Page 1: Replacement Passenger Terminal Concept Validation by

HOLLYWOOD BURBANK AIRPORT

REPLACEMENT PASSENGER TERMINAL CONCEPT VALIDATION

COPYRIGHT © BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

11-5-18 Commission Mtg. Item No. 8.a. RPT Concept Validation

Page 2: Replacement Passenger Terminal Concept Validation by

The proposed Replacement Passenger Terminal

is feasible in the preferred location

HOLLYWOOD BURBANK AIRPORT

REPLACEMENT PASSENGER TERMINAL CONCEPT VALIDATION

Page 3: Replacement Passenger Terminal Concept Validation by

O U R T E A M

BuroHappold Engineering – Project Management; Structural and MEP Engineering

Airbiz – Airport Planning

Gruen Associates – ADA and Restrooms

Psomas – Civil Engineering and Roadways

Innovat + 20/20 – Parking

BNP – Baggage Handling

ECG – Demolition

Capital Projects Group – Cost Model

Page 4: Replacement Passenger Terminal Concept Validation by

Replacement Passenger Terminal

• 355,000 SF (max)

• 14 gates

New Public Parking Structure

New Employee Parking

Support Buildings

New Access Roads

Demolition of Existing Terminal

Taxiway Extensions

P R O J E C T U N D E R S TA N D I N G – T H E W H AT

Page 5: Replacement Passenger Terminal Concept Validation by

Runway separation does not meet current standards

Seismically deficient

Inconsistent capability between gates

Complicated maneuvers required on airfield

Aging terminal building

Limited concessions and amenities

Underserves users with disabilities

P R O J E C T D R I V E R S – T H E W H Y

Page 6: Replacement Passenger Terminal Concept Validation by

Safety

• Proper runway separation

• Meets current seismic design standards

Customer Convenience

• ADA

• Amenities

• Maintain easy access and convenience

Community

• Resilience (Natural disasters)

• Energy efficient terminal

• Reduced emissions

B E N E F I T S

Page 7: Replacement Passenger Terminal Concept Validation by

Operations

• Reduction in taxi times and runway crossings

• Simplified aircraft maneuvers

• Consistency and capability at all gates

• Increased concessions revenue

• Expanded holdroom size

• Faster check-in

• Centralized TSA checkpoint

• Centralized bag check/screening

B E N E F I T S

Page 8: Replacement Passenger Terminal Concept Validation by

P H A S I N G

Phase 1: Northeast Quadrant• Terminal

• Parking

• Access Roads

• Support Facilities

Phase 2: Southeast Quadrant• Demolition

• Taxiway Extensions

Page 9: Replacement Passenger Terminal Concept Validation by

A S S U M E D S C H E D U L E I N CO N C E P T VA L I DAT I O N

PHASE 1 PHASE 2

Design Begins

Construction Begins

Replacement Passenger

Terminal Opens

Demolition of

Existing Terminal

Project

Completion

Q3-2020

Q1-2021

Q1-2024

Q1-2024

Q1-2026

Northeast Quadrant Southeast Quadrant

PHASE 0

Concept Validation

EIS

Public Charrettes

Validation

Begins

Q1-2018

Q3-2018

Validation

Complete

Page 10: Replacement Passenger Terminal Concept Validation by

Concept Validation

Page 11: Replacement Passenger Terminal Concept Validation by

The proposed Replacement Passenger Terminal works in

the preferred location

ADG III Aircraft Layout (Same capability at all gates)

14 Gates

355,000 SF Terminal

CO N C LU S I O N

Page 12: Replacement Passenger Terminal Concept Validation by

P R O P O S E D P R O G R A M VS 2 0 1 6 CO N C E P T

Increase in area

• Baggage

• Security

• Holdrooms

• Concessions

Decrease in area

• Check In

• Restrooms

• Offices

• MEP

TOTAL AREA = 355,000 SF

Page 13: Replacement Passenger Terminal Concept Validation by

P R O P O S E D L AYO U T : G R O U N D F LO O R

Total Floor Area = 247,601 SF

Page 14: Replacement Passenger Terminal Concept Validation by

A E R I A L

Page 15: Replacement Passenger Terminal Concept Validation by

1. Terminal Depth

2. Site Grade

3. Airport Access

4. Employee Parking

5. Public Parking Structure

6. Air Traffic Control Tower

7. Aircraft Rescue and Fire Fighting Facility

O P P O RT U N I T I E S TO B E A D D R E S S E D I N D E S I G N P H A S E

Page 16: Replacement Passenger Terminal Concept Validation by

COPYRIGHT © 1976-2016 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

ACC E S S

Page 17: Replacement Passenger Terminal Concept Validation by

COPYRIGHT © 1976-2016 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

Cost Model

Page 18: Replacement Passenger Terminal Concept Validation by

COPYRIGHT © 1976-2016 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

S U M M A RY

Project ElementConstruction

CostsSoft Costs

Project

Contingency

Total Project

Budget

Airside $85,500,000 $21,400,000 $10,700,000 $117,600,000

Landside $266,300,000 $70,600,000 $32,300,000 $369,200,000

Terminal $476,900,000 $189,000,000 $66,000,000 $731,900,000

Demolition $15,900,000 $4,000,000 $1,500,000 $21,400,000

Total All Elements $844,600,000 $285,000,000 $110,500,000 $1,240,100,000

Page 19: Replacement Passenger Terminal Concept Validation by

COPYRIGHT © 1976-2016 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

Design Contingency Included

Construction Contingency Included

Program Contingency Included

Pricing and Cost Escalation Contingency

• 2018 - 6%

• 2019 - 5%

• 2020 - 4%

• 2021 - 4%

• 2022 - 4%

B A S I S O F CO S T M O D E L

Page 20: Replacement Passenger Terminal Concept Validation by

COPYRIGHT © 1976-2016 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

Soft Costs

• Design Costs 7.0% - 15.0%

• Project / Program Management / Oversight 3.0% - 6.0%

• Consultant Construction Services 3.0% - 6.0%

• Quality Assurance / Testing / Inspection 2.0% - 3.0%

• Permitting, Utility Connections, Etc. 0.5% - 1.5%

• Furnishings, Fixtures and Equipment (FF&E) - Common Use 1.0% - 2.0%

• Low Voltage / Security Active Equipment - Common Use 2.0% - 5.0%

• Art in Public Places (Defined below) 0.5% - 1.0%

B A S I S O F CO S T M O D E L

Page 21: Replacement Passenger Terminal Concept Validation by

COPYRIGHT © 1976-2016 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

Cost model presents total program cost

Includes both Authority responsibilities and costs paid for by others

Certain program elements may be deferred

S U M M A RY

Replacement Terminal

Access Roadways

Aircraft Ramp

Public Parking

Employee Parking

Support Facilities

Taxiway Extensions

SEQ Modifications

TSA Equipment & Install Concession Fit Out

PROGRAM COST BY ELEMENT

Direct Construction

Cost

42%

Design &

Construction

Contingency

7%

Escalation

9%

Indirect Construction

Cost

14%

Design Cost

7%

Soft Costs

14%

Owner Contingency

7%