requirements tracking document

2
275125536.xls Page 1 of 1 Master Requirements Tracking Maintained by Last Updated on ID Description Originator Reviewed By Date If Reected! Reason Risks "#ternatives Duration 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 Date Received Date Reviewed $"%pproved $R%eected &a#ue '()*+ Risk '()*+ Responsib#e ,arty's+ -stimated .ost Derived Requirement Ids ,rerequisite Requirment Ids "ctua# .omp#etion Date "ctua# Duration "ctua# .ost ./ange Req ID

Upload: rochelle-mckay

Post on 05-Nov-2015

221 views

Category:

Documents


0 download

DESCRIPTION

Requirements Tracking Document

TRANSCRIPT

Sheet1Master Requirements TrackingMaintained byLast Updated onIDDescriptionDate ReceivedOriginatorDate ReviewedReviewed By[A]pproved [R]ejectedDateIf Rejected, ReasonValue (1-5)Risk (1-5)RisksAlternativesDurationResponsible Party(s)Estimated CostDerived Requirement IdsPrerequisite Requirment IdsActual Completion DateActual DurationActual CostChange Req ID1.002.003.004.005.006.007.008.00

&FPage &P of &NGeorge Spafford:What is the project number and/or name?George Spafford:Who maintains/is responsible for this file?George Spafford:When was it last updated.George Spafford:Unqiue tracking number that will identify this requirement.George Spafford:Briefly describe the requirement.George Spafford:When was this requirement received?George Spafford:From whom did it originate?George Spafford:When was it reviewed?George Spafford:Who, or what team, reviewed it?George Spafford:Is the requirement approved or rejected?George Spafford:When was the decision made?George Spafford:If the requirement was rejected, briefly explain why.George Spafford:What is the relative value, or importance, of this requirement?George Spafford:What is the relative risk of trying to implement/include this requirement?George Spafford:Briefly describe the risksGeorge Spafford:What alternatives exist for this requirement should it fail, or be determined impossible?George Spafford:How long will this requirement take to implement?George Spafford:Who, or what team, owns this requirement?George Spafford:What is the estimated cost of this requirement?George Spafford:What requirements were identified as a result of this requirement?George Spafford:What requirements must be implemented/exist for this requirement to be feasible?George Spafford:On what date was this requirement actually implemented?George Spafford:How long did this requirement actually take to implement?George Spafford:What was the final cost of this requirement?George Spafford:If this requirement orginated from a change request form, record the change request form's unique ID here.

Sheet2

Sheet3