACT 2003 (please tick () on the appropriate box)Refer Annexure-I LT-1 BJ/KJ Installation LT-2 Domestic Consumer Category LT-2a(i) LT-2a(ii) LT -2b(i) LT- 2b(ii) LT-3 Commercial Lighting & Heating LT-3(i) LT-3(ii) LT-4 IP Set Installations LT-4(a) LT-4(b) LT-4(c)(i) LT-4(c)(ii) LT-5 Installations of LT Industries LT-5(a) LT-5(b) LT-6 Water Supply/ Street light LT-6(a) LT-6(b) LT-7 Temporary Connection Applicatin Type o Regular o Tatkal A GENERAL PARTICULARS For individual Applicants only Name Father’s/Husband’s Name Name of the Nominee (Optional) For Organization/ Corporate Applicants only Name of the Organization Name of the Authorized Signatory Designation of the Authorized Signatory Complete Address of location where power supply is required House No./Flat No./Shop No./Plot No. Floor Street Name Area/ Location Cross Main City Pin Ph. No. Mobile Landmark Email Permanent Address/ Registered Office Address in case of Company o Same address as mentioned above o If different, specify below House No./Flat No./Shop No./ Plot No. Floor Street Name Area/ Location Cross Main City Pin Ph. No. Mobile Landmark Email B PARTICULARS OF CONNECTION No. of Points Desired load(KW/HP) o Lighting o Heating Required Voltage (V/ kV) Phase Requirement o Single phase o Three phase This requisition is for o A new Service o A sub-service from existing service

Upload: others

Post on 17-Nov-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REQUISITION FOR SUPP LY OF ENERGY - Karnataka · 2020. 5. 6. · Format-I MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED (Wholly owned Government of Karnataka Undertaking) F List of

Format-I

MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED

(Wholly owned Government of Karnataka Undertaking)

REQUISITION FOR SUPPLY OF ENERGY

UNDER ELECTRICITY ACT 2003

(please tick (√) on the appropriate box)Refer Annexure-I LT-1 BJ/KJ Installation LT-2 Domestic Consumer Category LT-2a(i) LT-2a(ii) LT -2b(i) LT- 2b(ii)

LT-3 Commercial Lighting & Heating LT-3(i) LT-3(ii)

LT-4 IP Set Installations LT-4(a) LT-4(b) LT-4(c)(i) LT-4(c)(ii)

LT-5 Installations of LT Industries LT-5(a) LT-5(b) LT-6 Water Supply/ Street light LT-6(a) LT-6(b)

LT-7 Temporary Connection Applicatin Type o Regular o Tatkal

A GENERAL PARTICULARS

For individual Applicants only

Name Father’s/Husband’s Name Name of the Nominee (Optional) For Organization/ Corporate Applicants only

Name of the Organization Name of the Authorized Signatory Designation of the Authorized Signatory Complete Address of location where power supply is required

House No./Flat No./Shop No./Plot No.

Floor Street Name Area/ Location Cross

Main City

Pin Ph. No. Mobile

Landmark

Email

Permanent Address/ Registered Office Address in case of Company

o Same address as mentioned above o If different, specify below

House No./Flat No./Shop No./ Plot No.

Floor Street Name Area/ Location Cross Main City Pin Ph. No. Mobile Landmark Email B PARTICULARS OF CONNECTION

No. of Points Desired load(KW/HP) o Lighting o Heating

Required Voltage (V/ kV) Phase Requirement o Single phase o Three phase

This requisition is for o A new Service o A sub-service from existing service

Page 2: REQUISITION FOR SUPP LY OF ENERGY - Karnataka · 2020. 5. 6. · Format-I MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED (Wholly owned Government of Karnataka Undertaking) F List of

Format-I

MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED

(Wholly owned Government of Karnataka Undertaking)

In case of sub-service from existing service

Name of the existing consumer

Existing R.R.No. Acc. ID.

C ACCOUNT DETAILS

Power Supply Required for (please tick (√) on the appropriate box)

Residential Commercial Industrial

Public Water Supply Agriculture IP Set Temporary

Kutira Jyothi Bhagya Jyothi Ganga Kalyana

If Government Central State

Public Street light/ Public Park light

Self Rental Public Use

D ADDITIONAL DETAILS

Any Other Special Government Scheme (please tick (√) on the appropriate box)

BJ KJ RGGVY GANGA KALYANA

Type of Ownership

Individual Leased/ Rental Co owned

Proprietorship Public Company Private Company

Partnership Trust

If IP set, Water Source

Open well Bore well River

Channel Sub-channel Nallah

Details of any other installation in his/her/their name in MESCOM area

R.R.No. Account No.

Installation #1

Installation #2

Installation #3

E PARTICULARS OF LEC Name of the Licensed Electrical Contractor

Address of the LEC

License No. Class

Validity d d m m y y y y

If LEC is different from the one mentioned herein, same may brought to the knowledge of MESCOM

DECLARATION I/We hereby declare that the information provided herein are true and to the best of my/our knowledge and I/We agree with the licensee to take a power supply for the above mentioned purposes in accordance with KERC Conditions of Supply (CoS & Supply Code) as amended from time to time generally and specifically bound by the provisions of Clause 43 of Conditions of Supply, 2006.

Affix Recent Passport Size

Photograph of Applicant

Name Name/Seal of Organization

Date d d m m y y y y

Place Applicant’s Signature

Page 3: REQUISITION FOR SUPP LY OF ENERGY - Karnataka · 2020. 5. 6. · Format-I MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED (Wholly owned Government of Karnataka Undertaking) F List of

Format-I

MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED

(Wholly owned Government of Karnataka Undertaking)

F List of Documents to be submitted (please tick (√) on the appropriate box) Refer Annexure-II

1 Proof of Ownership of the premises or Proof of Occupancy 2 General License from the local authority, if such License is provided for 3 In case of partnership firm, registered partnership deed 4 In case of a Limited Company, Memorandum and Articles of Association and

Certificate of Incorporation 5 Indemnity Bond if the Applicant is not the owner of the premises 6 Proof of Permanent residential address of the applicant and PAN number, if any 7 An undertaking stating that the applicant will not engage Child Labour in their

Industrial/ Commercial installation. Also consent to disconnect the power supply to the installation in case of violation

8 Full address with Location sketch 9 An undertaking on plain paper agreeing to install the Solar Water heater as per KERC

tariff order 10 A power supply agreement for supply of low/ high tension electrical energy in the

prescribed format on a specified stamp duty paper of amount as prescribed by the Commission from time to time

Page 4: REQUISITION FOR SUPP LY OF ENERGY - Karnataka · 2020. 5. 6. · Format-I MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED (Wholly owned Government of Karnataka Undertaking) F List of

Format-I

MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED

(Wholly owned Government of Karnataka Undertaking)

GENERAL INSTRUCTIONS

1. Application should be filled up in Block letters only and tick the boxes wherever necessary

2. Refer ANNEXURE-I to know your Tariff Category

3. Refer ANNEXURE-II to know the list of documents to be submitted

4. Affix your photograph and signature compulsorily

5. The filled in requisition form should be submitted to the AEE of the Sub Division

6. For any clarifications please contact concerned Sub Division office

7. The application Registration / Re-registration cum Processing fees payable by the Applicant for registration purpose is as follows (Clause 30.01) :

Sl. No.

Category Amount (in Rs.)

1. Domestic / Non-Commercial Lighting. 25.00

2. Domestic combined lighting & heating (AEH) / Non-Commercial / Non-Domestic combined lighting & heating.

50.00

3. Commercial Lighting. 50.00

4. L.T. Power (3 phase) 100.00

5. Commercial / Residential complexes / M.S. Buildings.

As prescribed for each installation of that category as above subject to minimum of Rs. 250.00 per premises

6. Layouts. 250.00 per layout

8. Process Flow Chart

Registration (AET)

Estimate (Field officer)

Power sanction

/Intimation (AEE)

Execution of work

(Field officer)

Issue of R.R

No.

(AET)

Servicing of

Installation

(Field officer)

Charges payment (Consumer)

Work Order (AET)

Submission of wiring diagram, Completion

report Agreement (Consumer)

Page 5: REQUISITION FOR SUPP LY OF ENERGY - Karnataka · 2020. 5. 6. · Format-I MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED (Wholly owned Government of Karnataka Undertaking) F List of

Format-I

MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED

(Wholly owned Government of Karnataka Undertaking)

9. Indicative Maximum time limit (Clause 3, Duty of Licensee to Supply Electricity on

request):

Release of Power Supply where service is feasible from existing network

Within one month of receipt of application

Release of supply where Network Expansion/ Enhancement required for providing connection

LT supply : 45 days 11kV HT supply : 60 days 33kV HT supply : 90 days EHT supply : 180 days

IP sets Within 30 days after attaining seniority (The number of new connections shall be limited to the target fixed for the year)

For any Electricity Complaints / Suggestions, please call MESCOM Helpline

18004251917 or visit: www.mesco.in.

Page 6: REQUISITION FOR SUPP LY OF ENERGY - Karnataka · 2020. 5. 6. · Format-I MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED (Wholly owned Government of Karnataka Undertaking) F List of

ANNEXURE - I

Tariff

ScheduleSub Category Applicable to

LT-1 --- Installations serviced under Bhagyajyothi and Kutirajyothi (BJ/KJ) Schemes

LT-2a(i) Applicable to areas

coming under Bruhat Bangalore

Mahanagara Palike (BBMP),

Municipal Corporation and all

Urban Local Bodies

LT-2a(ii) Applicable to Areas

under Village Panchayats

LT - 2b(i) Private and Professional

Educational Institutions in BBMP

Areas, Municipal Corporation and

all areas under urban Local

Bodies

LT- 2b(ii) Private & Professional

Educational Institutions in Areas

under Village Panchayats

ELECTRICITY TARIFF SCHEDULE – 2015(LOW TENSION)

Applicable to lighting/combined lighting, heating and motive Power installations of residential houses and also to

such houses where a portion is used by the occupant for (a) Handloom weaving (b) Silk rearing and reeling and

artisans using motors up to 200 watts (c) Consultancy in (i) Engineering (ii) Architecture (iii) Medicine (iv) Astrology

(v) Legal matters (vi) Income tax (vii) Chartered Accountants (d) Job typing (e) Tailoring (f) Post Office (g) Gold

smithy (h) Chawki rearing (i) Paying guests/Home stay guests (j) personal Computers (k) Dhobis (l) Hand operated

printing press (m) Beauty Parlours (n) Water Supply installations, Lift which is independently serviced for bonafide

use of residential complexes/residence, (o) Farm Houses and yard lighting limiting to 120 Watts, (p) Fodder

Choppers & Milking Machines with a connected load up to 1 HP. Also applicable to the installations of (i) Hospitals,

Dispensaries, Health Centers run by State /Central Govt. and local bodies. (ii) Houses, schools and Hostels meant for

handicapped, aged destitute and orphans (iii) Rehabilitation Centres run by charitable institutions, AIDS and drug

addicts Rehabilitation Centres (iv) Railway staff Quarters with single meter(v) fire service stations. It is also

applicable to the installations of (a) Temples, Mosques, Churches, Gurudwaras, Ashrams, Mutts and

religious/Charitable institutions (b) Hospitals, Dispensaries and Health Centres run by Charitable institutions

including X-ray units (c) Jails and Prisons (d) Schools, Colleges, Educational institutions run by State/Central

Govt.,/Local Bodies (e) Seminaries (f) Hostels run by the Government, Educational Institutions, Cultural, Scientific

and Charitable Institutions (g) Guest Houses/Travelers Bungalows run in Government buildings or by State/Central

Govt./Religious/Charitable institutions (h) Public libraries (i) Silk rearing (j) Museums (k) Installations of Historical

Monuments of Archaeology Departments(l) Public Telephone Booths without STD/ISD/FAX facility run by

handicapped people (m) Sulabh/ Nirmal Souchalayas (n) Viswa Sheds having Lighting Loads only.

LT-2(a)

Applicable to the installations of Private Professional and other Private Educational Institutions including aided,

unaided institutions, Nursing Homes and Private Hospitals having only lighting or combined lighting & heating, and

motive power.

LT-2(b)

Page 7: REQUISITION FOR SUPP LY OF ENERGY - Karnataka · 2020. 5. 6. · Format-I MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED (Wholly owned Government of Karnataka Undertaking) F List of

Tariff

ScheduleSub Category Applicable to

LT-3(i) Applicable in areas coming

under BBMP, Municipal

Corporation and all areas under

urban local bodies

LT-3(ii) Applicable in areas under

village Panchayats

LT-4 (a) Applicable to I.P. Sets Up

to and inclusive of 10 HPLT-4 (b) Applicable to IP sets

above 10 HPLT-4 (c)(i) Applicable to Private

Horticultural Nurseries, Coffee,

Tea and Rubber plantations of

sanctioned load up to and

inclusive of 10 HP.LT-4 (c)(ii) Applicable to Private

Horticultural Nurseries, Coffee,

Tea and Rubber plantations of

sanctioned load above 10 HP.

Applicable to Commercial Lighting, Heating and Motive Power installations of Clinics, Diagnostic Centers, X Ray

units, Shops, Stores, Hotels/Restaurants/Boarding and Lodging Homes, Bars, Private guest Houses, Mess, Clubs,

Kalyan Mantaps / Choultry, permanent Cinemas/ Semi Permanent Cinemas, Theatres, Petrol Bunks, Petrol, Diesel

and oil Storage Plants, Service Stations/ Garages, Banks, Telephone Exchanges. T.V. Stations, Microwave Stations, All

India Radio, Dish Antenna, Public Telephone Booths/ STD, ISD, FAX Communication Centers, Stud Farms, Race

Course, Ice Cream Parlours, Computer Centres, Photo Studio / colour Laboratory, Xerox Copiers, Railway Installation

excepting Railway workshop, KSRTC Bus Stations excepting Workshop, All offices, Police Stations, Commercial

Complexes, Lifts of Commercial Complexes, Battery Charging units, Tyre Vulcanizing Centres, Post Offices, Bakery

shops, Tailoring Shops, Beauty Parlours, Stadiums other than those maintained by Govt. and Local Bodies. It is also

applicable to water supply pumps and street lights not covered under LT 6, Cyber cafés, Internet surfing cafés, Call

centers, I.T. based medical transcription centers, Private Hostels not covered under LT-2 (a), Paying guests

accommodation provided in an independent / exclusive premise.

LT-3

(a) Agricultural Pump Sets including Sprinklers, (b) Pump sets used in (i) Nurseries of forest and Horticultural

Departments (ii) Grass Farms and Gardens (iii) Plantations other than Coffee, Tea, Rubber and Private Horticulture

Nurseries

LT-4

Page 8: REQUISITION FOR SUPP LY OF ENERGY - Karnataka · 2020. 5. 6. · Format-I MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED (Wholly owned Government of Karnataka Undertaking) F List of

Tariff

ScheduleSub Category Applicable to

LT-5(a) LT Industries: Applicable

to Bangalore Metropolitan Area

& Municipal Corporation

LT-5(b) LT Industries: Applicable

to all areas other than those

covered under LT-5(a)

LT-6(a) Water Supply

LT-6(b) Public Lighting

LT-7 ---

Hoardings& Advertisement boards, Bus Shelters with Advertising Boards, Private Advertising Posts / Sign boards in

the interest of Public such as Police Canopy Direction boards, and other sign boards sponsored by the Private

Advertising Agencies. Temporary Power Supply of all categories

Water supply and sewerage pumping installations and also Applicable to Public Street lights/ Park lights of village

Panchayat, Town Panchayat, Town Municipalities, City Municipalities / Corporations / State and Central Govt. /

APMC, Traffic signals, subways, water fountains of local bodies. Also applicable to Streetlights of residential Campus

of universities, other educational institutions, housing colonies approved by local bodies/development authority,

religious institutions, organizations run on charitable basis, industrial area / estate and notified areas, also

applicable to water supply installations in residential Layouts, Street lights along with signal lights including the

gateman’s shed with associated equipment provided at the Railway level crossing.

LT-5

Heating & Motive power (including lighting) installations of industrial Units, Workshops, Poultry Farms, Sugarcane

Crushers, Coffee Pulping, Cardamom drying, Mushroom raising installations, Flour, Huller & Rice Mills, Wet

Grinders, Milk dairies, Dry Cleaners and Laundries having washing, Drying, Ironing etc., Bulk Ice Cream and Ice

manufacturing Units, Coffee Roasting and Grinding Works, Cold Storage Plants, Bakery Product Mfg. Units, KSRTC

workshops/Depots, Railway workshops, Drug manufacturing units and Testing laboratories, Printing Presses,

Garment manufacturing units, Bulk Milk vending Booths, Swimming Pools of local Bodies, Tyre retreading units,

Stone crushers, Stone cutting, Chilly Grinders, Phova Mills, pulverizing Mills, Decorticators, Iron & Red-Oxide

crushing units, crematoriums, hatcheries, Tissue culture, Saw Mills, Toy/wood industries, Viswa Sheds with mixed

load sanctioned under Viswa Scheme, Cinematic activities such as Processing, Printing, Developing, Recording

theatres, Dubbing Theatres and film studios, Agarbathi manufacturing unit., Water supply installations of KIADB &

industrial units, Gem & Diamond cutting Units, Floriculture, Green House, Biotech Labs., Hybrid seed processing

units. Information Technology industries engaged in development of hardware & Software, Information Technology

(IT) enabled Services / Start-ups/ Animation / Gaming / Computer Graphics as certified by the IT & BT Department of

GOK/GOI, Silk filature units, Aqua Culture, Prawn Culture, Brick manufacturing units, Silk / Cotton colour dying,

Stadiums maintained by Govt. and local bodies, Fire service stations, Gold / Silver ornament manufacturing units,

Effluent treatment plants, Drainage water treatment plants, LPG bottling plants and petroleum pipeline projects,

Piggery farms, Analytical Lab. for analysis of ore metals, Satellite communication centers, Mineral water processing

plants / drinking water bottling plants and soda fountain units.

LT-6

Page 9: REQUISITION FOR SUPP LY OF ENERGY - Karnataka · 2020. 5. 6. · Format-I MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED (Wholly owned Government of Karnataka Undertaking) F List of

ANNEXURE-II

Sl.No Name of the document LT1 LT2 LT3 LT4 LT5 LT6 LT7

Voter ID Voter ID Voter ID Voter ID Voter ID Voter ID

BPL Card Ration Card Ration Card Ration Card Ration Card Ration Card

Ration Card Passport Passport Passport Passport Passport

Driving License Driving License Driving License Driving License Driving License

PAN card PAN card PAN card PAN card PAN card

Registered sale deed Registered sale deed Record of Rights (RTC) Registered sale deed Registered sale deed

Registered partition

deed

Registered partition

deed

Water rights certificate

issued by competent

authority

Registered partition

deed

Registered partition

deed

Registered gift deed Registered gift deed No objection

certificate (NOC) from

horticultural

department {only for

LT-4 (c)}

Registered gift deed Registered gift deed

Registered lease deed

and Indemnity Bond

(since the Applicant is

not the owner of the

premises)

Registered lease deed

and Indemnity Bond

(since the Applicant is

not the owner of the

premises)

Registered lease deed

and Indemnity Bond

(since the Applicant is

not the owner of the

premises)

Registered lease deed

and Indemnity Bond

(since the Applicant is

not the owner of the

premises)

3 Architect Plan by registered

Architect NA A A NA NA NA

4 An undertaking on plain

paper agreeing to install

the Solar Water heater as

per KERC tariff order.

NA A

A

(where hot water is

required for

processing or auxiliary

purpose)

NA

A

(where hot water is

required for processing

or auxiliary purpose)

NA

5 Trade license issued by

Competent Authority NA NA A NA

A

(General / Trade

license issued by

Competent Authority)

NA

Tariff wise List of documents required:

1 Proof of Identity

(Any one)

Proof of ownership

(Any one)

2 NA

Application

from the

competent

authority.

(MGP and

YGM to

examine)

Page 10: REQUISITION FOR SUPP LY OF ENERGY - Karnataka · 2020. 5. 6. · Format-I MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED (Wholly owned Government of Karnataka Undertaking) F List of

Sl.No Name of the document LT1 LT2 LT3 LT4 LT5 LT6 LT7

6

Approval from the electrical

inspectorate along with an

undertaking by the

applicant where assembly

of people is more than 99

along with other statutory

approvals.

NA NA NA NA NA A

7

Indemnity Bond

indemnifying the licensee

in respect of collateral

damages.

NA NA NA NA NA A

8

An undertaking stating that

the applicant will not

engage Child Labour in

their Industrial/

Commercial installation.

Also consent to disconnect

the power supply to the

installation in case of

violation.

NA NA A NA A NA

Application

from the

competent

authority.

(MGP and

YGM to

examine)

Page 11: REQUISITION FOR SUPP LY OF ENERGY - Karnataka · 2020. 5. 6. · Format-I MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED (Wholly owned Government of Karnataka Undertaking) F List of

Annex-7POWER SUPPLY AGREEMENT FOR SUPPLY OF LOW TENSION ELECTRICAL ENERGY

An Agreement made this day of (date) of (month)two thousand and __ between the --------------------ELECTRICITYSUPPLYCOMPANYLTD,a bodyconstituted by the Government of Karnataka (hereinafter called the 'LICENSEE'whichexpression,wherever the context so admits shall include its successorsand assigns)of the onepart;

AND

_______ (herein after called as the 'CONSUMER'which expression, wherever thecontext so admits shall include its successor,successorsin businessand assigns,heirs,executorsand administrators)of the other part.

Whereasat the request of the Consumer, the Licenseehasagreed to supply to the Consumerelectricity for the purpose of in hisher/it's premisesat

____________________________________________________________________ forbonafide purpose within the premises.

1. DEFINITIONS:In thisAgreement, unlessthe context otherwise requires:

a. "Act" shallmean the Electricity Act, 2003or such other enactment governing thesupply and useof electrical energy asmay be in force from time to time.

b. "Conditions of Supply" shall mean the "Conditions of Supply of Electricity ofDistribution Licensee in the State of Karnataka" approved by the KarnatakaElectricityRegulatoryCommissionand asamended from time to time.

c. "Commission"means the Karnataka ElectricityRegulatoryCommission.d. "Street" includes any way, road, lane, square, court, alley, passage or open

space, whether a thoroughfare or not, over which the public have a right of way,and also the roadway and footway over any public bridge or causeway;

2. CONDITIONS OF SUPPLY:a. The Licensee shall supply electrical energy to the aforesaid premises of theConsumer from its distributing main for the purpose at low tension as specified in the"Conditions of Supply" under classification of supply and the Consumer shall take fromthe Licensee, electricity required for the purpose herein above recited at the singlepoint of supply up to a maximum extent of __ KW/ HP,being the load sanctioned.The energy so supplied shall be utilized within the premisesmentioned hereto, for thebonafide useof the Consumer.

b. Electrical energy supplied to the premisesshall not be utilized by the Consumer inany manner prejudicial to the Licensee and all usage must be according to suchmethod or methods approved by the Licensee.Theuse of power must be confined tosuch places as shall have been previouslyapproved in writing by the Licensee. In caseprejudicial use of power is detected, the Consumer shall pay penal charges inaccordance with the provisionsof the "Conditions of Supply" as in force from time totime. Besides,for dishonestabstraction / use/ consumption of electricity or interferencewith the metering equipment or accessories, the Consumer shall also be liable forprosecution under the Act and any other law for the time being in force, and theinstallation shallbe liable for disconnection.

IGl

Page 12: REQUISITION FOR SUPP LY OF ENERGY - Karnataka · 2020. 5. 6. · Format-I MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED (Wholly owned Government of Karnataka Undertaking) F List of

c. The Consumer shall permit the Licensee, free of cost, to erect posts, distributionlines, structures, equipments, cables and other apparatus necessary for the supply ofelectrical energy under this Agreement over the land belonging to, or in the possessionof, the Consumer.

d. The Consumer agrees to take supply under any conditions of restrictions of loadand time that may be fixed by the Licensee from time to time and to pay fixed chargesunder this Agreement in full notwithstanding such restrictions.

e. The supply is liable to be restricted, staggered or cut off altogether, as the casemay be, if the power position or any other emergency warrants such a course ofaction. The Licensee reserves the right to periodical shutdown, as and when required,for the purposes of routine maintenance after giving reasonable intimation to theConsumer.

f. Fromthe date of commencement of supply as defined in the "Conditions of Supply"until termination of agreement, the Consumershallmake payment to the Licenseeforthe electricity supplied during the prescribed billing period at the rates specified in theLicensee's tariff from time to time and applicable to the class of power supplyirrespectiveof the installationbeing in serviceor under disconnection.

g. Subject to the provisionsof the Act, the "Conditionsof Supply" and any other lawfor the time being in force, the supply under thisAgreement isvalid initiallyfor a periodof two yearsfrom the date of commencement of supplyand shallstand automaticallyrenewed from year to year thereafter, until terminated by either of the parties.However, in case of TEMPORARYPOWERSUPPLY,the period of agreement shallbe fora period of days/weeks/months which period may beextended by the Licenseeat the request of the Consumer.The power supply shall bedisconnected after the expiration of the stipulated period unless a requisition isreceived for extension of the period, and such further deposit as may be demandedby the Licenseeispaid by the Consumerbefore the expirydate.

h.Without prejudice to the rights and liabilities of the parties in respect of any matterantecedent to termination, either party to this Agreement may terminate thisAgreement by giving three monthspriornotice inwriting.

i. The Licenseeshall not be liable to pay any damages or compensation in connectionwith lossof life or property arising,occurring or resultingfrom the useof power.

j. The industrial / I.P.Set Consumershall obtain written permissionfrom the Licenseeforany changes to be made in the equipment, machinery or motors installed by him atthe time of servicingthough hissanctioned load does not exceed due to suchchange.

k.ln case of street light installations,the maintenance of lamps and fixturesshall becarried out by the Consumerhimself/herself/itself.

I. Where the Consumer is required to obtain a license or permit or 'No objectioncertificate' for running hisIndustrial/commercial concern or lift irrigation scheme andthe Licenseor permit is suspended or cancelled, or the validity of the 'No objectioncertificate' issuedby the competent authority to lift water has expired, the Licenseeshallhave the right to discontinue power supplyduring the period when the Licenseorpermit iscancelled or suspended or the validity of the No Objection Certificate issuedby the competent authority hasexpired,

3. METERS:Theenergy supplied shallbe measuredand registeredby a meter or metersin or uponthe said premisesto be provided, fixed and kept in proper order by the Licensee.Theprocedure for billingwhen the meter isnot provided or is faulty shall be regulatedasper the relevant provisionsof the Act and the "Conditionsof Supply".

,I

Page 13: REQUISITION FOR SUPP LY OF ENERGY - Karnataka · 2020. 5. 6. · Format-I MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED (Wholly owned Government of Karnataka Undertaking) F List of

4. SECURITYDEPOSIT:

The Consumer, on a request made by the Licensee in this regard, shall renew orreplenish all security deposits in the event of the same becoming exhausted orinsufficient.

5. TARIFFAND PAYMENT OF ELECTRICITYCHARGES:

Fromthe date thisAgreement comes into force, the Consumershallbe bound by, andshall pay the Licensee,fixed charges, energy charges, and additional security depositin accordance with the tariffs approved by the Commissionand the "Conditions ofSupply" of the Licenseefrom time to time for the appropriate classof Consumers. TheConsumer shall pay the Licensee the tax on electricity charges as determined by theGovernment of Karnataka from time to time. In case even after disconnection, if thedues remain unpaid, then the Licensee shall be entitled to take recourse to theprovisionsstipulated in the "Conditions of Supply" and other laws for the time being inforce to recover the arrears.

6. DISCONNECTION FOR ARREARSAND RECONNECCTION:In case the Consumerfailsto pay the charges due for the electricity supplied within thedue date, the Licenseeshallbe entitled to cut off the supply after giving due notice asprovided in the Act and "Conditions of Supply" and power supply shallbe restoredonlyon payment of all arrears including interest and reconnection charges as stipulatedfrom time to time in the "Conditions of Supply".

7. CONTINUITY OF POWERSUPPLY:

The Licensee shall take all reasonable precautions to ensure continuity of supply ofpower to the Consumer at the point of commencement of supply. However, theLicenseeshall not be liable to the Consumer for any lossdue to the interruption in thesupply of power by reason of damage to the equipment of the Licenseeduring war,mutiny, riot, strike or by earth-quake, hurricane tempest or any accident or causesbeyond the control of the Licensee.

8. ENTRYINTO CONSUMER'S PREMISES:TheLicenseeshallhave access to the premisesof the Consumerat all reasonable timeswithout notice for meter reading, inspection, testing and / or for any other purposeincidental to, or connected with the proper maintenance of supply.

TheLicenseeshallhave access to the premisesat any time for inspection, if there isanyreason to suspect breach of the provision of this Agreement, the Act and the"Conditions of Supply".

If the Consumer, hisagent, employees or anyone else purporting to act on hisbehalfattempts to obstruct or impede the Licenseeor its employees or authorized person inthis regard, the Licensee shall be entitled to immediately cut off power supply. TheConsumershall also be liable to pay such penalty asmay be imposed by the Licenseein thisregard.

12-

Page 14: REQUISITION FOR SUPP LY OF ENERGY - Karnataka · 2020. 5. 6. · Format-I MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED (Wholly owned Government of Karnataka Undertaking) F List of

9. ASSIGNMENTS OR TRANSFER OF THE BENEFIT OF THIS AGREEMENT BY THE CONSUMER:The Consumer shall not, without the previous consent in writing of the Licensee, assign,transfer or part with the benefit of this Agreement and shall not in any manner partwith, or create any partial I separate interest in it.

10. APPLICATION OF THEPROVISIONS OF THEACT AND THE"CONDITIONS OF SUPPLY":

In all matters not herein specifically provided for, the provisions of the Act, the"Conditions of Supply" and other laws for the time being in force shall apply.

11. SAVING CLAUSE:Nothing contained in thisAgreement or any amendment thereof shall restrict any rightsand obligations, which the Licensee or the Consumer has derived under any legislationrelating to supply and consumption of electricity enacted during the period of thisAgreement.

In witness whereof, the Licensee through its duly authorized representative and theConsumer have executed this Agreement on the day month and year first abovewritten.

Consumer I Authorized signatory For .... mm .. Electricitv Supply CompanyLimitedSignature .Name .Designation .

(i) .(Signature)Name .Address .

Witnesses:(1) .(Signature)Name .Address .

Witnesses:(1) .(Signature)Name .Address .

Page 15: REQUISITION FOR SUPP LY OF ENERGY - Karnataka · 2020. 5. 6. · Format-I MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED (Wholly owned Government of Karnataka Undertaking) F List of

INDEMNITY BOND ANNEX-S(If the intending Consumer isnot the owner of the premises)

To:....................... Engineer,

From

Whereas the land / premisesdetailed hereunder, belongs to Sri/Smt.. and I am onlylessee / tenant / occupier of the said land / premiseswhere I have applied for the electricityconnection to the said land / premises and I am not able to obtain the consent of Sri /Smt.. but produced the proof of occupancy, ie valid power of attorney/ latest rent paid receipt / registered lease deed.

Thereto I, in consideration of the grant of electricity connection to me on the conditions ofsupply for which I have executed the Agreement, further agree to indemnify and keep harmlessthe Licenseefrom all damages and claims,whatsoever, including costs of suit, original petitionsand all manner of legal or other proceedings that the Licenseemay incur or likely to incur onaccount of any action or threat by or at the instance of the owner of the said land / premises(whether such owner be the said Sri/ Smt or any other). I also further agreethat such loss,damages and any other claim resulting out of the electricity connection beinggiven to me without the consent of the owner of the land / premisesare also recoverable fromme and my properties under the provisionsof the Revenue Recovery Act, in force at the time ofsuch recovery, or by such other proceedings as the Licenseemay deem fit to initiate.

I hold myselfanswerable to costsof such recoveries and proceedings also.

Place:Date:Witnessee:-1)2)

Signatureof lessee/ tenant / occupier