report et-odr activities
DESCRIPTION
World Meteorological Organization (WMO) CAeM XIV. Report ET-ODR activities. Performed activities. Meeting 19-21 November 2008: Development of pilot project concerning future OPMET data representation http://www.wmo.int/pages/prog/www/WDM/ET-ODR-1/Documents.html First tests in July 2009: - PowerPoint PPT PresentationTRANSCRIPT
Report ET-ODR activities
World Meteorological Organization (WMO)CAeM XIV
Report ET-ODR 2
Performed activities
Meeting 19-21 November 2008: Development of pilot project concerning
future OPMET data representation http://www.wmo.int/pages/prog/www/WDM/
ET-ODR-1/Documents.html
First tests in July 2009: XML-encoded METAR sent from Brussels
(Belgium) to Hong Kong (China) via London (UK), Singapore and Bangkok (Thailand) on 23-July-2009
ICAO AFTN is suitable for dissemination of XML-type messageso Full IA-5 character set necessaryo Only small size messages (<1800
characters) tested
Report ET-ODR 3
Performed activities
Meeting 16 October 2009: Discussion on results first tests
o Impending decision by ICAO to stop migration from TAC to BUFR
Discussion on future work of ET-ODR in relation to CBS IPET on MDIo ET-ODR becomes dormant until new
testing is envisaged by IPET on MDIo CAeM representative will actively
participate in IPET on MDI http://www.wmo.int/pages/prog/www/WDM/
ET-ODR-2/Documents.html
Report ET-ODR 4
Future activities of CBS IPET on MDI
Assess current data-standards landscape, a.o.: ISO 191xx series OGC O&M model WXCM-WXXM (Eurocontrol + US FAA)
Develop candidate common data-model to support all MET domains First focus on aviation MET & WMO resolution 40
« essential » data In line with WMO WIS concept
Develop candidate data-encodings, including XML-type encoding
Demonstrations via test-beds Develop governance / maintenance
arrangements for data-model and -encoding
Report ET-ODR 5
Future activities – envisaged timeline
ICAO Divisional Meeting• Endorse transition to from product- to data-centric information exchange• Prepare roadmap to phase out TAC
ICAO Divisional Meeting• Endorse transition to from product- to data-centric information exchange• Prepare roadmap to phase out TAC
ICAO• Annex 3 amended to permit exchange XML-encoded OPMET products* under bi-lateral agreement between member states
[ *based on current data- product specifications ]
ICAO• Annex 3 amended to permit exchange XML-encoded OPMET products* under bi-lateral agreement between member states
[ *based on current data- product specifications ]
WMO IPET-MDI• 1.0 data exchange standards passed to WMO IPET-DRC for maintenance
SESAR• Data exchange standards development complete
WMO IPET-MDI• 1.0 data exchange standards passed to WMO IPET-DRC for maintenance
SESAR• Data exchange standards development complete
WMO Executive Council• Endorse changes recommended by WMO CBS
WMO Executive Council• Endorse changes recommended by WMO CBS
WMO CBS• WMO IPET-MDI propose:-Candidate data model, controlled vocabularies & encodings (incl. XML)-Governance/maintenance arrangements & publication mechanisms for WMO IPET-DRC- Adjust WMO IPET-DRC mandate to maintain the data model & encodings (incl. XML) alongside TAC & TDCF
WMO CBS• WMO IPET-MDI propose:-Candidate data model, controlled vocabularies & encodings (incl. XML)-Governance/maintenance arrangements & publication mechanisms for WMO IPET-DRC- Adjust WMO IPET-DRC mandate to maintain the data model & encodings (incl. XML) alongside TAC & TDCF
20092009 20102010 20112011 20122012 20132013 20142014
WMO IPET-MDI:Inter-Programme Expert Team on Metadata & Data InteroperabilityWMO IPET-DRC:Inter-Programme Expert Team onData Representations & Codes
WMO IPET-MDI• 2009-10 work programme
WMO IPET-MDI• 2009-10 work programme
Report ET-ODR 6
Related activities in data-model domain
Establishment of a Weather Domain Working Group within the OGC (2009) To improve the O&M model http://
www.opengeospatial.org/projects/groups/meteodwg
SESAR & NextGen activities MET modelling (WXXM) is tackled in SESAR WP
8.1.6 (from 2009-2010 onwards) Early project: MET Fusion demonstrator for
WXXM v1.0.1 (2008-2009)o http://www.eurocontrol.int/aim/gallery/conte
nt/public/pdf/SESAR%20EP_08_02-WXXM%20V1.0.pdf
OGC Test-bed 7 (2010) Demonstration of WXXM v1.1 capabilities