BoRit Asbestos Superfund SiteRemedial Overview of USACE Reservoir Report
January 15, 2014
Jill Lowe, EPA Travis Fatzinger, USACE
![Page 2: Remedial Overview of USACE Reservoir Report January 15, 2014 Jill Lowe, EPA Travis Fatzinger, USACE](https://reader035.vdocuments.site/reader035/viewer/2022062318/55168b86550346a2698b6209/html5/thumbnails/2.jpg)
BoRit Asbestos Superfund SiteOverview
USACE Report on BoRit ReservoirReservoir HydrologyBerm StabilityOptions Reviewed
![Page 3: Remedial Overview of USACE Reservoir Report January 15, 2014 Jill Lowe, EPA Travis Fatzinger, USACE](https://reader035.vdocuments.site/reader035/viewer/2022062318/55168b86550346a2698b6209/html5/thumbnails/3.jpg)
BoRit Asbestos Superfund SiteUSACE Report
Remedial Inter Agency Agreement (IA) with U.S. Army Corps of Engineers (USACE)Tasks
Analyze Hydraulics of Reservoir Assess Berm Stability
Investigations Performed Geotechnical Investigations Water Level Investigation Berm slope stability and seepage
![Page 4: Remedial Overview of USACE Reservoir Report January 15, 2014 Jill Lowe, EPA Travis Fatzinger, USACE](https://reader035.vdocuments.site/reader035/viewer/2022062318/55168b86550346a2698b6209/html5/thumbnails/4.jpg)
BoRit Asbestos Superfund SiteUSACE Report
Hydraulics StudyTransducers – March-August 2013
3 transducers in wells MW-01a, MW-02, and MW-03 1 in Reservoir
Transducer – July 2013-August 2013 1 transducer in background well, MW-07
![Page 5: Remedial Overview of USACE Reservoir Report January 15, 2014 Jill Lowe, EPA Travis Fatzinger, USACE](https://reader035.vdocuments.site/reader035/viewer/2022062318/55168b86550346a2698b6209/html5/thumbnails/5.jpg)
Monitoring LocationsBoRit Asbestos Superfund Site
Ambler, PA
Figure 3.1
August 2013
LegendMonitoring Well, Transducer
Monitoring Well, No Transducer
Staff Gauge, Transducer
Staff Gauge, No Transducer
Pennsylvania
BoRit
![Page 6: Remedial Overview of USACE Reservoir Report January 15, 2014 Jill Lowe, EPA Travis Fatzinger, USACE](https://reader035.vdocuments.site/reader035/viewer/2022062318/55168b86550346a2698b6209/html5/thumbnails/6.jpg)
BoRit Asbestos Superfund SiteUSACE Report
Hydraulics Study ConclusionsReservoir
No direct correlation between groundwater and Reservoir
Water levels correlate to rainfall and evaporation Known seep is not significant
Groundwater Significant drawdown Monday through Friday
o Identified 2-Non-potable production wells
![Page 7: Remedial Overview of USACE Reservoir Report January 15, 2014 Jill Lowe, EPA Travis Fatzinger, USACE](https://reader035.vdocuments.site/reader035/viewer/2022062318/55168b86550346a2698b6209/html5/thumbnails/7.jpg)
BoRit Asbestos Superfund SiteUSACE Report
![Page 8: Remedial Overview of USACE Reservoir Report January 15, 2014 Jill Lowe, EPA Travis Fatzinger, USACE](https://reader035.vdocuments.site/reader035/viewer/2022062318/55168b86550346a2698b6209/html5/thumbnails/8.jpg)
Geophysical Investigation
Multi-channel analysis of surface waves (MASW)Characterize Soil
Self-potential (SP)Water flow
EM61 Metal Detector
Ground Penetrating Radar (GPR)
Probable pipe locations targeted based upon drawings from Whitpain Township and removal workKnown pipes likely filled in with sedimentation
8
![Page 9: Remedial Overview of USACE Reservoir Report January 15, 2014 Jill Lowe, EPA Travis Fatzinger, USACE](https://reader035.vdocuments.site/reader035/viewer/2022062318/55168b86550346a2698b6209/html5/thumbnails/9.jpg)
Zone of Weak Material in SW BermBoRit Asbestos Superfund Site
Ambler, PA
Figure 2.2
August 2013
![Page 10: Remedial Overview of USACE Reservoir Report January 15, 2014 Jill Lowe, EPA Travis Fatzinger, USACE](https://reader035.vdocuments.site/reader035/viewer/2022062318/55168b86550346a2698b6209/html5/thumbnails/10.jpg)
Geotechnical Investigation
Boring locations based on survey cross-sections, geophysical results, and seepage locations
Three BoringsContinuous Split Spoon SamplingAdvanced until bedrock refusal
Lab testing on SamplesIncluded sieve analyses, triaxial consolidated-
undrained, unconfined compression
10
![Page 11: Remedial Overview of USACE Reservoir Report January 15, 2014 Jill Lowe, EPA Travis Fatzinger, USACE](https://reader035.vdocuments.site/reader035/viewer/2022062318/55168b86550346a2698b6209/html5/thumbnails/11.jpg)
Locations of BOB-1, BOB-2, and BOB-3BoRit Asbestos Superfund Site
Ambler, PA
Figure 2.4
August 2013
![Page 12: Remedial Overview of USACE Reservoir Report January 15, 2014 Jill Lowe, EPA Travis Fatzinger, USACE](https://reader035.vdocuments.site/reader035/viewer/2022062318/55168b86550346a2698b6209/html5/thumbnails/12.jpg)
Slope Stability Model
GeoStudio 2012Seep /WSlope /W
Survey Profiles
Soil Profiles
Lab Results
12
![Page 13: Remedial Overview of USACE Reservoir Report January 15, 2014 Jill Lowe, EPA Travis Fatzinger, USACE](https://reader035.vdocuments.site/reader035/viewer/2022062318/55168b86550346a2698b6209/html5/thumbnails/13.jpg)
BOB-2 Current Geometry High HeadBoRit Asbestos Superfund Site
Ambler, PA
Figure 4.5
August 2013
Legend
FS= 0.93
Pennsylvania
BoRit
Layer Material γ (lbs/ft3) φ(°) Cohesion (lbs/ft2)Region 1 Sandy SILT (Drained) 115 22 0Region 2 Poorly Graded SAND (Drained) 120 33 0Region 3 Bedrock N/A N/A N/ARegion 4 N/A N/A N/A N/ARegion 5 Clean Silty Sand FILL (Drained) 115 34 0Region 6 Dense Silty SAND (Drained) 125 34 0Region 7 Loose Silty SAND (Drained) 115 29 0
![Page 14: Remedial Overview of USACE Reservoir Report January 15, 2014 Jill Lowe, EPA Travis Fatzinger, USACE](https://reader035.vdocuments.site/reader035/viewer/2022062318/55168b86550346a2698b6209/html5/thumbnails/14.jpg)
Current ConditionSlope Stability Results
Current Geometry
Boring Factor of Safety1
Normal Water Level
Factor of SafetyHigh Head
Level
BOB-1 3.28 2.70
BOB-2 1.12 0.93
BOB-3 1.46 1.26
1 Factor of Safety = material strength/design load. USACE target is 1.4
14
![Page 15: Remedial Overview of USACE Reservoir Report January 15, 2014 Jill Lowe, EPA Travis Fatzinger, USACE](https://reader035.vdocuments.site/reader035/viewer/2022062318/55168b86550346a2698b6209/html5/thumbnails/15.jpg)
BoRit Asbestos Superfund SiteUSACE Report
USACE Options to cover ACM and stabilize bermOption 1
Flatten exterior slope Add stability berm to exterior toe of slope (Wissahickon
side)Option 2
SheetpileOption 3
Increase berm’s cross-sectional width Flatten interior slope to 3H:1V =18° Material stable to 30° resulting in Factor of Safety of 1.7
![Page 16: Remedial Overview of USACE Reservoir Report January 15, 2014 Jill Lowe, EPA Travis Fatzinger, USACE](https://reader035.vdocuments.site/reader035/viewer/2022062318/55168b86550346a2698b6209/html5/thumbnails/16.jpg)
BOB-2 Proposed Geometry Normal HeadBoRit Asbestos Superfund Site
Ambler, PA
Figure 4.8
August 2013
Legend
FS= 1.63
Pennsylvania
BoRit
Layer Material γ (lbs/ft3) φ(°) Cohesion (lbs/ft2)Region 1 Sandy SILT (Drained) 115 22 0Region 2 Poorly Graded SAND (Drained) 120 33 0Region 3 Bedrock N/A N/A N/ARegion 4 N/A N/A N/A N/ARegion 5 Clean Silty Sand FILL (Drained) 115 34 0Region 6 Dense Silty SAND (Drained) 125 34 0Region 7 Loose Silty SAND (Drained) 115 29 0
Region 12 BACKFILL 110 30 0
![Page 17: Remedial Overview of USACE Reservoir Report January 15, 2014 Jill Lowe, EPA Travis Fatzinger, USACE](https://reader035.vdocuments.site/reader035/viewer/2022062318/55168b86550346a2698b6209/html5/thumbnails/17.jpg)
Proposed GeometrySlope Stability Results
17
Proposed Geometry
Boring Factor of SafetyNormal with Fill
Factor of SafetyHigh Head with Fill
BOB-1 3.87 3.44
BOB-2 1.63 1.62
BOB-3 1.57 1.47
![Page 18: Remedial Overview of USACE Reservoir Report January 15, 2014 Jill Lowe, EPA Travis Fatzinger, USACE](https://reader035.vdocuments.site/reader035/viewer/2022062318/55168b86550346a2698b6209/html5/thumbnails/18.jpg)
Option 3 with GCLSupplement clay fill with Geosynthetic Clay Liner (GCL)GCL consists of bentonite between layers
of Geotextile“Self Healing” PropertiesBenefits
Reduced berm widthHomogenous, uniform installationLess fill and haul trucks required
Sand and Clay fill geotechnical properties testing complete
GCL FS for Bob-2 Normal head conditions 1.50, High head 1.41
![Page 19: Remedial Overview of USACE Reservoir Report January 15, 2014 Jill Lowe, EPA Travis Fatzinger, USACE](https://reader035.vdocuments.site/reader035/viewer/2022062318/55168b86550346a2698b6209/html5/thumbnails/19.jpg)
GCL/ Backfill placementBackfill material Sandy Lean ClayClay material placed on inside slope
compacted in lifts to 90% standard ProctorGCL placed on top- then covered by 2-3 ft
additional compacted clayExisting berm will be dry and compacted
from additional weight
![Page 20: Remedial Overview of USACE Reservoir Report January 15, 2014 Jill Lowe, EPA Travis Fatzinger, USACE](https://reader035.vdocuments.site/reader035/viewer/2022062318/55168b86550346a2698b6209/html5/thumbnails/20.jpg)
BOB-2 GCL Normal HeadBoRit Asbestos Superfund Site
Ambler, PA January 2014
Legend
FS= 1.500
Pennsylvania
BoRit
Layer Material γ (lbs/ft3) φ(°) Cohesion (lbs/ft2)Region 1 Sandy SILT (Drained) 115 22 0Region 2 Poorly Graded SAND (Drained) 120 33 0Region 3 Bedrock N/A N/A N/ARegion 4 N/A N/A N/A N/ARegion 5 Clean Silty Sand FILL (Drained) 115 34 0Region 6 Dense Silty SAND (Drained) 125 34 0Region 7 Loose Silty SAND (Drained) 115 29 0
Region 12 BACKFILL 110 30 0