renovation costs area plan renovation & addition...
TRANSCRIPT
3,044 SF
RENOVATED PR AREA697 SF
EXISTING STORAGEAREA
5,348 SF
RENOVATEDMUSIC/THEATER
AREA
3,797 SF
EXISTING I.T. ANDFOUNDATION AREA
1,469 SF
RENOVATEDCOMPUTER LABS
1,154 SF
EXISTING ARTS DEANSUITE2,317 SF
RENOVATEDMULTI-MEDIA /
WINGSPAN AREA
6,653 SF
RENOVATED VISUALARTS AREA
2,888 SF
RENOVATEDCERAMICS AREA
1,197 SF
EXISTING SHAREDCLASSROOM
1,305 SF
EXISTINGMECHANICAL
7,102 SF
NEW PERFORMANCEHALL
4,762 SF
NEW LOBBY &GALLERY
752 SF
RENOVATED I.T.OFFICES
742 SF
RENOVATED PIANOLAB
1,155 SF
RENOVATEDSTORAGE & OFFICES
1,884 SF
RENOVATEDTHEATER STUDIO
1,660 SF
EXISTING KILN YARD
408 SF
RENOVATEDBATHROOMS
557 SF
RENOVATED OFFICES1,108 SF
RENOVATED OFFICES
PR
OJE
CT
DA
TE
:
LC
CC
LE
VE
L I
I P
LA
NN
ING
ST
UD
Y
Year.
month
.day
RENOVATION COSTS AREA PLAN
1/16" = 1'-0"1
FINE ARTS RENOVATION & ADDITION AREASPLAN
Renovation & Addition Areas
Name Area Area Type Comments
EXISTING ARTS DEAN SUITE 1,154 SF Gross Building Area $25/SF
EXISTING I.T. AND FOUNDATION AREA 3,797 SF Gross Building Area $25/SF
EXISTING KILN YARD 1,660 SF Gross Building Area $0/SF
EXISTING MECHANICAL 1,305 SF Gross Building Area $25/SF
EXISTING SHARED CLASSROOM 1,197 SF Gross Building Area $50/SF
EXISTING STORAGE AREA 697 SF Gross Building Area $25/SF
NEW LOBBY & GALLERY 4,762 SF Gross Building Area $400/SF
NEW PERFORMANCE HALL 7,102 SF Gross Building Area $600/SF
RENOVATED BATHROOMS 408 SF Gross Building Area $25/SF
RENOVATED CERAMICS AREA 2,888 SF Gross Building Area $75/SF
RENOVATED COMPUTER LABS 1,469 SF Gross Building Area $75/SF
RENOVATED I.T. OFFICES 752 SF Gross Building Area $150/SF
RENOVATED MULTI-MEDIA / WINGSPAN AREA 2,317 SF Gross Building Area $150/SF
RENOVATED MUSIC/THEATER AREA 5,348 SF Gross Building Area $225/SF
RENOVATED OFFICES 557 SF Gross Building Area $150/SF
RENOVATED OFFICES 1,108 SF Gross Building Area $150/SF
RENOVATED PIANO LAB 742 SF Gross Building Area $150/SF
RENOVATED PR AREA 3,044 SF Gross Building Area $150/SF
RENOVATED STORAGE & OFFICES 1,155 SF Gross Building Area $150/SF
RENOVATED THEATER STUDIO 1,884 SF Gross Building Area $180/SF
RENOVATED VISUAL ARTS AREA 6,653 SF Gross Building Area $150/SF
22
22
22
22
22
22
22
22
22
22
22
22
22
22
222
2222
2222
2222
2222
222
22
22
22
22
22
222
2222
2222
2
222
2222
2222
222
22
22
22
22
222
2222
2222
2222
2222
222
22
22
22
22
22
22
22
22
22
22
222
2222
2222
2222
2222
2222
222
22
22
22
22
22
22
22
22
22
22
22
22
2222
2222
2222
22
22
22
22
22
222
2222
2222
222
22
22
22
22
22
222
2222
2222
222
22
22
22
22
22
222
2222
2222
222
22
22
22
22
22
222
2222
2222
222
22
22
22
22
22
222
2222
2222
222
22
22
22
22
22
222
2222
2222
222
22222222
2222
2222
2222
2222
2222
2222
2222
2222
2222
22
22 22
222
222
2222
2222
22
22
22
22
22 2
222
222
222
2222
2222
22
2222
2222
22
22
22
222
222
2222
2222
22
2222222222222222222222
222222222222
222222222222
222222222222
2222222222
2222222222
2222
2222
22222222
A2.00
A2.00 3
A2.00
1
2
A5.01
1
2,048 SF
MUSIC REHEARSAL STUDIO
550 SF
THEATER / ARTS STORAGE
1,773 SF
THEATER STUDIO /CLASSROOM
827 SF
ARTS COLLAB. SPACE
692 SF
SHARED CLASSROOM
751 SF
PIANO PRACTICE
745 SF
COMPUTER CLASSROOM
721 SF
COMPUTER CLASSROOM
1,304 SF
PRINTING LAB
PR OFFICE
PR OFFICE
PR OFFICE
WORKROOM CONF. ROOM
PR OFFICE
PR OFFICE
PR OFFICE
434 SF
NEW PR STORAGE1,268 SF
MECHANICAL1,046 SF
FA DEAN'S SUITE
74 SF
RR
119 SF
PRACTICE
119 SF
PRACTICE
95 SF
PRACTICE
95 SF
PRACTICE
93 SF
PRACTICE
140 SF
MUSIC LIBRARY
113 SF
PRACTICE
408 SF
MUSIC STORAGE
2,569 SF
I.T. DEPT. [NO SCOPE]
1,314 SF
FOUNDATION [NO SCOPE]
2,862 SF
CERAMICS
311 SF
OFFICE BULLPEN
84 SF
OFFICE
146 SF
OFFICE
124 SF
OFFICE
126 SF
OFFICE
148 SF
ART OFFICE
148 SF
ART OFFICE
126 SF
OFFICE
126 SF
OFFICE
128 SF
OFFICE
2,329 SF
2D STUDIO
2,315 SF
2D STUDIO
1,626 SF
KILN YARD
85 SF
PRACTICE
107 SF
PRACTICE
122 SF
EXISTING RR
111 SF
THEATER STORAGE
1,203 SF
3D STUDIO
356 SF
VA STORAGE
196 SF
MENS RESTROOM
195 SF
WOMENS RESTROOM
147 SF
STORAGE
328 SF
RECEPTION
19'-5" 5'-0" 24'-5" 22'-4"
141 SF
OFFICE
861 SF
I.T. STORAGE
809 SF
MULTI-MEDIA / WINGSPAN
371 SF
MULTI-MEDIA / WINGSPAN
1,231 SF
GALLERY
187 SF
OFFICE
283 SF
BROADCAST LAB
142 SF
OFFICE
125 SF
PORTRAIT STUDIO80 SF
STORAGE
86 SF
BREAK AREA
7,118 SF
PERFORMANCE HALL
2,048 SF
LOBBY
3,608 SF
WFA CIRCULATION
2,639 SF
EFA CIRCULATION
506 SF
WFA CIRCULATION
A2.02 3
A2.02
1
A2.022
300 SF
UPS
208 SF
ELECTRICAL
307 SF
OFFICE BULLPEN
137 SF
OFFICE
137 SF
OFFICE
115 SF
OFFICE
149 SF
OFFICE
67 SF
WIRE CLOSET
217 SF
CONFERENCE
130 SF
OFFICE
181 SF
DRESSING RM
181 SF
DRESSING RM
PR
OJE
CT
DA
TE
:
LC
CC
LE
VE
L I
I P
LA
NN
ING
ST
UD
Y
Year.
month
.day
FINE ARTS OVERALL PLAN
1/16" = 1'-0"1 FLOOR PLAN - FINE ARTS OVERALL
N
ARCHITECT
SEMPLE BROWN DESIGN, P.C.1160 SANTA FE DRIVEDENVER, CO, 80204OFFICE: 303.571.4137FAX: 303.571.0403CONTACTS:CHRIS WINEMAN: [email protected] BEECHINOR: [email protected]
GENERAL CONTRACTOR
MECHANICAL & ELECTRICAL ENGINEER
MKK ENGINEERING 7600 E ORCHARD RD GREENWOOD VILLAGE, CO 80111PHONE: 303.796.6000FAX: 303.796.6099CONTACTS:ERIC STOERGER: [email protected]
STRUCTURAL
ENGINEER
MARTIN & MARTIN WYOMING4020 LARAMIE STREETCHEYENNE, WY, 82001PHONE: 307.637.8422FAX: 307.637.4022CONTACTS:JOHN R. SHAFFER: [email protected]
NAMEADDRESSPHONE: FAX: CONTACTS:
PROJECT DIRECTORY
CIVIL ENGINEER
MARTIN & MARTIN WYOMING4020 LARAMIE STREETCHEYENNE, WY, 82001PHONE: 307.637.8422FAX: 307.637.4022CONTACTS:RYAN RIGG: [email protected]
LANDSCAPE ARCHITECT
BHA DESIGN1603 OAKRIDGE DRFORT COLLINS, CO 80525OFFICE; 970.223.7577ROGER SHERMAN ([email protected])ASTRID VANDER ([email protected])
101A
150 SF
ROOM NAME
10.1
AFF
C1010'-6"
A1.011
SIM
AA
DRAWING #
SHEET #
DRAWING #
SHEET #
GRID #
DRAWING #
SHEET #
BUILDING ELEVATION:
INTERIOR ELEVATION:
STRUCTURAL GRID:
BUILDING SECTION:
WALL SECTION:
DRAWING #
SHEET #
CALL OUT DETAIL:
DRAWING #
SHEET #
SPOT ELEVATION / DATUM:
DOOR TAG:
DOOR #
ROOM #
ROOM TAG:
WALL TAG:
WALL TYPE
WINDOW TAG:
WINDOW TYPE
CEILING TAG:
CEILING TYPE
ROOF TAG:
ROOF TYPE
SE10
SPECIALTY EQUIPMENT TAG:
EQUIPMENT TYPE
GENERAL SYMBOL LEGEND
100'-0" ELEVATION
R10
REVISION TAG:
PLUMBING FIXTURE TAG:
PF-10 FIXTURE TYPE
TOILET ACCESSORY TAG:
TA-10 ACCESSORY TYPE
REVISION #
F10
FURN10
A -3
FLOOR TAG:
FURNITURE TAG:
LIGHT FIXTURE TAG:
FIXTURE TYPE
SWITCH #
FURNITURE TYPE
FLOOR TYPE
CEILING HEIGHT
1
A-10
A1.01
1SIM
1SIM 1 SIM
1SIM
A1.01
1 SIM
1
SIM
1SIM
1
SIM
A1.01
SIM
1
A1.01
SIM
1
DESCRIPTION:
...
DESCRIPTION OF WORK
NORTH
VICINITY MAP
N
RENDERINGGENERAL NOTES
PR
OJE
CT
DA
TE
:
LC
CC
LE
VE
L I
I P
LA
NN
ING
ST
UD
Y
Year.
month
.day
T TREAD
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TBC TOP OF BACK OF CURB
TELE TELEPHONE
TEMP TEMPORARY or TEMPERATURE
TG TEMPERED GLASS
THERM THERMOSTAT
THK THICK or THICKNESS
THLD THRESHOLD
TO TOP OF
TOC TOP OF CONCRETE
TOS TOP OF STEEL
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TPTN TOILET PARTITION
TS TUBE STEEL
TV TELEVISION
TYP TYPICAL
UL UNDERWRITER'S LABORATORY
UNFIN UNFINISHED
UON UNLESS OTHERWISE NOTED
UR. URINAL
USGS U.S. GEOLOGICAL SURVEY
V VOLT
VAR VARY or VARIES
VB VAPOR BARRIER
VCT VINYL COMPOSITION TILE
VENT VENTILATION
VER VERIFY
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VIN VINYL or SHEET VINYL
VOL VOLUME
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
W WEST or WIDE
W.O. WHERE OCCURS
W/ WITH
W/C WATER CLOSET
W/O WITHOUT
W/R WATER RESISTANT
WC WALL COVERING
WD WOOD
WDO WINDOW
WF. WIDE FLANGE or WOODFLOORING
WGL WIRE GLASS
WP WATERPROOF(ING)
WPT WORKING POINT
WSCT WAINSCOT
WT WEIGHT
WWF WELDED WIRE FABRIC
YD YARD
QTY QUANTITY
R RISER
RAD RADIUS
RB RUBBER BASE
RBC RUBBER BASE COVE
RBS RUBBER BASE STRAIGHT
RBT RUBBER TILE
RD ROOF DRAIN or ROAD
RE REFER TO or REFERENCE
REC RECESS(ED)
RECPT RECEPTACLE
REF REFRIGERATOR orREFRIGERATED
REINF REINFORCED
REQD REQUIRED
RESIL RESILIENT
REV REVISE, REVISED or REVISION(S)
RF RESILIENT FLOORING
RFG ROOFING
RFL REFLECTED
RH RIGHT HAND
RL RAIN LEADER
RM ROOM
RO ROUGH OPENING
ROD ROOF OVERFLOW DRAIN
ROW RIGHT OF WAY
RPM REVOLUTIONS PER MINUTE
RVS REVERSE (SIDE)
RWC RAIN WATER CONDUCTOR
S SOUTH or SEALED
SC SOLID CORE
SCHED SCHEDULE
SD SOAP DISPENSER
SEC SECTION
SF SQUARE FEET
SHT SHEET
SHTG SHEATHING
SHWR SHOWER
SIM SIMILAR
SOFF SOFFIT
SPECS SPECIFICATION(S)
SPKL SPRINKLER
SPKR SPEAKER
SPRT SUPPORT
SQ SQUARE
SR SINK RECEPTACLE
SS STAINLESS STEEL
SSK SERVICE SINK
STA STATION
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURE or STRUCTURAL
SUSP SUSPEND(ED)
SYM SYMMETRICAL
SYS SYSTEM
MISC MISCELLANEOUS
MM MILLIMETERS
MO MASONRY OPENING
MTD MOUNT(ED)
MTL METAL
MUL MULLION
N NORTH
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NRC NOISE REDUCTION COEFFICIENT
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OFF OFFICE
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OTO OUTSIDE-TO-OUTSIDE
P PAINT(ED)
P/L PROPERTY LINE
PAC PREVIOUSLY AWARDEDCONTRACT
PAR PARALLEL
PBO PROVIDED BY OTHERS
PC PRECAST
PERF PERFORATED
PERIM PERIMETER
PKG PARKING
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLY PLYWOOD
PNL PANEL
POL POLISHED
PR PAIR or PROPOSAL REQUEST
PREFAB PREFABRICATED
PREFIN PREFINISHED
PRESTR PRESTRESSED
PRIM PRIMARY
PROJ PROJECT
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POST TENSIONED or PORCELAINTILE
PTD PAINTED
PTDR PAPER TOWEL DISPENSER ANDRECEPTACLE
PTN PARTITION
PTR PAPER TOWEL RECEPTACLE
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
QT QUARRY TILE
HDR HEADER
HDWR HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR
HT HEIGHT
HTR HEATER
HVAC HEATING, VENTILATION and AIRCONDITIONING
HW HOT WATER
HWH HOT WATER HEATER
HWY HIGHWAY
IBC INTERNATIONAL BUILDING CODE
ID INSIDE DIAMETER
IN INCH(ES)
INCAND INCANDESCENT
INCL INCLUD(ED)
INFO INFORMATION
INSUL INSULATION or INSULATED
INT INTERIOR
INTMED INTERMEDIATE
INV INVERT
JC JANITOR CLOSET
JST JOIST
JT JOINT
KD KNOCKDOWN
KIT KITCHEN
KO KNOCKOUT
KP KICK PLATE
LAB LABORATORY
LAM LAMINATE
LAV LAVATORY
LBL LABEL
LDR LEADER
LH LEFT HAND
LKR LOCKER
LP LIGHTING PANEL or LIGHT PROOF
LT LIGHT
LTL LINTEL
LVR LOUVER
MACH MACHINERY
MAG MAGNETIC
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MB MOISTURE BARRIER
MECH MECHANICAL
MED MEDIUM
MEMB MEMBRANE
MEP MECHANICAL, ELECTRICAL andPLUMBING
MEZZ MEZZANINE
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MIRR MIRROR
EWH ELECTRIC WATER HEATER
EXT EXTERIOR
F FARENHEIT
FA FIRE ALARM
FAC FIRE ALARM CABINET
FACP FIRE ALARM CONTROL PANEL
FBO FURNISHED BY OTHER(S)
FD FLOOR DRAIN or FIRE DAMPER
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISHED FLOOR
FFL FINISHED FLOOR LINE
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FHMS FLAT HEAD MACHINE SCREW
FHV FIRE HOSE VALVE
FHWS FLAT HEAD WOOD SCREW
FIN FINISH(ED)
FIXT FIXTURE
FLG FLASHING
FLR FLOOR(ING)
FLUOR FLUORESCENT
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUD
FR FIRE RESISTIVE or FIRE RATED
FRP FIBERGLASS REINFORCEDPANEL(ING)
FRT FIRE RETARDANT TREATED
FT FOOT (FEET)
FTG FOOTING
FURN FURNISH(ED)
FURR FURRED or FURRING
FUT FUTURE
FVC FIRE VALVE CABINET
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GCMU GLAZED CONCRETE MASONRYUNIT(S)
GL GLASS or GLAZING
GND GROUND
GR GRADE
GRT GROUT
GWB GYPSUM WALLBOARD
GYP GYPSUM
GYP.BD.
GYPSUM BOARD
HAS HEADED ANCHOR STUD
HB HOSE BIB
HC HOLLOW CORE or HANDICAPPED
HDAS HEADED DEFORMED ANCHORSTUD
CJ CONTROL JOINT
CLG CEILING
CLOS CLOSET
CLR CLEAR
CM CENTIMETERS
CMU CONCRETE MASONRY UNIT
CO CHANGE ORDER or CLEANOUT
COL COLUMN
CONC CONCRETE
CONF CONFERENCE
CONN CONNECTION
CONSTR CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
CORR CORRIDOR or CORRUGATED
CPT CARPET
CT CERAMIC TILE
CTR COUNTER
CU CUBIC
CY CUBIC YARD
DAMP DAMPROOFING
DBL DOUBLE
DEG DEGREE
DEMO DEMOLISH or DEMOLITION
DEPT DEPARTMENT
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DISP DISPENSER
DIV DIVISION
DN DOWN
DR DOOR
DS DOWNSPOUT
DTL DETAIL
DWG DRAWING
DWR DRAWER
E EAST
EA EACH
EB EXPANSION BOLT
ED EXHAUST DUCT
EF EXHAUST FAN or EACH FACE
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
ENGR ENGINEER
EOS EDGE OF SLAB
EQ EQUAL
EQUIP EQUIPMENT
ES EACH SIDE
EST ESTIMATE
EW EACH WAY
EWC ELECTRIC WATER COOLER
# POUND(S) or NUMBER
& AND
(E) EXISTING
(N) NEW
(R) REMOVE
< ANGLE
@ AT
A/V AUDIO/VISUAL
AB ANCHOR BOLT
ABV ABOVE
ACOUS ACCOUSTICAL
ACT ACCOUSTICAL CEILING TILE
AD AREA DRAIN or ACCESS DOOR
ADD ADDENDUM
ADJ ADJACENT or ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AGG AGGREGATE
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZED
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ASI ARCHITECT'S SUPPLEMENTALINSTRUCTIONS
ASPH ASPHALT
AUTO AUTOMATIC
AVE AVENUE
AVG AVERAGE
AWP ACOUSTICAL WALL PANEL
B BASE
B.O. BOTTOM OF
B.O.F. BY OWNER, FUTURE
BD BOARD
BIT BITUMINOUS
BLDG BUILDING
BLKG BLOCKING
BM BEAM or BENCH MARK
BOT BOTTOM
BRG BEARING
BSMT BASEMENT
C CAULKING
C.L. CENTERLINE
CAB CABINET
CATV CABLE TELEVISION
CCD CONSTRUCTION CHANGEDIRECTIVE
CCTV CLOSED CIRCUIT TELEVISION
CDOT COLORADO DEPARTMENT OFTRANSPORTATION
CEM CEMENTITIOUS
CFL COUNTERFLASHING
CG CORNER GUARD
CIP CAST IN PLACE
CIRC CIRCUMFERENCE
DRAWING INDEX
SHEET NO. SHEET NAME
A0.02 PARTITION TYPES
A0.03 PARTITION TYPES
A1.00a SITE PLAN
A1.01a RENOVATION COSTS AREA PLAN
A1.01b FLOOR PLAN - FINE ARTS - DEMO
A1.01c FINE ARTS OVERALL PLAN
A1.02a FLOOR PLAN - WFA
A1.02b FLOOR PLAN - EFA
A1.02c FLOOR PLAN - NEW PAC
A1.11 REFLECTED CEILING PLAN
A2.00 BUILDING ELEVATIONS - WFA
A2.02 BUILDING ELEVATIONS - ADDITION
A3.01 BUILDING SECTIONS - PAC
A3.02 BUILDING SECTIONS - PAC
A9.01 3D DRAWINGS -PAC ADDITION
CIVIL
C1.01 ---
ARCHITECTURE
A0.00
STRUCTURAL
S1.01 ---
MECHANICAL
M1.01 ---
PLUMBING
P1.01 ---
ELECTRICAL
E1.01 ---
LCCC - LEVEL II PLANNING STUDY
PROJECT ABBREVIATIONS
STUDENTSERVICES
ARP
AUTO DIESEL
ADMIN
BUSINESS
TRAININGCENTER
CCC
DAY CARE
FINE ARTS [EXISTING]
NEW ADDITION SITE
PR
OJE
CT
DA
TE
:
LC
CC
LE
VE
L I
I P
LA
NN
ING
ST
UD
Y
Year.
month
.day
SITE PLAN
1" = 60'-0"1 FLOOR PLAN- SITE
N
3,044 SF
RENOVATED PR AREA697 SF
EXISTING STORAGEAREA
4,916 SF
RENOVATEDMUSIC/THEATER
AREA
3,797 SF
EXISTING I.T. ANDFOUNDATION AREA
1,469 SF
RENOVATEDCOMPUTER LABS
1,154 SF
EXISTING ARTS DEANSUITE2,317 SF
RENOVATEDMULTI-MEDIA /
WINGSPAN AREA
6,653 SF
RENOVATED VISUALARTS AREA
2,888 SF
RENOVATEDCERAMICS AREA
1,197 SF
EXISTING SHAREDCLASSROOM
1,305 SF
EXISTINGMECHANICAL
7,102 SF
NEW PERFORMANCEHALL
4,762 SF
NEW LOBBY &GALLERY
752 SF
RENOVATED I.T.OFFICES
742 SF
RENOVATED PIANOLAB
1,155 SF
RENOVATEDSTORAGE & OFFICES
1,884 SF
RENOVATEDTHEATER STUDIO
1,660 SF
EXISTING KILN YARD
408 SF
RENOVATEDBATHROOMS
557 SF
RENOVATED OFFICES1,108 SF
RENOVATED OFFICES
PR
OJE
CT
DA
TE
:
LC
CC
LE
VE
L I
I P
LA
NN
ING
ST
UD
Y
Year.
month
.day
RENOVATION COSTS AREA PLAN
1/16" = 1'-0"1
FINE ARTS RENOVATION & ADDITION AREASPLAN
Renovation & Addition Areas
Name Area Area Type Comments
EXISTING ARTS DEAN SUITE 1,154 SF Gross Building Area $25/SF
EXISTING I.T. AND FOUNDATION AREA 3,797 SF Gross Building Area $25/SF
EXISTING KILN YARD 1,660 SF Gross Building Area
EXISTING MECHANICAL 1,305 SF Gross Building Area $25/SF
EXISTING SHARED CLASSROOM 1,197 SF Gross Building Area $50/SF
EXISTING STORAGE AREA 697 SF Gross Building Area $25/SF
NEW LOBBY & GALLERY 4,762 SF Gross Building Area $400/SF
NEW PERFORMANCE HALL 7,102 SF Gross Building Area $600/SF
RENOVATED BATHROOMS 408 SF Gross Building Area
RENOVATED CERAMICS AREA 2,888 SF Gross Building Area $75/SF
RENOVATED COMPUTER LABS 1,469 SF Gross Building Area $75/SF
RENOVATED I.T. OFFICES 752 SF Gross Building Area $150/SF
RENOVATED MULTI-MEDIA / WINGSPAN AREA 2,317 SF Gross Building Area $150/SF
RENOVATED MUSIC/THEATER AREA 4,916 SF Gross Building Area $225/SF
RENOVATED OFFICES 557 SF Gross Building Area $150/SF
RENOVATED OFFICES 1,108 SF Gross Building Area $150/SF
RENOVATED PIANO LAB 742 SF Gross Building Area $150/SF
RENOVATED PR AREA 3,044 SF Gross Building Area $150/SF
RENOVATED STORAGE & OFFICES 1,155 SF Gross Building Area $150/SF
RENOVATED THEATER STUDIO 1,884 SF Gross Building Area $180/SF
RENOVATED VISUAL ARTS AREA 6,653 SF Gross Building Area $150/SF
8'-0"
EXISTING CONSTRUCTION TOBE REMOVED
DEMOLITION LEGEND:
DEMOLITION NOTES:
EXISTING CONSTRUCTION TO REMAIN
PR
OJE
CT
DA
TE
:
LC
CC
LE
VE
L I
I P
LA
NN
ING
ST
UD
Y
Year.
month
.day
FLOOR PLAN - FINE ARTS - DEMO
1/16" = 1'-0"1 FLOOR PLAN-WFA - EXISTING/DEMO
N
22
22
22
22
22
22
22
22
22
22
22
22
22
22
222
2222
2222
2222
2222
222
22
22
22
22
22
222
2222
2222
2
222
2222
2222
222
22
22
22
22
222
2222
2222
2222
2222
222
22
22
22
22
22
22
22
22
22
22
222
2222
2222
2222
2222
2222
222
22
22
22
22
22
22
22
22
22
22
22
22
2222
2222
2222
22
22
22
22
22
222
2222
2222
222
22
22
22
22
22
222
2222
2222
222
22
22
22
22
22
222
2222
2222
222
22
22
22
22
22
222
2222
2222
222
22
22
22
22
22
222
2222
2222
222
22
22
22
22
22
222
2222
2222
222
22222222
2222
2222
2222
2222
2222
2222
2222
2222
2222
22
22 22
222
222
2222
2222
22
22
22
22
22 2
222
222
222
2222
2222
22
2222
2222
22
22
22
222
222
2222
2222
22
2222222222222222222222
222222222222
222222222222
222222222222
2222222222
2222222222
2222
2222
22222222
A2.00
A2.00 3
A2.00
1
2
A5.01
1
2,048 SF
MUSIC REHEARSAL STUDIO
550 SF
THEATER / ARTS STORAGE
1,773 SF
THEATER STUDIO /CLASSROOM
827 SF
ARTS COLLAB. SPACE
692 SF
SHARED CLASSROOM
751 SF
PIANO PRACTICE
745 SF
COMPUTER CLASSROOM
721 SF
COMPUTER CLASSROOM
1,304 SF
PRINTING LAB
PR OFFICE
PR OFFICE
PR OFFICE
WORKROOM CONF. ROOM
PR OFFICE
PR OFFICE
PR OFFICE
434 SF
NEW PR STORAGE1,268 SF
MECHANICAL1,046 SF
FA DEAN'S SUITE
74 SF
RR
119 SF
PRACTICE
119 SF
PRACTICE
95 SF
PRACTICE
95 SF
PRACTICE
93 SF
PRACTICE
140 SF
MUSIC LIBRARY
113 SF
PRACTICE
408 SF
MUSIC STORAGE
2,569 SF
I.T. DEPT. [NO SCOPE]
1,314 SF
FOUNDATION [NO SCOPE]
2,862 SF
CERAMICS
311 SF
OFFICE BULLPEN
84 SF
OFFICE
146 SF
OFFICE
124 SF
OFFICE
126 SF
OFFICE
148 SF
ART OFFICE
148 SF
ART OFFICE
126 SF
OFFICE
126 SF
OFFICE
128 SF
OFFICE
2,329 SF
2D STUDIO
2,315 SF
2D STUDIO
1,626 SF
KILN YARD
85 SF
PRACTICE
107 SF
PRACTICE
122 SF
EXISTING RR
111 SF
THEATER STORAGE
1,203 SF
3D STUDIO
356 SF
VA STORAGE
196 SF
MENS RESTROOM
195 SF
WOMENS RESTROOM
147 SF
STORAGE
328 SF
RECEPTION
19'-5" 5'-0" 24'-5" 22'-4"
141 SF
OFFICE
861 SF
I.T. STORAGE
809 SF
MULTI-MEDIA / WINGSPAN
371 SF
MULTI-MEDIA / WINGSPAN
1,219 SF
GALLERY
187 SF
OFFICE
283 SF
BROADCAST LAB
142 SF
OFFICE
125 SF
PORTRAIT STUDIO80 SF
STORAGE
86 SF
BREAK AREA
7,118 SF
PERFORMANCE HALL
2,048 SF
LOBBY
3,608 SF
WFA CIRCULATION
2,639 SF
EFA CIRCULATION
506 SF
WFA CIRCULATION
A2.02 3
A2.02
1
A2.022
300 SF
UPS
208 SF
ELECTRICAL
307 SF
OFFICE BULLPEN
137 SF
OFFICE
137 SF
OFFICE
115 SF
OFFICE
149 SF
OFFICE
67 SF
WIRE CLOSET
217 SF
CONFERENCE
130 SF
OFFICE
181 SF
DRESSING RM
181 SF
DRESSING RM
PR
OJE
CT
DA
TE
:
LC
CC
LE
VE
L I
I P
LA
NN
ING
ST
UD
Y
Year.
month
.day
FINE ARTS OVERALL PLAN
1/16" = 1'-0"1 FLOOR PLAN - FINE ARTS OVERALL
N
2,862 SF
CERAMICS
311 SF
OFFICE BULLPEN
356 SF
VA STORAGE
2,329 SF
2D STUDIO
2,315 SF
2D STUDIO
1,203 SF
3D STUDIO
148 SF
ART OFFICE
124 SF
OFFICE
148 SF
ART OFFICE
126 SF
OFFICE
128 SF
OFFICE
126 SF
OFFICE
126 SF
OFFICE
506 SF
WFA CIRCULATION
196 SF
MENS RESTROOM
195 SF
WOMENS RESTROOM
146 SF
OFFICE
84 SF
OFFICE
53 SF
JANITOR
1,626 SF
KILN YARD
PLUMBING
ST
OR
AG
E
ST
OR
AG
E
PLU
MB
ING
PLU
MB
ING
TE
AC
HIN
G
WA
LL
SPRAY BOOTH: TWO HOODS
PLU
MB
ING
PLU
MB
ING
EX. HOODS / VENTS
TEACHING WALL
A2.00
A2.00 3
A2.00
1
2
A5.012
A5.01
1
1,773 SF
THEATER STUDIO /CLASSROOM
692 SF
SHARED CLASSROOM
751 SF
PIANO PRACTICE
745 SF
COMPUTER CLASSROOM
721 SF
COMPUTER CLASSROOM
1,046 SF
FA DEAN'S SUITE
111 SF
THEATER STORAGE
147 SF
STORAGE
141 SF
OFFICE
861 SF
I.T. STORAGE
809 SF
MULTI-MEDIA / WINGSPAN
371 SF
MULTI-MEDIA / WINGSPAN
187 SF
OFFICE
283 SF
BROADCAST LAB
142 SF
OFFICE
125 SF
PORTRAIT STUDIO
80 SF
STORAGE
86 SF
BREAK AREA
3,608 SF
WFA CIRCULATION
PR
OJE
CT
DA
TE
:
LC
CC
LE
VE
L I
I P
LA
NN
ING
ST
UD
Y
Year.
month
.day
FLOOR PLAN - WFA
1/8" = 1'-0"1 FLOOR PLAN-WFA
N
22 22
22
2,048 SF
MUSIC REHEARSAL STUDIO
550 SF
THEATER / ARTS STORAGE
1,773 SF
THEATER STUDIO /CLASSROOM
827 SF
ARTS COLLAB. SPACE
1,304 SF
PRINTING LAB
106 SF
PR OFFICE
108 SF
PR OFFICE
111 SF
PR OFFICE
Redundant Room
STORAGE
176 SF
WORKROOM
136 SF
CONF. ROOM
105 SF
PR OFFICE
103 SF
PR OFFICE
111 SF
PR OFFICE
434 SF
NEW PR STORAGE
1,268 SF
MECHANICAL
1,046 SF
FA DEAN'S SUITE
74 SF
RR
119 SF
PRACTICE
119 SF
PRACTICE
95 SF
PRACTICE
95 SF
PRACTICE
93 SF
PRACTICE
140 SF
MUSIC LIBRARY
113 SF
PRACTICE
408 SF
MUSIC STORAGE
2,569 SF
I.T. DEPT. [NO SCOPE]
1,314 SF
FOUNDATION [NO SCOPE]
85 SF
PRACTICE
107 SF
PRACTICE
122 SF
EXISTING RR
111 SF
THEATER STORAGE
328 SF
RECEPTION
1,219 SF
GALLERY2,048 SF
LOBBY
2,639 SF
EFA CIRCULATION
300 SF
UPS
208 SF
ELECTRICAL
137 SF
OFFICE
137 SF
OFFICE
115 SF
OFFICE149 SF
OFFICE
67 SF
WIRE CLOSET
217 SF
CONFERENCE
A3.021
A3.021
PR
OJE
CT
DA
TE
:
LC
CC
LE
VE
L I
I P
LA
NN
ING
ST
UD
Y
Year.
month
.day
FLOOR PLAN - EFA
1/8" = 1'-0"1 FLOOR PLAN-EFA
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
2222
2222
2222
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
2222
2222
2222
2222
2222
2222
2222
2222
2222
2222
2222
22
22 2
222
22
2222
2222
22
22
22
22
22
22
22
22
22
22
22
2222
2222
22
2222
2222
22
22
22
22
22
22
2222
2222
22
2222
2222
2222
2222
2222
22
2222
2222
2222
2222
2222
2222
2222
2222
2222
2222
2222
22
2222
2222
22
2222
2222
2222
2222
LOADING
2,048 SF
MUSIC REHEARSAL STUDIO
1,773 SF
THEATER STUDIO /CLASSROOM
74 SF
RR
93 SF
PRACTICE
140 SF
MUSIC LIBRARY
113 SF
PRACTICE
408 SF
MUSIC STORAGE
2,569 SF
I.T. DEPT. [NO SCOPE]
1,314 SF
FOUNDATION [NO SCOPE]
85 SF
PRACTICE
107 SF
PRACTICE
111 SF
THEATER STORAGE
1,219 SF
GALLERY
2,048 SF
LOBBY
7,118 SF
PERFORMANCE HALL
A2.02 3
A2.022
FOLLOW SPOT ABOVE
A3.021
A3.021
A3.011
A3.011
CONTROL BOOTHFOLLOW SPOT ABOVE
AD
A S
EA
TIN
G
PR
OJE
CT
DA
TE
:
LC
CC
LE
VE
L I
I P
LA
NN
ING
ST
UD
Y
Year.
month
.day
FLOOR PLAN - NEW PAC
1/8" = 1'-0"1 ENLARGED SITE PLAN- NEW BUILDING SOUTH
A3.021
A3.021
A3.011
A3.011
PR
OJE
CT
DA
TE
:
LC
CC
LE
VE
L I
I P
LA
NN
ING
ST
UD
Y
Year.
month
.day
REFLECTED CEILING PLAN
1/4" = 1'-0"1 LEVEL 01
LEVEL 0196' - 0"
LEVEL 02116' - 0"
71'-7 3/4"32'-4"
LEVEL 0196' - 0"
LEVEL 02116' - 0"
A5.011
Sim
EXAMPLE OF PROPOSED WALL CLADDING SYSTEM
LEVEL 0196' - 0"
LEVEL 02116' - 0"
PR
OJE
CT
DA
TE
:
LC
CC
LE
VE
L I
I P
LA
NN
ING
ST
UD
Y
Year.
month
.day
BUILDING ELEVATIONS - WFA
1/8" = 1'-0"1 WFA NORTH FACADE
1/8" = 1'-0"2 WFA SOUTH FACADE
1/8" = 1'-0"3 WFA WEST FACADE
A3.021
A3.021
A3.011
A3.011
A3.011
A3.011
PR
OJE
CT
DA
TE
:
LC
CC
LE
VE
L I
I P
LA
NN
ING
ST
UD
Y
Year.
month
.day
BUILDING ELEVATIONS - ADDITION
1/8" = 1'-0"1 PAC ADDITION - NORTH ELEVATION
1/8" = 1'-0"2 PAC ADDITION - EAST ELEVATION
1/8" = 1'-0"3 PAC ADDITION - WEST ELEVATION
A3.021
A3.021
PR
OJE
CT
DA
TE
:
LC
CC
LE
VE
L I
I P
LA
NN
ING
ST
UD
Y
Year.
month
.day
BUILDING SECTIONS - PAC
1/4" = 1'-0"1 PERFORMANCE HALL - CENTERLINE SECTION1
LEVEL 0196' - 0"
LEVEL 02116' - 0"
A3.011
A3.011
PR
OJE
CT
DA
TE
:
LC
CC
LE
VE
L I
I P
LA
NN
ING
ST
UD
Y
Year.
month
.day
BUILDING SECTIONS - PAC
1/4" = 1'-0"1
PERFORMANCE HALL - MIDPOINT SECTIONFACING PROCENIUM
LEVEL 0196' - 0"
A5.01
5
A5.01
4
DOUBLE-T RIB DOUBLE-T RIBDOUBLE-T RIB BEYOND
17
'-0
"
A5.01
5
VERTICAL STEEL CHANNEL GIRT SECURED TO CONCRETE
HORIZONTAL STEEL CHANNEL GIRT
VARIOUS PROFILES OF HEAVY GAGE METAL PANELA5.01
4 BREAK METAL CLOSURE PANEL
VERTICAL STEEL CHANNEL GIRT SECURED TO CONCRETE
HORIZONTAL STEEL CHANNEL GIRT
VARIOUS PROFILES OF HEAVY GAGE METAL PANEL
EXISTING CONCRETE DOUBLE-T WALL
2"2"
2"
17
'-0
"
2'-0"
O.C
. T
YP
.
METAL PARAPET CAP
VERTICAL STEEL CHANNEL GIRT SECURED TO CONCRETE
HORIZONTAL STEEL CHANNEL GIRT
VARIOUS PROFILES OF HEAVY GAGE METAL PANEL
EXISTING CONCRETE DOUBLE-T WALL BEYOND
2"2" 2"
4"
17
'-0
"
6"
2'-0"
O.C
. T
YP
.
METAL PARAPET CAP
PR
OJE
CT
DA
TE
:
LC
CC
LE
VE
L I
I P
LA
NN
ING
ST
UD
Y
Year.
month
.day
DETAILS - WFA CLADDING
1/2" = 1'-0"1 ELEVATION DETAIL - DOUBLE-T CLADDING
1/2" = 1'-0"2 PLAN DETAIL - DOUBLE-T WALL CLADDING
3 DOUBLE-T CLADDING
1/2" = 1'-0"5 SECTION DETAIL - DOUBLE-T WALL CLADDING
1/2" = 1'-0"4
SECTION DETAIL - DOUBLE-T WALL CLADDING2
PR
OJE
CT
DA
TE
:
LC
CC
LE
VE
L I
I P
LA
NN
ING
ST
UD
Y
Year.
month
.day
3D DRAWINGS -PAC ADDITION
1 3D VIEW FROM NW 2 3D VIEW FROM NE
3 3D VIEW FROM SW 4 3D VIEW FROM SE