reportes de aceite 05hrs 10-09-2014

5
3.3 3.8 39.0 91 605 24 24 24 24 3.8 2.3 4- 2.7 24 610 89 63 24 24 24 24 2.0 0 2.6 84 24 2.6 89 89 38.0 VTP % VPG 39.0 2.6 62 61 2.6 2.5 39.0 81 TEMP (°C) PCD/Kg. 89 TREN-A 38.0 Hrs. OP'N 24 3.1 598 40.0 39.0 3.5 566 55 43 1.8 5.5 1.8 TEMPORAL EDO. P. DESC. (Kg/cm2) P. SUCC. (Kg/cm2) 39.0 79 538 FECHA: 05:00 HRS. Hrs. REP 81 DISP. OPDO. 26 10- CENTRO DE PROCESO ABKATUN-"A" 53 Hrs. MTTO. Hrs. DISP (kg/cm²) 35 --- (°C) kg/cm2 46 OPDO. 14.0 DISP. (°C) 1- F/O´P 50 5.5 °C 43 5.3 kg/cm 2 TBB No. (kg/cm²) OPDO. DISP. 3- 18.6 (kg/cm²) 2- 3- 1.0 F/O´P OPDO. OPDO. 49 RECT. 1a. PRES. DESP. DE PV RECT. 2a. 1.3 90 2.2 24 3.6 89 598 kg/cm 2 44 OPDO. 596 3.1 551 7- 5.5 PERMNTE. 9- PRESION ANTES DE PV 3114 1.0 IPC-75 42 kg/cm 2 TEMP. SEP. DE PRUEBA TEMPERATURA DE BOMBEO °C TEMP. TANQUE FA-3103-A 2.5 24 32.0 OPDO. PRESION DESPUES DE PV-3114 °C kg/cm 2 8- PRES.TANQUE FA-3103-A 87 TURBOBOMBAS TEMP. 1a. ETAPA No. ARRANQ 566 5- 2.9 73 PRESION DE SEP. DE PRUEBA TEMP. BOMBEO OPDO. OPDO. --- 2- (kg/cm²) PERMANENTE (°C) TEMP. TQ. BAL. 0.9 TREN-B 5- SEP. 1a. ETAPA TEMPORAL 43 (kg/cm²) 6- °C 90 39.0 39 PRES. TQ. BAL. RGA m³/m³ BATERIAS MIÉRCOLES 10 DE SEPTIEMBRE DISP. 257.70659 21666 GAS MANEJADO COMP BPD VOLTAJES (VAC) ABK-C DESC 90 62.0 DESMANTELA 477 HABITACIONAL 461 POZO-77 TRANSFORMADORES 4- % 709 C- 2- INF COMPRESORES 12.2 FA-3151-B OPDO. T°C FA-3151-A 445 6.1 SUCC DISP. 6.7 CDA Kg/cm 2 Kg/cm 2 2.2 Kg/cm 2 CDA Dens. °API 1.0 Kg/Cm² 709 TOT 100 T°C 100 7.5 DESC SUP 5.0 12.6 OPDO. 796 13.4 4.8 BPD MTG-1R PRES. ANTES DE MASICOS=2.5 kg/cm 2 3.6 3.5 3.8 11.0 1.1 0.6 505 TC-SOLAR ASTM- D-3230 1 PRES. EN TP POZO 77 =0.0 Kg/cm 2 C.I. DISP. MTC-101 PRAXIS 6.3 100 AT CRUDO PARA MEZCLA 15:00 0.075 39.3 EM 0.8261 0.075 HORA Peso Esp. A 20/4 °C 0.075 0.075 0.0 METODO 3752 MTC-102 COMP. DISP. OPDO. 6- PCD P. SALIDA ABK-C 0 62.0 3- OPDO. INF °C DISP. MTG-2R 10.0 0.0 DISP. PCD/kg 12.6 %AGUA CENTRIFUG 0.8266 0.075 0.075 39.7 0.075 0.075 0.075 39.3 12:00 09:00 39.1 33.0 506 % VEL. SUCC 687 OPDO No. OPDO. 4.8 AT 0.075 0.0 28,200 0.075 4.7 5- 0.075 69.0 34.0 0 26,808 100 1.0 100 0.0 34.0 35.0 0.075 0.0 06:00 0.075 39.8 DRENAD O TOTAL 26,784 30,048 28,200 71 69.0 6.2 OPDO. 62.0 507 26,890 72 14.5 OPDO. OPDO. 0 0.0 4.7 26,784 0 72 14:00 0 26,890 26,760 0 0.075 93 2.4 75 12.2 792 71 24 100 733 90 COND AL 06:00 0.0 6.2 70 H. REP DISP. 24 401 24 1,553 402 P. SUCC. 2.4 OPDO. COND No. MODULOS 2.5 EDO. 2.1 1,700 R GA- 3153 DISP. 74 459 24 83 430 H. MTTO. H. OP. 24 6.1 P. DESC. 0 B 5.8 A TEMPORAL m³/m³ No. 5.9 TEMPORAL 2 BOCAS 0 1,553 161,855 MEZCLA TEMPORAL ABK-A 157,543 157,650 ACEITE (BPD) ABK-D PERMANENTE PERMNTE. 157,650 PRODUCCIÓN AMP 1,553 GAS (MMPCD) 0 157,543 MED VOLT. 378.0 39.4 H. DISP. 0.00 RGA m³/m³ POL-A ABK-A 24 OPDO. 235,416 235,494 2.4 235,416 LECTURAS GAS IPC-75 QL Qg PSEP RPM GA-3152 C D OPDO. 74 402 TURBOGENERADORES. % VEL. 257.7 4.7 5.6 33.1 DISP. GAS MANEJADO PRAXIS PERMNTE. INSTANTÁNEA (BPD) 125,156 PROMEDIO (BPD) CALIDAD DEL FLUIDO PROM. 235,494 IPC- 75 4.7 0.00 0.00 257.7 26.0 0.00 A OPDO. DISP. 1,600 5.9 24 5.9 0.00 4.8 66 B- 9060 MTTO. CONDICIONES DE OPERACIÓN DESHIDRATADORES TOTAL DISP. 24 24 0 AGUA OPDO. OP'N °API LB/MB FA-3151B FA-3151A F ABK-D SALINIDAD DOS BOCAS B 0.1 26.0 % ESTATICA 235,494 0.0 257.7 257.7 25.9 GAS DE 2a TOT. GAS DE 2a COMP 1.7 EDO. DISP. DISP. TEMP. B A 2BOCAS GAS DE 1a COMP 0 DISP. 1- 62.0 E 283.7 PERM. BPD % (Hrs.) GAS DE 1a TOT. 0.00 PHASE DINAMIC (INTEGRADA) TREN A BPD C CAAN-C TEMPERATURA GA-3154 OPDO. PLANTA CAAN A SEP ABK-B ABK-H 0 3578 R1 45 OPDO. B NG 27,674 Kg/cm 2 3.76 0.075 39.3 0.8257 0.0 32.0 0.075 AL Dens. °API ASTM- D- 3230 %AGUA CENTRIFUGA EM 34.0 36.0 38.8 0.8266 39.2 33.0 11.0 0.0 4,671 39.1 0.8257 39.2 34.0 10.0 0.0 0.0 39.2 ASTM-OUP- 22 EM 39.7 0.8232 18:00 0.075 0.0 0.075 39.8 0.8237 0.075 0.8261 0.075 0.075 0.8261 16:00 28,872 31,176 0 0.075 39.3 32.0 34.0 0.8242 0.0 MAGNÉTI CO 70 Dens. °API AL 39.5 EM ASTM- D- 3230 0.8247 15:00 0.0 0.075 0.0 0.075 0 28,230 0.075 72 0.0 CON PLACAS 0.8232 30,480 32.0 26,808 MASICO POZO 77 0.075 70 25,592 26,784 25,584 28,128 28,128 26,760 71 29,904 0 23,880 21,888 70 28,200 09:00 21,888 29,904 25,584 0.0 0.8250 NIVEL INTERFASE B 33.1 MASICO ABK-C 33.0 DRENADO MASICO 0.075 0.075 TOTAL 30,480 0.0 0.075 0.0 0.075 0 0 72 0 24,432 0 28,872 70 10:00 72 0.075 13:00 70 0 0 24,432 DRENADO PLACA+MAGNETICO SALIDA A 0.075 0.075 0.0 39.3 AT 39.2 0.075 0.0 %AGUA CENTRIFUG 32.0 0.075 31.0 39.3 0.8257 0.075 25,592 26,784 71 28,200 0 0 28,230 0.075 0.075 0.075 Peso Esp. A 20/4°C 35.0 33.0 39.4 36.0 0.0 72 71 0.0 69 74 08:00 0 0 23,880 38.9 0.8276 10.0 10.0 0.0 39.0 11.0 4,077 03:00 0.0 FA-3151-B 0.075 35.0 35.1 0.0 EM %AGUA CENTRIFUG 0.8281 4,219 METODO 3752 HORA 39.0 07:00 ENTRADA 38.8 0.075 Prom 0.8237 12.0 0.0 39.6 11.0 ASTM-OUP- 22 39.4 39.8 00:00 21:00 37.0 34.0 0.0 39.4 #### 0.0 100 0.075 0.0 69 148 0.8257 38.8 NIVEL DE INTERFASE 0.8281 ENTRADA AT CORRIENTES (AMP) 0.075 0.8257 0.075 0.075 0.075 34.0 %AGUA CENTRIFUGA AL 0 PLATAF. TREN B 532.77 DOS BOCAS 0.00 % 14.12 7.0 PERMANENTE A- OPDO. DISP. Kg/cm 2 31 0 GAS TOT. FORM. GAS MANEJADO TOTAL °C MBPD 15.39 GAS DE 1a QUEM DIFERENCIAL AKAL-J 283.7 0.0 MBPD A IXTAL-A 37 69 °C DISP. GAS DE 2a QUEM OPDO. 345.71 AGUA EN OLEODUCTO H2O 36 COMPR.KOBELCO GAS TOT. COMP. 18.8 6.5 % 70 COND. DE OPERACIÓN IPC 75 MED 464 SUP PRESIÓN 187.06 % 45 MTG-C OPDO. 7.1 6.5 SDV-3117 2 0.00 Vol. Agua Drenada 27,674 REP. 3.10 12638 12.8 FA-3151-A 5.1 Kg/cm 2 283.6 PRAXIS PRODUCCIÓN DE CRUDO PARA MEZCLA A BCO. FPSO VIA AKAL-J 235,494 DESHIDRATADORES GAS DE FLUENTA DISP. 0.1 0.00 283.6 D R2 25.9 MBPD 1.7 Kg/cm 2 39.3 PLATAFORMA ABK-F/G 3.1/3.0 PV-0823 31.0 Peso Esp. A 20/4 °C 09:00 VOLUMEN HORA Peso Esp. A 20/4 °C 134 0 % Dens. °API 10.0 0 9 0 SDV-120 PRESIÓN DE LLEG. SALIDA 06:00 10.0 3,970 0.8286 4,066 10.0 0.8276 11.0 204 EB-498-1 4,476 21:00 CAAN- C 12:00 PRODUCTO 10.0 0.8281 0 38.7 0.0 4,688 38.9 0.0 0.8271 39.0 108 1 0.8257 18:00 11.0 00:00 0.8232 0.8257 15:00 EB-498-1 0.8269 39.3 0.8252 POZOS ABK-A ADP-172 4,118 39.4 1,305 0.8242 10.0 12.0 Prom 10.6 0.8252 1,617 4,695 5,025 EB-782 ABK -B 0 0.0 0.0 03:00 0.8252 4,464 10.0 06:00 11.0 39.4 36.0 0.0 11 14 0.0 ENLACE CAAN CAMPO TARAT. TOTAL 12 Rep. 14 0 13 10.0 10.6 0.8271 39.0 1 4 Cdo. 9 3,619 MANIK IXTAL 1 Fluyen ENLACE IXTAL Pozos 16 ABKATUN 2 HORA 0 12:00 10.0 9.0 11.0 AT 1 9.0 1 Peso Esp. A 20/4 °C 09:00 0 6 AL 0 Dens. °API 5 0.0 38.8 4,096 5 3 1 0.0 0.8271 3 3 15:00 10.6 18:00 4,571 16 KANAAB DIAS SIN INCIDENTES IND. 63 47 TARAT. MANIK 0 Prom 3 00:00 0 0.8252 2 21:00 0.0 0 39.3 0.8257 DISP 0 0 0.8267 03:00 0 5 0 0.8281 AFOROS DEL MES ABK-A Acumulados ABKATUN 3 10.0 39.6 11.0 0 0.8257 0.8252 0.8261 0.0 12.0 0.8237 12.0 0.0 CAAN CAMPO No. Diario 0.8252 KANAAB TOTAL ONEL 4,819 4,372 39.1 39.4 11.0 TOTAL 134 62 196 66 2000 A FECHA ULTIMO ACCIDENTE NO 39.7 F/OP 34.0 0.075 * 0 0 209.86 0.0 40 DISP DIAS SIN ACCIDENTES DISP m 3 C DISP B 76 % VALVULA DERRAMES DE HC´S 04/04/2014 NO INCIDENTES 159 OPERACIÓN DE INSTALACIONES 2,204 FECHA ULTIMO INCIDENTE 0 7 ACCIDENTES TG * DISP 0 200 m 3 PERMANENTE 04:00 68 70 71 00:00 72 0 CIAS m 3 * ENLACE 69 69 29,952 69 28,070 PERFORACIÓN 69 01:00 70 30,552 28,070 EXISTENCIA HOY ENCARGADO DE PRODUCCION ING. OBED PABLO CELAYA. DEMANDA SERGIO FIERRO GONZALEZ PROM. 05:00 W 20:00 19:00 68 29,952 28,008 69 68 28/08/2008 0 HABITACIONAL 68 03:00 COMPRESIÓN E 68 DIESEL 70 27,144 GRUAS PEMEX TOTAL 4,978 0.8237 26,664 26,712 EXISTENCIA AYER 18:00 30,048 26,664 31,176 39.5 0.075 12.0 39.4 0.0 28,008 17:00 71 33.4 0.075 0.075 0 0 72 DISP 10.6 0.8249 12.0 0 26,712 26,784 10 10.0 12:00 0 0 0 0.075 69 30,168 #### CONSUMO 7.36 0 70 39.7 0 70 0.0 0.075 70 0.075 0 26,784 ETAPA 0 0.075 28,248 71 * 4,599 11:00 28,248 25,248 40,176 27,984 0 IXTAL 0 217.22 F. PARCIAL 70 0 0 0 0 30,552 0 71 26,880 25,248 29,424 TOTAL 29,568 F. TOTAL ONEL 27,552 70 27,936 0 272 NO TEMPORAL 30,480 31,992 21,192 31,992 0 0 0 0 0 29,568 0 0 69 70 0 68 29,424 0 0 0 21,984 0 30,480 21:00 DISP 69 27,674 30,168 F/OP DISP 27,984 * 69 69 02:00 26,880 40,176 27,144 23:00 22:00 70 27,674 0 0 27,552 27,936 21,192 0 21,984

Upload: aleybagoas

Post on 09-Sep-2015

228 views

Category:

Documents


2 download

DESCRIPTION

Nos da la producción de petróleo crudo de la RMSO PEMEX

TRANSCRIPT

  • 3.3

    3.8

    39.0

    91

    605

    24

    24

    24

    24

    3.8

    2.3

    4-2.7

    24

    610

    89

    63

    24

    24

    24

    24

    2.0

    0

    2.6

    84

    24

    2.6 89

    89

    38.0

    VTP% VPG

    39.0

    2.6

    62

    61

    2.6

    2.5

    39.0

    81

    TEMP (C) PCD/Kg.

    89

    TREN-A

    38.0

    Hrs.

    OP'N

    24

    3.1

    598

    40.0

    39.0

    3.5

    56655

    43

    1.8

    5.5

    1.8

    TE

    MP

    OR

    AL

    EDO.P. DESC.

    (Kg/cm2)

    P. SUCC.

    (Kg/cm2)

    39.0

    79 538

    FECHA: 05:00 HRS.

    Hrs.

    REP

    81

    DISP.

    OPDO.

    26

    10-

    CENTRO DE PROCESO ABKATUN-"A"

    53

    Hrs.

    MTTO.

    Hrs.

    DISP(kg/cm)

    35

    ---

    (C)

    kg/cm2

    46

    OPDO.

    14.0

    DISP.

    (C)

    1-

    F/OP

    50

    5.5

    C

    43

    5.3

    kg/cm2

    TBB No.

    (kg/cm)

    OPDO.

    DISP.

    3-18.6 (kg/cm)

    2-

    3-1.0

    F/OP

    OPDO.

    OPDO.

    49

    RECT. 1a.

    PRES. DESP. DE PV

    RECT. 2a. 1.3

    90

    2.2

    24

    3.6

    89

    598

    kg/cm2

    44

    OPDO.

    596

    3.1

    551

    7-

    TEMPORAL

    5.5 PE

    RM

    NT

    E.

    9-PRESION ANTES DE PV 3114

    1.0

    IPC

    -75

    42

    kg/cm2

    TEMP. SEP. DE PRUEBA

    TEMPERATURA DE BOMBEO C

    TEMP. TANQUE FA-3103-A

    2.5

    24

    32.0 OPDO.PRESION DESPUES DE PV-3114

    C

    kg/cm2

    8-

    PRES.TANQUE FA-3103-A

    87

    TURBOBOMBAS

    TEMP. 1a. ETAPA

    No.

    ARRANQ

    566

    5-

    2.9

    73PRESION DE SEP. DE PRUEBA

    TEMP. BOMBEO

    OPDO.

    OPDO.

    ---

    2-

    (kg/cm)

    PERMANENTE

    (C)TEMP. TQ. BAL.

    0.9

    TREN-B

    5-

    SEP. 1a. ETAPA

    TEMPORAL

    43

    (kg/cm)

    6-C 9039.039

    PRES. TQ. BAL.

    RGA m/m

    BATERIAS

    MIRCOLES 10 DE SEPTIEMBRE

    DISP.

    257.70659

    21666

    GAS MANEJADO COMP

    BPD

    VOLTAJES (VAC)

    ABK-C

    DESC

    90

    62.0

    DESMANTELA

    477

    HABITACIONAL

    461

    POZO-77

    TRANSFORMADORES

    4-

    % 709

    C-

    2-

    INF

    COMPRESORES

    12.2

    FA-3151-B

    OPDO.

    TC

    FA-3151-A

    445

    6.1

    SUCC

    DISP.

    6.7

    CDA

    Kg/cm2

    Kg/cm2

    2.2

    Kg/cm2

    CDA

    Dens.

    API

    1.0 Kg/Cm

    709

    TOT

    100

    TC

    100

    7.5

    DESCSUP

    5.0

    12.6

    OPDO. 796 13.44.8

    BPDMTG-1R

    PRES. ANTES DE MASICOS=2.5 kg/cm2

    3.6

    3.5

    3.8

    11.0

    1.1

    0.6

    505

    TC-SOLAR

    ASTM-

    D-3230

    1

    PRES. EN TP POZO 77 =0.0 Kg/cm2

    C.I. DISP. MTC-101 PRAXIS 6.3 100

    AT

    CRUDO PARA MEZCLA

    15:000.075 39.3

    EM

    0.8261 0.075

    HORAPeso Esp. A

    20/4 C

    0.075

    0.075

    0.0

    METODO

    3752

    MTC-102 COMP.

    DISP. OPDO.

    6-

    PCD

    P. SALIDA ABK-C

    0

    62.0

    3-

    OPDO.

    INF

    C

    DISP.

    MTG-2R

    10.0 0.0

    DISP.

    PCD/kg

    12.6

    %AGUA CENTRIFUG

    0.8266

    0.075

    0.075

    39.7 0.0750.075

    0.075 39.3

    12:00

    09:00

    39.1

    33.0

    506

    % VEL.SUCC

    687

    OPDO

    No.

    OPDO.

    4.8

    AT

    0.075

    0.0

    28,200

    0.075

    4.7

    5-

    0.075

    69.0

    34.0

    0

    26,808

    100

    1.0

    100

    0.0

    34.0

    35.0 0.075

    0.0

    06:00

    0.075

    39.8

    DRENAD

    O TOTAL

    26,784

    30,048

    28,200

    71

    69.0

    6.2

    OPDO.

    62.0

    507

    26,890

    72

    14.5

    OPDO.

    OPDO.

    0

    0.0

    4.7

    26,7840

    72

    14:00

    026,890

    26,760

    0

    0.075

    932.4

    75

    12.2

    792

    71

    24

    100

    733

    90

    COND

    AL

    06:00

    0.0

    6.2

    70

    H. REP

    DISP.

    24

    401

    24

    1,553 402

    P. SUCC.

    2.4

    OPDO.

    CONDNo.

    MODULOS

    2.5

    EDO.

    2.1

    1,700

    R

    GA

    -

    31

    53 DISP.

    74

    459

    24

    83430

    H. MTTO.H. OP.

    24

    6.1

    P. DESC.

    0

    B

    5.8

    ATEMPORAL

    m/m No.

    5.9

    TEMPORAL

    2 BOCAS

    0

    1,553

    161,855

    MEZCLA

    TEMPORAL ABK-A

    157,543

    157,650

    ACEITE (BPD) ABK-D

    PERMANENTE

    PERMNTE.

    157,650

    PRODUCCIN AMP

    1,553GAS (MMPCD)

    0

    157,543

    MED

    VOLT.378.0

    39.4

    H. DISP.

    0.00

    RGA m/m

    POL-AABK-A

    24

    OPDO.

    235,416

    235,494

    2.4235,416

    LECTURAS

    GAS IPC-75

    QL Qg PSEP

    RPM

    GA

    -31

    52

    C

    D

    OPDO. 74402

    TURBOGENERADORES.

    % VEL.

    257.7

    4.7

    5.6 33.1

    DISP.

    GAS MANEJADO PRAXIS

    PERMNTE.

    INSTANTNEA (BPD)

    125,156PROMEDIO (BPD)

    CALIDAD DEL FLUIDO PROM.

    235,494

    IPC- 75

    4.7

    0.00

    0.00

    257.7

    26.0

    0.00

    A

    OPDO.

    DISP.

    1,6005.9

    245.9

    0.00

    4.8

    66

    B-

    9060

    MTTO.

    CONDICIONES DE OPERACIN DESHIDRATADORES

    TOTAL

    DISP.

    24 24

    0

    AGUA

    OPDO.

    OP'N

    API

    LB/MB

    FA-3151BFA-3151A

    F

    ABK-D

    SALINIDAD

    DOS BOCAS

    B

    0.1

    26.0

    %ESTATICA

    235,494

    0.0

    257.7

    257.7

    25.9

    GAS DE 2a TOT.

    GAS DE 2a COMP

    1.7

    EDO.

    DISP.

    DISP.

    TEMP.

    B

    A 2BOCAS

    GAS DE 1a COMP

    0

    DISP.

    1- 62.0

    E

    283.7

    PERM. BPD

    %

    (Hrs.)

    GAS DE 1a TOT.

    0.00

    PHASE DINAMIC (INTEGRADA)

    TREN A

    BPD

    C

    CAAN-C

    TEMPERATURA

    GA

    -31

    54

    OPDO.

    PLANTA CAAN A

    SEP

    ABK-B

    ABK-H

    0

    3578

    R1

    45

    OPDO.

    B

    NG

    27,674

    Kg/cm2

    3.76

    0.075

    39.3 0.8257

    0.0

    32.00.075

    AL

    Dens.

    API

    ASTM- D-

    3230

    %AGUA CENTRIFUGA

    EM

    34.0

    36.0

    38.8

    0.8266

    39.2 33.011.0 0.04,671

    39.1

    0.825739.2 34.010.00.0

    0.0 39.2

    ASTM-OUP-

    22 EM

    39.7

    0.8232

    18:00

    0.075 0.0

    0.075

    39.8

    0.82370.075

    0.8261

    0.075 0.0750.8261

    16:00

    28,872

    31,176

    0

    0.075

    39.3

    32.0

    34.0

    0.8242

    0.0

    MAGNTI

    CO

    70

    Dens.

    API AL

    39.5

    EM

    ASTM- D-

    3230

    0.8247

    15:00

    0.0

    0.075

    0.0 0.075

    0

    28,230

    0.075

    72

    0.0

    CON

    PLACAS

    0.8232

    30,480

    32.0

    26,808

    MASICO

    POZO 77

    0.075

    70 25,592

    26,784

    25,584

    28,128 28,128

    26,760

    71

    29,904

    0 23,880

    21,888

    70

    28,20009:00

    21,888

    29,904

    25,584

    0.00.8250

    NIVEL INTERFASE

    B

    33.1

    MASICO

    ABK-C

    33.0

    DRENADO MASICO

    0.075

    0.075

    TOTAL

    30,480

    0.0

    0.075 0.0 0.075

    0

    0

    72

    0

    24,432

    0

    28,872

    70

    10:00

    72

    0.075

    13:00

    70

    0

    0

    24,432

    DRENADO PLACA+MAGNETICO

    SALIDA A

    0.075

    0.075

    0.0

    39.3

    AT

    39.2

    0.075 0.0

    %AGUA CENTRIFUG

    32.0

    0.075

    31.0

    39.30.8257

    0.075

    25,592

    26,784

    71 28,2000

    0

    28,230

    0.075

    0.075

    0.075

    Peso Esp. A

    20/4C

    35.0

    33.0

    39.4

    36.0 0.0

    72

    71

    0.0 69

    74

    08:00

    00

    23,88038.90.8276

    10.0

    10.0

    0.039.0 11.0

    4,077

    03:00

    0.0

    FA-3151-B

    0.07535.0

    35.1

    0.0

    EM

    %AGUA CENTRIFUG

    0.8281 4,219

    METODO

    3752

    HORA

    39.0

    07:00

    ENTRADA

    38.8

    0.075 Prom

    0.8237

    12.00.0 39.6

    11.0

    ASTM-OUP-

    22

    39.4

    39.8

    00:00

    21:00

    37.0

    34.0 0.0

    39.4 ####

    0.0

    100

    0.075

    0.0

    69

    148

    0.8257

    38.8

    NIVEL DE INTERFASE

    0.8281

    ENTRADA

    AT

    CORRIENTES (AMP)

    0.075 0.82570.075

    0.075

    0.07534.0

    %AGUA CENTRIFUGA

    AL

    0

    PLATAF.

    TREN B

    532.77 DOS BOCAS

    0.00

    %

    14.12

    7.0

    PERMANENTE

    A- OPDO.

    DISP.

    Kg/cm2

    31

    0

    GAS TOT. FORM.

    GAS MANEJADO TOTAL

    C

    MBPD

    15.39

    GAS DE 1a QUEM

    DIFERENCIAL

    AKAL-J283.7

    0.0

    MBPD

    A

    IXTAL-A

    37

    69

    C

    DISP.

    GAS DE 2a QUEM

    OPDO.

    345.71

    AGUA EN OLEODUCTO

    H2O

    36

    COMPR.KOBELCO

    GAS TOT. COMP.

    18.8

    6.5

    %70COND. DE OPERACIN IPC 75

    MED

    464

    SUP

    PRESIN

    187.06

    %

    45

    MTG-C

    OPDO.

    7.1

    6.5

    SDV-3117

    2

    0.00

    Vol. Agua

    Drenada27,674

    REP.

    3.10

    12638 12.8

    FA-3151-A

    5.1 Kg/cm2

    283.6

    PRAXIS

    PRODUCCIN DE CRUDO PARA

    MEZCLA A BCO. FPSO VIA AKAL-J

    235,494

    DESHIDRATADORES

    GAS DE FLUENTA

    DISP.

    0.1

    0.00 283.6

    D

    R2

    25.9

    MBPD

    1.7

    Kg/cm2

    39.3

    PLATAFORMA

    ABK-F/G 3.1/3.0

    PV-0823

    31.0

    Peso Esp. A

    20/4 C

    09:00VOLUMEN

    HORAPeso Esp. A

    20/4 C

    1340

    %

    Dens.

    API

    10.0

    0

    9

    0

    SDV-120

    PRESIN DE LLEG.

    SALIDA

    06:00 10.03,970

    0.8286 4,066 10.0

    0.8276 11.0

    204

    EB-498-1

    4,47621:00

    CAAN- C 12:00

    PRODUCTO

    10.0

    0.82810

    38.7 0.0

    4,68838.9 0.0

    0.8271 39.0

    108

    1

    0.8257

    18:00 11.0

    00:00

    0.8232

    0.8257

    15:00EB-498-1

    0.8269

    39.3

    0.8252POZOS ABK-A

    ADP-172

    4,118

    39.4

    1,305

    0.8242

    10.0

    12.0

    Prom 10.6

    0.8252

    1,617 4,695

    5,025

    EB-782

    ABK -B

    0

    0.0

    0.0

    03:00

    0.8252

    4,464

    10.0

    06:00

    11.0

    39.4

    36.0

    0.0

    11

    14

    0.0

    ENLACE

    CAAN

    CAMPO

    TARAT.

    TOTAL

    12

    Rep.

    14

    0

    13

    10.0

    10.6

    0.8271 39.01

    4

    Cdo.

    9

    3,619MANIK

    IXTAL

    1

    Fluyen

    ENLACE IXTAL

    Pozos

    16

    ABKATUN

    2

    HORA

    0 12:00 10.0

    9.0

    11.0

    AT

    1 9.01

    Peso Esp. A

    20/4 C

    09:000

    6

    AL0

    Dens.

    API5

    0.038.8 4,096

    5

    3

    1

    0.0

    0.8271

    3 3

    15:00

    10.6

    18:00 4,571

    16

    KANAAB

    DIAS SIN INCIDENTES IND.

    63 47

    TARAT.

    MANIK 0

    Prom

    3

    00:00

    0

    0.8252

    2

    21:00

    0.0

    0

    39.30.8257

    DISP0

    0

    0.8267

    03:00

    0

    5

    0

    0.8281

    AFOROS DEL MES ABK-A

    Acumulados

    ABKATUN

    3 10.0

    39.611.0

    0

    0.8257

    0.8252

    0.82610.0

    12.0 0.823712.0 0.0

    CAAN

    CAMPO No. Diario

    0.8252

    KANAAB

    TOTAL

    ONEL

    4,819

    4,37239.1

    39.4

    11.0

    TOTAL

    134

    62

    196

    66

    2000A

    FECHA ULTIMO ACCIDENTE

    NO

    39.7

    F/OP

    34.0

    0.075

    *

    0 0

    209.86

    0.0

    40

    DISP

    DIAS SIN ACCIDENTES

    DISP

    m3

    C DISP

    B

    76

    % VALVULA

    DERRAMES DE HCS

    04/04/2014

    NO INCIDENTES

    159 OPERACIN DE INSTALACIONES

    2,204

    FECHA ULTIMO INCIDENTE

    0 7

    ACCIDENTES

    TG

    *DISP

    0

    200

    m3

    PERMANENTE

    04:00

    68

    70

    71

    00:00

    72

    0

    CIAS

    m3*

    ENLACE

    69

    69

    29,952

    69

    28,070

    PERFORACIN

    69

    01:00

    70 30,552

    28,070

    EXISTENCIA HOY

    ENCARGADO DE PRODUCCION

    ING. OBED PABLO CELAYA.

    DEMANDA

    SERGIO FIERRO GONZALEZ

    PROM.

    05:00

    W

    20:00

    19:00

    68

    29,952

    28,008

    69

    68

    28/08/2008

    0

    HABITACIONAL 68

    03:00

    COMPRESIN

    E

    68

    DIESEL

    70

    27,144

    GRUASPEMEX TOTAL

    4,978 0.8237

    26,664

    26,712

    EXISTENCIA AYER 18:00

    30,048

    26,664

    31,176

    39.5 0.075

    12.039.4

    0.0

    28,00817:00

    71

    33.4

    0.075 0.075

    0

    072

    DISP

    10.6 0.8249

    12.0

    0

    26,712 26,784

    10

    10.0

    12:00

    00

    0

    0.075

    69

    30,168

    ####

    CONSUMO

    7.36

    070

    39.7

    070

    0.0

    0.075

    70

    0.075

    0

    26,784

    ETAPA

    0

    0.075

    28,248

    71

    *

    4,599

    11:00

    28,248

    25,248

    40,176

    27,984

    0

    IXTAL

    0 217.22F. PARCIAL

    70

    0

    0

    0

    0

    30,552

    0

    71

    26,880

    25,248

    29,424

    TOTAL

    29,568F. TOTALONEL

    27,552

    70

    27,936

    0

    272

    NO

    TEMPORAL

    30,480

    31,992

    21,192

    31,992

    0 0

    0

    0 0 29,568

    0

    0

    69

    70

    0

    68

    29,424

    0

    0

    0

    21,984

    0

    30,480

    21:00

    DISP

    69

    27,674

    30,168F/OP

    DISP

    27,984

    *

    69

    6902:00

    26,880

    40,176

    27,144

    23:00

    22:00

    70 27,6740

    0

    27,552

    27,936

    21,192

    0

    21,984

  • OBSERVACIONES Y/O COMENTARIOS

    GRAFICAS MENSUALES

    CENTRO DE PROCESO ABKATUN-"A" FECHA: 05:00 HRS.MIRCOLES 10 DE SEPTIEMBRE

    300.0

    350.0

    400.0

    450.0

    500.0

    550.0

    600.0

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

    GAS (MMPCD)

    AGOSTO

    156,500

    157,000

    157,500

    158,000

    158,500

    159,000

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

    ACEITE (BPD)

    AGOSTO

    1.00

    6.00

    11.00

    16.00

    21.00

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

    PERM. TREN A

    PERM. TREN B

    TEMP. TREN A

    TEMP. TREN B

    AGOSTO

    0.10

    0.20

    0.30

    0.40

    0.50

    0.60

    0.70

    0.80

    0.90

    1.00

    1.10

    1.20

    1.30

    1.40

    1.50

    1.60

    1.70

    1.80

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

    GAS QUEMADO (MMPCD)

    JULIO

    0

    50,000

    100,000

    150,000

    200,000

    250,000

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

    CLM ENV. A LA RMNE (BPD)

    AGOSTO

    0.1

    5.1

    10.1

    15.1

    20.1

    25.1

    30.1

    35.1

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

    SALINIDAD (LB/MB)

    AGOSTO

    PHASE DINAMIC

    (%H2O INTEGRADA)

    IPC-75 CIA. TURBO-CONTROL.- ADQUISICIN DE 4 SISTEMAS DE GAS FUEGO PARA LAS TURBOBOMBAS DEL IPC 75 ABK-A PERMANENTE, INCLUYE DESMANTELAMIENTO, INSTALACIN, COMISIONAMIENTO, ADIESTRAMIENTO Y PUESTA EN OPERACIN" AVANCE =19.5% TBB-9 05:30 HRS. ENTRA EN OPERACION CON CARGA. TBBA-8 05:40 HRS. SALE DE OPERACION EN PARO PROGRAMADO. PERMANENTE TBB-3 09:25 HRS.SALE DE OPERACION EN PARO PROGRAMADO. TBBA-03 09:44HRS. ENTRA EN OPERACION CON CARGA. MTC-101 15:05HRS SALE DE OPERACION EN PARO PROGRAMADO,QUEDANDO EN MANTO. CORRECTIVO. CORRIGE FALLA ENTRA EN OPERACION CON CARGA GRUA L/E- 15:00 HRS SALE DE OPERACION POR COLOCACION DE ANDAMIOS PARA MANTO. A PENDANTES PERFORACION GRUA 15:00 HRS. CONCLUYE MANTO. A PENDANTES. 19:00 HRS. QUEDA DISPONIBLE HABITACIONAL GRUA. 13:30 F/OPN. POR MANTO A GANCHO PRINCIPAL(WARNER) 17:00 HRS. COCLUYE MANTTO. QUEDA DISPONIBLE DESHIDRATACION CIA. MMM CONTINUA MANTTO. ANTICORROSIVO A BASE DE DESHIDRATADORES. 86% 22:00 HRS. FALLA EN EL MONITOREO DEL SISTEMA DE MEDICIN DE SALMUERA (PLACA Y MAGNETICO) . ABK-H K-125 CIA. CENTRAL EP-01 (PROGRAMA: CAMBIO DE MAV, CAMBIO SSSV , CONVERSION A BN, ESTIMULACION) 04:00 A 16:00 HRS. EN ESPERA DE EMBARCACION PARA BAJAR EQUIPOS Y MATERIAL PARA CONTINUAR CON PROGRAMA DEL POZO KANNAB-125. 16:00 A 21:30 HRS. BAJA TF A EMBARCACION EFECTUA ENGRACE DE VALVULA DE 62 600# Y BBEAN 63 BLS DE LODO FAP 21:30 A 22:00 HRS. CIA. BAKER CIERRA VALVULA DE TORMENTA ,. PERSONAL DE FMC INSTALA VALVULA TIPO H 22:00 A 04:00 HRS. DESMONTAN CRUCETA DE TRABAJO RECORRIDO SPARRAGOS A 1/2 ARBOL PARA RETIRAR MISM O AVANCE 30% LLEGADA DE BN=125 KG/CM TEMP=26C Q INY BN GRAL= 2.99 MMPCD LLEGADA TARAT L-1= 9.2 KG/CM TEMP=26C. SALIDA = 9.2Kg/CM TEMP=46C. CIA. CALDIVE: (26/08/14) EFECTUA PRUEBA DE APERTURA Y CIERRE DE SDV-2100 DE LA LLEGADA DE BN DE LA LLEGADA DE BATAB S/EXITO, SE DEJA EN OPERACION MANUAL AVANCE=65%. ONEL-A POZO-11. PAE PANUCO (PROGRAMA: PERFORACIN A 4623 M) 04:00 A 16:00 HRS. BAJA CORONA PVC DE 8 1/2" CON BARIL MUESTRERO DE 6 3/4" BAJANDO A 3678MTS. 16:00 A 19:00 HRS.BAJAN A 3840 MTS. DONDE CORTA NUCLEO DE 3840 MTS. A 3849 MTS. 19:00 A 04:00 HRS. LEVANTAN CORONA DE 8 1/2 DE 3849 MTS. A 479 MTS. LLENANDO E.A. CADA 5 LINGADAS SIG. OPN. BAJAR A RECUPERAR NUCLE. NOTA. CIA. EMERSON INSTALA INHALAMBRICA PARA MONITOREAR PARAMETROS DE POZO DE CONSOLA BAKER Y SEPARADOR DE PRUEBA AL 100 %. POZO 23.- (05-09-14) 20:15 HRS. SE AMPLIA POZO DE 2 1/4" A 2 1/2 " TP= 40.3 kg/cm2 BJTE=28.3 kg/cm TEM= 97C EST. 2 1/2" P.FDO-279.4 Kg/cm2 T.FDO-123.4 C POZO 2.- 10:45-11:00 HRS. SE AMPLIA 3RA BAJANTE 3/4" A 1" PTP= 40.9 KG/CM2 PBJATE. 28.3 TEMP. 89c CAAN-A PROYECTO REDUCCIN DE CONTRAPRESIN CIA. SCHLUMBERGER. % DE AGUA EN POZOS. POZO-34: 34% , POZO-52: 60%, POZO-56: 46%, POZO-72: 36%, 76-D:52% P SALIDA CAAN-C= 10.2 KG/CM2. TEMP=90C. PSALIDA CAAN-1= 6.5 KG/CM2 TEM=89C. CIA. INVENSYS.- HABILITANDO TUBERIA CONDUIT PARA SIST. PARO POR EMERGENCIA AVANCE=90.0%. SEMI-1 POZO 31.- (PROGRAMA: TOMA DE INFORMACION, ANCLAR TAPON MECANICO A 3910, REDISPARAR 3853-3873, ESTIMULACION Y LIMPIEZA) CONTINUA EN ACOPIO DE MATERIALES. 16:00 A 04:00HRS. EN ESPERA DE PERSONAL DE URE FOLIO=26 SERVICIO A POZOS CIA. MMM AVANCE: 19.55% FOLIO- 28 PBS. NO DESTRUCTIVAS A SEP Y LINEAS AVANCE-18.75% FOLIO- 29 REAVILITACION DE MUELLES AVANCE-17.54%. IXTAL- A POZO-5 COND. 02 04:00 A 16:00HRS. LEVANTA SARTA A SUPERFICIE Y ELIMINA MISMA. ARMA URE AL 100%. REALIZAN REGISTROS DE SATURACION DE 4020MTS A 4010MTS. SIG. OPN. REALIZAR REGISTROS AL 100%. 16:00 A 04:00 HRS. BAJAN SONDA DE URE A 3500 MTS. OBSERVANDO PERDIDA DE SEAL INTENTAN RESTABLECER S/EXITO SUSPENDE REGISTRO IXTAL - B EQUIPO 4042 POZO-69 C-3 (PROGRAMA: CAMBIO DE MAV, LIMPIAR SSSV, TOMA DE INFORMACION, ESTIMULACION Y LIMPIEZA) 04:00 A 16:00 HRS. EN ESPERA DE LIBRANZA PARA ENTREGAR POZO. POZO 83.- Ptp= 27.6 Kg/Cm Pbte=24.6 Kg/Cm TEM=76C. EST. 1" PTR= 83.0 KG/CM2. PSAL= 24.2 KG/CM2. TEM=90C. TARAT-TF POZO 52 A/E JHON SANDIFER (PROG: PBA. DE HERMETICIDAD A MAV Y SSSV, TUBING PUNCHER A 2900 MD, CALIBRACIN, ESTIMULACION Y LIMPIEZA) 04:00 A 12:30HRS. CON PERSONAL DE SLB DESFOGA PRESION DE 200 PSI A 0. ELIMINA HTAS TROQUELADOR DE 2 1/2" Y ARMA HTAS ENSAMBLE DE CAJA DE 2 7/8" CON CONECTOR DE ROLL-ON DE 1 1/2" Y TF DE 1 1/2". 12:30 A 16:00HRS. CON PERSONAL DE PEMEX ALINEA POZO Y BAJA TF DE 1 1/2" CON HTA DE 2 7/8" OBSERVANDOSE RESISTENCIA FRANCA A 18MTS. Y TRABAJA SARTA EN 3 16:00 A 04:00 HRS. CONTINUAN TRABAJANDO POZO POR ENCONTRAR RESISTENCIA A 18 M. TRABAJAN TROQUELADOR DE 2" LOGRANDO VENCER RESISTENCIA SIG. OPN. BAJAR CON GET BLASTER A 120 M. POZO DL-1. Ptp=16.0 kg/cm Pbte=13.0 kg/cm2 Temp=49c Estr= 3/4". Ptr= 34 Kg/Cm. BN.Q= 1. 1MMPCD. PSAL. 11.8Kg/cm. Temp= 41C. LLEG. BN. 124.8Kg/cm CAAN-TF SEMI-2 POZO 93 (PROGRAMA: ESTIMULACIN E INDUCCIN) CONTINUA CON ACOPIO DE MATERIALES Y EQUIPO FOLIO-66 APOYO A SERAP AVANCE-29.78 % FOLIO-67 MANTTO. A PREVENTIVO AL SEP. PBA. AVANCE: 66.67% FOLI-69 SUSTITUCION DE REGILLA IRVING AVANCE-26.58% PSS- SEMI-2 12:30 HRS. EN TRANSITO HACIA CAAN-A.PARA TRASPALEO DE MATERIALES Y EQUIPO 20:00 HRS. ARRIBA A CAAN -TF PARA CONTINUAR CON TRABAJOS ABK-G POZO -57 Ptp= 8.0 Kg/Cm Pbte= 6.5 Kg/Cm Temp= 82.3C Estr= 1" Psal= 6.1Kg/Cm Temp= 73.1C. Ptr= 32 Kg/Cm TARAT-TD POZO 25 BEN LOYAL (PROGRAMA: LIMPIEZA DE TP, TOMA DE REGISTROS, ESTIMULACIN, CAMBIO DE MAV) 04:00 A 16:00 HRS. SE INSTALA CRUZETA DE TRABAJO Y EN ESPERA DE BARCO CONTRAINCENDIO. 16:00-24:00 HRS.BBEA. BACHE DE SOLVENTE, NVERSPERCERD Y PAD HCL AL 15% ESPERA REPOSO 1 HORA 24:00 A 02:00 DEZPLAZO PRODUCTOS DE LIMPIEZA 02:00 A 04:00 HRS DESMANTELA EQUIPO PANTER E INSTALAN EQUIPO URE AVANCE 40% POZOS TRABAJADOS EN PLATAFORMAS SATELITES ABK-G SE OBSERVA POZO CON PROBLEMA DE DESPLAZAMIENTO EN DUCTO DE TRANSPORTACIN PTR= 32 KG/CM2. CONTINUA POZO OBSERVACIN. ONEL-A SE REALIZAN TRABAJOS DE POZOS DE 09:45 A 10:25HRS. POZO-1 POZO-2 Y POZO-23. IXTAL-A. POZO-88 SE REALIZA TRABAJOS DE POZOS DE 11:00 A 11:30 HRS. POZO-34. SE REALIZAN TRABAJOS DE POZOS DE 11:30 A 12:00 HRS. CAAN-A. SE TRABAJA POZO-34 DE 14:05 A 14:30 HRS. POZO-72 SE TRABAJA POZO DE 14:30 A 15:00 HRS. POZO-74 SE TRABAJA DE 15:00 A 15:20HRS. ACTIVIDADES REALIZADAS EN SATELITES POR AYUDANTES "C" IXTAL-B AYUDANTE "C".- IRVN GUILLN BLANCO SEGUIMIENTO DEL POZO-83 , TOMA DE PRESIONES CADA HORA , SE TRASLADA A MANIK- PARA DESMONTAJE DE ESTRANGULADORES ABK-H AYUDANTE "C".- CRISTOBAL GARCIA JIMENEZ ING. ENRIQUE MENDOZA MENDOZA PASANDO CONDICIONES CADA HR. RECUPERANDO MUESTRAS.MANIPULANDO VALVULAS, LIMPIEZA TARAT-TF AYUDANTE "C".- ARTURO GUILLEN CUSTODIO SEGUIMIENTO DEL POZO DL1 TOMANDO PARAMETROS CADA HR, MUESTRE DE POZOS, PASANDO REPORTE CADA HR. DEL POZO-52 CAAN-A AYUDANTE "C".- RICARDO A. SOLER. TRABAJANDO POZO 76-D, MONITOREO CONSTANTE DE PRESIONES, RECUPERA MUESTRAS, SUPERVISA TRABAJOS CIA.MMM IXTAL-A AYUDANTE "C".- ARMANDO GARCIA E ING. DANIEL GMEZ HERNANDEZ CAMBIO DE GRAFICAS, TOMA DE MUESTRAS. AFORANDO POZO-47 PASANDO CONDICIONES CADA HR. ONEL-A AYUDANTE "C".- PEDRO RAMON E ING: JESUS DANIEL MORALES HERTEWING LIMPIEZA SEPARADOR DE PRUEBA, MONITOREO DE PRESONES CADA HR.TOMANDO MUESTRAS CADA 4HRS.AFORO POZO-23, TRABAJA POZOS. TARAT-TD AYUDANTE "C".- JONATHAN CORDERO MONITOREO DE PRESIONES CADA HR. ENTREGA POZO-25 A RTP. RECUPERA MUESTRAS. CAAN- TF AYUDANTE "C" CANDIDO VALENCIA BOLON SUPERVISION DE TRABAJOS CALIENTES A CIA MMM ,SEGUIMIENTO AL POZO-93 CADA HR. TOMA DE MUESTRAS, RECORRIDO CON EL ING. MARCO

    SE SOLICITA ENVIEN VALVULAS DE AGUJA Y PASO COMPLETO , ASI COMO NIPLES DE 1/2" Y 3/4 PARA

  • 5.5 kg/cm PEMEX CIAS. TOTAL

    20.8 kg/cm 174 65 239

    23.1 kg/cm PARCIAL TOTAL

    20.3 kg/cm 197 42 239

    8.0 kg/cm

    5.3 kg/cm

    6.8 kg/cm BATAB (BN) 3

    5.9 kg/cm CHUC (BN) 16

    5.1 kg/cm FLUYENTES 22

    EN REP'N 1

    16.1 kg/cm

    bpd CDO. kg/cm POL-A 161,855 bpd

    bpd 16.1 kg/cm ABK-D 125,156 bpd

    MMpcd 16.4 kg/cm ABK-A 157,543 bpd

    MMpcd CDA kg/cm TOTAL 444,554 bpd

    MMpcd 15.3/80 kg/cm

    MMpcd 32.0 % TREN-A 1.73 2800

    MMpcd 12.0 kg/cm TREN-B 1.69 2739

    GAS DE BAJA GENERAL 24.200 NIVEL DEL SEP.

    GAS DE BAJA A COMPRESION 24.200

    0.000 P. SALIDA GAS

    GAS DE ALTA AL QUEM. 0.000 P/SEP. TEMP. PHASE DYNAMICS

    P. SALIDA OLEO

    GAS DE BAJA AL QUEMADOR

    INSTANTNEA 162,096 LLEG. HOMOL-A 1

    GAS DE ALTA GENERAL 161.356 LLEG. HOMOL-A 2

    GAS DE ALTA A COMPRESION 161.356 LLEG. TUMUT- A

    SIST. DE PARO POR EMERGENCIA MANUAL

    PRODUCCION

    PROMEDIO 161,855 LLEG. CHUC-1

    LLEG. CHUC-B

    PRESIN ANTES FISHER 38.5 68.0 LLEG ABK- A

    42PRESIN DESPUS FISHER 9.0 37.2 LLEG. POL- B

    RECTIFICADOR 1a. 5.9 62.0 LLEG. POL-D POZOS PRODUCTORES

    RECTIFICADOR 2a. 2.1 60.0 BATAB-A-1-A

    SEPARADOR 1a. ETAPA 61.0 SAL/ABK-D

    SEPARADOR 2a. ETAPA

    6.4

    62.0 LLEG. CHUC-12.4

    CABEZAL DE BAJA 5.0 46.0 LITORAL ENLACE 36"

    CENTRO DE PROCESO POL-A. MIERCOLES 10 DE SEPTIEMBRE DEL AO 2014 05:00

    HRS.

    CABEZAL GENERAL Y BATERIA DE SEPARACIN PRESIN DE LLEGADAS/SALIDAS EN POL-APERSONAL ABORDO

    Presion(kg/cm) Temp. (C) SALIDA D.B. L-3

    P. CABEZAL GENERAL 7.0 61.0 LLEG. O-U-K 24"

    MMpcd 15.3 kg/cm % AGUA BLS

    MMpcd 157.638 BPD

    MMpcd ABKN-I COND. MANTTO. H2O DB 3.50 %

    GAS TOT. QUEMADOR 0.000

    0.000 P. SALIDA GAS

    GAS TOT. BATERIA 185.556

    GAS DE BAJA AL QUEMADOR

    GAS TOTAL A COMPRESION 185.556

    MEDICION SEP. REMOTO LABORATORIO

    MMpcdTC-1A DISPONE 24 VOLUMEN 5665 bpd

    MMpcdTC-1B OPERANDO 24 SALINIDAD 99783 PPM

    MMpcdCAMPO PRESIN QtBN

    MMpcdCHUC 127.60 19.22 MMPCD POZOS 158/77

    /196/178 0.0 kg/cm

    M3/M3BATAB 127.00 7.12 MMPCD VOLUMEN 14,386 BLS

    ABKH/ TARAT 125.50 3.88 176,241 BLS

    EQ. ESTADO OPERA DISP. REP. MANTTO DISPAR. ARRANQ. P.SUCC P/DES VPG V BBA T c Sale de op'n Entr en op'n

    TB-1 DISPONIBLE 24 30-ago-1901 15-ago-2014

    TB-2 OPERANDO 24 2.8 39.0 10707 2888 714 15-ago-2014 15-ago-2014

    TB-3 OPERANDO 24 2.8 39.0 10530 2843 727 28-ago-2014 28-ago-2014

    TB-5 OPERANDO 24 2.8 39.0 10637 2858 702 26-ago-2014 15-ago-2014

    COND SUCC DESC % CARGA A

    OPERANDO 4.55 63.1 100.0 87.67 MMpcd B

    OPERANDO 4.92 63.8 100.0 110.45 MMpcd

    OPERANDO 4.25 63.1 100.0 100.70 MMpcdUBICACIN W E 1 2 3

    OPERANDO 4.60 63.1 100.0 106.54 MMpcd REPARACION DISPONIBLE OPERANDO F/OPN DISPONIBLE

    405.36 MMpcd N/E REPARACION DISPONIBLE

    DESC %VEL DISPONIBLE N/E DIESEL 54,591 M3

    AGUA M3

    SEPTIEMBRE HOY ACUM

    BATAB 0 0

    POL 0 0

    CHUC 0 26

    CHUHUK 0 2

    MOTOCOMPRESOR DE VAPORES HOMOL-CHE 0 9

    Q= INST. Q= PROM KUIL-A 0 10

    ETKAL 0 0

    TOTAL 0 47

    COORDINADOR DE OPERACION ENCARGADO DE PRODUCCION.

    OPERA

    24 HRS. 10.22 10.38 MARTIN SOTO SORIA. LUIS E. PERALES RODRIGUEZ

    C. SOLAR S. PAQUETES DE MEDICIN

    TREN-B 1301

    TREN-A 1300

    TREN-B 1301

    TREN-A 1300

    MUESTREADOR AUTOMATICO

    OPERANDO

    OPERANDO AFOROS MENSUALES

    OPERANDO

    F/OPN

    TEMPORALTOTAL MANEJADO.

    No. ENLACE

    COMP. ATLAS COPCO

    2 G R A S COMPRESORES DE TEMPORAL

    3

    4 COMPRESION

    DISPONIBLE

    MOTOGENERADORES DE RENTAMDULOS TURBOGENERADORES

    1 TG-2

    OPERANDO

    DISPONIBLE

    No. GAS MANEJADO TG-1 DISPONIBLE

    RGA. 232.51

    PRODUCCION TOTAL

    GAS DE B N. TOTAL 25.730

    GAS TOT. FORMACION. 185.556

    GAS DEL SEP. REMOTO 161.231

    GAS TOT. QUEMADOR 0.000

    5000

    6000

    7000

    8000

    9000

    10000

    11000

    12000

    13000

    14000

    15000

    16000

    17000

    18000

    19000

    20000

    21000

    22000

    23000

    140,000

    150,000

    160,000

    170,000

    180,000

    190,000

    200,000

    210,000

    220,000

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

    Ag

    ua

    (b

    pd

    )

    T

    (b

    pd

    )

    Da

    Comportamiento mensual

    PROD. ACEITE (bl/dia) PROD. AGUA (bpd)

    PLATAFORMA HABITACIONAL. MOTOGENERADORES "A Y B" CONTINAN F/OPERACION.

    SISTEMA DE PARO POR EMERGENCIA. (06-09-2014) OPERA EN MODO , MANUAL Y CONTINUA PRESENTANDO FALLA EN TARJETAS DE COMUNICACIN.

    09:00 HRS. SE PASA EN MODO MANUAL POR PRESENTAR DISPARO DEL SISTEMA DE EMERGENCIA. CIA INVENSYS.- (12-08-2014) CONTINUA EN MANTENIMIENTO PREVENTIVO AL SISTEMA DE CONTROL DISTRIBUIDO DEL PROCESO,

    Y TRABAJA EN MANTENIMIENTO DE RESPALDO DE HIM. AVANCE=58% GLOBAL. PLATAFORMA DE TEMPORAL. GRA NICA 16:00 HRS. 18-08-2014. FUERA DE DE OPERACION POR FALLA EN MOTOR (NO ARRANCA).

    PSV-3102"A" DEL SEP. R1. ACTUALMENTE LA VALVULA ESTA BLOQUEADA. CON ACTUADOR MECANICO IMPROVIZADO PERSONAL DE INSTRUMENTOS CONCLUY MANTTO. EN ESPERA DE QUE PERSONAL DE ESTRUCTURAS LA SUSTITUYA, SE REQUIERE DISPONIBILIDAD DE LA GRA DE TEMPORAL

    MUESTREADORES AUTOMATICOS (LECHERAS).- TREN "A" OPERANDO MUESTREADOR RECUPERANDO MUESTRA DE MANERA NORMAL, RECUPERADORA DE MUESTRA DEL TREN "B" CONTINUA FUERA DE OPERACIN.

    PLATAFORMA ENLACE. VLVULA No. 1. 12:30 HRS. SEW CIERRA UN 10% QUEDANDO ABIERTA 40% 12:50 HRS. SE CIERRA DE UN 10% QUEDANDO ABIERTA UN 30%, 13:20 HRS. SE CIERRA UN 5% QUEDANDO ABIERTA UN 25%, 13:25 HRS. SE CIERRA UN 5%

    QUEDA ABIERTO UN 20%, 03:00 HRS. SE ABRE UN 4% QUEDANDO ABIERTA UN 24%, 04:00 HRS. SE ABRE UN 4% QUEDANDO ABIERTA UN 28%.

    PLATAFORMA COMPRESION GRA LADO "W" 05:00 HRS. - CONTINUA FUERA DE OPERACION POR FALTA DE BOMBA HIDRULICA.

    PLATAFORMA BATAB-A

    08:00 A 11:00 HRS. SE TRABAJA POZO 63 POR CONGELAMIENTO DE LINEAS DE B.N. FLUYENDO CON LAS SIGUIENTES CONDICIONES: Ptp = 19 (kg/cm2) Pbaj= 12.5 (kg/cm2) Temp= 23.8 C ESTRANG.= 3/4 Qbn = 1.92 MMMPCD.

    PLATAFORMA CHUC-A. EQ. RIG. 5. POZO 24 COND. No.13. ING. DE OPERACION DE POZOS Y AYUDANTE "C" SUPERVISAN LAS CONDICIONES DE POZO 24 PARA SU ESTABILIZACIN, ACTUALMENTE LAS CONDICIONES

    DEL POZO 24 SON Tp= 18.2 KG/CM2 Pbjte= 16.1 KG/CM2 Temp= 82C Est= 3/4" Tr= 92 Psal= 12.5 KG/CM2. T. SAL. = 83C QBn= 1.75 MMPCD., REALIZAN OPERABILIDAD DE VLVULAS MECNICAS DE LAS LLEGADAS Y SALIDAS, ASI COMO DEL SEPARADOR REMOTO E INTERMEDIAS DE LA PLATAFORMA. AVANCE=

    75%.

    REALIZAN MUESTREO DE POZOS Y SE ENVIAN MUESTRAS PARA SU ANLISIS, REALIZAN MAPEO DE TEMPERATURAS DE BAJANTES Y SEPARADOR REMOTO. SE TRABAJA PAQUETE DE INYECCIN DE POZO 42 POR PRESENTAR OBTURAMIENTO DEBIDO A LA PRESENCIA DE HIDRATOS POR FALTA DE GLICOL

    SE PRESENTA PERSONAL DE LA CIA. EVYA PARA LEVANTAMIENTO ESTRUCTURAL. POZO 201.- CONDICIONES EST DE 1 3/8" Y 1 1/4" PTP = 18.8 KG/CM2 BAJ 1 16.6 KG/CM2 64C, BAJ2 16.6 KG/CM2 CON 83 C, INY BN 3.2 MMPCSD TR

    114 KG/CM2. CIA . INTENSISTA : SDV-1106 (SALIDA DE GASODUCTO HACIA POL-A) AVANCE= 55%. , SDV-1111 ACTUALMENTE EN ESPERA DE PBAS OPERATIVAS

    AVANCE GRAL. 98% , SE PRESENTA PERSONAL PARA CONTINUAR ACTIVIDADES.

    PLATAFORMA CHUC-B. EQ. MASE 801. POZO No.193.

    INGENIERO DE POZOS Y AYUDANTE "C" REALIZAN LIMPIEZA A REGISTRADORES DE PRESION Y DE FLUJO EN POZOS FLUYENTES, REALIZAN REVISIN Y OPERABILIDAD DE VLVULAS DEL MEDIO ARBOL DE TODOS LOS POZOS, ASI COMO VLVULAS DE GRUPO Y PRUEBA. AVANCE=78%, REALIZAN MUESTREO DE

    POZOS Y SE ENVIAN PARA SU ANLISIS. 12:00 SE AMPLIA POZO 81 DE 1 1/4" A 1 3/8"

    DE ACUERDO A PROGRAMA SE TRABAJAN LOS POZOS 63 Y 101 EN UN HORARIO DE 22:30 A 23:11 HRS. 02:30 HRS. SE OBSERVA ALTA PRESIN EN LA LLEGADA DE B.N. POR OBTURAMIENTO EN PAQUETES DE INYECCIN DE B.N. DE LOS POZOS.

    03:00 A 04:30 SE TRABAJAN POZOS 171 Y 173 POR CONGELAMIENTO DE LINEAS DE B.N. DEBIDO A LA FORMACIN DE HIDRATOS.

    PLATAFORMA KUIL-A. PAE NOBLE EARL FREDERICK SON. POZO-No.-26. COND. No.6. (ADOSADA).

    ING. DE OPERACION DE POZOS Y AYUDANTE "C" REALIZAN MUESTREO DE POZOS Y SE ENVIAN MUESTRAS PARA SU ANLISIS. REALIZAN MAPEO DE TEMPERATURAS ASI COMO ORDEN Y LIMPIEZA EN LA PLATAFORMA.

    12:00 HRS. SE AMPLIA POZO 19 DE 1 3/4" A 1 7/8"

    POZO 41.- PTP = 40.8 KG/CM2, PBAJ. = 27.9 KG/CM2, ESTR.= 1 1/4, TEMP.= 81C P.SALIDA = 27.7 (KG/CM2) TEMP.= 114 C

    PLATAFORMA KUIL-A. PAE NOBLE CARL NORBERG POZO. 21 COND. NO. 7 ING. DE OPERACION DE POZOS AYUDANTE "C" REALIZAN MUESTREO DE POZOS Y SE ENVIAN MUESTRAS PARA SU ANLISIS, REALIZAN MAPEO DE

    TEMPERATURAS , ASI COMO ORDEN Y LIMPIEZA EN LA PLATAFORMA, SE VERIIFICA CALIBRACIN DE MANOMETROS Y MANOGRAFOS, OK.

    PLATAFORMA HOMOL-A. EQ. RIG-3 POZO -49 COND. 3.

    CIA MMM CONTINUA HABILITANDO E INSTALANDO CABEZAL DE GRUPO Y PBA. ALTERNO Y BAJANTE PARA EL POZO No 49 (CABEZAL FUTURO). AVANCE GRAL = 24%

    ING. DE OPERACION DE POZOS AYUDANTE "C" REALIZAN MUESTREO DE POZOS, SE ENVIAN PARA SU ANLISIS, REALIZAN ORDEN Y LIMPIEZA Y REACOMODO DE MATERIALES DIVERSOS EN PISO DE PRODUCCIN. AVANCE = 65% , CONTINUAN CON PROGRAMA DE OPERABILIDAD DE VLVULAS MECNICAS DE LAS

    LLEGADAS Y SALIDAS, ASI COMO VALVS. INTERMEDIAS DE LA PLATAFORMA. AVANCE = 60% CIA SLB REALIZA REVISIN Y RECUPERACIN DE DATOS DE SENSORES DE FONDO DE LOS POZOS DE LA PLATAFORMA, QUEDA FUERA DE OPERACIN

    SENSORES DE 21 Y 102.

    CIA. SURPETROL. CON PROGRAMA DE MEDICIN DE POZOS, ACTUALMENTE CON AVANCE ESTRUCTURAL= 80% 12:00 HRS. SE AMPLIA POZO 1 DE 1 1/4" A 1 3/8"

    POZO 4: 20:25- 20:35 HRS. SE TRABAJA POZO POR LATERALES.

    PLATAFORMA CHUHUK-A. PAE SANTA MARIA. POZO. No. 33. COND. 1.

    INGENIERO DE OPERACION DE POZOS Y AYTE . "C" DE PRODUCCION SUPERVISAN LA SUSTITUCION DE 17 VALVULAS DE 24 DE LOS CABEZALES DE GRUPO Y PRUEBA. AVANCE GRAL. AVANCE=88%. TOTAL A SUSTITUIR 24 VALVULAS.

    ING. DE OPERACION DE POZOS Y AYDANTE "C" REALIZAN MUESTREO DE POZOS, SE ENVIAN PARA SU ANLISIS, REALIZAN MAPEO DE TEMPERATURAS Y PURGADO DE DEPURADOR, REALIZAN OPERABILIDAD DE VLVULAS MECNICAS DE LAS LLEGADAS Y SALIDAS E INTERMEDIAS DE LA PLATAFORMA. AVANCE=

    90%. EN PROGRAMA DERIVAR EL FLUJO DE LA BAJANTE No. 3 A LAS BAJANTES No.1 Y 2. AS MISMO CONTINUAR CON EL CAMBIO DE VLVULAS DE 6 " 600 PSI EN

    LOS DISPAROS DE GRUPO Y PRUEBA DE LA BAJANTE No.3. PENDIENTE DE AUTORIZACIN.

    ABK- N1 A LAS 19:00 INFORMA DISMINUCIN DE GAS DE B.N. ENVIADO HACIA LOS CAMPOS DE BATAB Y CHUC.

    URGE NOS SUMINISTREN EL SIGUIENTE MATERIAL: - GRASA Y EMPAQUES PARA FITTING.

    - VLVULAS Y NIPLES DE 1/2. - ACTUADORES MECANICOS PARA VALVULAS DE BLOQUEO DIF. DIAMETROS.

  • Da:

    Hora:

    Fecha:

    Tren 3117 Tren 3118

    P(kg/cm) T (C) P(kg/cm) T (C) 125,167

    Salida Enlace 38.7 85 118,909 0

    Llegada Pol-A 22.9 20.7 6,258 0

    Llegada Abk-D ducto 155 L-263Salida Pol-A ducto 374Llegada Abk-D ducto 374%Aper vl. 30" lleg Abk-D L-374

    P(kg/cm) T (C) P(kg/cm) T (C) Tren 3117 3118 L-374 (llegada) L-263 (llegada) Salida ABK-A

    Antes de regulacion 11.5 45 11.5 45 API 43.4 43.7 45.0 43.8

    Despus de regulacin 9.2 45 9.2 45 H2O(%) 5.0% 4.0% 3.5% 4.0%

    PPM 111,805 113,972 108,487 108,719

    LMB

    P (kg/cm) T C P (kg/cm) T C

    Separacin 1 c. 9.0 43 9.0 41 Gas de alta total

    Separacin 2a. 2.6 34 2.6 36 Gas alta enviado a compresin

    Rectificacin 1a. 8.9 Kg/cm2 C 38 Gas quemado alta

    Rectificacin 2a. 2.4 Kg/cm3 C 37 Gas baja total

    Rectificacin 1a (FA-3103-B) 8.9 Kg/cm3 C 38 Gas baja enviado compresin

    Equipos No. 2 No. 3 No. 4 No.5 Vapores Generados en ABK-A

    OP OP OP DISP Gas quemado baja

    Presin succin 3.4 3.4 3.4 Gas total formacin

    Presin descarga 42.0 42.0 42.0 Gas total a compresin

    VPG(%) Velocidad productor de gas 87.3% 91.8% 88.8% Gas total comprimido

    V/BBA(rpm) Velocidad bomba 3,184 3,410 3,146 Gas quemado medido "Fluenta"

    Temperatura escape (C) 597 600 608 Gas combustible

    Horas revisin RGA (m/m)

    Horas disponible 24 Gas enviado a ABK-A/ Pol-A

    Horas operando 24 24 24

    Horas mantenimiento Habitacional Perforacin ltimo accidente

    Fecha de paro 06/09/14 06/09/14 PEMEX 151 1 Parcial 613 08-ene-13

    Entro en operacin 06/09/14 09/08/14 17/08/14 Cias. 137 359 Total 35 Das sin accidentes

    Manejo Tren 3118 Tren 3117 Total 288 360 Total 648 609

    Certificada Estatus PTCRS SolicitadosHabitacional Si Disponible Clase - "A" 60

    Antes regulada Lado norte SI Disponible Clase - "B" 63

    Despus regulada Lado sur SI Disponible Total de Permisos 123

    Disel (M) 609.70Agua (TON) 145 Op Disp Op'nGeneracin elctrica (KW) 35,522 Disp Disp DISP.

    Disp

    Equipo

    Turbocompresor - A

    Turbocompresor - B

    Mdulo No - 7

    Mdulo No - 8

    .

    66.2 100.0%

    MG-1 Ca. RR 3er N

    "B" "A"

    MG-2 Ca. RR 1er N

    Trenes

    Fases de evacuacin

    P(kg/cm) T (C)

    40.0

    10.343

    Succin

    TG - BTG - ATurbogeneradores

    Temperatura CDescarga

    MG-1 GB-3501 "IR" nuevo

    CargaEstado

    Agua por Tren de Medicin (recuperador aut)

    ING. GREGORIO RUIZ DOMINGUEZ

    ENCARGADO DE PRODUCCION INGENIERO DE OPERACIN ACEITE

    MANTTO

    OP

    MANTTO

    32

    OP

    6.7 94.1%

    JUAN MANUEL MOCTEZUMA GARCIA

    2.3

    6.1

    10,107

    GB-3502

    MIERCOLES

    05:00 HRS

    10-sep-14

    Cabezales Manejo de Aceite (BPD) Actividades

    Volumen de Agua Drenada a Pozo

    118,909

    Litoral (263) O.U.K.

    Produccin bruta total 129,0163,849

    Produccin neta total medida

    Prod. Ac. Neto (Qo)

    Prod. Ac. Bruto (Qb)

    6.36

    Oleoducto salida ABK-A GRUAS

    7.83%

    Instantnea (+ agua drenada) 126,264

    499.68

    492.76

    121.79

    5.04

    5.04

    11.62

    9.74

    2.33

    1.88

    40

    Compresores de aireMoto generadores

    488.06

    483.02

    Produccin de agua manejada total

    4920.3 5517.5 49

    17.1

    Anlisis de fluidos

    80%

    "A" "B"

    Paquete de Regulacin Entrada a Bateria

    689.85

    370.97

    Manejo de Gas (MMPCD)

    % de agua total manejada

    600

    2,600

    4,600

    6,600

    8,600

    10,600

    20,000

    40,000

    60,000

    80,000

    100,000

    120,000

    140,000

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

    Tren 3117 Tren 3118 TOTAL Volumen de Agua Drenada a Pozo

    PERFORACION SDV - 3161 AVANCE 93.0% Personal de Ca. Emerson contina mantenimiento SDV - 3162 AVANCE 71.0% PERMANENTE MODULO No. 7 En reparacin del sistema de sellado PROYECTOS F-OSA-33 Suministro y prefabricado e instalacin de Cuarto de Control Aceite, CCM y de bateras en la plataforma permanente 1er nivel. .............................................................................AVANCE 78.19% F-OSA-021 Instalacin de paquete drenaje aceitoso....................................................AVANCE 98.39% F-CAMSA-001 Programa de actividades posteriores a la libranza del proyecto de adecuacin de los procesos en la plataforma ABK-D .....................................................................................................AVANCE 49.35% F-COTEMAR-01-FASE 2 Reacondicionamiento de cuarto de compresin de la plataforma permanente 3er nivel de c.p. ABK-D incluye equipos y muros contraincendio ...............................................AVANCE 98.90% F-COTEMAR-02 FASE 2 Instalacin de talleres de mantenimiento mecnico, elctrico e instrumentos gas en tercer nivel de permanente ............................................................................................AVANCE 81.77%

    F-COTEMAR-03 FASE 2Instalacin de laboratorio quimico 2DO.nivel de CP ABK-D(Incluye interconexin y servicios)................................................................................................................... ......AVANCE 20.73% F-COTEMAR-06 FASE 2 Instalacin, pruebas y puesta en operacin del sistema de aspersin que protege al FA3101-A.......................................................................................................................AVANCE 58.601% F-COTEMAR-09 FASE 2 Instalacin y puesta en operacin de paquete de aire de planta e instrumentos................................................................................................................. .AVANCE 86.3%

    F-COTEMAR-08 FASE 2 Instalacion y puesta en operacin 02 tanques acumuladores de aire para el paquete de aire instrumentos..............................................................................AVANCE 98.97% F-COTEMAR-15 FASE 2 Instalacin, configuracin, pruebas y puesta en operacin de instrumentacin local elctrica, equipos paquete y generacin de desplegados grficos en el SDMC............AVANCE 93.42% F-COTEMAR-16 FASE 2 Instalacin del sistema de fuerza, alumbrado y tierras para puente y tripode nuevo........................................................................................................................ ......AVANCE 53.90% F-COTEMAR-23 2 FASE Suministro e instalacin a vlvulas mecnicas y vlvulas de control de presin .................................................................................................................................. ......AVANCE 99.02% F-COTEMAR-08 FASE 2 Instalacin y puesta en operacin de 02 tanques acumuladores de aire para el paquete de aire de instrumentos.....................................................................................................AVANCE 98.39% F-COTEMAR-11 FASE 2 Instalacin y puesta en operacin del sistema de medicin de gas de descarga de modulos...................................................................................................................... ....AVANCE 71.71% F-COTEMAR-14 FASE 2 Suministro, instalacin, pruebas y puesta en operacin de vlvulas de control de nivel en diversos diametros en plataforma permanente del C.P ABK-D .....................................AVANCE 96.50% F-COTEMAR 17 FASE 2 suministro instalacion, calibracion y puesta en operacin de valvulas de seguridad.................................................................................................................... .....AVANCE 100% F-COTEMAR-19 FASE 2 Suministro, instalacin, interconexion, pruebas y puesta en operacin de sistema de medicin de diesel, instrumentacin, equipos, canalizacin de seales y configuracin .........................................................................................................................................AVANCE 92.86% F-COTEMAR-22 FASE 2 Instalacin de cuarto de baterias en el pimer nivel de plataforma ABK-D Permanente. ....................................................................................................................................... AVANCE 3.80% F-COTEMAR-23 FASE 2 Suministro e instalacin de valvulas mecanicas y valvulas de control de presin ..........................................................................................................................................AVANCE 99.14% Ca. EMERSON Rehabilitacin de actuadores hidrulicos y neumticos de la marca Betis y shafer.......AVANCE 87.26% ROLLS ROYCE Instalacin en su fase II de 1 paquete de generacin electrica 501-KB5S EN TG-C de la plataforma ABKATUN-D Litoral Tabasco ............................................................................................................ .. AVANCE 38.69% KIDDE Rehabilitacin del sistema de deteccin de gas, fuego, alarmas y supresin de fuego, instalado en la Plataforma Habitacional................................................................................................................. .....AVANCE 98.60% DRESSER RAND ADQUISICION DE DOS MODULOS DE COMPRESION PARA EL CENTRO DE PROCESO ABK-D, INCLUYE INSTALACION, PRUEBAS, PUESTA EN OPERACION Y ADIESTRAMIENTO NO. 4180928019.- COMPAIA ETM/DRESSER RAND .....................................................................................................AVANCE 63.50% Instalacin, pruebas y puesta en operacin del modulo 9 del C.P A..BK-D...................AVANCE 56.0% Instalacin, pruebas y puesta en operacin del modulo 10 del C.P ABK-D......................AVANCE 71.10% ROCKWELL Mantenimiento al sistema de paro por emergencia (ESD) de la marca ICS triplex, del CP Abkatun-D, del Activo Litoral de Tabasco.......................................................................................... AVANCE 6.0%

    KAB POZO 81 06:45 horas se encuentra con presiones igualadas, Ptp=Pbaj=37 kg/cm, se procede a cerrarlo por laterales, para recuperar presin, sin xito 19:00 horas se cierra por laterales y se espera para recuperar presin en TP. MAY POZO 113 06:45 horas se encuentra con presiones igualadas, Ptp=Pbaj=47 kg/cm, se procede a cerrarlo por laterales, para recuperar presin, sin xito 19:00 horas se cierra por laterales y se espera para recuperar presin en TP.

  • Lnea 1 LlegadaTurno API A/S Salinidad

    20 M4

    V 12.9 23.0000 9,900.4112 N 13.3 9.0000 3,336.7124 M8

    V 15.4 21.0000 4,213.8716 N 14.2 21.0000 4,555.96

    Promedio 14.0 18.5000 5,501.74Muestreador Automtico 22.1 0.6200 28.85 400.1

    Salida a Nuevo TeapaTurno API A/S Salinidad Viscosidad

    20 M 22.7 0.4800 25.504

    V 22.1 0.6700 28.5012 N 21.8 0.7100 33.3724 M 22.4 0.5800 28.208

    V 22.0 0.6700 24.7316 N 21.8 0.6000 32.77

    Promedio 22.1 0.6183 28.85 00.0

    Lnea 2 LlegadaTurno API A/S Salinidad

    20 M4

    V 15.7 24.0000 4,809.1612 N 14.9 25.0000 6,772.2024 M8

    V 14.7 26.0000 4,745.5216 N 14.8 25.0000 4,183.13

    Promedio 15.0 25.0000 5,127.50Muestreador Automtico 30.0 0.2000 31.05 70.2

    Salida a Nuevo TeapaTurno API A/S Salinidad Viscosidad

    20 M 31.0 0.2500 17.204

    V 30.1 0.3300 23.1112 N 31.5 0.2800 25.0024 M 29.8 0.3100 22.008

    V 31.6 0.3000 24.7316 N 31.2 0.2800 25.54

    Promedio 30.9 0.2917 22.93 00.0

    Lnea 3 LlegadaTurno API A/S Salinidad

    20 M4

    V 36.3 1.5000 1,769.3812 N 35.2 0.5000 363.2524 M8

    V 36.3 1.3000 660.3916 N 36.8 1.5000 813.13

    Promedio 36.2 1.2000 901.54

    Lnea 4 LlegadaTurno API A/S Salinidad

    20 M 26.9 19.3000 10,177.004

    V 20.5 30.0000 10,215.3612 N 23.7 27.3000 9,336.6424 M 24.9 20.7000 10,876.008

    V 26.8 17.4000 7,816.1116 N 27.6 27.6000 10,292.47

    Promedio 25.1 23.7167 9,785.60

    Lnea 3API % A/KF Salinidad Viscosidad

    Muestreador Automtico 36.2 1.2000 901.54

    El GolpeTurno API A/S Salinidad

    20 M4

    V 32.2 0.2200 35.1712 N 32.7 0.2500 34.5624 M 33.4 0.1800 26.508

    V16 N 32.6 0.1900 32.77

    Promedio 32.7 0.2100 32.25

    CunduacanTurno API A/S Salinidad

    20 M4

    V12 N24 M8

    V16 N

    Promedio 40.9 0.2000 59.8300Muestreador Automtico 40.9 0.2000 59.8300

    Puerto CeibaTurno API A/S Sedimento Salinidad

    20 M4

    V12 N24 M8

    V16 N

    Promedio

    Observaciones

    Muestreador Automtico

    Fecha de Imp 10/09/2014 Pgina: 1Hora 05:15:43 a.m.

    COORDINACIN DE TRANS. Y DISTRIBUCIN DE ACEITEGERENCIA DE TRANSPORTE Y DISTRIBUCIN DE HIDROCARBUROS MSO

    10/09/2014DIARIO DE LNEAS