Located in the Tahoe-Reno Industrial Corridor and with
an on-site substation designed to deliver 280 MW of
utility power, EdgeCore’s Reno Data Center Campus is
planned to support 225 MW of critical load across one
million square feet of new, state-of-the-art data centers.
With sub-4 millisecond latency to the Bay Area, low-cost
utility power including renewable options, and a design
PUE of < 1.25, our Reno Campus offers an intelligent
solution to mission-critical customer requirements.
By ensuring low-latency network access to leading
cloud providers coupled with our 100% uptime SLA,
EdgeCore’s national data center platform supports the
high-performance, high-availability needs of demanding
enterprises. Our Tier III design and best-in-class facilities
management underpin the trust that customers have
put in our team for decades. Finally, our relentless focus
on customer service ensures that you will be met with
experienced professionals at every touch point.
edgecore.com
![Page 2: RENO CAMPUS - Fastly€¦ · management underpin the trust that customers have put in our team for decades. Finally, our relentless focus on customer service ensures that you will](https://reader034.vdocuments.site/reader034/viewer/2022043017/5f39af75e0775a0821652ebc/html5/thumbnails/2.jpg)
FLOOR PLAN
WHYRENO?
Reno Airport
200 S Virginia St
Reno Campus
30 min
25 min
Secure Entry
Data Hall
Generators
Loading Dock
• Attractive TCO profile compared to the Bay Area and other western US markets
• Reno’s climate supports data center free cooling approximately 70% of the year
• Nevada has no corporate or personal income tax
• Tax savings from Nevada’s data center tax incentive legislation
![Page 3: RENO CAMPUS - Fastly€¦ · management underpin the trust that customers have put in our team for decades. Finally, our relentless focus on customer service ensures that you will](https://reader034.vdocuments.site/reader034/viewer/2022043017/5f39af75e0775a0821652ebc/html5/thumbnails/3.jpg)
SITESPECIFICATIONSBuilding - RENO 1
• Size: 180,000 square feet supporting raised and non-raised floor environments
• Power: 40 MW of utility power designed to support up to 32 MW of critical load at a design PUE of < 1.25
• Located in a low natural-disaster risk area outside of the 500-year flood plain
FACILITY OPERATIONS
• 24x7 on-site facilities management
INFRASTRUCTURE
• N, N+1 and 2N UPS systems with lithium-ion batteries
• Standby generators supporting N, N+1, and 2N redundancies
• Fuel storage: 48 hours of run time at full load
• Air-cooled chillers with economizers supported by independent utility and generator feeds
• Redundant chilled water loops
• Lighting: Zoned lighting controls utilizing efficient dimmable LEDs
• Elevators: 2 freight elevators each rated to 10,000 lbs
SECURITY
• 24x7 security staff
• Video monitored surveillance
• Card and bio access controls
• Mantrap entry with anti-tailgating security system
FIRE & LIFE SAFETY
• Addressable smoke detection
• Pre-action fire sprinklers
AMENITIES
• Secure staging and storage adjacent to loading dock
• Tech lounge
• Private and shared office space available
• Ample on-site parking
*Buildout shown reflects six buildings of 180,000 square feet each, totaling over 1 million square feet. Configuration can be revised easily; flexible designs and build-to-suit are available.
SITE PLAN
![Page 4: RENO CAMPUS - Fastly€¦ · management underpin the trust that customers have put in our team for decades. Finally, our relentless focus on customer service ensures that you will](https://reader034.vdocuments.site/reader034/viewer/2022043017/5f39af75e0775a0821652ebc/html5/thumbnails/4.jpg)
DATA CENTERS• Scalable, secure access to best-in-class
cloud providers enabling hybrid- and multi-cloud enterprise architectures
• Facilities designed to meet or exceed Tier III standards
• Best-in-class 24x7 on-site facilities support
• Modular design and proven construction practices enable 12-week expansion timeline within existing shell
• LEED Gold design
• Design PUE of < 1.25
BACKGROUND• Founded by industry veterans with
a combined 65 years of data center experience
• Headquartered in Denver, CO
• Experience developing over 40 data centers totaling more than 2 million square feet
FINANCIAL STRENGTH• Institutional capital with a long-term view
• Initial capitalization designed to support data center investments exceeding $2.0 billion expandable to over $4.0 billion
PRODUCTS• Turn-key data center
• Infrastructured shell
• Powered shell
• Build-to-suit
EdgeCore is a US-based provider of highly scalable,
cloud-connected data center solutions to the
world’s most demanding customers. Backed by
some of the world’s largest institutional investors
as we roll out our North American platform, we
are currently developing data center campuses
in Dallas, Phoenix, and Reno, with initial capacity
available in the fourth quarter of 2018. We plan to
develop campuses in three additional markets in
2018, with each campus designed to support over
100 MW of critical load. EdgeCore is committed
to enabling the growth and performance of our
customers across our highly scalable platform of
new, state-of-the-art data centers, all supported by
our relentless focus upon delivering an outstanding
customer experience.