REPAIR ELECTRICAL DISTRIBUTION SYSTEM TO THE COMMUNICATION BUILDING Site Visit March 12, 2015 NASA Armstrong Flight Research Center 1

Upload: marybeth-fox

Post on 21-Dec-2015

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REPAIR ELECTRICAL DISTRIBUTION SYSTEM TO THE COMMUNICATION BUILDING Site Visit March 12, 2015 NASA Armstrong Flight Research Center 1

1

REPAIR ELECTRICAL DISTRIBUTION SYSTEM

TO THE COMMUNICATION BUILDING

Site Visit

March 12, 2015

NASA Armstrong Flight Research Center

Page 2: REPAIR ELECTRICAL DISTRIBUTION SYSTEM TO THE COMMUNICATION BUILDING Site Visit March 12, 2015 NASA Armstrong Flight Research Center 1

2

Presentation Outline

• Introduction• Instructions for Site Visit• Acquisition Information• Logistics of Site Visit• Amendments• Invitation for Bid (IFB) Due Date

Page 3: REPAIR ELECTRICAL DISTRIBUTION SYSTEM TO THE COMMUNICATION BUILDING Site Visit March 12, 2015 NASA Armstrong Flight Research Center 1

3

Introduction

Repair Electrical Distribution System to the Communication Building

Solicitation # NND15529509E

Contracting Officer Representative (COR): Stanford Dickson

Contracting Specialist (CS): Jenny StaggsContracting Officer (CO): Brian Bowman

Page 4: REPAIR ELECTRICAL DISTRIBUTION SYSTEM TO THE COMMUNICATION BUILDING Site Visit March 12, 2015 NASA Armstrong Flight Research Center 1

4

Instructions of Site Visit

• Remain with group, even if badged• This presentation, including the sign-in

sheets, will be posted as part of an amendment to the solicitation (everyone must sign in)

• Procedures for asking and presenting questions All questions shall be submitted in

writing Due date for all questions is March 19,

2015 Q&As will be posted as an amendment

to the solicitation

Page 5: REPAIR ELECTRICAL DISTRIBUTION SYSTEM TO THE COMMUNICATION BUILDING Site Visit March 12, 2015 NASA Armstrong Flight Research Center 1

5

Instructions of Site Visit

• Photography- no pictures can be taken during this site visit

• SafetyNo Personal Protective Equipment

(PPE) required No smoking, except in designated

smoking areas

Page 6: REPAIR ELECTRICAL DISTRIBUTION SYSTEM TO THE COMMUNICATION BUILDING Site Visit March 12, 2015 NASA Armstrong Flight Research Center 1

6

Acquisition Information • This acquisition is a Economically

Disadvantaged Women-Owned (EDWOSB) Set-Aside In accordance with FAR 19.1503 (b), a

EDWOSB small business concern must be (1) registered in the System for Award Management (SAM); (2) self-certified as an EDWOSB concern in SAM; and (3) has submitted documents verifying its eligibility at the time of initial offer to the WOSB Program Repository. The contract will not be awarded until all required documents are received.

Page 7: REPAIR ELECTRICAL DISTRIBUTION SYSTEM TO THE COMMUNICATION BUILDING Site Visit March 12, 2015 NASA Armstrong Flight Research Center 1

7

Acquisition Information

• Magnitude of project: $1,000,000 - $5,000,000

• Period of Performance- a total of 245 days from Notice to Proceed (NTP)

Page 8: REPAIR ELECTRICAL DISTRIBUTION SYSTEM TO THE COMMUNICATION BUILDING Site Visit March 12, 2015 NASA Armstrong Flight Research Center 1

8

Logistics of Site Visit

• Group will take their own vehicles to B4824

• This site visit should take approximately 1 hour to complete

Page 9: REPAIR ELECTRICAL DISTRIBUTION SYSTEM TO THE COMMUNICATION BUILDING Site Visit March 12, 2015 NASA Armstrong Flight Research Center 1

9

Amendments

• Continue to monitor the solicitation on line All amendments to solicitation must

be acknowledged in block 19 of the Standard Form 1442, Solicitation, Offer and award.

Failure of your acknowledgement may result in rejection of offer

Page 10: REPAIR ELECTRICAL DISTRIBUTION SYSTEM TO THE COMMUNICATION BUILDING Site Visit March 12, 2015 NASA Armstrong Flight Research Center 1

10

Invitation for Bid Due Date

• Invitation for Bid (IFB) Due Date and Bid Opening March 31, 2015, 2:00 p.m. PDT Original Bid + 1 copy Bids will be opened at that time and the

apparent successful bidder will be announced

Everything said at this site visit is not binding. All official changes to the IFB will be issued via a written amendment.

Thank You for Coming