C.Y.2021 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
LOCAL PROGRAM
LOCAL INFRASTRUCTURE PROGRAM
BUILDINGS AND OTHER STRUCTURES
MULTIPURPOSE / FACILITIES
CONSTRUCTION OF MULTI-PURPOSE BUILDING
AT CABIDIAN, MABINI, BOHOL
DATE:
DATE:
DATE:
THE REPUBLIC OF THE PHILIPPINES
Luzon Strait
South china sea
Philippine SeaLuzon
Samar
Mindoro
Sulu Sea
Palawan
Mindanao
Leyte
BoholCebu
Negros Oriental
Panay
K E Y M A P
THIS SITE REGION VII
N
S
EW
Siquijor
Bohol
Cebu
SiquijorREGION VII MAP
THIS SITE BOHOL PROVINCE
N
S
EW
N
S
EW
THIS SITE
ANDAGUINDULMAN
CANDIJAY
DUERO
JAGNAGARCIA HERNANDEZVALENCIADIMIAOLILALOAY
ALBURQUERQUE
LOBOC
SEVILLABILAR
BATUAN
CARMENSIERRA BULLONES
PILAR
DAGOHOY ALICIA MABINI
DANAO
SAGBAYAN
UBAY
SIKATUNA
BALILIHAN
REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE VII
BOHOL 3RD DISTRICT ENGINEERING OFFICE
GUINDULMAN, BOHOL
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: SUBMITTED: RECOMMENDED:
APPROVED:
TEOTIMO C. BAGHUCAN
CHIEF,PLANNING AND DESIGN SECTION
DATE: DATE:
MAGITING A. CRUZ
DISTRICT ENGINEER
DATE:
SET NO. SHEET NO.
9
REVIEWED:
DATE:
GUMER M. CASTILLO, ASEAN Eng.,DPA
ASSISTANT DISTRICT ENGINEER
LOUIEL IAN R. LOMOTOS
ENGINEER II
CARINA L. ABREA
ARCHITECT II
PREPARED:
2
AS SHOWN
MARK ANTHONY B. BUAL
ENGINEER I
C.Y.2021 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
LOCAL PROGRAM
LOCAL INFRASTRUCTURE PROGRAM
BUILDINGS AND OTHER STRUCTURES
MULTIPURPOSE / FACILITIES
CONSTRUCTION OF MULTI-PURPOSE BUILDING
AT CABIDIAN, MABINI, BOHOL
LOCATION PLAN
NTS
PERSPECTIVE
NTS
THIS SITE
T
O
P
A
N
A
D
T
A
R
A
N
, C
A
N
D
IJ
A
Y
T
O
M
A
B
IN
I
1.0 STANDARDS AND REFERENCES
THE FOLLOWING SHALL GOVERN THE DESIGN, FABRICATION AND
CONSTRUCTION OF THE PROJECT.
1.1 NATIONAL STRUCTURAL CODE OF THE PHILIPPINES (N.S.C.P.), VOL. 1, 6TH
EDITION, 2016
2.0 DESIGN CRITERIA
2.1 LOADINGS
A. DEAD LOAD
CONCRETE = 23.56 kN/m³
STEEL = 76.93kN/m³
150mm THK. CHB WALL = 2.73 kPa
100mm THK. CHB WALL = 2.11 kPa
B. LIVE LOAD
ROOF = 1.00 kPa
CLASSROOMS, LABORATORY = 1.90 kPa
TOILETS = 2.40 kPa
CORRIDORS ABOVE, STAIRS = 3.80 kPa
CORRIDORS ON GROUND = 4.80 kPa
C. WIND LOAD (NSCP 2015)
BASIC WIND VELOCITY, V = 290 KPH
P = qh [(GCpf) - (GCpi)] (DESIGN WIND PRESSURE)
WHERE: qh = VELOCTY PRESS
GCpf = EXTERNAL PRESSURE COEFFICIENT
GCpi = INTERNAL PRESSURE COEFFICIENT
D. SEISMIC LOAD (NSCP 2016)
V = CV (DESIGN BASE SHEAR)
RT
Vmax = 2.50 Cal Vmin = 0.11 CalW
R
Vmin = 0.80 ZNvl
R
WHERE: W = TOTAL DEAD LOAD
T = NATURAL PERIOD = C₂ (hn)
WHERE: C = NUMERICAL COEFFICIENT
h = BUILDING HEIGHT
I = IMPORTANCE FACTOR = 1.50
R = NUMERICAL FACTOR = 8.50
SEISMIC COEFFICIENT Cv = 0.44Nv
Ca = 0.64 N
NEAR SOURCE FACTOR (10km.) Nv = 1.2
Na = 1.0
Z = SEISMIC ZONE = 0.40 (ZONE 4)
S = SOIL TYPE = D
2.2 DESIGN STRESSES
A. CONCRETE
COMPRESSIVE STRENGTH @ 28 DAYS
B. REINFORCING BARS
FOR BARS 16mmØ AND GREATER
C. FOR BARS LESS THAN 16mmØ
D. STRUCTURAL STEEL, ASTM-A36
FOR TRUSSES, BRACINGS AND STRUTS
E. PURLINS
COLD FORMED LIGHT CAGE SHAPES
F. MASONRY UNIT (CHB)
NON LOAD BEARING CHB WALLS
G. WELDS-USE E=60 ELECTRODES
H. STRUCTURAL BOLTS, ASTM-A307
4.0 MATERIALS
4.1 CONCRETE
4.1.1 CONCRETE COVER OVER REINFORCED BARS SHALL BE AS FOLLOWS:
A. FOOTINGS, FOOTING-TIE BEAMS (CAST AGAINST EARTH) 75mm
B. BEAMS AND COLUMNS (TO STIRRUPS AND TIES) 40mm
C. WALLS, SIDE OF FOOTING-TIE BEAMS (CAST AGAINST FORMS) 40mm
D. SUSPENDED SLAB 20mm
4.1.2 BEFORE CONCRETE IS POURED, CHECK WITH ALL TRADES TO ENSURE PROPER PLACEMENT OF
ALL OPENINGS, SLEEVES, CURBS, CONDUITS, ETC. RELATING TO THE WORK.
4.2 REINFORCING BARS
4.2.1 ALL REINFORCING BARS SHALL BE CLEAN OF RUST, GREASE OR OTHER MATERIALS THAT WILL
IMPAIR BOND.
4.2.2 ALL REINFORCING BARS SHALL BE ACCURATELY AND SECURELY PLACED BEFORE POURING
CONCRETE OR APPLYING MORTAR OR GROUT.
4.2.3 LAPPED SPLICES SHALL BE STAGGERED WHERE POSSIBLE
4.2.4 UNLESS OTHERWISE INDICATED, SPLICING OF REINFORCEMENT SHALL BE IN ACCORDANCE WITH
ACI - 318M, EXCEPT THAT THE MINIMUM LAP SPLICE SHALL BE 40 BAR DIAMETER BUT NOT
LESS THAN 500mm,
4.2.5 UNLESS SHOWN OTHERWISE ON PLANS, SPLICES SHALL BE AS FOLLOWS:
A. INTERMEDIATE BEAMS TOP BARS SHALL BE SPLICED AT MID-SPAN, AND BOTTOM
B. BEAMS FRAMING TO COLUMNS; TOP BARS SHALL BE SPLICEDAT MID-SPAN, AND BOTTOM BARS SHALL
NOT BE
SPLICED W/ IN THE COLUMN OR W/ IN A DISTANCE OF TWICE THE MEMBER DEPTH FROM THE FACE OF THE
COLUMN THE SPLICED LENGTH SHALL NOT BE LESS THAN 1.4 TIMES THE DEVELOPMENT LENGTH (Ld) IN
4.2.8 BELOW BUT NOT LESS THAN 600mm.
C. COLUMS: LAP SPLICES SHALL BE MADE WITHIN THE CENTER HALF OF THE HEIGHT AND THE SPLICE SHALL
NOT
BE LESS THAN 30 BAR DIAMETER. WELDING OR THE USE OF APPROVED MECHANICAL DEVICES MAY BE
PERMITTED PROVIDED NOT MORE THAN ALTERNATE BARS ARE WELDED OR SPLICED AT ANY LEVEL AND
THE
MINIMUM VERTICAL DISTANCEBETWEEN TWO ADJADENT BAR SPLICES SHALL BE 600mm.
D. CHB WALLS; VERTICAL BARS SHALL BE SPLICED AT THE TOP OF WALL FOOTINGS OR FOOTING-TIE BEAMS
AND
AT THE BOTTOM OF REINFORCED CONCRETE LINTEL BEAMS OR BEAMS.
3.0 FOUNDATION
3.1 ASSUMED SOIL BEARING CAPACITY SHALL BE 98
3.1.1 IN CASE THE ACTUAL LOCATION OF THE STRUCTURE IS LESS THAN THE ASSUMED
DISTANCE FROM THE SEISMIC SOURCE OF 40km.; NOTIFY THE DIRECTOR, BUREAU
OF DESIGN FOR PROPER REVISION OF THE DESIGN. REFER TO THE SEISMIC
SOURCE MAP PROVIDED IN THE NATIONAL STRUCTURAL CODE OF THE PHILIPPINES
OR PHIVOLCS SEISMIC SOURCE MAP.
3.1.2 SOIL TEST SHALL BE CONDUCTED PRIOR TO START OF CONSTRUCTION.
3.1.3 IN CASE THE ACTUAL SOIL BEARING CAPACITY IS FOUND LESS THAN THE ASSUMED,
96 kP; NOTIFY THE DIRECTOR, BUREAU OF DESIGN FOR PROPER REVISION OF
FOUNDATION.
3.1.4 NO FOOTING SHALL REST ON FILL.
3.1.5 BOTTOM OF FOOTING SHALL BE ATLEAST 100mm BELOW NATURAL GRADE LINE.
3.1.6 SOIL BEARING CAPACITY SHALL BE INCREASED BY 33% WHEN IN COMBINATION
WITH SEISMIC OR WIND LOAD.
3.2 WHERE LOOSE/SOFT MATERIAL IS ENCOUNTERED AT DEPTH OF EMBEDMENT
INDICATED, EXCAVATE TO FIRM LAYER AND REPLACE LOOSE/MATERIALS
UNDERNEATH THE FOOTING WITHIN THE FOOTING AREA PLUS 1/2 DEPTH OF SOFT
MATERIAL ON ALL SIDES WITH SELECT GRANULAR BACKFILL. COMPACT SELECT
GRANULAR BACKFILL TO 95% OF MAXIMUM DRY DENSITY.
4.2.6 UNLESS OTHERWISE INDICATED: ALL BEAMS TERMINATING AT A COLUMN SHALL HAVE TOP AND
BOTTOM BARS EXTENDING TO THE FAR FACE OF THE COLUMN, TERMINATING IN A STANDARD 90 HOOK
LENGTH OF ANCHORAGE SHALL NOT BE LESS THAN 600mm.
4.2.7 SHOP DRAWING FOR REINFORCEMENT SHALL BE SUBMITTED FOR APPROVAL OF THE ENGINEER
PRIOR TO FABRICATION & INSTALLATION.
4.2.8 DEVELOPMENT LENGTH (Ld) OF REINFORCING BARS SHALL BE AS FOLLOWS:
SIZE OF REBARS DEVELOPMENT LENGTH
10 mm 170 mm
12 mm 220 mm
16 mm 270 mm
20 mm 380 mm
25 mm 600 mm
4.3 STRUCTURAL STEEL
4.3.1 ALL STRUCTURAL STEEL SHALL CONFORM TO ASTM A36 AND SHALL HAVE A MINIMUM YIELD STRESS,
Fy - 248 MPa (36,000 psi)
4.3.2 ALL STRUCTURAL STEEL SHALL BE FABRICATED AND ERECTED IN ACCORDANCE WITH THE AISC
SPECIFICATIONS AND CODE OF STANDARD PRACTICE AS AMENDED TO DATE.
4.3.3 ALL BOLTS SHALL CONFORM TO ASTM A-307 UNLESS OTHERWISE INDICATED.
4.3.4 SHOP AND FIELD WELDING SHALL BE IN ACCORDANCE W/ AWS D1.1 AND PERFORMED BY QUALIFIED
WELDERS.
4.3.5 UNLESS OTHERWISE INDICATED, WELDING ELECTRODES SHALL BE E60.
4.3.6 WELD/(CONFORM WITH THE AMERICAN WELDING STANDARDS) USING E 60xx ELECTRODES fy = 93.77
MPa.
4.3.7 ANCHOR BOLTS (CONFORM WITH ASTM A-307) ft = 96.60 MPa, fv = 69 MPa.
4.3.8 DOWELS ARE PREPARED FOR THE SECOND FLOOR BEAMS- WHICH IS NOT INCLUDED IN THE SCOPE
OF WORK.
4.4 CONCRETE HOLLOW BLOCKS (CHB):
4.4.1 UNLESS OTHERWISE INDICATED, CHB USE IN THIS WORK SHALL HAVE A MINIMUM ULTIMATE
COMPRESSIVE STRENGTH f'm = 3.45 MPa (500 psi)
4.4.2 ALL CHB CELLS SHALL BE FILLED SOLIDLY WITH GROUT.
5.0 CONSTRUCTION JOINT
5.1 CONSTRUCTION JOINT NOT INDICATED ON THE PLANS SHALL BE MADE SO AS TO LEAST IMPAIR THE
STRENGTH OF THE STRUCTURE AND SHALL BE SUBJECT TO THE APPROVAL OF THE ENGINEER
EXCEPT SLAB ON GRADE.
5.2 UNLESS SHOWN OTHERWISE, SLAB ON GRADE SHALL HAVE CONTROL JOINTS SPACED AT 600mm
MAXIMUM CENTER TO CENTER.
5.3 BEAMS CONSTRUCTION JOINT SHALL BE LOCATED WITHIN THE MIDDLE THIRD OF THE SPAN. IT SHALL
BE PROVIDED WITH 3 EXTRA STIRRUPS @ 75mm O.C. ON EACH SIDE OF THE JOINT.
APEX OF ROOF
BOT. OF STEEL STRUT
3745
5000 5000 5000
5000 5000 50001000 1000
1 2 3 4
5700
TOP OF FLOORING
EXISTING STAGE
100
3000
2700
5800
5000
5000
5000
16000
2300 8600 10100
3130
0
21000
A B
3
2
1
4
15000
FLOOR PLAN
REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE VII
BOHOL 3RD DISTRICT ENGINEERING OFFICE
GUINDULMAN, BOHOL
SHEET CONTENTS: DRAFTED: SUBMITTED: RECOMMENDED:
APPROVED:
TEOTIMO C. BAGHUCAN
CHIEF,PLANNING AND DESIGN SECTION
DATE: DATE:
MAGITING A. CRUZ
DISTRICT ENGINEER
DATE:
SET NO. SHEET NO.
9
REVIEWED:
DATE:
GUMER M. CASTILLO, ASEAN Eng.,DPA
ASSISTANT DISTRICT ENGINEER
LOUIEL IAN R. LOMOTOS
ENGINEER II
CARINA L. ABREA
ARCHITECT II
PREPARED:
3
NTS
TYPICAL SIDE ELEVATION
NTS
GENERAL NOTES
AS SHOWN
PROJECT NAME AND LOCATION:
C.Y.2021 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
LOCAL PROGRAM
LOCAL INFRASTRUCTURE PROGRAM
BUILDINGS AND OTHER STRUCTURES
MULTIPURPOSE / FACILITIES
CONSTRUCTION OF MULTI-PURPOSE BUILDING
AT CABIDIAN, MABINI, BOHOL
MARK ANTHONY B. BUAL
ENGINEER I
8-20mmØ VERT.BARS
W/ 10mmØ TIES 4-50mm,
6-100mm, REST @ 150mm O.C.
7-20mmØ
40
0
1200
350425 425
15
00
11
00
GROUND LINE
FIN.GRND. LINE
PLAN
TB-1
TB-1
2 - 20mmØ HOR. BARS
2 - 20mmØ HOR. BARS
10mmØ STIRRUPS
[email protected], [email protected] rest @ 150mm O.C.
TB - 1 DETAILS
250
35
0
SECTION
45
05
25
52
5
9-20mmØ
50
00
50
00
50
00
15
00
0
16000
Level and Compact the
Surface only (No Flooring),
Already Provided on POW
the Embankment Materials
A B
3
2
1
4
F1C1
F1C1
F1C1
F1C1
F1C1
F1C1
F1C1
F1C1
TB-1
TB-1
TB-1
TB-1
TB-1
TB-1
TB-1
REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE VII
BOHOL 3RD DISTRICT ENGINEERING OFFICE
GUINDULMAN, BOHOL
SHEET CONTENTS: DRAFTED: SUBMITTED: RECOMMENDED:
APPROVED:
TEOTIMO C. BAGHUCAN
CHIEF,PLANNING AND DESIGN SECTION
DATE: DATE:
MAGITING A. CRUZ
DISTRICT ENGINEER
DATE:
SET NO. SHEET NO.
9
DATE:
GUMER M. CASTILLO, ASEAN Eng.,DPA
ASSISTANT DISTRICT ENGINEER
LOUIEL IAN R. LOMOTOS
ENGINEER II
CARINA L. ABREA
ARCHITECT II
PREPARED:
4
FOUNDATION PLAN
NTS
DETAIL OF F1C1
NTS
AS SHOWN
MARK ANTHONY B. BUAL
ENGINEER I
PROJECT NAME AND LOCATION:
C.Y.2021 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
LOCAL PROGRAM
LOCAL INFRASTRUCTURE PROGRAM
BUILDINGS AND OTHER STRUCTURES
MULTIPURPOSE / FACILITIES
CONSTRUCTION OF MULTI-PURPOSE BUILDING
AT CABIDIAN, MABINI, BOHOL
REVIEWED:
5000
5000
5000
3
2
1
4
16000
15000
A B
S1
S2
L/4 L/4
5000
2-20MM DIA BARS
4-20MM DIA BARS
4-20MM DIA BARS
4650
2-20MM DIA BARS
4-20MM DIA BARS
2-20MM DIA BARS
10MM DIA STIRRUP, 1@50MM,8@ 100MM, 6@150MM, REST @ 175MM
GROUND LINE
FIN.GRND. LINE
10
0
TOP OF ROOF
BEAM LINE
4-20mmØ TOP BAR
2-12mmØ BARS
2-20mmØ BOTTOM BARS
RB-1
350
35
0
CENTER LINE OF
ST BEAM
30
00
27
00
4-20mmØ TOP BAR
2-12mmØ BARS
2-20mmØ BOTTOM BARS
B-1
RB-1
B-1
2-20mmØ TOP BAR
2-12mmØ BARS
4-20mmØ BOTTOM BARS
@ MID SPAN
@ MID SPAN
@ SUPPORT
@ SUPPORT
2-20mmØ TOP BAR
2-20mmØ TOP BAR
250
350
DETAIL S-1
DETAIL S-2
350
35
0
2-20mmØ TOP BAR
2-12mmØ BARS
4-20mmØ BOTTOM BARS
2-12MM DIA BARS
3 2
REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE VII
BOHOL 3RD DISTRICT ENGINEERING OFFICE
GUINDULMAN, BOHOL
SHEET CONTENTS: DRAFTED: SUBMITTED: RECOMMENDED:
APPROVED:
TEOTIMO C. BAGHUCAN
CHIEF,PLANNING AND DESIGN SECTION
DATE: DATE:
MAGITING A. CRUZ
DISTRICT ENGINEER
DATE:
SET NO. SHEET NO.
9
DATE:
GUMER M. CASTILLO, ASEAN Eng.,DPA
ASSISTANT DISTRICT ENGINEERLOUIEL IAN R. LOMOTOS
ENGINEER II
CARINA L. ABREA
ARCHITECT II
PREPARED:
5
BEAM LAYOUT
NTS
AS SHOWN
MARK ANTHONY B. BUAL
ENGINEER I
PROJECT NAME AND LOCATION:
C.Y.2021 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
LOCAL PROGRAM
LOCAL INFRASTRUCTURE PROGRAM
BUILDINGS AND OTHER STRUCTURES
MULTIPURPOSE / FACILITIES
CONSTRUCTION OF MULTI-PURPOSE BUILDING
AT CABIDIAN, MABINI, BOHOL
REVIEWED:
6 in x 2 in x 2mm @ 700mm O.C. CEE PURLIN
2- 63mm x 63mm x 6mm ANGLE BAR (TOP & BOT. CHORD)
2- 50mm x 50mm x 6mm ANGLE BAR (WEB MEMBER)
Prepainted Metal Sheets (Rib Type, Long Span)
16mmØ ROUND BARS CROSS BRACING
WITH 16mm STD. TURNBUCKLES
12mmØ ROUND BARS SAGROD (STAGGERED)
STEEL STRUT 1
STEEL STRUT 2
BEAMS AND COLUMNS PROVIDED W/ PAINTING
MATERIALS
4"X4" ANGULAR CLEATS
5000
5000
5000
17000
A B
1000
16000
FASCIA FRAME FASCIA FRAME
FA
SC
IA
F
RA
ME
FA
SC
IA
F
RA
ME
FA
SC
IA
F
RA
ME
FA
SC
IA
F
RA
ME
FA
SC
IA
F
RA
ME
FA
SC
IA
F
RA
ME
ST
-1
ST
-1
ST
-1
ST
-1
ST
-1
ST
-1
ST
-2
ST
-2
ST
-2
1000
TRUSS 1 TRUSS 1
TRUSS 1 TRUSS 1
TRUSS 1 TRUSS 1
TRUSS 1 TRUSS 1
150mm x50mm x 20mmx 2mm - CEE PURLINS
SPACE @ 700 O.C.
12mmØ ROUND BARSAG ROD
(3-LINES EVERY BAY"STAGGERED")
16mmØ BAR CROSSBRACING
1
7
0
0
5700
2
DETAIL-A
SEE ST-2 DETAIL
SEE DET. B
SEE DET.C
700
COLUMN 1 COLUMN 1
16450
2 - 63x63x6mm
2 - 50x50x6mm
9947.39
800
9947.39
3745
1
1
16000
7
0
0
3000
800 800 800 800 800 800 800 800 800
713 713
SEE ST-1 DETAIL
SEE DET. D
3745
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE VII
BOHOL 3RD DISTRICT ENGINEERING OFFICE
GUINDULMAN, BOHOL
SHEET CONTENTS: DRAFTED: SUBMITTED: RECOMMENDED:
APPROVED:
TEOTIMO C. BAGHUCAN
CHIEF,PLANNING AND DESIGN SECTION
DATE: DATE:
MAGITING A. CRUZ
DISTRICT ENGINEER
DATE:
SET NO. SHEET NO.
9
DATE:
GUMER M. CASTILLO, ASEAN Eng.,DPA
ASSISTANT DISTRICT ENGINEER
LOUIEL IAN R. LOMOTOS
ENGINEER II
CARINA L. ABREA
ARCHITECT II
PREPARED:
6
ROOF FRAMING PLAN
NTS
ELEVATION OF TRUSS-1
NTS
SAMPLE PERSPECTIVE
NTS
MARK ANTHONY B. BUAL
ENGINEER I
PROJECT NAME AND LOCATION:
C.Y.2021 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
LOCAL PROGRAM
LOCAL INFRASTRUCTURE PROGRAM
BUILDINGS AND OTHER STRUCTURES
MULTIPURPOSE / FACILITIES
CONSTRUCTION OF MULTI-PURPOSE BUILDING
AT CABIDIAN, MABINI, BOHOL
REVIEWED:
CONN.DETAIL SAG ROD
DETAIL PURLIN CONNECTION
SAGROD DETAIL
6"x2"x2.0 PURLIN
TOP OF
TRUSS
TECKSCREW WITH NEOPRENE
WASHER
Prepainted Metal Sheets
(Rib Type, Long Span)
BENT P 4mm THK
x140 x 100 LEG x 50 LEG
(FILLET WELD TO TOP CHORD AND
BOLT TO PURLINS) OF STL FRAME
TOP CHORD
12mm THICK
BUCKLE PLATE
150
50 150
20
0
50
10
05
0
PURLIN DETAIL
6 in x 2 in x 2mm CEE
PURLIN
12mmØ SAG ROD
w/ NUT & WASHER
TOP CHORD
12mmØ SAG ROD
w/ NUT & WASHER
Cleats Must be: 100mmx100m ANGLE BAR
(4"x4" ANGLE BAR)
600
1000 1000 1000 1000 1000 1000 1000
400
500500500500500500
820
1000 1000 1000 1000 1000 1000 1000
1
2 - 50x50x6mm
2 - 38x38x6mm
2
1
1
1
1
2 2 2 222
1
2 - 50x50x6mm
2 - 38x38x6mm
2
1
1
1
1
222 2 2 2
1
1 - 38x38x4.5mm
1
1
1 1 1 111
REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE VII
BOHOL 3RD DISTRICT ENGINEERING OFFICE
GUINDULMAN, BOHOL
SHEET CONTENTS: DRAFTED: SUBMITTED: RECOMMENDED:
APPROVED:
TEOTIMO C. BAGHUCAN
CHIEF,PLANNING AND DESIGN SECTION
DATE: DATE:
MAGITING A. CRUZ
DISTRICT ENGINEER
DATE:
SET NO. SHEET NO.
9
DATE:
GUMER M. CASTILLO, ASEAN Eng.,DPA
ASSISTANT DISTRICT ENGINEER
LOUIEL IAN R. LOMOTOS
ENGINEER II
CARINA L. ABREA
ARCHITECT II
PREPARED:
7
DETAIL OF STRUT-1
NTS
DETAIL OF STRUT-2
NTS
AS SHOWN
FASCIA FRAME DETAILS
NTS
MARK ANTHONY B. BUAL
ENGINEER I
PROJECT NAME AND LOCATION:
C.Y.2021 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
LOCAL PROGRAM
LOCAL INFRASTRUCTURE PROGRAM
BUILDINGS AND OTHER STRUCTURES
MULTIPURPOSE / FACILITIES
CONSTRUCTION OF MULTI-PURPOSE BUILDING
AT CABIDIAN, MABINI, BOHOL
REVIEWED:
DETAIL B
75
0
300
70
30
53
05
70
70 160 70
10
4
47
6mm THK
GUSSET PLATE
6 - Ø 16mm
BOLTS A 36
2 - 12mm THK
GUSSET PLATE
2 - 12mm THK
GUSSET PLATE
RIDGE ROLL
2 - ∠ 65x65x 6mm BAR TOP
& BOT. MEMBER
2 - ∠ 65x65x 6mm
BAR TOP & BOT. MEMBER
150mm x 65mm x 20mm x 2mm
CEE PURLIN
Prepainted Metal Sheets
(Rib Type, Long Span)
2 - ∠ 50x50x 6mm
WEB MEMBERS
200
15
0
2 - ∠ 50x50x 6mm
WEB MEMBERS
.
2 - ∠ 65x65x 6mm
BAR TOP & BOT. MEMBER
15
0
200
2 - ∠ 65x65x 6mm
BAR TOP & BOT. MEMBER
2 - ∠ 50x50x 6mm
WEB MEMBERS
.
8mm thk. GUSSET PLATE
8mm thk.
GUSSET
PLATE
60
0
75
0
60
0
DETAIL C
DETAIL A
4 - 20mmØ ANCHOR BOLTS
STEEL TRUSS
450 x 350mm x 16mm thk.
BASE PLATE
FULL WELD
ON TRUSS
FULL WELD
ON PLATE
120
70 385mm x 220mm x 8mm
thk. GUSSET PLATE
450 x 350mm x 16mm thk.
BASE PLATE
450
185
220
150
4 - 20mmØ ANCHOR BOLTS
GUTTER DETAIL
T
R
U
S
S
T
O
P
C
H
O
R
D
TRUSS BOT. CHORD
6''x 2''x 2mm CEE PURLINS
BASKET STRAINER
0.60mm (BMT)
PREPAINTED GUTTER
(0.65mm TCT)
1-38mm x 38mm x 4.5mm thk. -
ANGLE BAR FASCIA FRAME
with 400mmx0.50mm STEEL PLATE FASCIA
4''PVC DOWNSPOUT
200
REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE VII
BOHOL 3RD DISTRICT ENGINEERING OFFICE
GUINDULMAN, BOHOL
SHEET CONTENTS: DRAFTED: SUBMITTED: RECOMMENDED:
APPROVED:
TEOTIMO C. BAGHUCAN
CHIEF,PLANNING AND DESIGN SECTION
DATE: DATE:
MAGITING A. CRUZ
DISTRICT ENGINEER
DATE:
SET NO. SHEET NO.
9
DATE:
GUMER M. CASTILLO ASEAN Eng.,DPA
ASSISTANT DISTRICT ENGINEERLOUIEL IAN R. LOMOTOS
ENGINEER II
CARINA L. ABREA
ARCHITECT II
PREPARED:
8
AS SHOWN
MARK ANTHONY B. BUAL
ENGINEER I
PROJECT NAME AND LOCATION:
C.Y.2021 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
LOCAL PROGRAM
LOCAL INFRASTRUCTURE PROGRAM
BUILDINGS AND OTHER STRUCTURES
MULTIPURPOSE / FACILITIES
CONSTRUCTION OF MULTI-PURPOSE BUILDING
AT CABIDIAN, MABINI, BOHOL
REVIEWED:
DETAIL D (TRUSS TO COLUMN CONNECTION DETAIL)
5000
5000
5000
A B
3
2
1
4
REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE VII
BOHOL 3RD DISTRICT ENGINEERING OFFICE
GUINDULMAN, BOHOL
SHEET CONTENTS: DRAFTED: SUBMITTED: RECOMMENDED:
APPROVED:
TEOTIMO C. BAGHUCAN
CHIEF,PLANNING AND DESIGN SECTION
DATE: DATE:
MAGITING A. CRUZ
DISTRICT ENGINEER
DATE:
SET NO. SHEET NO.
9
DATE:
GUMER M. CASTILLO ASEAN Eng.,DPA
ASSISTANT DISTRICT ENGINEERLOUIEL IAN R. LOMOTOS
ENGINEER II
CARINA L. ABREA
ARCHITECT II
PREPARED:
9
AS SHOWN
MARK ANTHONY B. BUAL
ENGINEER I
PROJECT NAME AND LOCATION:
C.Y.2021 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
LOCAL PROGRAM
LOCAL INFRASTRUCTURE PROGRAM
BUILDINGS AND OTHER STRUCTURES
MULTIPURPOSE / FACILITIES
CONSTRUCTION OF MULTI-PURPOSE BUILDING
AT CABIDIAN, MABINI, BOHOL
REVIEWED: