Report copyright - TENNECO LYDONIA CANYON - BOEM OPERATIONAL SUMMARY The Tenneco Lydonia Canyon (LC) Block 187 No. 1 well (figure 1) was drilled by the Alaskan Star semisubmersible drilling rig to a
Please pass captcha verification before submit form