request for engineering services march 2021 agency ...€¦ · dfd “policy and procedure manual...

3
REQUEST FOR ENGINEERING SERVICES MARCH 2021 AGENCY: Department of Health Services DHS CONTACT: Mark Zaccagnino, (608) 266-2902, [email protected] DFD CONTACT: Jerome Jansen, (608) 261-8019, [email protected] LOCATION: Winnebago Mental Health Institute, City of Oshkosh, Winnebago County PROJECT REQUEST: Request release of $140,000 Building Trust Funds Planning to prepare preliminary plans and a design report for the Central Wisconsin Center West Steam System Improvement Project. The A/E will provide pre-design through construction administration services as indicated in the DFD “Policy and Procedure Manual for Architects/Engineers and Consultants”, the “Guide for Developing Program Statements for Projects Requiring Enumeration”, and the DFD “Contract for Professional Services as directed by DFD at the Design Kickoff meeting. The services may be contracted for in multiple contracts, or a multi-part contract with project-specific review/ approval/ authorization points in the contract, as determined by the needs of the project. PROJECT NUMBER: 21A1D PROJECT DESCRIPTION: This project will relocate sections of the steam distribution system at the facility and repair the above ground portion of an existing service tunnel. One thousand seven hundred feet of steam and condensate piping will be replaced. Six steam vaults will be constructed. The top of the existing service tunnel will be repaired while the tunnel remains in operation. All disturbed areas will be restored. PROJECT JUSTIFICATION: This project is required to maintain a safe and reliable steam distribution system at WMHI. The current piping is over 70 years old and sections are underneath the Food Service Building and cannot be accessed. Other sections pass through an abandoned Department of Corrections building (Kempster Hall) before entering an active WMHI patient care building (Gordon Hall). This project will route new steam piping around the south and east sides of the Food Service Building. A vault will be established between Kempster and Gordon Halls so that steam service can be provided to both buildings without the distribution piping passing through either one. The service tunnel was constructed with the Food Service Building in 1955. This tunnel is the only means of transporting food from the Food Service Building to Patient care buildings at WMHI and the Wisconsin Resource Center (WRC). The top of the tunnel is above ground and serves as a walkway to the west side of the building. The top of the tunnel including expansion joints have deteriorated to the point that repairs are required.

Upload: others

Post on 25-Mar-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REQUEST FOR ENGINEERING SERVICES MARCH 2021 AGENCY ...€¦ · DFD “Policy and Procedure Manual for Architects/Engineers and Consultants”, the “Guide for Developing Program

REQUEST FOR ENGINEERING SERVICES

MARCH 2021

AGENCY: Department of Health Services

DHS CONTACT: Mark Zaccagnino, (608) 266-2902, [email protected]

DFD CONTACT: Jerome Jansen, (608) 261-8019, [email protected]

LOCATION: Winnebago Mental Health Institute, City of Oshkosh, Winnebago County

PROJECT REQUEST:

Request release of $140,000 Building Trust Funds – Planning to prepare preliminary plans and a

design report for the Central Wisconsin Center West Steam System Improvement Project. The

A/E will provide pre-design through construction administration services as indicated in the

DFD “Policy and Procedure Manual for Architects/Engineers and Consultants”, the “Guide for

Developing Program Statements for Projects Requiring Enumeration”, and the DFD “Contract

for Professional Services as directed by DFD at the Design Kickoff meeting. The services may

be contracted for in multiple contracts, or a multi-part contract with project-specific review/

approval/ authorization points in the contract, as determined by the needs of the project.

PROJECT NUMBER: 21A1D

PROJECT DESCRIPTION:

This project will relocate sections of the steam distribution system at the facility and repair the

above ground portion of an existing service tunnel. One thousand seven hundred feet of steam

and condensate piping will be replaced. Six steam vaults will be constructed. The top of the

existing service tunnel will be repaired while the tunnel remains in operation. All disturbed areas

will be restored.

PROJECT JUSTIFICATION:

This project is required to maintain a safe and reliable steam distribution system at WMHI. The

current piping is over 70 years old and sections are underneath the Food Service Building and

cannot be accessed. Other sections pass through an abandoned Department of Corrections

building (Kempster Hall) before entering an active WMHI patient care building (Gordon Hall).

This project will route new steam piping around the south and east sides of the Food Service

Building. A vault will be established between Kempster and Gordon Halls so that steam service

can be provided to both buildings without the distribution piping passing through either one. The

service tunnel was constructed with the Food Service Building in 1955. This tunnel is the only

means of transporting food from the Food Service Building to Patient care buildings at WMHI

and the Wisconsin Resource Center (WRC). The top of the tunnel is above ground and serves as

a walkway to the west side of the building. The top of the tunnel including expansion joints have

deteriorated to the point that repairs are required.

Page 2: REQUEST FOR ENGINEERING SERVICES MARCH 2021 AGENCY ...€¦ · DFD “Policy and Procedure Manual for Architects/Engineers and Consultants”, the “Guide for Developing Program

BUDGET/SCHEDULE:

Construction A/E Selection Mar 2021

Design Design Report Oct 2021

DFD Mgt SBC Approval Dec 2021

Contingency Bid Opening Mar 2022

Equipment Start Construction May 2022

Other Fees Substantial Completion Dec 2022

TOTAL $4,940,000 Final Completion May 2023

PREVIOUS ACTION:

None

Page 3: REQUEST FOR ENGINEERING SERVICES MARCH 2021 AGENCY ...€¦ · DFD “Policy and Procedure Manual for Architects/Engineers and Consultants”, the “Guide for Developing Program

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

ST

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

ST

O

S

TO

S

T

O

ST

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

ST

O

SA

N

SA

N

SA

N

S

A

N

SA

N

E

E

E

S

T

E

S

T

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

STO

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

E

E

E

E

E

E

E

S

A

N

S

A

N

W

W

W

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

ST

O

ST

O

ST

O

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

SA

N

SA

N

S

A

N

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

G

A

S

S

A

N

E

E

E

E

E

E

E

E

E

E

E

S

A

N

E

E

E

W

W

W

W

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

E

E

E

E

E

E

E

E

E

E

E

E

S

A

N

SA

N

E

E

E

E

E

S

T

O

E

E

E

W

IS

C

O

N

S

IN

W

O

M

E

N

'S

R

E

S

O

U

R

C

E

C

E

N

T

E

R

B

U

IL

D

IN

G

B

B

U

IL

D

IN

G

C

B

U

IL

D

IN

G

A

BUILDING D

G

A

T

E

H

O

U

S

E

A

D

M

IN

IS

T

R

A

T

IO

N

K

E

M

P

S

T

E

R

H

A

L

L

G

O

R

D

O

N

H

A

L

L

N

U

R

S

E

S

H

O

M

E

C

H

A

P

E

L

A

D

M

IN

IS

T

R

A

T

IO

N

B

U

IL

D

IN

G

R

E

C

B

U

IL

D

IN

G

F

O

O

D

S

E

R

V

IC

E

F

A

C

IL

IT

Y

S

E

R

V

IC

E

S

S

H

E

R

M

A

N

H

A

L

L

R

O

O

T

H

O

U

S

E

1

M

A

IN

T

E

N

C

E

B

U

IL

D

IN

G

G

R

E

E

N

H

O

U

S

E

M

A

IN

T

E

N

C

E

/

S

T

O

R

A

G

E

C

R

E

A

M

E

R

Y

H

E

A

T

IN

G

P

L

A

N

T

C

R

E

D

IT

U

N

IO

N

S

H

E

D

S

T

O

R

A

G

E

B

U

I

L

D

I

N

G

S

S

T

O

R

A

G

E

B

U

IL

D

IN

G

PE

TE

RS

IK

HA

LL

R

E

S

I

D

E

N

C

E

#

7

R

E

S

I

D

E

N

C

E

S

#

2

+

#

3

MUSEUM

N

O

R

T

H

C

O

T

T

A

G

E

S

O

U

T

H

C

O

T

T

A

G

E

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N S

T

O

S

T

O

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

E

E

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

W

ST

1

S

T2

1

0

"

W

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

ST

4

W

S

T

3

S

T

3

a

S

T

5

S

T

6

ST7

S

T

1

0

ST12

ST13

8

"

8"

6

"

6

"

W

W

S

T

1

1

S

T

E

S

T

E

S

T

E

S

T

E

S

T

E

S

T

E

S

T

E

S

T

E

S

T

E

S

T

E

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

S

T

O

21"

21"

1

5

"

2

4

"

2

4

"

1

2

"

6"

6"

6"

1

0

"

6

"

6

"

8

"

18"

1

8

"

1

0

"

3

0

"

3

0

"

6"

8"

8

"

8"

1

0

"

6

"

8"

1

2

"

8"

6"

1

8

"

1

8

"

6"

E

EE

EE

E E E E EE

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

605

301

W

W

W

W

W

W

W

N

O

R

T

H

D

R

N

O

R

T

H

D

R

T

R

E

F

F

E

R

T

D

R

T

R

E

F

F

E

R

T

D

R

S

H

E

R

M

A

N

R

D

S

H

E

R

M

A

N

R

D

B

U

T

L

E

R

A

V

E

S

O

U

T

H

D

R

SO

U

TH

D

R

P

I

C

N

I

C

P

O

I

N

T

T

R

A

I

L

S

O

U

T

H

D

R

S

O

U

T

H

D

R

HS1

2

4

1

110

7

103

308

309

304

112

101

603

108

3

206

5

204

212

216

111

607

207

210

322

102

316

307

609

608

203

604

LAKE

WINNEBAGO

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

Flag Pole

Lights

Sign

Lights

E

E

VISITOR

CENTER

7A

6

S

T

O

R

A

G

E

S

T

E

S

T

E

S

T

E

S

T

E

S

T

E

S

T

E

S

T

E

S

T

E

S

T

E

S

T

E

S

T

E

S

T

E

S

T

E

S

T

E

S

T

E

S

T

E

S

T

E

S

T

E

ST

E

S

T

E

S

T

E

S

TE

S

TE

S

TE

S

TE

S

TE

S

T

E

S

T

E

S

T

E

S

T

E

S

T

E

ST

E

S

T

E

E

S

T

E

S

T

E

S

T

E

S

T

E

Abandoned

2014

E

E

E

E

S

T

O

S

T

O

S

T

O

S

T

O

E

E

E

E

E

E

E

E

E

E

E

S

T

O

S

T

O

E

E

E

E

E

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

S

T

E

S

T

E

S

T

E

S

T

E

S

T

E

Sheet T

itle:

Agen

cy / Institution

:

First Line

Second Line

Project T

itle:

Project Location:

State of W

isconsin

Departm

ent of A

dm

inistration

Division of F

acilities D

evelopm

ent

tmz02/20/15

Revisions:

By: Description:Date:

WRC Lot lights

1

No.

ARNO

LD AN

D O'SH

ERIDA

N

MARK

HAWK

INSON

SAM K

ING

JIM YU

RS

KEVIN

STEF

ANCZ

YK

JIM YU

RS

Sheet

Date

Set

DFD

Graphic

Scale

1" = 100'-0"

A100

25' 50' 100' 150'0'

Number

Issued

Type

Number

Scale

Utility S

ite

P

la

n

. . .

Departm

ent of H

ealth S

ervices

Winnebago M

ental H

ealth Institute / W

isconsin R

esource C

enter

-

-

-

tmz11/09/16 WRC Visitor Add.

2

ZaccaM
Cloud
ZaccaM
Cloud
ZaccaM
Cloud
ZaccaM
Engineer
ZaccaM
Pen
.
ZaccaM
Architect
Existing steam and condensate to be replaced
ZaccaM
Architect
Existing steam and condensate to be replaced
ZaccaM
Typewritten Text
ZaccaM
Architect
New steam and condensate piping
ZaccaM
Architect
ZaccaM
Architect
ZaccaM
Architect
ZaccaM
Polygon
Service Tunnel
ZaccaM
Text Box
Service Tunnel
ZaccaM
Line