request for proposal (rfp) · 1 day ago · page 1 of 31 request for proposal (rfp) rfp number:...
TRANSCRIPT
![Page 1: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/1.jpg)
4525 MAIN STREET // SUITE 900 // VIRGINIA BEACH, VA 23462 // 757.497.2113 // DIVARIS.COM
REQUEST FORPROPOSAL
Hague Club ApartmentsEastern Virginia Medical School
Complex is bounded by Colley Avenue, W. Olney Road, Dundaff
Street and Fairfax Avenue
![Page 2: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/2.jpg)
Page 1 of 31
REQUEST FOR PROPOSAL (RFP)
RFP Number: 2020-2
EVMS Internal Reference: BV21-3
Issue Date: July 13, 2020
Project Title: Hague Club Apartments – Renovation
Anticipated Dates
of Initial
Contract Term:
To be determined
Due Date (Sealed
Proposals will be
received Until):
August 3rd, 2020 at 2:00 PM
Due Date for RFP
Questions:
July 24, 2020 at 2:00 PM
Additional RFP
Information:
Addenda and Amendments to this RFP will be posted on the following CDP &
EVMS websites:
http://www.evms.edu/about_evms/administrative_offices/materials_manageme
nt/solicitations/
my.sharepoint.com/:f:/g/personal/slucas_cdp-va_com/EvQOH2_CmspMvaXwPrkg0ZYB_Y9Qv_xUAdDHUf-w89IIhQ?e=A8HTsl
Please direct all inquiries for information about this RFP, in writing, to
Morgan Lucas, at the following email address: [email protected]
NO QUESTIONS WILL BE ANSWERED BY PHONE
CDP & EVMS will post all questions and responses on the above websites to
ensure that responses to RFP questions are available to all responsible bidders
(“Offerors”). However, it is the sole responsibility of the Offeror(s) to periodically
check the before mentioned website for any response(s) to RFP question(s).
In addition, while the RFP is open, and once the RFP has closed, Offeror(s) shall
not contact CDP staff directly to ask questions about the RFP. This restriction
![Page 3: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/3.jpg)
Hague Club Apartments RFP No. 2020-2
Page 2 of 31
on Offeror communication with CDP staff is to ensure fairness in the
competitive process.
RFP Time
Extensions: Requests for additional RFP information and the associated responses shall not
extend the due date for bids in response to this RFP. To ensure, fairness in the
competition process and that all Offerors are given the same amount of time to
respond to the RFP CDP reserves the right, at CDP’s sole discretion, to extend the
time for responses to this RFP to all Offerors, as deemed appropriate; and, under
no circumstances shall separate or individual extensions be granted. EVMS will
post all RFP extensions on the following website:
http://www.evms.edu/about_evms/administrative_offices/materials_manageme
nt/solicitations/
PROPOSALS MAY BE MAILED, SENT BY OVERNIGHT OR EXPRESS COURIER, OR HAND-
DELIVERED TO:
Mail, Overnight, Express Courier, or Hand Delivery
Creative Development Partners
C/o Divaris Real Estate
Attn: RFP No: 2020-2
4525 Main Street, Suite 900
Virginia Beach, VA 23462
Electronic Submissions
Send all electronic submissions to [email protected]
![Page 4: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/4.jpg)
Hague Club Apartments RFP No. 2020-2
Page 3 of 31
TABLE OF CONTENTS PAGE
1.0 Purpose Page 4
2.0 Method of Payment Page 5
3.0 Invoices, Reporting and Delivery Instructions Page 6
4.0 Pre-proposal Conference Page 6
5.0 Proposal Preparation and Submission Instructions Page 7
6.0 Proposal Evaluation Page 10
7.0 General Terms and Conditions Page 11
8.0 Special Terms and Conditions Page 17
9.0 Contract Negotiation Page 20
10.0 Award Announcement Page 22
11.0 Attachments
• Attachment A – RFP Coversheet Page 23
• Attachment B – Offeror RFP Certification Page 24
• Attachment C - Entity Data Sheet Page 25
• Attachment D – W9/W8 Instruction Sheet Page 27
• Attachment E – Contractor’s License & Insurance Information Page 28
• Attachment F – Small Business Subcontracting Plan Page 29
• Attachment G – Building Condition Report Page 31
• Attachment H – Preliminary Schedule Page 51
• Attachment I – General Conditions Matrix Page 52
![Page 5: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/5.jpg)
Hague Club Apartments RFP No. 2020-2
Page 4 of 31
1.0 PURPOSE:
The purpose of this RFP is to provide information to responsible bidders (referred throughout this RFP as “Offeror(s)” and/or “Contractor(s).”) in order to solicit competitive proposals (“Proposals”), in accordance with the policies of Eastern Virginia Medical School, for:
A. Services:
Creative Development Partners LLC (CDP), Owner’s Representative for EVMS is requesting proposals General Contractor services relating to renovations to Hague Club Apartments in Norfolk, VA. The complex consists of 81 units which include loft, one-bedroom and two- bedroom units. A general description of the work includes, but is not necessarily limited to the following:
1. Interior Improvements: Flooring, tile, miscellaneous framing repairs, new pre-hung doors, partial trim replacement, new blinds, new toilet accessories, cabinet & counter replacement, drywall repairs and painting.
2. Minor electrical service upgrade in units. Meter base replacement in breezeways. 3. Complete plumbing fixture and piping replacement. Includes replacement of domestic
water service lines to each building. 4. Replacement of HVAC condensing units, fan coil units and controls (ductwork not
replaced). 5. Exterior Improvements: Replace siding, windows, breezeway slabs and stairs. Repair
exterior masonry stairs and rails and building foundation as needed. 6. Construction of a retaining wall at SW corner of property to protect vulnerable units
from periodic flooding.
Proposals to include:
1. Fee: As a percentage of cost $_____________ 2. General Conditions: GC must provide the following information on the attached matrix
a. Specific Project personnel, materials and cost (rates to be charged) b. Must reflect staffing accurately (Include resumes of key personnel) c. Executive level personnel (Only charged to project if approved by Owner)
3. Schedule: Schematic CPM 4. Provide a narrative for your planned approach to the project
a. Contingency plan b. How to handle possible Covid-19 impacts c. Plan to access upper floors when breezeway stairs are out of service
5. 5% Bid Bonds & 100% Payment & Performance Bonds will be required a. Submit a letter from your bonding company stating that they will provide
bonds for this project. Letter should state the bond rate. 6. Contract AIA form A133-2009 with General Conditions AIA form A201-2007
EVMS’s goal is to publish a Notice to Proceed to the selected Architect on or about July 30, 2020. 90% drawings must be completed by October 2, 2020. CD’s will be completed by October 16, 2020. Architect will assist in selection of a qualified General Contractor in the early stages of
![Page 6: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/6.jpg)
Hague Club Apartments RFP No. 2020-2
Page 5 of 31
design. Selection will be determined based on qualifications, approach to the aggressive schedule,
fee and general conditions. The successful General Contractor will assist with budgeting and
offer design input to ensure budget compliance.
To meet this very aggressive renovation requirement for The Hague Club Apartments, the
following plan will be implemented.
1. Competitively bid, select and contract with a qualified Architect. Architect to receive
NTP no later than July 30, 2020.
2. Competitively bid, select and contract with a qualified General Contractor. Contractor
selection will be based on fee and general conditions but owner reserves the right to
make the selection by also considering Contractor experience, staffing, resources and
proposed approach to the project.
3. Successful Contractor will assist/provide input on the scope of work, design and budget.
4. Architect will complete 90% construction documents no later than October 2nd, 2020.
Documents will then go out to Subcontractors and Supplies for a minimum of three (3)
competitive bids for each category/item. There will be a goal of 10% SWAM
participation. Sub/Supplier awards will be completed by November 20th, 2020 with
priority given to the release of long lead items.
5. Contractor will develop a GMP within the project budget and contract will be amended
to include.The intent is for all materials/fabrications to be submitted, approved, shipped
and stored locally no later than May 19th, 2021.
6. Contractor to mobilize May 19th, 2021 through May 31st, 2021 and commence work on
June 1st, 2021. Project must be 100% complete and ready for tenant occupancy by
August 31st, 2021.
7. Liquidated damages of $2,500 per day will be assessed for every day the project goes
over the agreed-upon completion date. (Tenant move-in is September 1, 2021)
2.0 METHOD OF PAYMENT:
Monthly, based on percent complete. Use AIA Form G702 – 1992 (Include periodic lien waiver).
Language for Entities in the United States:
Payment to Contractor:
1. The Offeror shall enroll in and acknowledges that payment will be made by payment card, also
known as ePayables. Once an invoice is approved for payment, an electronic remittance advice
shall be sent to the Offeror by email or facsimile, instead of a check. Payments can be retrieved
with EVMS’s designated account number that will be assigned to the Offeror. Terms begin
after receipt of proper invoice or material/service, whichever is later.
2. Offeror cannot charge fees to accept ePayables.
3. A .5% administrative fee may be charged for check payments and default payment terms of
Net 30, or others outside of ePayables.
![Page 7: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/7.jpg)
Hague Club Apartments RFP No. 2020-2
Page 6 of 31
Submit invoices to the following address:
Eastern Virginia Medical School (C/O Creative Development Partners)
Attn: Morgan Lucas
4525 Main Street, Suite 900
Virginia Beach, VA 23462
Email: [email protected]
3.0 INVOICES, REPORTING AND DELIVERY INSTRUCTIONS
A. Contractor shall prepare and submit invoices and reports to CDP according to
the following schedule:
Monthly
1. Invoices First of the month.
B. The following is a schedule of deliverables including any specific delivery instructions:
N/A
C. Other Optional Reporting Language:
The contractor will facilitate periodic progress meetings to review progress/status
of material procurement/deliveries. Contractor will effectively manage timely
deliveries and notify CDP/EVMS of any possible delays.
The Contractor shall facilitate a Weekly Progress Meeting prior to Mobilization
and throughout construction.
The Contractor shall provide periodic progress updates to CDP/EVMS as required
outlining the following:
1. The specific accomplishments achieved during the previous week.
2. An updated CPM schedule with 3 week look ahead.
4.0 PRE-PROPOSAL CONFERENCE Mandatory
Pre-proposal Conference is scheduled for July 20, 2020 at 1:00 PM at Hofheimer Hall 825 Fairfax
Ave, Norfolk, VA Room 753. After the meeting, a tour will be conducted of the Hague Club
Apartments. Attendance of this meeting is mandatory for those submitting a bid. Those proposers
attending the Pre-Proposal Conference virtually only, are required to conduct an in-person site visit
prior to RFP submittal due date to ensure a thorough understanding of the existing conditions. Site
visits can be coordinated through:
![Page 8: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/8.jpg)
Hague Club Apartments RFP No. 2020-2
Page 7 of 31
De’Laine Goodman Harper
[email protected]; (757) 446-5961
Virtual Conference Information:
Joining from a desktop or laptop: https://bluejeans.com/133914931/1893
Phone only dial: 1.888.240.2560 enter meeting ID 133914931# enter passcode 1893#
Joining via video conferencing system: [email protected]
Please note that universal masking is now in effect for anyone on the EVMS campus for any
reason. As such, all meeting attendees are required to have proper face covering.
5.0 PROPOSAL PREPARATION AND SUBMISSION INSTRUCTIONS
A. General Instructions:
Delivery of the Proposal must be by the following methods:
Mail, Overnight, Express Courier or Hand Delivery:
Creative Development Partners
Attn: Morgan Lucas RFP No: 2020-2
4525 Main Street, Suite 900
Virginia Beach, VA 23462
Electronic Submission:
Email proposals to Morgan Lucas at [email protected]
B. RFP Submission:
1. Complete Submissions:
Except as provided for under the Proposal Preparation Section, 7.0 (A)(2)(a)(iii),
which addresses the circumstances under which the submission of missing
Proposal information would be acceptable, Offerors must submit a complete
response to this RFP in order to be considered for selection under this RFP.
2. Delivery:
By Mail, Overnight or Express Courier or Hand Delivery -
If Proposals are delivered by mail, overnight or express courier or hand-delivery,
Offerors must provide one (1) original and 2 copies of each Proposal along with
an electronic copy of the proposal on a flash drive in Microsoft Word, Excel(if
applicable) and PDF format must be submitted to CDP for consideration. Each
![Page 9: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/9.jpg)
Hague Club Apartments RFP No. 2020-2
Page 8 of 31
copy must include all addenda acknowledgements, if any, and completed
attachments signed and filled out as required.
3. Proposal Acceptance Period:
All Proposals must be received by the Due Date and time found on page 1 of this
RFP (the “RFP Close”). Proposals received after RFP Close will not be
considered. RFP modifications, unless requested by CDP and posted to all
Offerors on the CDP RFPs website, will not be considered.
4. Proposal Withdrawals:
At the sole discretion of the Offeror(s), Proposals may be withdrawn at any time
prior to the RFP Close. After RFP Close, letters to withdraw a Proposal will not
be accepted and Proposals will remain valid until an award is made and a contract
is executed or the RFP is canceled. If an award is not made within 120 days from
the RFP closure date, the Proposal may be withdrawn at the written request of the
Offeror.
C. Proposal Preparation:
1. Proposals shall be signed by an authorized representative of the Offeror (Section
11 Attachment B). All information requested should be submitted to ensure
consideration as a responsive bidder. Failure to submit all information requested
may result in the following:
a. CDP may reject the Proposal as unresponsive. Proposals, which are
substantially incomplete or lack key information, may be rejected by CDP;
or,
b. CDP may lower the overall evaluation score due to missing information;
or,
c. CDP may require prompt submission of missing information within a
prescribed time period and/or the Offeror shall receive a lower overall
evaluation score due to missing information lowered evaluation of the
Proposal. If after being given an opportunity to submit missing
information, the Offeror does not provide all of the requested information
then subsections 7.0 C (1)(a) and (b) above apply.
2. All information above must be submitted along with the RFP cover sheet (Section
13, Attachment A) and an Entity Data Sheet (Section 13, Attachment C). Failure
to submit all information requested may result in CDP requiring prompt
submission of missing information and/or giving a lowered evaluation of the
Proposal. CDP may reject Proposals, which are substantially incomplete or lack
key information.
![Page 10: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/10.jpg)
Hague Club Apartments RFP No. 2020-2
Page 9 of 31
3. Proposals should be prepared simply and economically, providing a
straightforward, concise description of capabilities to satisfy the requirements of
the RFP. Emphasis should be placed on completeness and clarity of content and
include or address the following:
a. Organization - Proposals should be organized in the order in which the
requirements are presented in the RFP;
b. Pagination - All pages of the Proposal should be numbered;
c. Paragraph Structure - Each paragraph in the Proposal should reference
the paragraph number of the corresponding section of the RFP and it is
also helpful to cite the paragraph number, sub letter, and repeat the text of
the requirement as it appears in the RFP. If a response covers more than
one page, the paragraph number and sub letter should be repeated at the
top of the next page;
d. Table of Contents - The Proposal should contain a table of contents,
which cross-references the RFP requirements; and,
e. Additional Information - Information which the Offeror desires to
present that does not fall within any of the requirements of the RFP should
be inserted at an appropriate place or be attached at the end of the Proposal
and designated as additional material.
Incomplete Proposals or Proposals, which, lack clarity of contact and organization
submitted to CDP submitted under this RFP may risk a reduced evaluation score
or elimination from consideration.
4. As used in this RFP, the terms “must”, “shall”, “should” and “may” identify the
critical requirements. “Must” and “shall” identify requirements where absence
will have a major negative impact on the suitability of the Project and/or mandatory
requirements, which are required by law or regulation and as such they cannot be
waived and are not subject to negotiation. This includes any applicable prime
award funding flow-down provisions, which are mandatory and/or required as
applicable. Any federal standard provisions are an example of mandatory terms
and conditions that are not subject to negotiation. Items labeled as “should” or
“may” are highly desirable, although their absence will not have a large impact on
the Project and would be useful, but are not absolutely necessary or required. The
inability of an Offeror to satisfy a “must” or “shall” requirement does not
automatically remove that Offeror from consideration; however, it may seriously
affect the overall rating of the Offerors’ Proposal.
5. Each copy of the submitted Proposal contained in a single volume where practical
(i.e., binder, stapled, or otherwise secured so that the pages will not easily separate
or come loose). All documentation submitted with the Proposal should be
contained in that single volume.
6. All expenses involved with the preparation and submission of Proposals to CDP,
or any work performed in connection therewith, shall be borne by the Offeror. No
![Page 11: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/11.jpg)
Hague Club Apartments RFP No. 2020-2
Page 10 of 31
payment(s) will be made for any responses received; or, for any other effort
required of or made by the Offeror(s) prior to commencement of work as defined
by a fully executed contract.
7. Ownership of all data, materials, and documentation originated and prepared for
CDP pursuant to the RFP shall belong exclusively to CDP and may be subject to
public inspection in accordance with the Virginia Freedom of Information Act
(FOIA) unless a confidentiality or non-disclosure agreement is signed by the
parties.
D. Specific Proposal Instructions:
Proposals should be as thorough and detailed as possible so CDP may properly evaluate
your capabilities to provide the required goods/services. Offerors are required to submit
the following items as a complete Proposal:
1. Return the RFP cover sheet (Attachment A) and all addenda, if any, along with
all attachments signed and filled out as required;
2. Completed Entity Data Sheet (Attachment C) attached to the RFP, and other
specific items or data requested in the RFP;
3. Contractor must provide proof of insurance via a Certificate of Liability
Insurance (COI) to the CDP Development Coordinator, Morgan Lucas.
4. Address each item in the Statement of Work;
5. Briefly describe what sets your Company/Proposal apart from your competitors
and provide a list of completed multifamily renovation projects;
6. Offeror must provide a list of all accounts that have been lost during the past five
(5) years including reasoning for cancellation or non-renewal.
7. Specific plans for providing the proposed goods/services, such as:
a. Schedule for completion
8. Internal Revenue Service (IRS) form W-9 for entities based in the United States
(US) and appropriate W-8 for non-US based entities, signed by the Contractor’s
authorized official (See Section 11, Attachment D for W9/W8 Instructions).
6.0 PROPOSAL EVALUATION
A. Evaluation Criteria
Award of the Contract under this RFP shall be based on a written evaluation of the RFP
evaluation criteria below (i.e., score sheet) of each responsible Offeror. Note that failure
to provide accurate information required by this RFP may result in a lower score or
![Page 12: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/12.jpg)
Hague Club Apartments RFP No. 2020-2
Page 11 of 31
rejection of the Proposal. CDP has broad flexibility in fashioning the details of competition
for this RFP. This may include conducting on-line Reverse Auctions for certain products
within this RFP or setting price targets as part of follow-on negotiations in order to
determine the prices that will be used to evaluate the pricing part of your Proposal.
NUMERICAL WEIGHTS ASSIGNED TO SPECIFIC CRITERIA:
For Services: Point Value
Point Value
1. Qualifications and experience of Offerors
in providing the services
20
2. Specific plans or methodology to be used to perform services 20
3. Price (Fee & General Conditions) 20
4. Personnel Assigned to Project 20
5. References 10
6. Small, Women, and Minority Vendors (SWaM)
(Including Small Business Plan, Attachment F)
10
Total 100
7.0 GENERAL TERMS AND CONDITIONS
A. Applicable Laws and Courts: This solicitation and any resulting contract shall be
governed in all respects by the laws of the Commonwealth of Virginia and any
litigation with respect thereto shall be brought in the courts of the Commonwealth.
The contractor shall comply with all applicable federal, state and local laws, rules
and regulations.
B. Anti-Discrimination: By submitting their proposals, offerors certify to the Medical
School that they will conform to the provisions of the Civil Rights Act of 1964, as
amended as well as the Virginia Fair Employment Contracting Act of 1975 as
amended, where applicable. If the award is made to a faith-based organization, the
organization shall not discriminate against any recipient of goods, services, or
disbursements made pursuant to the contract on the basis of the recipient’s religion,
religious belief, refusal to participate in a religious practice, or on the basis of race,
age, color, gender or national origin and may be subject to the same rules as other
organizations that contract with public bodies to account for the use of the funds
provided.
In every contract, the provisions in 1. and 2. below apply:
1. During the performance of this contract, the contractor agrees as follows:
![Page 13: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/13.jpg)
Hague Club Apartments RFP No. 2020-2
Page 12 of 31
a. The contractor will not discriminate against any employee or applicant
for employment because of race, religion, color, sex, national origin,
age, disability, or any other basis prohibited by state law relating to
discrimination in employment, except where there is a bona fide
occupational qualification reasonably necessary to the normal operation
of the contractor. The contractor agrees to post in conspicuous places,
available to employees and applicants for employment, notices setting
forth the provisions of this nondiscrimination clause.
b. The contractor, in all solicitations or advertisements for employees
placed by or on behalf of the contractor, will state that such contractor
is an equal opportunity employer.
2. The contract will include the provision of 1. above in every subcontract or
purchase order, so that the provisions will be binding upon each subcontractor
or vendor.
C. Ethics In Contracting: By submitting their proposal, offerors certify that their
proposals are made without collusion or fraud and that they have not offered or
received any kickbacks or inducements from any other offeror, supplier,
manufacturer or subcontractor in connection with their proposal, and that they have
not conferred on any Medical School employee having official responsibility for this
procurement transaction any payment, loan, subscription, advance, deposit of
money, services or anything of more than nominal value, present or promised, unless
consideration of substantially equal or greater value was exchanged.
D. Immigration Reform and Control Act of 1986: By submitting their proposals,
offerors certify that they do not and will not during the performance of this contract
employ illegal alien workers or otherwise violate the provisions of the federal
Immigration Reform and Control Act of 1986.
E. Debarment Status: By submitting their proposals, offerors certify that they are not
currently debarred by the Commonwealth of Virginia, from submitting bids or
proposals on contracts for the type of goods and/or services covered by this
solicitation, nor are they an agent of any person or entity that is currently so debarred.
Also, offerors certify that they are not on the Department of Health and Human
Services (HHS) and Office of Inspector General’s (OIG) monthly list of excluded
individuals/entities from providing medical services and supplies to Medicare,
Medicaid or other federal health care program participants.
F. Antitrust: By entering into a contract, the contractor conveys, sells, assigns, and
transfers to the Medical School all rights, title and interest in and to all causes of
action it may now have or hereafter acquire under the antitrust laws of the United
States and the Commonwealth of Virginia, relating to the particular goods or
services purchased or acquired by the Medical School under said contract.
![Page 14: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/14.jpg)
Hague Club Apartments RFP No. 2020-2
Page 13 of 31
G. Mandatory Use of Terms and Conditions for RFPs: Modification of or additions to
the General Terms and Conditions of the solicitation may be cause for rejection of
the proposal; however, the Medical School reserves the right to decide, on a case-
by-case basis, in its sole discretion, whether to reject such a proposal.
H. Clarification of Terms: If any prospective offeror has questions about the
specification or other solicitation documents, the prospective offeror should contact
the buyer whose name appears on the face of the solicitation no later than five
working days before the due date. Any revisions to the solicitation will be made
only by addendum issued by the buyer.
i. I. Payment:
1. To General Contractor:
a. Monthly pay applications shall by submitted by the Contractor
directly to the payment address shown on the purchase
order/contract. All applications shall show the contract
number.
b. Any payment terms requiring payment in less than 30 days will
be regarded as requiring payment 30 days after invoice or
delivery, whichever occurs last. This shall not affect offers of
discounts for payment in less than 30 days, however.
c. The date of postmark shall be deemed to be the date of payment
in all cases where payment is made by mail.
J. Precedence of Terms: The following General Terms and Conditions
APPLICABLE LAWS AND COURTS, ANTI-DISCRIMINATION,
ETHICS IN CONTRACTING IMMIGRATION REFORM AND
CONTROL ACT OF 1986, DEBARMENT STATUS, ANTITRUST,
MANDATORY USE OF TERMS AND CONDITIONS, CLARIFICATION
OF TERMS, PAYMENT shall apply in all instance. In the event there is a
conflict between any of the other General Terms and Conditions and any
Special Terms and Conditions in this solicitation, the Special Terms and
Conditions shall apply.
K. Qualifications of Offerors: CDP may make such reasonable investigations as
deemed proper and necessary to determine the ability of the offeror to
perform the services/furnish the goods and the offeror shall furnish to CDP
all such information and data for this purpose as may be requested. CDP
reserves the right to inspect offeror’s physical facilities prior to award to
satisfy questions regarding the offeror’s capabilities. CDP further reserves
![Page 15: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/15.jpg)
Hague Club Apartments RFP No. 2020-2
Page 14 of 31
the right to reject any proposal if the evidence submitted by, or investigations
of, such offeror fails to satisfy CDP that such offeror is properly qualified to
carry out the obligations of the contract and to provide the services and/or
furnish the goods contemplated therein.
L. Assignment of Contract: The contract shall not be assignable by the
Contractor in whole or in part without the written consent of CDP.
M. Changes to the Contract: Changes can be made to the contract in any of the
following ways followed by a change order/revised purchase order:
1. The parties may agree in writing to modify the scope of the contract. An
increase or decrease in the price of the contract resulting from such modification
shall be agreed to by the parties as a part of their written agreement to modify
the scope of the contract.
2. The Purchasing Department may order changes within the general scope of the
contract at any time by written notice to the contractor. Changes within the
scope of the contract include, but are not limited to, things such as services to
be performed, the method of packing or shipment, and the place of delivery or
installation. The Contractor shall comply with the notice upon receipt. The
Contractor shall be compensated for any additional costs incurred as the result
of such order and shall give EVMS a credit for any savings. Said compensation
shall be determined by one of the following methods:
a. By mutual agreement between the parties in writing; or
b. By agreeing upon a unit price or using a unit price set forth in the
contract, if the work to be done can be expressed in units, and the
Architect accounts for the number of units of work performed subject to
the EVMS’s right to audit the Contractor’s records and/or to determine
the correct number of units independently; or
c. By ordering the Contractor to proceed with the work and keep a record
of all costs incurred and savings realized. A markup for overhead and
profit may be allowed if provided by the contract. The same markup
shall be used for determining a decrease in price as the result of savings
realized. The Contractor shall present CDP with all vouchers and
records of expenses incurred and savings realized. CDP shall have the
right to audit the records of the Architect as it deems necessary to
determine costs or savings. Any claim for an adjustment in price under
this provision must be asserted by written notice to the CDP within
thirty (30) days from the date of receipt of the written order from CDP.
N. Disputes: Neither the existence of a claim nor a dispute resolution process,
litigation or any other provision of this contract shall excuse the contractor
![Page 16: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/16.jpg)
Hague Club Apartments RFP No. 2020-2
Page 15 of 31
from promptly complying with the performance of the contract generally or
with the changes ordered by CDP.
O. Default: In case of failure to deliver goods or services in accordance with the
contract terms and conditions, CDP/EVMS, after due oral or written notice,
may procure them from other sources and hold the contractor responsible for
any resulting additional purchase and administrative costs. This remedy
shall be in additional to any other remedies which EVMS may have.
i. P. Insurance: By signing and submitting a proposal under this solicitation, the
ii. offeror certifies that if awarded the contract, it will have the following insurance
iii. coverage at the time the contract is awarded. The offeror further certifies that it will
maintain these insurance coverage during the entire term of the contract and
that all insurance coverage will be provided by insurance companies authorized
iv. to sell insurance in Virginia by the Virginia State Corporation Commission.
MINIMUM INSURANCE COVERAGES AND LIMITS REQUIRED FOR
MOST CONTRACTS:
1. Workers’ Compensation – Statutory requirements and benefits. Waiver of Subrogation in favor of EVMS. Coverage is compulsory for employers of three or more employees, to include the employer. Contractors who fail to notify the Medical School of increases in the number of employees that change their workers’ compensation requirements under the Code of Virginia during the course of the contract shall be in noncompliance with the contract.
2. Employer’s Liability - $1,000,000.
3. Commercial General Liability - $1,000,000 per occurrence. Commercial General Liability is to include bodily injury and property damage, personal injury and advertising injury, products and completed operations coverage. The Medical School must be named as an additional insured for both ongoing and completed operations and so endorsed on the policy. Coverage shall be primary and any coverage carried by EVMS shall be non-contributory. Waiver of Subrogation in favor of EVMS is included.
4. Automobile Liability - $1,000,000 per occurrence.
5. Pollution Liability with a minimum limit of $1,000,000 per claim with no exclusion for mold/fungus/microbial water.
6. Umbrella Liability – Minimum limits of $5,000,000 excess of General Liability, Auto Liability and Employers Liability.
![Page 17: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/17.jpg)
Hague Club Apartments RFP No. 2020-2
Page 16 of 31
7. Builder’s Risk – Contractor shall carry builder’s risk coverage in the full
amount of the contract for all perils including mechanical breakdown / testing.
Coverage shall not apply to the existing structure. Contractor shall be
responsible for any applicable deductible.
Note: In addition, various Professional Liability/Errors and Omissions coverages
are required when soliciting those services as follows:
U. Announcement of Award: Upon the award or the announcement of the decision to
award a contract over $100,000, as a result of this solicitation, CDP notify the
Offerer by email and phone.
V. Drug-Free Workplace: During the performance of this contract, the contractor
agrees to provide a drug-free workplace for the contractor’s employees; (ii) post in
conspicuous places, available to employees and applicants for employment, a
statement notifying employees that the unlawful manufacture, sale, distribution,
dispensation, possession, or use of a controlled substance or marijuana is prohibited
in the contractor’s workplace and specifying the actions that will be taken against
employees for violations of such prohibition: (iii) state in all solicitations or
advertisements for employees placed by or on behalf of the contractor that the
contractor maintains a drug-free workplace; and (iv) include the provisions of the
foregoing clauses in every subcontract or purchase order of over $10,000, so that the
provisions will be binding upon each subcontractor or vendor.
For the purpose of this section, “drug-free workplace” means a site for the
performance of work done in connection with a specific contract awarded to a
contractor, the employees of whom are prohibited from engaging in the unlawful
manufacture, sale, distribution, dispensation, possession or use of any controlled
substance or marijuana during the performance of the contract.
W. Nondiscrimination of Contractors: An offeror or contractor shall not be
discriminated against in the solicitation or award of this contract because of race
religion, color, sex, national origin, age or disability, faith-based organizational
status, any other basis prohibited by state law relating to discrimination in
employment or because the bidder or offeror employs ex-offenders unless CDP has
made a written determination that employing ex-offenders on the specific contract
is not in its best interest. If the award of this contract is made to a faith-based
organization and an individual, who applies for or receives goods, services, or
disbursements provided pursuant to this contract objects to the religious character of
the faith-based organization from which the individual receives or would receive the
goods, services, or disbursements, CDP shall offer the individual, within a
reasonable period of time after the date of his objection, access to equivalent goods,
services, or disbursements from an alternative provider.
X. Permits and Fees: All proposals submitted shall have included in price the cost of
any business or professional licenses, permits or fees required by the
![Page 18: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/18.jpg)
Hague Club Apartments RFP No. 2020-2
Page 17 of 31
Commonwealth of Virginia. The Offeror must have all necessary licenses to
perform the services in Virginia, and, if practicing as a corporation, be authorized to
do business in the Commonwealth of Virginia.
Y. OSHA Standards: All services for CDP are required and shall comply with all
Occupational Safety and Health Administration (OSHA) State and City Safety and
Occupational Health Standards and any other applicable rules and regulations. Also,
Contractor shall be held responsible for the safety of their employees and any unsafe
acts or conditions that may cause injury or damage to any persons or property within
and around the work site area under this RFP.
Z. Equal Employment Opportunity (EEO) Clause for Veterans: An offeror or
contractor shall abide by the requirements of 41 CFR 60-300.5(a). This regulation
prohibits discrimination against qualified protected veterans, and requires
affirmative action by covered prime Contractor and Subcontractors to employ and
advance in employment qualified protected veterans.
AA. Equal Employment Opportunity (EEO) Clause for Individuals with Disabilities:
An offeror or contractor shall abide by the requirements of 41 CFR 60-741.5(a).
This regulation prohibits discrimination against qualified individuals on the basis of
disability, and requires affirmative action by covered prime Contractor and
Subcontractors to employ and advance in employment qualified individuals with
disabilities.
BB. Equal Employment Opportunity (EEO) Clause for Individuals based on Race,
Color, Religion, Sex, or National Origin: An offeror or contractor shall abide by the
requirements of 41 CFR 60-1.4(a). This regulation prohibits discrimination against
qualified individuals on the basis of race, color, religion, sex, or national origin, and
requires affirmative action by covered prime Contractor and Subcontractors to
employ and advance in employment qualified individuals without regard to their
race, color, religion, sex, or national origin.
8.0 SPECIAL TERMS AND CONDITIONS
A. Advertising: In the event a contract is awarded for supplies, equipment, or services
resulting from this proposal, no indication of such sales or services to the Medical
School will be used in product literature or advertising. The Contractor shall not
state in any of its advertising or product literature that the Medical School has
purchased or uses its products or services.
B. Audit: The Contractor shall retain all books, records, and other documents relative
to this contract for five (5) years after final payment, or until audited by CDP,
![Page 19: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/19.jpg)
Hague Club Apartments RFP No. 2020-2
Page 18 of 31
whichever is sooner. CDP, its authorized agents, and/or auditors shall have full
access to and the right to examine any of said materials during said period.
C. Best and Final Offer (BAFO): At the conclusion of negotiations, the offeror(s) may
be asked to submit in writing, a Best And Final Offer (BAFO). After the BAFO is
submitted, no further negotiations shall be conducted with the offeror(s). The
offeror’s proposal will be rescored to combine and include the information
contained in the BAFO. The decision to award will be based on the final evaluation
including the BAFO.
D. Proposal Acceptance Period: Any proposal in response to this solicitation shall be
valid for 120 days. At the end of the 120 days the proposal may be withdrawn at
the written request of the offeror. If the proposal is not withdrawn at that time it
remains in effect until an award is made or the solicitation is canceled.
Proposals received after the proposal due date and time are late and will not be
considered. Modifications received after the proposal due date are late and will not
be considered. Letters of withdrawal received either after the proposal due date or
time, or after contract date, whichever is applicable, are late and will not be
considered.
E. RFP Postponement/Cancellation: CDP/EVMS may, at its sole and absolute
discretion, reject any and all, or parts of any or all proposals; readvertise this RFP;
postpone or cancel, at any time, this RFP process; or waive any irregularities in this
RFP or in the proposals received as a result of this RFP.
F. Cancellation of Contract: CDP/EVMS reserves the right to cancel and terminate
any resulting contract, in part or in whole, without penalty, upon 60 days written
notice to the contractor. In the event the initial contract period is for more than 12
months, the resulting contract may be terminated by either party, without penalty,
after the initial 12 months of the contract period upon 60 days written notice to the
other party. Any contract cancellation notice shall not relieve the contractor of the
obligation to deliver and/or perform on all outstanding orders issued prior to the
effective date of cancellation.
G. Identification of Proposal Envelope: If a special envelope is not furnished, or if
return in the special envelope is not possible, the signed proposal should be returned
in a separate envelope or package, sealed and identified as follows:
![Page 20: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/20.jpg)
Hague Club Apartments RFP No. 2020-2
Page 19 of 31
From: ______________________________ _______________ ____________
Name of Offeror Due Date Time
_____________________________ ______________________________
Street or Box Number RFP No.
_____________________________ ______________________________
City, State, Zip Code RFP Title
_______________________________
Name of Contract/Purchase Officer or Buyer
The envelope should be addressed as directed on Page 2 of the solicitation.
If a proposal not contained in the special envelope is mailed, the offeror takes the
risk that the envelope, even if marked as described above, may be inadvertently
opened and the information compromised which may cause the proposal to be
disqualified. Proposals may be hand delivered to the designated location in the
office issuing the solicitation. No other correspondence or other proposals should
be placed in the envelope.
H. Indemnification: Contractor agrees to indemnify, defend and hold harmless CDP
and the Medical School, its officers, agents, and employees from any claims,
damages and actions of any kind or nature, whether at law or in equity, arising from
or caused by the use of any materials, goods, or equipment of any kind or nature
furnished by the contractor/any services of any kind or nature furnished by the
Architect, provided that such liability is not attributable to the sole negligence of
CDP and the Medical School or to failure of the Medical School to use the
materials, goods, or equipment in the manner already and permanently described
by the contractor on the materials, goods or equipment delivered.
I. Accuracy/Competition: By submitting a proposal, offerors certify that all
information provided in response to this RFP is true and accurate. Failure to
provide information required by this RFP may ultimately result in rejection of the
proposal.
Furthermore, the Medical School has broad flexibility in fashioning the details of
competition for this RFP. This may include conducting on-line Reverse Auctions
for certain products within this RFP or setting price targets as part of follow-on
negotiations in order to determine the prices that will be used to evaluate the pricing
part of your proposal.
![Page 21: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/21.jpg)
Hague Club Apartments RFP No. 2020-2
Page 20 of 31
J. Additional Cost: No service fees or additional costs will be invoiced to the Medical
School by the Contractor during the term of the contract except as allowed for in
the contract.
9.0 CONTRACT NEGOTIATION
A. Based on evaluation of the Proposals, one or more successful Offerors will be selected.
Award of the contract shall be made to the Offeror(s) deemed to be fully qualified and best
suited for the project based on the evaluation criteria set forth herein. CDP/EVMS will
select the Proposal determined during the evaluation of the timely submitted Proposals to
be the most advantageous in meeting the specifications as outlined under this RFP. This
may or may not be the Offeror, which presented the lowest costs/price.
B. CDP will request a copy of the contract from the Offeror. An AIA contract will be required.
C. Non-Negotiable Terms and Conditions.
By submitting a response to this RFP the Offeror agrees that it, and any consultants that
Offeror shall utilize to fulfill the Contract Workscope, shall be subject to mandatory
standard provisions that flow-down from the prime award made to EVMS by the Federal
Government or private funders applicable to that contract under the prime award and that
it must certify compliance with certain federal laws/guidelines, as applicable, including,
but not limited to the following:
1. Equal Employment Opportunity (EEO) Clause for Veterans. An offeror or
contractor shall abide by the requirements of 41 CFR 60-300.5(a). This regulation
prohibits discrimination against qualified protected veterans, and requires
affirmative action by covered prime contractors and subcontractors to employ and
advance in employment qualified protected veterans.
2. Equal Employment Opportunity (EEO) Clause for Individuals with Disabilities.
An offeror or contractor shall abide by the requirements of 41 CFR 60-741.5(a).
This regulation prohibits discrimination against qualified individuals on the basis
of disability, and requires affirmative action by covered prime contractors and
subcontractors to employ and advance in employment qualified individuals with
disabilities.
3. Equal Employment Opportunity (EEO) Clause for Individuals based on Race,
Color, Religion, Sex, or National Origin. An offeror or contractor shall abide by
the requirements of 41 CFR 60-1.4(a). This regulation prohibits discrimination
against qualified individuals on the basis of race, color, religion, sex, or national
origin, and requires affirmative action by covered prime contractors and
subcontractors to employ and advance in employment qualified individuals
without regard to their race, color, religion, sex, or national origin;
4. Copeland “Anti-Kickback” Act (18 U.S.C. 874 and 40 U.S.C. 276c), as
supplemented by Department of Labor regulations (29 CFR part 3, “Contractors
and Subcontractors on Public Building or Public Work Financed in Whole or in
![Page 22: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/22.jpg)
Hague Club Apartments RFP No. 2020-2
Page 21 of 31
Part by Loans or Grants from the United States”), prohibiting the Contractor from
inducing, by any means, any person employed in the construction, completion, or
repair of public work, to give up any part or compensation to which otherwise
entitled;
5. Contract Work Hours and Safety Standards Act (40 U.S.C. 327-333) as
supplemented by Department of Labor regulations (29 CFR part 5), regulating
laborer and mechanic work hours and safety standards;
6. Rights to Inventions Made Under a Contract or Agreement – (37 CFR part 401,
“Rights to Inventions Made by Nonprofit Organizations and Small Business Firms
Under Grants, Contracts and Cooperative Agreements,” providing for the
invention rights of the Parties and the Federal Government;
7. Clean Air Act (42 U.S.C. et seq.) and the Federal Water Pollution Control Act (33
U.S.C 1251 et seq.) as amended related to applicable standards under said
regulations; and,
8. Worker’s Compensation Insurance (42 U.S.C. 1651, et seq.) requiring worker’s
compensation insurance for contracts, which require performance outside the
United States as applicable per the circumstance of each particular contract.
D. All EVMS contracts are subject to prime funding constraints and applicable federal and
state laws, regulations, guidelines as well as EVMS policies and procedures. If EVMS and
the Offeror(s) are unable to agree on the negotiated contract terms and conditions, EVMS
may elect to terminate negotiations and begin negotiations with the second best ranked
Offeror and so forth. If those negotiations do not result in mutually acceptable contract
terms and conditions, the negotiations with the next best qualified Offeror(s) will continue
until there is an executed contract, there are no more Offerors to negotiate with based on
submitted/complete Proposals or EVMS, at its sole discretion, terminates the RFP. No
Offeror shall have any claims and/or rights against EVMS arising from such negotiations
and/or the RFP evaluation or overall process.
E. At the conclusion of negotiations, the Offeror(s) may be asked to submit in writing, a Best
And Final Offer (BAFO) along with an executed copy of the negotiated contract with the
understanding that all contracts funded under prime awards to EVMS by the United States
Government, private foundations or other nonprofit organizations may be subject to
availability of funds. Under these circumstances, there may be additional approval
requirements required by the funding federal agency, private foundation or other
organization. After submitting the BAFO and/or the Contract is fully executed, no further
negotiations shall be conducted with the Offeror(s). In the case of BAFO submission, the
Offeror’s Proposal will be rescored to combine and include the information contained in
the BAFO. EVMS will base its final decision regarding the contract award on the final
evaluation, which will include the BAFO.
F. Cancellation of Contract.
EVMS reserves the right to cancel and terminate any resulting contract, in part or in whole,
without penalty, unless otherwise negotiated under the contract, upon thirty (30) days prior
written notice to the contractor. Any contract cancellation notice shall not relieve the
![Page 23: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/23.jpg)
Hague Club Apartments RFP No. 2020-2
Page 22 of 31
Offeror of the obligation to deliver and/or perform on all outstanding orders issued prior to
the effective date of cancellation.
10.0 AWARD
A. Upon the announcement of the decision to award under this RFP, the EVMS Department
of Materials Management will publicly post such notice on the EVMS Internet web site at
https://www.evms.edu for a minimum of ten (10) days. EVMS will contact each successful
Offeror with additional post-award information as deemed appropriate per award.
B. While it is the intent of EVMS to award only one contract. EVMS reserves the right to not
make an award or to award multiple contracts, if deemed in the best interest of EVMS or
as required under the applicable prime funding award. All decisions made by EVMS are
final. In addition, EVMS reserves the right, in its sole and absolute discretion, to:
1. Issue or not reissue a subsequent RFP if no award is made;
2. Not select any Offeror that submitted a Proposals
3. Make a partial award;
4. Modify, change or reduce the scope of work for this RFP; and/or
5. Waive any irregularities in this RFP or in the Proposals received as a result
of this RFP.
11.0 ATTACHMENTS:
• Attachment A – RFP Cover Sheet
• Attachment B – Offeror RFP Certification
• Attachment C - Entity Data Sheet
• Attachment D – W9/W8 Instruction Sheet
• Attachment E – Contractor’s License & Insurance Information
• Attachment F – Small Business Subcontracting Plan
• Attachment G – Building Condition Reports
• Attachment H – Preliminary Schedule
• Attachment I – General Conditions Matrix
![Page 24: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/24.jpg)
Hague Club Apartments RFP No. 2020-2
Page 23 of 31
Attachment A
RFP
Coversheet
From: ______________________________ Due Date: _______________
Approximate Time: _______
Address: ______________________________
______________________________
_____________________________
______________________________
______________________________
Name of
Contractor’s
Project
Manager: ______________________________
Project Title: ______________________________
Name of
EVMS
Technical
Monitor: ______________________________
![Page 25: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/25.jpg)
Hague Club Apartments RFP No. 2020-2
Page 24 of 31
Attachment B
Offeror RFP Certification
RFP Number: ______________________________
Issue Date: ______________________________
Project Title: ______________________________
Name of Entity: ______________________________
Street Address: ______________________________
State/ Zip Code: ______________________________
Federal Employer Identification Number (FEIN): ______________________________
Foreign Identification Number (FIN), if applicable: ______________________________
Data Universal Numbering System # (DUNS): ______________________________
By signing below, I hereby certify that:
1. I have the authority to submit the attached Proposal and am the authorized signatory for the entity
listed above;
2. The terms and conditions of this RFP are accepted by the entity listed above and all good/services
will be provided in accordance with the attached Proposal; and,
3. All information provided in the attached Proposal is true and correct to the best of my knowledge,
information and belief.
Signature By: _____________________________________________ Date: ____________
Name: ______________________________________
Title: ______________________________________
Phone: ______________________________________
Fax: ______________________________________
E-mail: ______________________________________
![Page 26: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/26.jpg)
Hague Club Apartments RFP No. 2020-2
Page 25 of 31
Attachment C
Entity Data Sheet
Please complete the following information:
1. Entity Name: _________________________________________________
_________________________________________________
_________________________________________________
2. Signatory Name: _________________________________________________
& Title
_________________________________________________
3. Address: _________________________________________________
_________________________________________________
_________________________________________________
_________________________________________________
4. Primary Negotiation
Point of Contact
Name: _________________________________________________
Title: _________________________________________________
Email Address: _________________________________________________
Telephone Number: _________________________________________________
5. Is the entity registered in System for Award Management (SAM), formerly known as the Central
Contractor Registration (CCR)? Registration in SAM is required under 2 CFR 25 unless the
entity is exempt under 2 CFR 25.110.
Yes ______ No ______ Expiration Date: ________________
6. Entity
DUNS Number: __________________________________________________
![Page 27: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/27.jpg)
Hague Club Apartments RFP No. 2020-2
Page 26 of 31
7. Entity Employer Identification Number(EIN): ______________________________________
8. Commercial and Government Entity Code, if applicable (CAGE): _____________________
9. Past Work Experience: (Past work experience in general and as it pertains to the Proposal
submitted in response to an RFP or an RFQ.)
10. Key Personnel: (List Names and Titles and attach resumes).
11. Professional references: Please include length of time Offeror has been providing this type of
service and what year the service was provided).
12. Small Business Status (Check all that apply): Offeror must be registered with an authorizing
agency, such as the Small Business Administration or Department of Small Business and Supplier
Diversity. A copy of the certificate(s) must be provided.
___ Small Disadvantaged Owned Business (SDB)
___ Woman Owned Small Business (WOSB)
___ Veteran Owned Small Business (VOSB)
___ Minority Owned Small Business (MOSB)
___ HubZone Small Business (HSB)
___ Service Disabled Small Business (SDVOSB)
___ Small Business (SB)
___ Not Applicable (NA)
![Page 28: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/28.jpg)
Hague Club Apartments RFP No. 2020-2
Page 27 of 31
Attachment D
W9/W8 Instruction Sheet
The Internal Revenue Service (IRS) requires verification of taxpayer information when making
disbursements to individuals and entities. This is accomplished by either IRS formW9 for United States
(US) entities or W8 for foreign entities not based in the US.
Please refer to https://IRS.gov for more detailed information regarding which is the appropriate taxpayer
information form that must be completed by your organization and returned with your Proposal in response
to the RFP. The links below are provided for your convenience but it is the responsibility of your
organization to submit the correct form with your request. Please see the below for links to examples of
Taxpayer Information Forms:
IRS Form - W9 (US)
http://www.irs.gov/pub/irs-pdf/fw9.pdf.
IRS Form – W8 (Non-US)
There are several types of W8 forms that are available. See the following as an example of one type of W8
that is frequently used:
http://www.irs.gov/pub/irs-pdf/fw8ben.pdf.
![Page 29: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/29.jpg)
Hague Club Apartments RFP No. 2020-2
Page 28 of 31
Attachment E
Contractor’s License & Insurance Information
(COPIES OF ALL LICENSES AND INSURANCE CERTIFICATES MUST BE PROVIDED)
Contractor’s License:
1. Virginia Contractor’s License Number: ___________________________________
2. Class: ___________________________________
3. Specialty Codes: ___________________________________
4. Expiration Date: ___________________________________
Insurance Information:
1. Producer Of Insurance: ___________________________________
2. Name and Address of Insured: ___________________________________
___________________________________
___________________________________
___________________________________
3. Commercial General Liability: _____YES _____NO
-Policy Number ___________________________________
-Effective Dates ___________________________________
4. Automobile Liability: _____YES _____NO
-Policy Number ___________________________________
-Effective Dates ___________________________________
5. Workers Compensation: _____YES _____NO
-Policy Number ___________________________________
-Effective Dates ___________________________________
6. Property Insurance: _____YES _____NO
-Policy Number ___________________________________
-Effective Dates ___________________________________
![Page 30: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/30.jpg)
Hague Club Apartments RFP No. 2020-2
Page 29 of 31
Attachment F
Small Business
Subcontracting Plan
SMALL BUSINESS SUBCONTRACTING PLAN
Offeror:
Address:
Solicitation Number: Supplies or services offered:
Total estimated cost of subcontract to Small Businesses: $
Period of Performance From: To:
1. We plan to subcontract the following principal types of supplies and services to SDB,
WOSB, VOSB, MOSB, HSB, SDVOSB, SB(reference Attachment B – Section12)
Types of Supplies and Service Type of SB
**It is the policy of the Medical School to facilitate the establishment, preservation, and strengthening of small
businesses and businesses owned by woman and minorities and service disabled veterans and to encourage their
participation in the Medical School’s procurement activities. Toward that end the Medical School encourages these
firms to compete and encourages other firms to provide for the participation of these firms through partnerships,
joint ventures, subcontracts, or other contractual opportunities. Offeror are asked, as part of their submission, to
describe any planned use of such business in fulfilling this contract.
![Page 31: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/31.jpg)
Hague Club Apartments RFP No. 2020-2
Page 30 of 31
2. We developed the small business subcontracting principles in 1 above by the following
methods. Explain how they are to be used and identify any source list used.
3. Identify the overall goals you plan to accomplish by instating this small business
subcontracting plan.
4. The employee who will administer our subcontracting program is:
Name:
Title:
Address:
Telephone:
The administrator’s duties include:
5. We will make the following internal/external efforts to ensure that SDB, WOSB, VOSB,
MOSB, HSB, SDVOSB, SB have an equitable opportunity to compete for subcontracts by:
6. We will maintain the following types of records to document our efforts to solicit small
businesses as it relates to this small business subcontracting plan:
![Page 32: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/32.jpg)
Table of Contents
Introduction.................................................................................................................................................... 3
1.0 Purpose ........................................................................................................................................... 3
Site Descriptions ....................................................................................................................................... 4
1.0 Location and Legal Description ................................................................................................. 4
2.0 Site and Vicinity Characteristics ................................................................................................ 4
3.0 Building Description .................................................................................................................. 4
Hazardous Materials ................................................................................................................................. 4
1.0 Hazardous Material ................................................................................................................... 4
Investigations and Evaluations of Systems for Functionality and Compliance of Codes ......................... 4
1.0 Plumbing ................................................................................................................................... 4
2.0 Fire Protection ........................................................................................................................... 4
3.0 Heating, Ventilation, and Air Conditioning ................................................................................ 6
4.0 Electrical/Communications ........................................................................................................ 6
5.0 Building Framing/Structural ....................................................................................................... 7
6.0 Units/General ............................................................................................................... ………..6
7.0 Units/Finishes……………………………………………………………………………….…………6
8.0 Common Areas………………………………………………………………………………………..7
Finding and Conclusions .............................................................................................................................
Appendices ............................................................................................................................................... 9
1.0 Photographs and Existing Conditions ....................................................................................... 8
HAGUE CLUB APARTMENTS ATTACHMENT H
![Page 33: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/33.jpg)
Hague Club Apartments - Building Condition Assessment May 9, 2019 Page 3
Introduction
1.0 Purpose
TS3 Architects PC (TS3) was retained by Eastern Virginia Medical School (EVMS), to perform a Building
Condition Assessment of the existing Hague Club Apartments.
Mr. Carmine R. Barone, AIA, of TS3, visited the site to document the existing condition of the property
and evaluate materials or system defects that might significantly impact the function of the property. In
addition, Structural, Plumbing, Mechanical and Electrical conditions were observed by TS3’s design
consulting engineers and their comments are included in this report
We understand the primary interest of EVMS is to document the existing condition of the building system
defects which might significantly affect the value of the property or the continued operations of the facility.
The building components and systems included in this Building Condition Assessment are:
▪ Plumbing
▪ Fire Protection
▪ Heating, Ventilation, & Air Conditioning
▪ Electrical & Communications
▪ Structural & Seismic
▪ Building Accessibility
The following sections present a summary of the building systems and or opinion of the general condition
of each of the building systems and our opinion of the general condition of each of the building systems
observed.
The following are descriptors used for this project:
Good: Above average for this type and age of building system in this geographic area.
No immediate repair work required or recommended.
Average: Average condition for this type and age of building system in this geographic area.
Some work may be required or recommended primarily due to the normal aging of
the building system or material.
Poor: Below average condition for this type and age of building system in this
geographic area. Significant work required to return building system or material
to normal operating condition.
The conclusions and recommendations presented in this report were based on personal interviews of
persons knowledgeable about the facility, our field observations, and our experience on similar projects.
No material testing of the building’s components was performed and no calculations were performed to
determine adequacy of the facility’s original design. It was not the intent of this survey to perform an
exhaustive study to locate every existing defect. “Walk-through” observations were made by trained
professionals; but there may be defects at the facility that were not readily accessible, not visible, or
which were inadvertently overlooked. Other problems may develop with time that were not evident at the
time of this survey.
![Page 34: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/34.jpg)
Hague Club Apartments - Building Condition Assessment May 9, 2019 Page 4
Site Descriptions
1.0 Location and Description
The property is located at 600 Fairfax Avenue, City of Norfolk, Parcel #41 (refer to Zoning Analysis
prepared by TS3 Architects, dated March 12, 2019). The current owner of the facility is EVMS. The site is
currently zoned IN-C: Institutional
2.0 Site and Vicinity Characteristics
The property boundary encompasses 1.6872 acres, including concrete paved parking area. The site
includes three, 3-story buildings constructed on crawl spaces.
Landscaping and Appurtenances: Ornamental shrubs and grassy areas exist in front of the buildings
and on both the parking lot and street elevations. Landscaping appeared to be in good condition.
Utilities Water: The City if Norfolk provides water and sewer services. Water pressure appeared
adequate in the plumbing lines.
Observations, Comments, and Remedies No problems with the water utility system were reported or observed by the City of Norfolk Water
Department.
Utilities Electricity: Dominion Energy provides electricity underground via pad mount transformers to
serve meter centers located within the breezeway.
Observations, Comments, and Remedies No obvious problems with the electrical utility system were reported or observed. The electrical utility
system appears to be adequate and code compliant.
Utilities Sanitary Sewer: Sanitary sewer service is provided by the City of Norfolk and is served by
piping leaving the building and transferring to the city sewer system.
Observations, Comments, and Remedies No obvious problems with the sanitary sewer system were reported or observed, and it appears to be in
good condition.
3.0 Building Description
The facility was constructed in 1985/86 and includes 82 apartment units served by open breezeways
containing wood framed stairs, laundry facilities, leasing office and maintenance shop.
Hazardous Materials
1.0 Type of Hazardous Material
A hazardous material survey was not included as part of the initial Building Condition Assessment by the
TS3 and their design team.
Investigations and Evaluations of Systems for Functionality
1.0 Plumbing
Waste and Water Supply Piping: Waste and water supply piping is entering and exiting the building
underground and is then routed through each building’s crawlspace. PVC sanitary waste and copper
water supply piping were observed for the mains. The water supply piping transitions to polybutylene
QEST piping for the smaller sizes, (3/4” and ½”, although some copper piping was observed in these
smaller sizes as well). This piping type has now been banned for domestic water use due to the
![Page 35: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/35.jpg)
Hague Club Apartments - Building Condition Assessment May 9, 2019 Page 5
abnormally large number of failures experienced across the U.S. market. We understand there have
been several failures experienced in this facility as well. There is no water pressure boosting system but
water pressure and flowrate seemed adequate with no obvious problems reported or observed.
Domestic Hot Water Production: Hot water is produced by individual electric water heaters in each
apartment. The typical size is 30 gallons of storage with 4.5 kW of heat. These have been replaced as
they have failed over time and therefore are of various ages. Each water heater is served from the
individual apartment’s electric service. The central laundry area is supplied with hot water by a relatively
new gas fired water heater, manufactured in 2015. [DBB1]
Fixtures: The fixtures in the units observed for this assessment all appeared to date from the original
installation. Kitchen sinks are single bowl stainless steel drop-in type, water closets are floor mounted
flush tank type, lavatory sinks are wall hung china type and the shower/tub combinations utilize single
control valves with diverter valves for shower operation. Fixtures are generally in average condition given
their age of approximately 34 years.
Natural Gas System[DBB2]: There is a small natural gas system serving the laundry area. Clothes dryers are natural gas fired and the laundry water heater utilizes natural gas. The piping system appears to date from the original construction. This system appears to be functioning acceptably.
Observations, Comments, and Suggested Remedies The water supply system should be upgraded to replace the polybutylene QEST. A plumbing contractor evaluated the work and cost to replace the domestic water piping in each apartment unit with PEX type piping. This evaluation was conducted by Bay Mechanical in 2016. The plumbing work was estimated at $6,500 per apartment but this did not include the required repairs to walls, ceilings and finishes. This work should be included in any future renovations to ensure this source of water system failure and subsequent general building damage is eliminated.
The sanitary waste and natural gas system are approximately 34 years old. These piping systems have an anticipated service life of 40 to 60 years. Utilizing a median number of 50 years, these systems may be expected to serve another 16 years before a major replacement project is required. If a major renovation is undertaken in the near term, replacement of these systems is recommended. Plumbing Fixtures, while still serviceable, are beyond their anticipated service life of 30 years. They are dated in appearance and are no longer aesthetically appealing. Maintenance issues should be expected to increase in frequency as the fixtures age and failures should be seen as an opportunity for replacement versus repair. They are recommended for replacement during any general upgrade projects.
2.0 Fire Protection
Wet Sprinkler System: The building is not fully sprinklered. A limited area type sprinkler system is fitted
in the maintenance/storage area.
Smoke Detectors, Fire Extinguishers and Other Equipment:
Each unit is equipped with single station smoke detectors in the corridor, but no smoke detectors were
observed within the bedrooms.
The apartment building with the maintenance office has a natural gas service which serves gas laundry
dryers and water heater. No carbon monoxide detectors were observed.
Observations, Comments, and Remedies The maintenance/Storage Area is currently protected with a limited area sprinkler system in the form of older style fusible link pendent sprinklers located approximately 5” down from the ceiling. Sprinklers are supplied directly from the domestic cold-water system with no visible means of backflow prevention, or supervision from a fire alarm system. [DBB3]The sprinklers are not provided with listed escutcheons, but with
![Page 36: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/36.jpg)
Hague Club Apartments - Building Condition Assessment May 9, 2019 Page 6
hinged pipe escutcheons at the ceilings. Pendent sprinklers are required to be provided with listed escutcheons in order to behave in an expected manner during a fire. As limited area sprinkler systems are not recognized by modern building codes, a Life Safety Code Analysis is recommended to determine if the existing system should be removed, or if the entire building should be provided with sprinkler protection. It is recommended to add smoke detectors within each bedroom/sleeping area. Current codes require carbon monoxide detection within sleep areas for buildings with fuel fired equipment. It is recommended to add carbon monoxide detectors in the apartments adjacent to the natural gas fired water heater and dryers. Apartment unit all have a fire extinguisher located in the kitchen, mounted to the wall cabinets.
3.0 Heating, Ventilation, and Air Conditioning
Heat Pumps (HP): Each apartment is fitted with a split system air to air heat pump with backup electric
resistance heat. The indoor unit is located within an interior closet and outdoor units are located on grade
outside each building. The unit sizes provide 1 ton, 1.5 ton or 2 tons of cooling depending on apartment
size and orientation. Each apartment’s electrical system provides metered tenant power for its HVAC
system. The refrigerant piping is routed through the crawlspace to the interior closets which are stacked
vertically in each building. Condensate piping is PVC through the crawlspace and a main riser is routed
vertically through the stacked closets with the refrigerant piping. Ductwork for air distribution is routed
within furred down soffit areas to each room. Sidewall registers deliver the conditioned air to each space.
Programmable thermostats were fitted in the apartments observed for this report. Heat Pump system
condition varies depending on the date of replacement.
Bathroom Exhaust Fans: Each bathroom is fitted with a ceiling exhaust fan for required ventilation.
Exhaust air is routed to the attic and a common roof vent. Fans are activated with a wall switch.
Range Hoods: Each kitchen is fitted with a residential range hood ducted to an exterior wall cap. Range
Hoods appeared to date from the original construction in the observed apartments.
Observations, Comments, and Suggested Remedies The current Heat Pump installations consist of various manufacturers and ages due to replacements
following failures. The anticipated service life for an air to air heat pump is 15 years. Maintenance
personnel can expect to continue replacements as intermittent failures continue. It was noted that due to
outdoor unit size increasing over time as efficiency requirements have increased, many of the
installations are now crowded together and no longer provide proper airflow clearances, and in some
cases electrical code clearance requirements are not met. Attention to these clearances and placement
of the outdoor unit in future replacements is recommended. Bathroom fans and range hoods are likely
close to their anticipated service lives and failures will increase in frequency. They are recommended for
replacement during any general upgrade project.
Distribution:
Observations, Comments, and Suggested Remedies
Distribution ductwork systems for the building appear to be in average condition, with no obvious signs of
deficient items noted. The building temperature appeared adequate during the site visit.
4.0 Electrical/Communications
Electrical Service: Electrical service to each building is via underground conductors from pad mount
transformers to meter stacks located in the breezeway. Each apartment is separately metered by
Dominion Energy. No electrical generator was observed on site. Each meter stack is equipped with 125-
2P main circuit breakers for each apartment. Each apartment is equipped with a 125A MLO load center.
Lighting is a combination of incandescent and fluorescent fixtures. Lighting controls are via standard
![Page 37: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/37.jpg)
Hague Club Apartments - Building Condition Assessment May 9, 2019 Page 7
toggle switches. The distribution system has insulated conductors in the walls. Security cameras are
located on lighting poles within the parking lot. Telephone and TV services are run to each unit.
Observations, Comments, and Remedies Meter stacks appear to be in fair condition with visible surface rusting of their enclosures. Recommend
replacing meter centers as part of any major upgrades. Unit panelboards are original to construction and
appear to be in good condition.
Receptacles within each unit are not tamper resistant to comply with current code. Standard duplex, non
GFCI, receptacles were observed above counters within unit kitchens. No weatherproof receptacles were
observed next to exterior HVAC equipment. There are a few instances within apartments where
receptacle placement does not satisfy the NEC requirement of a receptacle within 6’. Recommend
replacing/adding receptacles with code compliant devices as part of any renovations.
At least a portion of the exterior building mounted lighting fixtures have been replaced with LED. LED
replacement lamps, for use in incandescent fixtures, were observed within the maintenance office.
Recommend replacing existing fixtures with LED as part of any renovation.
5.0 Structural
Foundation: Scope of the structural work was to perform a review of the crawlspace areas to determine if
there is water damage to the first-floor framing or lower portions of the first-floor walls. Additionally,
destructive investigation was performed at multiple locations to determine if first floor wall framing has
damage to it. Findings were conveyed in letter dated 4/12/19.
Breezeway/Wood Stairs: The existing breezeway stairs service three stories of apartments and include
landings on the second and third floor. The stairs and landings consist of wood framing bearing on a
slab-on-grade. Damage to the wood framing was observed at the base of the first-floor stringers due to
moisture and at connection points to the landing beams. The center first-floor stringer does not meet the
code prescribed loading conditions. Several of the slab-on-grade conditions at the breezeway were
observed to be cracked or have been previously patched. Most likely, the slab-on-grade at the
breezeway is not supported on a deep foundation system as indicated in the Lynch Mykins report dated
12.19.2017, provided by the owner.
Observations, Comments, and Remedies Therefore, continuous future maintenance at these areas is likely to be needed. To remediate the
observed conditions, it is recommended the first-floor stair system be removed and replaced. It is
recommended the slab-on-grade between the breezeways be removed and a new reinforced structural
concrete slab be installed to span between the existing grade beams supporting the building.
Note, the findings and conclusions obtained are drawn in accordance with generally accepted
engineering principles and practices. The evaluation performed is not intended to be a complete and
comprehensive analysis of the structure, nor is it intended to represent a complete inspection to
determine building code non-compliances. Our scope was limited to review of the foundation and lower
framing area. Hence, a review of all units and attic spaces was not performed. Finally, the conclusions
contained herein are based solely on the information obtained during the performance of this investigation
and represent only a professional opinion based on this information and past experience with similar
conditions.
![Page 38: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/38.jpg)
Hague Club Apartments - Building Condition Assessment May 9, 2019 Page 8
Exterior Wall System: The exterior cladding system on the building consists of brick veneer and vinyl
siding and trim.
Observations, Comments, and Remedies
Our observations of the exterior walls were limited to viewing the systems from grade level. Based upon
our limited observations, the vinyl siding was in average condition. With the repairs/replacement of the
wood stairs and landings, the vinyl siding in the breezeways will need to be replaced to accommodate
new framing. Based on the presumed age of the siding and inability to match the existing faded finish we
recommend replacement of the vinyl siding, at a minimum, in each breezeway. The brick veneer was
generally in good condition with some settling noted at the breezeway slabs as noted in the Structural
report.
Roofing System: The roof consists of asphalt shingles over wood decking. Observations, Comments, and Suggested Remedies Our observations of the roof and roofing were limited to viewing the systems from grade level. Based
upon our limited observations, the roofing generally appeared to be in average condition. No major
issues were identified by the facilities staff but an more in depth analysis is required to determine the
remaining usable life and potential replacement.
6.0 Units/General
Doors: Entry doors are rated steel doors. Interior doors are hollow core lauan.
Observations, Comments, and Remedies Entry doors observed were in average to poor condition. Entry doors located on the first floor showed signs of some weathering. Entry door, thresholds and seals replacement is recommended. Interior doors showed wear. Interior doors and hardware replacement is recommended. Window System: Existing windows are vinyl single-hung.
Observations, Comments, and Suggested Remedies In units entered during site investigation, windows appeared to be in average condition based on their age and were in proper working order. Mini blinds were undamaged and in proper working condition.
7.0 Units/Finishes:
Walls/Ceilings: The interior walls, ceilings, door and base trim are all painted.
Observations, Comments, and Remedies Painted finishes are generally in average condition. Application of new wall and ceiling finishes is recommended. In addition, refer to the plumbing review as there may be substantial GWB repair and replacement associated with the plumbing upgrades required.
Flooring: Existing flooring consists of VCT, carpet and ceramic tile.
Observations, Comments, and Remedies VCT flooring located in the kitchens is in poor condition as is the carpet and should be replaced as part of any renovation. Ceramic tile located in the unit bathrooms that were entered during the site investigation were in average condition. Grout will need to be cleaned but there were no signs of damage noted.
Kitchen: Cabinets and countertops are built-in and appear to be original.
![Page 39: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/39.jpg)
Hague Club Apartments - Building Condition Assessment May 9, 2019 Page 9
Observations, Comments, and Remedies Cabinets and countertops are dated and in poor condition and should be replaced as part of any
renovation.
8.0 Common Areas:
Leasing Office: The leasing office consists of a waiting room, restroom, workroom and storage room.
Observations, Comments, and Remedies Wall and floor finishes appear to be in average to good condition. Bathroom has been remodeled and has newer fixtures and finishes throughout. Owner to evaluate whether to include this space in the proposed renovation.
Laundry/Maintenance Shop: The walls and ceilings are painted with a wallpaper border applied in the
laundry room.
Observations, Comments, and Remedies Wall and floor finishes appear to be in average condition. Refer to PME notes for extent of utility work in these spaces.
Sincerely, Carmine R. Barone. AIA TS3 Architects PC
Carmine R. Barone, AIA
Appendices
1.0 Consulting Engineers
Structural:
David P. Carter, PE
Speight Marshall & Francis
1228 Perimeter Parkway
Suite 201
Virginia Beach, Virginia 23454
Plumbing/Mechanical/Electrical:
Brian K. Wall PE
PACE Collaborative
1277 Perimeter Parkway
Virginia Beach, Virginia 23454
![Page 40: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/40.jpg)
Hague Club Apartments - Building Condition Assessment May 9, 2019 Page 10
2.0 Photographs and Existing Plans
Photos:
1. Typical Unit Finishes - Entry 2. Typical Unit Finishes – Living Room
3. Typical Unit Finishes – Living Room 4. Typical Unit Finishes – Bedroom
![Page 41: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/41.jpg)
Hague Club Apartments - Building Condition Assessment May 9, 2019 Page 11
5. Duct Soffit – Living Room 6. Typical Unit Finishes – Living Room
7. Typical Unit Finishes – Kitchen. 8. Typical Unit Finishes – Kitchen.
9. Typical Unit Finishes – Bathroom 10. Typical Unit Finishes – Bathroom
![Page 42: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/42.jpg)
Hague Club Apartments - Building Condition Assessment May 9, 2019 Page 12
11. Typical Unit Finishes – Bathroom 12. Typical Unit Finishes – Living Room in Loft
13. Typical Unit Finishes – Living Room in Loft 14. Typical Unit Finishes – Loft
15. Typical Unit Finishes – Loft Staircase 16. Clubhouse – Typical Unit Finishes – Hall
![Page 43: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/43.jpg)
Hague Club Apartments - Building Condition Assessment May 9, 2019 Page 13
17. Typical Unit – Mechanical Closet RAG 18. Typical Unit – Mechanical Closet RAG
19. Water supply piping , copper main and QEST branch
piping. 20. Relatively new gas fired water heater for central laundry
area.
![Page 44: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/44.jpg)
Hague Club Apartments - Building Condition Assessment May 9, 2019 Page 14
21. 30 gallon electric water heater per apartment. 22. Plumbing fixtures in average condition.
23. Kitchen sink plumbing with dishwasher connection. 24. Outdoor heat pump units, various replacement
manufacturers.
25. Indoor heat pump installation. 26. Range hood.
![Page 45: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/45.jpg)
Hague Club Apartments - Building Condition Assessment May 9, 2019 Page 15
27. Sidewall register in soffit for kitchen supply air. 28. Programmable thermostat.
29. Meter center with rusting enclosure. 30. Unit panelboard.
![Page 46: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/46.jpg)
Hague Club Apartments - Building Condition Assessment May 9, 2019 Page 16
31. Incandescent light fixture. 32. Linear flourescent fixture.
33. Non GFCI type receptacles above kitchen counter. 34. Non tamper resistant type receptacle within apartment
unit.
35. No HVAC service receptacle. Telephone service to
building. 36. Security cameras in parking lot.
![Page 47: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/47.jpg)
1228 Per im eter Par kway, Suite 201, Virginia Beach, VA 23454 ● 757.427.1020
7814 Carouse l Lan e , Suite 200, Richmond , VA 23294 ● 804.464.4111
S t r u c t u r a l E n g i n e e r i n g
● S p e c i a l I n s p e c t i o n s
w w w . s m a n d f . c o m
Daniel W. Speight, P.E.
Matt J. Marshall, Jr., P.E.
Jonathan Walesczyk, P.E.
J. Stephen Cowan, P.E.
April 12, 2019
Thomas F. Smith, AIA TS3 Architects, PC 1228 Perimeter Parkway, Suite 101 Virginia Beach, VA 23454
Re: EVMS Hague Club Apartments – Structural Assessment, Norfolk, VA SM&F Job No.: 19.061-A
Dear Tom:
On March 7 and 8, 2019, the writer visited the referenced project. The purpose of our visit was to perform a cursory review for the framing located in the apartment unit crawl spaces. In general, the masonry foundation walls and first floor wood framing were observed to be dry and in very good condition. Vapor barriers were also observed in most crawl spaces and were found to be in good condition. The following photograph shows the conditions observed in a typical crawl space.
Photograph 1 Overall View of Crawlspace
HAGUE CLUB APARTMENTS ATTACHMENT H
![Page 48: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/48.jpg)
E V M S H a g u e C l u b A p a r t m e n t s – S t r u c t u r a l A s s e s s m n t A p r i l 1 2 , 2 0 1 9 P a g e 2 o f 5
1228 Per im eter Par kway, Suite 201, Virginia Beach, VA 23454 ● 757.427.1020
7814 Carouse l Lan e , Suite 200, Richmond , VA 23294 ● 804.464.4111
During the review, minor moisture damage to the continuous rim board and sill plate was observed at Unit 612 adjacent the exterior stair area at the end of the breezeway. Major moisture damage to the rim board and sill plate was observed at Unit 602A along the breezeway area. The following photograph shows the conditions observed at Unit 602A.
Photograph 2 View of Rim Board and Sill
Plate at Unit 602A
![Page 49: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/49.jpg)
E V M S H a g u e C l u b A p a r t m e n t s – S t r u c t u r a l A s s e s s m n t A p r i l 1 2 , 2 0 1 9 P a g e 3 o f 5
1228 Per im eter Par kway, Suite 201, Virginia Beach, VA 23454 ● 757.427.1020
7814 Carouse l Lan e , Suite 200, Richmond , VA 23294 ● 804.464.4111
On March 11, 2019, the writer revisited the referenced project. The purpose of our visit was to review the conditions of the sill plate and wall studs. Destructive investigation was performed with the assistance of the Owner’s Contractor to cut an approximate 2-foot square hole in the gypsum wall board at 10 predetermined locations at the lower portion of a first-floor unit exterior wall boarding the breezeway. Conditions were reviewed and access holes were immediately patched by the Contractor. Wall framing and sill plates at Units 600A, 600C, 606C, 608D, 610D, 612C, 614C, 614D were observed to be dry and in very good condition. It is our understanding from discussions with the Contractor, prior wall repairs to the several units throughout the complex had been performed in the past. The following photograph shows a typical access hole condition:
Photograph 3 View of Typical Access Hole
![Page 50: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/50.jpg)
E V M S H a g u e C l u b A p a r t m e n t s – S t r u c t u r a l A s s e s s m n t A p r i l 1 2 , 2 0 1 9 P a g e 4 o f 5
1228 Per im eter Par kway, Suite 201, Virginia Beach, VA 23454 ● 757.427.1020
7814 Carouse l Lan e , Suite 200, Richmond , VA 23294 ● 804.464.4111
At Units 602C and 602A termite and significant moisture damage was observed to have occurred to the framing. We recommend the framing to be removed and replaced. The following photographs show these conditions:
Photograph 4 Termite Damage at Unit 602C
Photograph 5 View of Moisture Damage at
Unit 602A
![Page 51: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/51.jpg)
E V M S H a g u e C l u b A p a r t m e n t s – S t r u c t u r a l A s s e s s m n t A p r i l 1 2 , 2 0 1 9 P a g e 5 o f 5
1228 Per im eter Par kway, Suite 201, Virginia Beach, VA 23454 ● 757.427.1020
7814 Carouse l Lan e , Suite 200, Richmond , VA 23294 ● 804.464.4111
Damage observed at Unit 602A was in close proximity to the location of the overhead stair landing beam framing. It was also at a location where the exterior slab was observed to have settled causing a noticeable gap between the top of the slab and bottom of the siding cladding system leaving a path for moisture infiltration. It is our understanding from discussions with the Contractor previous wall framing repair work performed was in response to moisture damage attributed to building envelop related conditions at the landing stair beams. Based upon the magnitude of the damage discovered during the initial investigation at Unit 602A, we were directed to return to the site to perform further destructive investigation at 4 additional predetermined locations. Locations selected were similar in that access holes were cut in the first-floor exterior wall boarding the breezeway in close proximity to the overhead stair landing beam framing. Locations were also similar in that the exterior breezeway slab had settled or had been previously repaired due to possible settlement related issues. In summary, the wall framing at Units 600D and 608B was observed to be dry and in very good condition. The wall framing at Units 600B and 606D was observed to have minor moisture damage but was dry at the time of the investigation. At the conclusion of the investigation, we asked the Contractor and EVMS Campus Housing manager if records of previously repair work were available for review. At the time of the investigation the requested records were unable to be produced. Given the absence of previous repair documentation in conjunction with the numerous locations where moisture damage was discovered to the wall framing, we would recommend removal of finishes be performed at all exterior walls boarding the breezeways in order to verify similar moisture damages to the framing have not occurred and gone unaddressed. The professional services for this structural evaluation and letter have been performed, the findings obtained, and the conclusions drawn in accordance with generally accepted engineering principles and practices. This evaluation is not intended to be a complete and comprehensive analysis of the structure, nor is it intended to represent a complete inspection to determine building code non-compliances. The conclusions contained herein are based solely on the information obtained during the performance of this investigation and represent only a professional opinion based on this information and past experience with similar conditions. If you have any questions, please do not hesitate to contact us. Sincerely, SPEIGHT, MARSHALL & FRANCIS, P. C. 1228 Perimeter Parkway, Suite 201, Virginia Beach, VA 23454 David P. Carter, P.E., M.S. dpc/trk F:\Jobs\2019\19061-A EVMS Hague Club Apts - Structural Assessment\06 Nondesign Letters & Reports\190412_EVMS Hague Club Apts - Structural Assessment Letter.docx
4/12/19
![Page 52: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/52.jpg)
EVMS - Hague Club Apartments
Page 1 of 1Exported on July 13, 2020 8:47:26 AM EDT
![Page 53: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/53.jpg)
General Conditions General
Conditions
CONSTRUCTION MANAGEMENT
Senior Project Manager (If applicable) %
Project Manager %
Senior Project Superintendent 100%
Project Administrator/Clerk (Onsite only) X
Assist. Superintendent 100%
Preconstruction w/Owner
Approval
Safety Officer - Project %
SAFETY. SECURITY, AND SERVICES
First Aid Supplies (PPE & Expendables) X
Fire Extinguishers and Fire Watch X
FACILITIES, EQUIPMENT, AND SERVICES
Field Office / Trailers (Including Decks, Stairs, etc.) X
Water. Ice. and Coffee Etc. X
Power Expenses X
Utility Expenses (power, water, etc.) X
Temp. Water Services X
Temp. Toilets and Sewer Services X
Change/Shower/Lunch Rooms N/A
Temporary Stairs X
Temporary Enclosures and Partitions X
Other Project Signs and Bulletin Boards X
Telephone / Internet Expenses X
Computers, Electronic Equipt. and Peripherals X
Temporary Roads N/A
Misc. Equipment and Small Tools X
Fuel, Repairs, and Maintenance X
Field Office Supplies, Material, and Equip X
Project Photographs X
Field Vehicles & Fuel (Not Office Personnel) X
Project Management Systems X
Project Manager Vehicle and Fuel %
Tolls X
Clean-Up
Periodic & Final Clean-Up X
Cleaning Supplies X
Dumpster Service/Fees X
Street Cleaning X
G&A
Cost of the
Work
![Page 54: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/54.jpg)
Trash Bins X
Trash Chutes X
Floor protection X
Waste Management Documentation X
HOISTING
Elevator Operations and Service N/A
REPRODUCTION AND PRINTING
Duplication Expense All Project Docs X
Shop Drawing Printing X
Postage and Delivery Expense X
QUALITY CONTROL
Geotechnical Investigations Owner
Hazardous Materials Investigations Owner
Testing and Inspections (Inc. Special) Owner
PERMITS, FEES, AND OTHER
Storage Yard Parking Lot Rental N/A
Parking Fees N/A
Sign and Trailer Permits - Temporary X
Zoning Fees and Consultants Owner
![Page 55: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/55.jpg)
7.13.20
General
Conditions
CONSTRUCTION MANAGEMENT
General Liability Insurance %
Professional Liability Insurance (Project) %
Project Builders Risk Insurance %
X
Safety Equipment - Site and Special X
Scaffolding, Handrails, and Toe Boards X
Opening Protection X
Security Guard and Watchman Services X
Periodic and Final Cleanup X
Covered Walkways X
Temporary Fencing X
Barricades X
Safety Nets X
X
Roadway Maintenance X
Dust and Traffic Control X
Trash Chute and Hoppers X
Snow and lce Removal X
Traffic Control X
FACILITIES, EQUIPMENT, AND SERVICES
Storage, Tool, and Utility Trailers X
Temp. Power/Lighting System - Trailers X
Temp. Power/1.ighting System - Building X
Temp. Heat and Building Conditioning X
Owner Architect Project Sign X
Air Compressors and Generators X
Dewatering X
Bobcat&/or Backhoe X
X
Clean-Up
Temporary Filters X
Final Cleaning Service X
HOISTING
Hoist and Crane Rental and Operation X
G&A
Cost of the
Work
![Page 56: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/56.jpg)
Forklift Rental and Operation X
PERMITS, FEES, AND OTHER
Sign Permits - Permanent X
Staking and Layout Fees and Costs X
Plan Check Fees X
Building Permit Fees X
Water, Sanitary, and Storm Fees Owner
Gas and Power Service Fees Owner
Special Tap Fees Owner
All other Permits and Fess X
Contractor's Licenses and Other Fees X
Use Fees and Project Bonds X
![Page 57: REQUEST FOR PROPOSAL (RFP) · 1 day ago · Page 1 of 31 REQUEST FOR PROPOSAL (RFP) RFP Number: 2020-2 EVMS Internal Reference: BV21-3 Issue Date: July 13, 2020 Project Title: Hague](https://reader034.vdocuments.site/reader034/viewer/2022050112/5f4947721aa3a204bd087699/html5/thumbnails/57.jpg)
7.13.20
G&A General
Conditions
CONSTRUCTION MANAGEMENT
Owner / Principal (s)/VP Level (Unless Owner
Approved)X
Project Executive(s) X
Mechanical Coordinator (VCM Coordinator) X
Electrical Coordinator (VCM Coordinator) X
Quality Control Agent(s) X
Accounting / Accounting System(s) X
Project Management System(s) X
Scheduling X
Estimating X
Purchasing X
Accounting / Accounting System(s) X
Project Budget Estimating X
System Development X
Safety Officer - Corporate X
E.E.O. Officer X
SAFETY. SECURITY, AND SERVICES
Estimating Forms X
Cost Reporting Forms X
Presentation Charts and Graphics X
Value Analysis Studies X
Data Processing (In-House) X
Reference Materials X
Maintenance and Operations Manuals X
Special Forms X
Prepare Maint. and Operation Manuals X
PERMITS, FEES, AND OTHER
Construction Association Fees X
G&A
Cost of the
Work