© 2015 Navigant Consulting (Europe) Ltd. Page I

Liquefied Natural Gas Supply – Request for Proposal Document Jordan LNG Project

Request for Proposal for the Supply of LNG

(for two spot cargos to be delivered in Quarter One 2016)

Issued by:

National Electric Power Company of Jordan

14 December 2015

© 2015 Navigant Consulting (Europe) Ltd. Page II

Liquefied Natural Gas Supply – Request for Proposal Document Jordan LNG Project

Acronyms

bcf/d Billion Cubic Feet Per Day

Btu British Thermal Units

FSRU Floating Storage and Regasification Unit

GWh Gigawatt Hour

IPP Independent Power Producer

JGTP Jordan Gas Transmission Pipeline

JKM Japan/Korea Marker

LNG Liquefied Natural Gas

LNGC Liquefied Natural Gas Carrier

MMBtu Million British Thermal Units

mmscf/d Million Standard Cubic Feet Per Day

MSA Master Sale and Purchase Agreement

MW Megawatt

NBP National Balancing Point (United Kingdom)

NEPCO National Electric Power Company

RfP This Request for Proposal

TBtu Trillion British Thermal Units

© 2015 Navigant Consulting (Europe) Ltd. Page III

Liquefied Natural Gas Supply – Request for Proposal Document Jordan LNG Project

Disclaimer

This Request for Proposal (RfP) has been prepared by Navigant Consulting (Europe) Ltd (Navigant) for the

National Electric Power Company of Jordan, to invite proposals for the supply of LNG to be delivered to the

Terminal.

Although the information contained herein has been obtained from sources believed to be reliable, NEPCO and

Navigant expressly disclaim any and all liability for incomplete or inaccurate information, or representations

expressed or implied, contained in, or omitted from, the RfP or any other written or oral or electronic media

communication transmitted or made available to any recipients of this RfP. NEPCO AND NAVIGANT

MAKE NO EXPRESS OR IMPLIED WARRANTIES WITH RESPECT TO THE COMPLETENESS OF

ANY FINANCIAL OR OTHER DATA CONTAINED HEREIN. NEPCO and Navigant also expressly

disclaim all liability, including, without limitation, liability for misrepresentation, negligence or otherwise

arising from any recipient's reliance upon the accuracy or completeness of the information contained in this

RfP.

Each recipient of this RfP must rely upon its own investigations and evaluations to establish its own

conclusions as to the merits of the opportunity. This RfP is provided for information only and is not intended to

be, and must not be, taken as the basis for any investment decision. In making an investment decision,

prospective Bidders must rely on their own examination of the opportunity including the merits and risks

involved.

This RfP must be treated in the strictest confidence and may not be used for any other purpose or be reproduced,

disclosed or distributed by any party receiving a copy to any other party without the express prior written

consent of NEPCO.

Prospective Bidders are not to construe the contents of the RfP as tax or legal advice. No professional, financial

or legal adviser or any Government authority identified herein or any other independent third party has

independently verified or advised on the accuracy or completeness of this RfP, the information presented herein,

or the applicable laws of any jurisdiction. Neither do any of the above assume any responsibility for the contents

of the RfP. Prior to making a bid for the supply of LNG, any prospective Bidder should consult with its own

legal, business and tax advisors to determine the appropriateness and consequences of bidding for the supply of

LNG.

The delivery of this RfP at any time does not imply that the information contained herein is correct at any time

subsequent to its date. NEPCO reserves the right to supplement or amend the information contained herein at

any time. Neither NEPCO nor its advisors have any obligation to update or otherwise revise any information in

this RfP including, without limitation, any projections, including any revisions to reflect changes in economic

conditions or other circumstances arising after the date hereof or to reflect the occurrence of unanticipated

events, even if the underlying assumptions do not come to fruition.

© 2015 Navigant Consulting (Europe) Ltd. Page IV

Liquefied Natural Gas Supply – Request for Proposal Document Jordan LNG Project

Table of Contents

Section A: Instructions to Bidders .................................................................................... 1

1. Overview of Tender Process ..................................................................................... 2

1.1 Introduction .................................................................................................................................. 2 1.2 Prerequisite for Bidding .............................................................................................................. 2 1.3 Bid Summary ................................................................................................................................ 2 1.4 Bid Timetable ................................................................................................................................ 3 1.5 Bid Instructions ............................................................................................................................. 3 1.6 Bid Requirements ......................................................................................................................... 9

Section B: Forms ................................................................................................................. 11

1. Bid Letter .................................................................................................................... 12

2. Form of Confirmation Notice ................................................................................. 13

© 2015 Navigant Consulting (Europe) Ltd. Page 1

Liquefied Natural Gas Supply – Request for Proposal Document Jordan LNG Project

Section A: Instructions to Bidders

© 2015 Navigant Consulting (Europe) Ltd. Page 2

Liquefied Natural Gas Supply – Request for Proposal Document Jordan LNG Project

1. Overview of Tender Process

1.1 Introduction

The National Electric Power Company of Jordan (NEPCO) hereby invites bids (each a Bid)

for the supply of Liquefied Natural Gas (LNG) to be delivered to the Al-Sheikh Sabah LNG

Terminal at Aqaba, Jordan (the Terminal).

This RfP is being made available to all companies who have expressed an interest in

supplying LNG to NEPCO (each a Bidder). This RfP, any addenda, and responses to Bidder

questions together form the bidding documents (the Bidding Documents).

1.2 Prerequisite for Bidding

NEPCO has executed a number of Master Sale and Purchase Agreements (each an MSA)

and is continuing to negotiate with other suppliers. Where a Bidder does not yet have a

signed MSA with NEPCO, NEPCO will work with Bidders to execute an MSA prior to Bid

submission. An MSA must have been signed by a Bidder and received by NEPCO by the

deadline set out in Clause ‎1.4 below for its Bid to be considered.

1.3 Bid Summary

This RfP is being issued for the purpose of selecting suitable LNG supplier(s) to enter into

Agreement(s), as defined in the MSA, to provide NEPCO with LNG as detailed below:

Contract Requirements

Total Contract Volume Two cargos of LNG

Partial Bid Volume Bidders may bid for one or more of the cargos

Delivery Timing Cargo #1: 13 February 2016 through 14 February 2016

Cargo #2: 24 March 2016 through 25 March 2016

Delivery Point LNG is to be provided on a DES (Delivered Ex-Ship) basis

to the Terminal

Provisional Contract Quantity 3.0 – 3.6 TBtu per cargo

Delivered LNG Volume No greater than 155,000 m3 per cargo

Other Terms and Conditions As detailed in the MSA executed between the Bidder and

NEPCO

© 2015 Navigant Consulting (Europe) Ltd. Page 3

Liquefied Natural Gas Supply – Request for Proposal Document Jordan LNG Project

More detailed requirements are set out as follows:

a. LNG specifications as provided in the Form of Confirmation Notice set out in Annex

A of the MSA (the Specifications);

b. LNG Ship specifications as provided in the MSA; and

c. Buyer's Facilities specifications as provided in the MSA.

1.4 Bid Timetable

RfP release date 14 December 2015

Deadline for NEPCO to receive MSA

signed by Bidder 20 December 2015

Bid Submission Window 11:00 to 13:00 (Jordan time)

on 21 December 2015

Confirmation Notice(s) executed by

NEPCO

No later than 18:00 (Jordan time)

on 24 December 2015

1.5 Bid Instructions

Bidders are required to submit binding Bids. Bids should comply with the following

requirements:

a. Compliant Bids

The documents comprising the Bid shall consist of the following:

i. Bid Letter in the form set out in Section B1; and

ii. Confirmation Notice(s) in the form set out in Section B2.

As noted above, NEPCO must have received a signed MSA from the Bidder no later

than 20 December 2015 for its Bid to be considered. Bids received from Bidders who

have not provided a signed MSA to NEPCO will be rejected.

b. Alternative Bids

Bidders may provide alternative Bids for the supply of LNG. For example,

alternative Bids may include:

i. A Price Proposal containing a price formula; or

© 2015 Navigant Consulting (Europe) Ltd. Page 4

Liquefied Natural Gas Supply – Request for Proposal Document Jordan LNG Project

ii. A cargo Delivery Window lying partially outside the relevant date range

stated in ‎1.3 above.

Alternative Bids are not required to be in compliance with the Bid requirements.

NEPCO will consider alternative Bids at its sole discretion.

c. Bidder Questions

Bidders may submit questions at any time up to three (3) days prior to the beginning

of the Bid Submission Window.

Questions should be submitted by e-mail to:

[email protected]

with copies to:

[email protected] ;

[email protected] ; and

[email protected] .

Copies of any questions and replies from NEPCO will be circulated to all Bidders,

though the identity of the Bidder asking the question will be kept confidential.

d. Amendment of the RfP

At any time up to four (4) days prior to the beginning of the Bid Submission

Window, NEPCO may amend the RfP by issuing an addendum.

Any addendum issued shall be part of the RfP and shall be issued in writing to all

Bidders.

e. Bid Submission

All Bids must be sent by e-mail between 11:00 and 13:00 hours local time in Amman,

Jordan on 21 December 2015 (the Bid Submission Window).

Any Bid sent outside the Bid Submission Window may be rejected, no matter what

the reason for the early or late submission. It is the responsibility of Bidders to

comply with the Bid Submission Window.

f. Presentation of Bids

© 2015 Navigant Consulting (Europe) Ltd. Page 5

Liquefied Natural Gas Supply – Request for Proposal Document Jordan LNG Project

Bids must be submitted by e-mail. Bids submitted by facsimile, telex, telegram,

courier, mail or personal delivery may not be accepted.

Bids should be submitted by e-mail to:

[email protected] ; and

[email protected]

only, without any other recipients in copy.

The subject of the e-mail should be: “Proposal for the Supply of Liquefied Natural

Gas”.

Bids are to be provided as signed PDF documents.

g. Bid Validity

Bids shall be valid for a period of seventy-seven (77) hours from the end of the Bid

Submission Window (the Bid Validity Period). A Bid valid for a shorter period may

be rejected by NEPCO.

h. Clarification of Bids

To assist in the qualification, evaluation and comparison of the Bids, and ranking of

the Bidders, NEPCO may, at its discretion, ask any Bidder for a clarification of its

Bid, (a Request for Clarification) and provide a reasonable time for the preparation

and submission of a response from that Bidder. Any clarification submitted by a

Bidder that is not in response to a request by NEPCO shall not be considered.

No change, including any voluntary increase or decrease, in the prices of the Bid

shall be sought, offered, or permitted, except to confirm the correction of arithmetic

errors discovered by NEPCO in the evaluation of the Bids.

If a Bidder does not provide the requested clarifications of its Bid by the date and

time set in NEPCO’s Request for Clarification, its Bid may be rejected.

i. Evaluation of Bids

NEPCO will evaluate the Bids received and rank Bidders based on:

(i) Price; and

(ii) Form and value of the requested credit support.

NEPCO will select the Bids that provide the required LNG volumes and energy

content at the lowest overall cost. The cost assessment will include price and other

© 2015 Navigant Consulting (Europe) Ltd. Page 6

Liquefied Natural Gas Supply – Request for Proposal Document Jordan LNG Project

commercially important contract terms as set out in the MSA (including the

Confirmation Notice).

NEPCO is willing to provide credit support on a per cargo basis. However NEPCO

prefers Bids that: (i) do not require credit support; or (ii) require a standby letter of

credit from a Jordanian bank only. The form of credit support will be taken into

account in the choice of the selected Bidder(s).

NEPCO reserves the right to award fewer than two cargos. Depending on the LNG

supply portfolio selected by NEPCO, there may be multiple selected Bidders.

NEPCO reserves the right to accept or reject any Bid, and to annul the Bid process

and reject all Bids at any time prior to execution of the Confirmation Notice, without

thereby incurring any liability to Bidders.

j. Confidentiality

Bids will not be publically opened. Information relating to the evaluation of Bids

shall not be disclosed to Bidders or any other persons not officially concerned with

the Bid process, and the Bid ranking will not be disclosed to Bidders. NEPCO may

announce the identity of the selected Bidder, but no further information will be

disclosed.

k. Notification of Bid Results

Prior to the expiration of Bid Validity Period, NEPCO shall:

i. notify each selected Bidder in writing that its Bid has been accepted, sign the

Confirmation Notice(s) by the deadline set out in ‎1.4 above, and issue the

Confirmation Notice(s) to each selected Bidder; and

ii. notify each unsuccessful Bidder that its Bid has not been selected.

l. Performance Guarantee

For each cargo, no later than twenty (20) days before the start of the cargo Delivery

Window, the selected Bidder shall provide NEPCO with a US Dollar denominated

performance guarantee for an amount of ten percent (10%) of the cargo value, based

on the Contract Quantity multiplied by the Price Proposal, and issued by a bank in

Jordan (the Performance Guarantee) as security for NEPCO for the performance

obligations required by the MSA. The Performance Guarantee must be valid for at

least (25) days after the start of the cargo Delivery Window.

© 2015 Navigant Consulting (Europe) Ltd. Page 7

Liquefied Natural Gas Supply – Request for Proposal Document Jordan LNG Project

The form of Performance Guarantee is annexed to the Confirmation Notice at Section

B2.

m. NEPCO discretion

NEPCO reserves the right to reject any or all Bids without assigning any reasons and

its decisions shall be final and binding. NEPCO will be under no obligation at any

time to select any Bid.

n. Cost of Bidding

The Bidder shall bear all costs associated with the preparation and submission of its

Bid, and NEPCO shall not be responsible or liable for any of those costs, regardless of

the conduct or outcome of the Bid process.

o. Language of Proposal

Bids and all related correspondence and documents shall be written in the English

language.

p. Currencies to be used in the RfP

The currency to be used in the Bid will be United States Dollars (USD). Bids not

using USD may be rejected by NEPCO.

q. Fraud and Corrupt Practices

NEPCO requires that Bidders, suppliers, contractors, consultants and concessionaries

(including their respective officers, employees and agents), adhere to the highest

ethical standards, and report to NEPCO all suspected acts of fraud or corruption of

which they have knowledge or become aware during the selection process. The

definitions of actions set forth below involve the most common types of fraud and

corruption but are not exhaustive. For this reason NEPCO shall also take action in

the event of any similar deed or complaint involving alleged acts of fraud and

corruption even when these are not specified in the following list. In pursuit of this

policy, NEPCO:

i. defines, for the purpose of this article the terms set forth below as follows:

(aa) Corrupt Practice means the offering, giving, receiving, or soliciting,

directly or indirectly, of anything of value to influence the action of another

Bidder or a NEPCO official, advisor or representative in the selection process;

© 2015 Navigant Consulting (Europe) Ltd. Page 8

Liquefied Natural Gas Supply – Request for Proposal Document Jordan LNG Project

(bb) Fraudulent Practice means a misrepresentation or omission of facts in

order to influence the selection process and includes collusive practice among

Bidders designed to establish indicative prices at artificial, non-competitive

levels and to deprive NEPCO of the benefits of free and open competition;

(cc) Collusive Practice means a scheme or arrangement between two or more

Bidders, with or without the knowledge of NEPCO, designed to establish

indicative prices at artificial, non-competitive levels or to influence the action

of any party in the selection process;

(dd) Coercive Practice means impairing or harming, or threatening to impair

or harm, directly or indirectly, persons or their property in order to influence

their participation in the selection process; and

(ee) Obstructive Practice means deliberately destroying, falsifying, altering,

or concealing of evidence material to the investigation or making false

statements to investigators in order to materially impede a NEPCO

investigation into allegations of a Corrupt, Fraudulent, Coercive or Collusive

Practice; and/or threatening, harassing or intimidating any party to prevent it

from disclosing its knowledge of matters relevant to the investigation or from

pursuing the investigation.

ii. will reject a Bid if it determines that the Bidder recommended for award, of

the LNG supply contract or any of its personnel, or its agents, or its sub-

consultants, subcontractors, service providers, suppliers and/or their

employees, has, directly or indirectly, engaged in corrupt, fraudulent,

collusive, coercive, or obstructive practices in competing for this project or

other projects in Jordan; and

iii. will sanction a firm or individual, including declaring them ineligible, either

indefinitely or for a stated period of time, to be awarded a contract with the

Government of Jordan if it at any time determines that they have, directly or

through an agent, engaged, in corrupt, fraudulent, collusive or coercive

practices.

© 2015 Navigant Consulting (Europe) Ltd. Page 9

Liquefied Natural Gas Supply – Request for Proposal Document Jordan LNG Project

1.6 Bid Requirements

a. Volume Proposal

Bidders should submit a separate Confirmation Notice for each cargo if bidding for

multiple cargos.

Bidders must demonstrate their capability to supply the volume they are bidding for.

Specifically Bidders should provide in their Confirmation Notice(s):

i. Delivery Timing

For each cargo, Bidder must specify a delivery window lying entirely within

the relevant date range stated in ‎1.3 above (the Delivery Window).

ii. Contract Quantity and Volume Commitment

Bidder must confirm that each cargo it is bidding to supply will comply with

the (3.0—3.6) TBtu range stated in ‎1.3 above (the Provisional Contract

Quantity). No later than forty-five (45) days before the start of each Delivery

Window, the selected Bidder must confirm the Btu content of the cargo. The

confirmed amount must be a single value in Btu lying within the Provisional

Contract Quantity range (the Contract Quantity).

For each cargo, the actual quantity of LNG delivered may be the Contract

Quantity plus or minus two percent (+/- 2%).

For each cargo, the volume of LNG delivered must not exceed 155,000 m3.

For the avoidance of doubt, Bidder must comply with both of the

requirements above in terms of energy content (Btu) and volume (m3).

NEPCO requires this level of certainty because the FSRU is the only storage

facility available to it and there is limited capability downstream for varying

gas off-take. NEPCO therefore has to ensure that the FSRU has sufficient

storage capacity for unloading each cargo and that the energy can be

consumed in its power stations.

iii. Shipping Commitment

Bidder shall specify the LNG Ship(s) to be used for transporting the LNG.

Note that the Terminal can accommodate LNGC sizes up to Q-Flex.

iv. LNG Source

© 2015 Navigant Consulting (Europe) Ltd. Page 10

Liquefied Natural Gas Supply – Request for Proposal Document Jordan LNG Project

Bidder shall specify the LNG supply source(s).

v. LNG Specifications

Bidders must confirm that their LNG supply will conform to the

Specifications as set out in the Confirmation Notice(s).

b. Price Proposal

For each cargo that the Bidder is bidding to supply, the Bidder must propose a fixed

price (the Price Proposal). NEPCO will analyse the Price Proposals and choose the

most advantageous, taking account of the cost of NEPCO's alternative fuels (diesel

and fuel oil) and considering, for the avoidance of doubt, the contractual and other

terms associated with a Bid.

The Price Proposal should be presented net of all custom duties or fees, transfer

taxes, stamp duties and general and special sales taxes that are applicable within

Jordan. The liability for payment of taxes will be as set out in the MSA.

Bidders are allowed to propose different prices for the different cargo combinations

that can be bid for. For example, Bidders are allowed to propose different prices for

supplying two cargos versus supplying a single cargo. Bidders should clearly

explain their different price/cargo proposals and, for clarity, Bidders should submit

separate Confirmation Notices for each different price/cargo proposal.

© 2015 Navigant Consulting (Europe) Ltd. Page 11

Liquefied Natural Gas Supply – Request for Proposal Document Jordan LNG Project

Section B: Forms

© 2015 Navigant Consulting (Europe) Ltd. Page 12

Liquefied Natural Gas Supply – Request for Proposal Document Jordan LNG Project

1. Bid Letter

[Name of Bidder and Address]

[Date]

H. E. Abdul Fattah Aldaradkah,

General Manager of the National Electric Power Company

National Electric Power Company

Sweifieh – 7th Circle, Zahran Street

Amman, 11814

Jordan

Your Excellency,

Bid to supply Liquefied Natural Gas

We, the undersigned, declare that:

(a) we have executed a Master Sale and Purchase Agreement for LNG with NEPCO;

(b) we have examined the Bidding Documents, including any addenda, and have no

reservations;

(c) we hereby offer to supply LNG in conformity with the Bidding Documents in

accordance with the Confirmation Notice(s) provided as part of our Bid;

(d) our Bid is valid for a period of seventy-seven (77) hours from the end of the Bid

Submission Window and it shall remain binding upon us and may be accepted at any

time before the expiration of the Bid Validity, in accordance with the Bidding

Documents; and

(e) we understand and acknowledge that you are not bound to accept any Bid that you

may receive.

We hereby confirm that the information provided as part of our Bid is complete and

accurate and all necessary Board and other approvals have been obtained prior to the

submission of our Bid.

Yours faithfully,

Signed

Name

Duly authorized to sign the Bid for and on behalf of [name of Bidder]

Dated

© 2015 Navigant Consulting (Europe) Ltd. Page 13

Liquefied Natural Gas Supply – Request for Proposal Document Jordan LNG Project

2. Form of Confirmation Notice

Confirmation Notice

Pursuant to the Master Sale and Purchase Agreement for LNG dated [ ], between the National

Electric Power Company (NEPCO) and [ ] (the Seller) (the Master Agreement), NEPCO and the

Seller agree upon the following sale and purchase of LNG on this day of

, 2015.

1. Terms of Delivery

The deliveries under this Confirmation Notice shall be DES deliveries and Annex B of the Master

Agreement shall apply.

2. Source of LNG

The Gas Supply Area shall comprise [ ].

The Loading Port shall be the port located in [ ].

The expected departure date from the Loading Port shall be [ ].

3. Discharge Port and Buyer’s Facilities

The Discharge Port and Buyer’s Facilities shall be those located at Aqaba LNG Terminal, Jordan.

4. Quantities

4.1 The Contract Quantity shall be confirmed in writing by Seller to Buyer no later than

forty-five (45) days before the start of the Delivery Window; such Contract Quantity shall

be a single value in Btu between three million (3,000,000) MMBtu and three million, six

hundred thousand (3,600,000) MMBtu.

4.2 For operational and tolerance purposes, the actual quantity of LNG that Seller may, at its

option, deliver to Buyer shall be the Contract Quantity plus or minus two percent (+/-

2%).

4.3 For avoidance of doubt, where Seller delivers to Buyer any quantity of LNG within the

range set out in Clause 4.2 of this Confirmation Notice and where Buyer accepts in full

such quantity of LNG, the provisions of Clauses 4.2 or 4.3 of the Master Agreement shall

not apply.

© 2015 Navigant Consulting (Europe) Ltd. Page 14

Liquefied Natural Gas Supply – Request for Proposal Document Jordan LNG Project

5. Specifications

The Specifications shall be:

Component Units Min Max

Nitrogen Mole % 0.00 1.00

Methane Mole % 83 100

Ethane Mole % 0.00 13.00

Propane Mole % 0.00 4.00

I-Butane Mole % 0.00 2.00

N-Butane Mole % 0.00 1.00

I-Pentane Mole % 0.00 0.2

N-Pentane Mole % 0.00 0.15

Specification Limits Units

Wobbe Index Btu/SCF Min 1320 Max 1470

Gross Heating Value Btu/SCF Min 980 Max 1180

Hydrogen Sulphide mg per

NCM

Max 6.0

Carbon Dioxide mol per

cent

Max 0.1

Total sulphur including

mercaptans

mg per

NCM

Max 30.0

NOTE: Hydrogen Sulphide will only be measured at the Loading Port, and notified to the Buyer

in the Certificate of Quality and Quantity provided that such notification is received from the

Loading Port.

© 2015 Navigant Consulting (Europe) Ltd. Page 15

Liquefied Natural Gas Supply – Request for Proposal Document Jordan LNG Project

6. Contract Price

The Contract Price shall be [ ] per MMBtu.

7. Parties' Bank Account Details

The name of Seller's bank and Seller's account details for the purposes of Clause 8.4 of the Master

Agreement are as follows:

[Include relevant bank details]

Account Name:

Bank Name:

Bank Address:

Account Number:

Sort Code:

Swift Code:

IBAN:

The name of Buyer's bank and Buyer's account details for the purposes of Clause 8.4 are as

follows:

[Include relevant bank details]

Account Name:

Bank Name:

Bank Address:

Account Number:

Sort Code:

Swift Code:

IBAN:

© 2015 Navigant Consulting (Europe) Ltd. Page 16

Liquefied Natural Gas Supply – Request for Proposal Document Jordan LNG Project

8. LNG Ship(s)

The LNG Ship(s) to be utilised for transportation of LNG under this Confirmation Notice and

her/their technical descriptions are as follows:

Name of LNG Ship:

Gross Vessel Capacity: [ ] m3 of LNG

Daily Boil-Off Rate: [ ] % of capacity

9. Demurrage Rate(s)

The rate(s) of Demurrage for the purposes of paragraph 5 of Annex B of the Master Agreement

shall be [ ] per day and pro rata for any begun day.

10. Delivery Window(s)

For each cargo to be delivered under this Agreement, the Delivery Window shall be a period of

[ ] hours commencing at [ ] (local time at the Discharge Port) on [ ].

11. Allowed Laytime

The Allowed Laytime shall be forty-eight (48) hours for LNG Ships with a gross vessel capacity

of up to one hundred and seventy thousand (170,000) cubic metres. For LNG Ships with a gross

vessel capacity that is in excess of one hundred and seventy thousand (170,000) cubic metres, 1.6

hours will be added to the standard forty-eight (48) hour laytime for every thousand (1000) cubic

metres of gross vessel capacity that the LNG Ship is in excess of one hundred and seventy

thousand (170,000) cubic metres. This will be calculated in accordance with the following

formula:

12. Credit Support

Buyer shall provide the Seller with credit support in accordance with Clause 8.6 of the Master

Agreement as follows:

[Details of credit support to be specified here (form, start date, duration, amount, etc.)]

© 2015 Navigant Consulting (Europe) Ltd. Page 17

Liquefied Natural Gas Supply – Request for Proposal Document Jordan LNG Project

13. Performance Guarantee

No later than twenty (20) days before the start of the cargo Delivery Window, Seller shall

provide Buyer with a US Dollar denominated performance guarantee (the Performance

Guarantee) for an amount equal to 10 per cent (10%) of the cargo value (being the Contract Price

multiplied by the Contract Quantity), after the Contract Quantity has been confirmed in

accordance with Clause 4.1 of this Confirmation Notice, valid for a period of at least (25) days

after the start of the cargo Delivery Window. and issued by a bank in Jordan, as security for the

obligations of Seller to Buyer under the Master Agreement and this Confirmation Notice in

relation to that cargo.

The Performance Guarantee shall be substantially in the form annexed to this Confirmation

Notice.

14. Port Charges

For the avoidance of doubt, Seller shall be liable for the payment of all Port Charges due in

relation to each LNG cargo in accordance with Annex 1 to this Confirmation Notice.

15. Other Provisions

- All cargo documents (Bill of Lading, Certificate on Loading, Certificate of Origin, Cargo

Manifest) shall be delivered to NEPCO within 3 weeks after the start of the cargo

Delivery Window.

- [ ]

In witness whereof, each of the Parties, in accordance with the Master Agreement, has caused

this Confirmation Notice to be executed by its duly authorised representative.

[ ] NATIONAL ELECTRIC POWER COMPANY

By: _________________________________ By: _________________________________

Title: ________________________________ Title: ________________________________

© 2015 Navigant Consulting (Europe) Ltd. Page 18

Liquefied Natural Gas Supply – Request for Proposal Document Jordan LNG Project

Annex 1 Port Charges

Service Value (Dinars, JOD)

Ships' entry fees to the Jordanian water Around JOD 4500 for each trip

Navigation safety fees JOD 4500 for each trip

Inspection fees for the ship's safety JOD 25 for each trip

Fees for the ship parking at the liquid natural gas port Around JOD 1000 for each parking

process

Towing, guiding and mooring the liquid natural gas ships -

Tugs used for normal vessels movements and standby

operations, and Pilot Boat fees

35,000 JOD (Paid through NEPCO by

a deduction from the Invoice)

Wages and/or fees for the marine agent Around 2000 JOD for each trip

Other services' fees for ships in relation to the supply of food,

fuel and water and ship crew services

Specified as per request and the type

of the service for each of the supply

categories or the services provided by

the port agent to the ship

Handling fees for each cubic meter of liquid gas 0.65 JOD per cubic meters (Paid

through NEPCO by a deduction from

the Invoice)

Environmental fees to ASEZA 0.05 JOD / ton of cargo

Use of sea water for cooling have to pay 1 JD/10000 m3 of used

water, with a floor of 3000JD and 10000JD/year

1 JOD / 10,000 m3 of used water

Minimum payment of 3,000 JOD and

10,000 JOD / year

NOTE 1: This table provides the relevant Port Charges applicable at the date of this Confirmation

Notice, and such Port Charges may be subject to change. However, any extra port charges not

mentioned in the above table can only be charged to the Seller provided that the sum of the extra port

charges shall not exceed 10,000 JOD/cargo including any agency fees claimed by the marine agent

regarding this cargo.

© 2015 Navigant Consulting (Europe) Ltd. Page 19

Liquefied Natural Gas Supply – Request for Proposal Document Jordan LNG Project

Annex 2 – Form of Performance Guarantee

[Date]

National Electric Power Company

PO Box 2310

Amman

11181

Jordan

We refer to the DES Master Sales Agreement (the MSA) between [ ] (the Principal) and

National Electric Power Company dated [ ] (the Beneficiary).

We, [insert name of Jordanian bank], having our head office at [insert address of bank],

hereby irrevocably and unconditionally guarantee and undertake to pay the Beneficiary any

sum or sums up to an aggregate amount of [insert the amount being 10% of the expected

cargo value] United States Dollars (USD) upon first written demand of the Beneficiary, all

without there being need for legal or administrative procedures and without need to prove

the Principal’s default.

This Performance Guarantee must be valid for at least (45) days from the date hereof. With

respect to any demand for payment under this Guarantee received by us on or before the

expiry date of this Guarantee, our obligations under this Guarantee shall remain in force

until such demand is finally settled.

This Guarantee shall be governed by English law.

Yours faithfully,

Signed

Name

Duly authorised for and on behalf of [name of bank]

Date