REQUEST FOR PROPOSALS
Invitation for Architects to Present Proposals and Qualification Statement for
Architectural and Engineering Services for
Harris Community Village
Harris Community Village Design & Engineering Services RFP
2
Giv Communities (the “Developer”) on behalf of Harris Community Village
Partners (the “Managing Member”) will be accepting qualification statements and fee
proposals from qualified architectural and engineering firms by January 8th until 5:00
PM at 50 N 600 W, Unit D, Salt Lake City, Utah 84116 or via email at
[email protected]. No additional information may be submitted after this deadline
unless specifically requested.
The details of the Harris Community Village project (the “Project”) and the requirements
for proposals/qualification statements are set forth below. Please review the requirements
carefully, as incomplete or noncompliant proposals/qualification statements may be
rejected.
Giv Communities is acting as the owner's representative and general development
consultant for the entirety of the first phase of the Harris Community Village project. In
addition, Giv Communities will be actively working with both Tooele County Housing
Authority and Friends of Switchpoint as key stakeholders and decision makers. Tooele
County Housing Authority is the owner of the property and will act as the property
manager of the Low-Income Housing Tax Credit (LIHTC) units. Friends of Switchpoint
will be acting as lessor of the Community Resource Center and service provider for all
62 permanent supportive housing LIHTC units. Any questions and or concerns related to
the project will be facilitated and handled through Giv Communities.
Any questions regarding the Project or the requirements for fee proposals and
qualification statements should be directed to:
Melissa Jensen
Giv Communities
50 N 600 W, Unit D
Salt Lake City, Utah 84116
Significant questions will not be considered within 48 hours of deadline. Any significant
information formulated from questions will be issued to all RFP holders to the best of our
ability before that 48 hour period. In order to develop an effective proposal,
communication during the submission period is encouraged.
This request for proposals does not commit the Managing Member to award a contract or
to pay any costs incurred in the preparation of proposals. The Managing Member
reserves the right to extend the due date for proposals, to accept or reject any or all
proposals received as a result of this request, or to cancel this request in part or in its
entirety. The Managing Member reserves the right to waive any irregularity, informality,
or technicality in the proposals in its best interest and will award a contract based upon
the highest scoring, lowest priced responsible qualified submission.
Non-disclosure and Confidentiality. By submitting a qualification statement and/or
proposal pursuant to this Request for Proposals, you agree that the information provided
Harris Community Village Design & Engineering Services RFP
3
to you in this Request for Proposals is confidential. You agree to keep the information
obtained herein and any other information obtained regarding the Project from the
Developer or Managing Member, strictly confidential, and only to disclose the
information (i) to those members of your firm necessary to create and submit a proposal,
and then only under the terms and obligations of confidentiality imposed by this Request
for Proposals; and (ii) after being authorized to do so by Developer and/ or Managing
Member.
Equal Opportunity and Affirmative Action Program. The successful applicant must
covenant and agree to abide by Federal and State regulations pertaining to Equal
Employment as set forth in Executive orders 11246, 11375, 11625 and 41 CFR Part 60-4,
Section III of the Housing and Urban Development Action of 1968 (12 USC 170u), as
amended and HUD regulations at 24CFR Part 135.
In summary, these regulations require project participants no discriminations against
any employee or applicant for employment because of race, color, religion sex, age,
disability, or national origin and project participants will take appropriate measures to
employ minority owned businesses. A copy of all noted regulations can be obtained from
the sponsor. Also, the sponsor will make every effort to ensure that all offerors are
treated fairly and equally throughout the entire advertisement, review and selection
process. The procedures established herein are designed to provide all parties
reasonable access to the same basic information.
The Developer does not discriminate on the basis of race, color, national origin, sex,
religion or age.
1. Project Summary.
A. The Project consists of a low-income housing tax credit development
(“LIHTC”) that will consist of a renovated education facility, Harris
Elementary, and new construction for the LIHTC units. The project is
anticipated to be 100% electric and Energy Star MFNC and Enterprise
Green Communities certified. The project is located at 251 N 1st Street,
Tooele, UT 84074
B. The project will include two newly constructed 3-story walk ups
connected by a single-story community club house with adjacent leasing
space.
i. Building One will have 42 studios (450SF) with roughly
6,944SF/floor and 21,832SF total
ii. Building Two will have 6 One-Bedrooms (600SF) and 18 Two-
Bedrooms (900SF) with roughly 7,260SF/floor and 21,780SF total.
iii. The connecting clubhouse and office space will consist of roughly
1,640SF
Harris Community Village Design & Engineering Services RFP
4
C. The Project will involve the renovation of the existing building to include
a Community Resource Center (CRC) and other community facilities. The
following are the slated uses:
i. Emergency shelter,
ii. Community daycare,
iii. Office space for case management and administration
iv. Food bank,
v. Community public space (in the old gym)
vi. Computer use areas
New apartment units will each include a kitchen with stove, refrigerator,
sink and microwave, and a full bath. There will also be an outdoor garden
space with raised beds. There will be significant landscaping and natural
area definition required to help distinguish the outdoor spaces.
The demolition will consist of complete removal of the North West wings
of the building as referenced in the attachment. In addition, internal
demolition of the existing structure to meet the necessary anticipated uses
will be required. The emergency shelter units will primarily have shared
bathroom and kitchen facilities with the exception of the family units
which will have their own bathroom units.
Under this RFP the Architect will provide demolition plans and
specifications as part of contract documents. The project will be both
Energy Star MFNC certified and Enterprise Green Communities certified.
The Architect will provide plans and specifications to meet both of those
certification’s criteria.
This residential project is a “Permanent Supportive Housing” project and
emergency shelter. As such the facility will provide housing and
emergency services for vulnerable adults, primarily with special needs. A
safe and secure homelike setting is desired that incorporates trauma-
informed design and precautionary measures such as anti-ligature
hardware and fixtures.
Demolition and new construction will be awarded to a general contractor
under a separate Bid/RFP. The RFP processes will run parallel and be
awarded simultaneously.
A. Alternates.
There will be several additive alternates for general contractor to price
during pre-construction that may be included as bid alternates when
construction documents are issued to subcontractors. Proposals for design
services are to include the following as alternates:
Harris Community Village Design & Engineering Services RFP
5
i. Replacement of existing windows.
ii. Replacement of existing exterior wall studs.
iii. Provide impact resistant drywall in apartment units.
iv. Replacement of existing roof.
B. Mandatory Pre-proposal Meeting.
There is will be a mandatory pre-proposal, on-site meeting to visit the
site and review existing conditions. Please RSVP to Melissa Jensen,
Giv Communities, [email protected].
Pre-proposal Meeting
December 17th from 10:30 - Noon
251 North 1st Street Tooele
* Please use on-street parking. We will meet on 1st Street at the east side of
the existing property.
2. Anticipated Schedule.
A. The Project is anticipated to be notified of a federal LIHTC reservation
from Utah Housing Corporation by mid-December 2020. The existing
property is not occupied
See attached Appendix A – Project Schedule.
vii. Design: Duration is anticipated to be three months and be complete
April of 2021.
viii. Construction: Duration is expected to be 12 to 18 months and
begin in Summer 2021 for completion Spring 2023.
3. Architectural Services.
The architectural firm selected for the Project will be expected to provide the
following services:
A. Architectural, Engineering and Design Services.
Architectural, structural, landscape, civil, mechanical, electrical,
plumbing, acoustical, interior design, lighting, data/telecommunications,
security, graphics, environmental testing/remediation, and related services
as may be required in connection with the planning, design, and
construction of the Project.
Harris Community Village Design & Engineering Services RFP
6
B. Code Analysis.
Building, planning, and access analyses and reviews for Project.
C. Sustainable Design.
Develop, analyze, and implement programs for sustainable site and
building design.
D. Cost Analysis and Schedule Planning.
Provide, in conjunction with the Developer and its general contractor,
cost-estimating services and participate in all aspects of project cost
estimating and schedule planning, including design schedule, construction
estimating, life cycle costing, value engineering, and critical path/special
scheduling.
E. Site Planning and Landscape Architecture.
Provide services, as required, necessary for site design, including grading,
water detention, utilities, parking lots, roads, driveways, hardscape,
landscape, accessibility, lighting, and irrigation.
Irrigation and landscaping work to include reconfiguring existing around
final new footprint and include 800SF of raised garden beds.
Civil design is to include Storm Water Pollution Prevention Plan (SWPPP)
and benchmarks for existing site and structures benchmarks.
F. Environmental Standards.
Design the Project to meet Energy Star MFNC and Enterprise Green
Communities standards.
G. Bid/Proposal Process and Value Engineering.
Assistance with the bidding process, contract award and value engineering
in working with the selected contractor.
H. Construction Administration.
Provide construction administration services during the course of
construction, including attendance at weekly OAC meetings, responding
to RFIs, review and approval of submittal and draw requests, and
Harris Community Village Design & Engineering Services RFP
7
execution of certifications as may be required by project’s lenders and
investors.
4. Architectural Firm Requirements.
A. Satisfaction of federal, state, county, and municipal licensing and
standards requirements.
B. Past experience with multi-family and rehabilitation.
C. Experience with buildings and designs of the type being contemplated.
D. Demonstrated ability to meet deadlines.
5. Required Submissions
Each responding applicant should submit an electronic copy via email to
[email protected]. Applicants may also choose submit two (2) hard copies of their
proposal.
A. Cover letter.
Include the name of the primary contact person and preferred contact
information, including an email address.
B. Completed Architect-Engineer Qualifications (Standard Form 330).
C. Fee Proposal.
Please provide a detailed fee proposal for the project, including all
engineering and other required services.
Fee proposal to include fee schedule for when progress payments need to be made.
D. Proposed Project Team.
Provide (1) an organizational chart indicating your firm’s proposed Project
team, (2) a current resume for each proposed team member, (3) a
statement regarding each proposed team member’s experience with similar
projects and reasons why they were selected for the proposed project team,
and (4) an estimate of the percentage of their time each Project teach
member will devote to the Project. Identify the proposed lead architect
Harris Community Village Design & Engineering Services RFP
8
and lead engineers, and list/describe any subcontractors or consultants
your firm anticipates using.
E. Description of relevant experience.
Description, elevations or images, and other information of interest on any
and all projects of a similar size, value, structure, and scope completed by
your firm during the last ten years.
As the Project will be financed primarily through tax credits, please
highlight other tax credit projects your firm has been involved in, if any.
If your firm has not completed a tax credit project before, provide
evidence of your familiarity with applicable tax credit programs, including
the names and specific experience of anyone in your firm with relevant
knowledge/experience.
For each project, please provide the following information:
i. Project name and location.
ii. Dates of involvement in the project.
iii. Types of tax credits involved in the project, if any.
iv. A detailed description of your firm’s role in the project and the
involvement of any members of the Project team set identified
pursuant to subsection 5.D above.
v. Value of the project.
vi. Names and contact information of the project owner(s),
developer(s), and tax credit investor(s), if any, and other points of
contact regarding your involvement with the project.
F. Client References.
Provide three client references. If possible, include as references clients
whose project was either similar in nature and/or scope (e.g., square
footage, configuration, and number of units) or involved members of the
Project team set forth pursuant to subsection 5.D above.
G. Certification of licensure, non-debarment.
Provide a statement from a principal of your firm affirming that you are in
compliance with all applicable federal, state, county, and municipal
licensing and standards laws, and that your firm is not now, and has not
been, debarred or otherwise prohibited from competition for government
contracts.
H. Insurance.
Harris Community Village Design & Engineering Services RFP
9
Provide certifications of types and amounts of all insurance coverage
currently in effect.
I. Energy Star.
Please identify the individuals on the proposed project team or who will be
working on the Project that have experience in completing Energy Star
Projects and obtaining Energy Star certifications. Provide information for
any team members who have been trained with regards to Energy Star
MFNC or have worked on other projects seeking certification under
Energy Star MFNC.
J. Design Schedule.
Provide a timeline for 50% and 100% completion of construction plans
and specifications.
K. Design Concept.
Provide a preliminary floor plan of a studio and one-bedroom unit.
L. Other relevant information.
Please provide any other information that you believe is relevant and
would be helpful to the Developer in evaluating your proposal based on
the criteria for decision set forth in Section 6.A of this RFP.
M. Confidentiality.
Provide a signed, written acknowledge that your firm agrees to, and is
bound by, the obligations of non-disclosure and confidentiality set forth on
above.
6. Criteria and Anticipated Timeline for Decision.
A. Criteria for Decision.
The Developer has created a committee to evaluate the proposals
submitted pursuant to this RFP. Proposals will be evaluated and scored
according to the criteria below. Respondents will then be ranked according
to those scores. Review and acceptance of the proposal will be based on
the following criteria:
i. Past performance/experience (40%); Specific attention will be paid
to those with affordable housing, permanent supportive housing
and shelter experience.
Harris Community Village Design & Engineering Services RFP
10
ii. Proposed project principals and team (25%);
iii. Fee proposal (25%);
iv. Other (Timeline, References, Quality of Response…) (10%)
There may be a shortlist and selection interview before acceptance of
proposal.
After full review and scoring the top ranked firm/team will then be
contacted to formulate a more detailed scope and final negotiation. If
agreement cannot be reached the second ranked firm will be contacted and
so on and so forth.
B. Timeline for Decision.
The anticipated date for decision is January 29, 2021. Applicants will be
notified of the decision via email.
7. Appendices.
A. All respondents are responsible for reviewing and understanding the
attached documents:
i. Appendix A: Project Schedule
ii. Appendix B: Site Plan
iii. Appendix C: Existing As-Built Drawings
iv. Appendix D: Demolition Plan
Harris Community Village Design & Engineering Services RFP
11
Appendix A
20D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
DesignDesign & Engineering Request for Proposals
Design & Engineering RFP 12/7/20 - 1/8/2021Pre-proposal Site Visit 12/17/20Architect Selection 1/11/2021 - 1/29/2021
Design Kick-off Meeting 2/10/21Program/ Design Development 2/11/21- 3/8/2021
Design Charrette 02/18/2021Design Charrette 2/25/2021
50% Construction Documents 03/11/2021 - 04/05/202190% Construction Documents 04/10/2021 - 05/08/2021100% Construction Documents 05/08/2021Design Assist
General Contractor Request for ProposalsGC RFP 12/7/20 - 1/8/2021Pre-proposal Site Visit 12/17/20GC Selection 2/10/21
50% Estimate 04/19/202190% Estimate 05/22/2021Construction Subcontractor Bid & Award 5/22/2021 - 7/22/2021
Procure Permit - Architect 6/3/2021 - 08/16/2021SWPPP 07/30/2021Groundbreaking TBDMobilize 07/30/2021
Construction 08/16/2021 - 02/15/2023Construction Complete - GC 2/15/23
2023Harris Community Village (11/25/20) 2022
CONSTRUCTION
PRECONSTRUCTION
2021
Harris Community Village Design & Engineering Services RFP
12
Appendix B
10’ 50’ 100’10’ 50’ 100’
FAMILY BUILDING(24 UNITS)
Harris Community Village Design & Engineering Services RFP
13
Appendix C
Scale: 1/32" = 1'-0"
0' 16' 32' 64'
when printed on 11" x 17" paperN
W
SEHistoric Floor Plans
1998 GymAddition
1998 Teachers'Lounge Remodel
1991 Boiler Room Addition
1978 Kitchen Addition
1962 Ten ClassroomAddition
WheelchairLift Addition
1952 OriginalBuilding Construction
NW
SEBuilding History Plan
Scale: 1/32" = 1'-0"
0' 16' 32' 64'
when printed on 11" x 17" paper
Outside Building Addition
OUTSIDE STORAGE BUILDING
Harris Community Village Design & Engineering Services RFP
14
Appendix D
Classroom wings to be demolished and removed from site.
Scale: 1/32" = 1'-0"
0' 16' 32' 64'
when printed on 11" x 17" paperN
W
SEDemo Floor Plan
26,985 sf
Main Entry
Cafeteria
Gym