Remedial Action Construction Jane A. Williams, E.I. Mike Pennington, P.E. Natalie Monteiro, P.E. 3/30/2017 FDEP-PRP 1

Upload: others

Post on 25-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Remedial Action Construction

Jane A. Williams, E.I. Mike Pennington, P.E. Natalie Monteiro, P.E.

3/30/2017 FDEP-PRP 1

Page 2: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Remediation Methods

• Most Common: • Excavation • Air Sparging/Soil Vapor Extraction • Multi-Phase Extraction • Bio-Sparging

• Not as Common: • Biological Treatment • Chemical Treatment

3/30/2017 FDEP-PRP 2

Page 3: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Trenching

3/30/2017 FDEP-PRP 3

Page 4: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Air Sparging Compressor

3/30/2017 FDEP-PRP 4

Page 5: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Air Sparging Meters and Valves

3/30/2017 FDEP-PRP 5

Page 6: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Air Sparging/ Soil VaporExtraction Trailer

3/30/2017 FDEP-PRP 6

Page 7: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Soil Vapor Extraction Blower

3/30/2017 FDEP-PRP 7

Page 8: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Pump and Treat

• Use Ground Water Pumps to CaptureContaminated Groundwater • For Treatment use an Air Stripper or ActivatedCarbon to Remove Contaminants from Groundwater to Levels Acceptable forDisposal. • Disposal - Transfer to Infiltration Gallery,Injection Well, or Surface Water

3/30/2017 FDEP-PRP 8

Page 9: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Regulation

• NPDES (National Pollutant Discharge EliminationSystem) Permit • For Disposal of Treated Water to a Lake or Stream or

Storm Drain

• UIC (Underground Injection Control) • For Disposal of Treated Water to an Injection Well • For Injecting Chemicals into the Ground

3/30/2017 FDEP-PRP 9

Page 10: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Air Strippers

3/30/2017 FDEP-PRP 10

Page 11: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Off-Gas Treatment

• Treatment of Recovered Vapors • Thermal Treatment • Vapors Are Incinerated • Thermal Treatment: Catalytic Oxidizer, Internal

Combustion Engine

• Carbon Treatment • Vapors Are Absorbed On To Granular Activated Carbon

(GAC)

3/30/2017 FDEP-PRP 11

Page 12: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Thermal Vapor Treatment Unit

3/30/2017 FDEP-PRP 12

Page 13: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Granular Activated Carbon

3/30/2017 FDEP-PRP 13

Page 14: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Granular Activated Carbon

3/30/2017 FDEP-PRP 14

Page 15: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Biological Treatment

• Injection of Nutrients, Enzymes, etc. • Used Alone and in Conjunction with Other

Technologies • Enhanced Bio-Sparging

• Careful Planning Required • Not Always Easy to Get Injected Material in

Contact with Contamination

3/30/2017 FDEP-PRP 15

Page 16: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Biological Treatment

3/30/2017 FDEP-PRP 16

Page 17: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Chemical Treatment

• Oxidizing Chemicals are Injected Underground • Hydrogen Peroxide (H2O2) • Hydrogen Peroxide with Ozone (H2O2/O3) • Fenton’s Reagent (Iron-catalyzed Hydrogen Peroxide) • Potassium Permanganate (KMnO4)

• Heat and Chemistry Destroy the Contamination • Not Always Easy to Get Chemicals in Contact with

Contamination

3/30/2017 FDEP-PRP 17

Page 18: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Chemical Injection Treatment

3/30/2017 FDEP-PRP 18

Page 19: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Post Active Remediation Monitoring (PARM)

• Following Source Removal • 1 Groundwater Sampling Event if NO Previous

Groundwater Contamination Existed • 4 Quarters of Groundwater Sampling if Previous

Groundwater Contamination Existed

• Following O&M • Four Quarters of Groundwater Monitoring • Soil Confirmation (if applicable)

3/30/2017 FDEP-PRP 19

Page 20: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Scope of Work (SOW)

• Source Removal SOW • Schedule Pay Items • Attachment A

• Source Removal Table • Water Sampling Table • Soil-Air Sampling Table • Well Abandonment (if applicable) • Well Installation (if applicable)

• Remedial Action Construction SOW • Schedule Pay Items • Attachment A

• Remedial Action Construction (RAC)Table • Trenching Calculations Workbook

• O&M Parameters Table (Optional) • Water Sampling Table • Soil-Air Sampling Table • Well Abandonment (if applicable) • Well Installation (if applicable)

3/30/2017 FDEP-PRP 20

Page 21: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

RAC Table

3/30/2017 FDEP-PRP 21

Page 22: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

RAC Table Exercise

• Open your books to Construction Drawings 1through 3. • Fill out Section 5 and 6 of the RAC Table. • You have 15 minutes to complete this exercise.

3/30/2017 FDEP-PRP 22

Page 23: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Construction Drawing 2

3/30/2017 FDEP-PRP 23

Page 24: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Construction Drawing 3

3/30/2017 FDEP-PRP 24

Page 25: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Exercise Solution

3/30/2017 FDEP-PRP 25

Page 26: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Trenching Calculation Workbook

3/30/2017 FDEP-PRP 26

Page 27: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Trenching Example

3/30/2017 FDEP-PRP 27

Page 28: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Trenching Calculation Exercise

• Open your books to Construction Drawing 1 andDrawing 4. • Fill out the trenching workbook. • You have 15 minutes to complete this exercise.

3/30/2017 FDEP-PRP 28

Page 29: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Construction Drawing 1

3/30/2017 FDEP-PRP 29

Page 30: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Construction Drawing 4

3/30/2017 FDEP-PRP 30

williams_jaw
Pencil
williams_jaw
Typewritten Text
1
williams_jaw
Pencil
Page 31: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Exercise Solution

3/30/2017 FDEP-PRP 31

Page 32: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Exercise Solution

3/30/2017 FDEP-PRP 32

Page 33: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

ATC Contract • 17. Remediation System O&M Packaged Work

Scopes (Excluding Remediation System Equipment) • All inclusive packages on a monthly basis of

• Mobilization, Per Diem, Labor, and Materials • Equipment necessary for conduction operation monitoring,

system related sampling, preventative maintenance, troubleshooting after startup in accordance with the approved RAP.

• Excluding quarterly monitoring well sampling.

3/30/2017 FDEP-PRP 33

Page 34: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

ATC Contract

• 18. Remedial Action Equipment/System Use (EquipmentOnly, Excluding O&M)

• Unless otherwise specified, the following pay items include: • All equipment, material and non-O&M labor costs. • All down well groundwater pumps, if applicable • Carbon polishing equipment and initial carbon. • Major repairs or replacement items including remediation equipment

in need of replacement, and associated mobilizations to and form sitefor that purpose.

• Costs for equipment and liability insurance and/or liability damagewaivers.

• Mobilization to and from the site for replacement remediation system. • Excluding mobilization of personnel and equipment to and from site for

initial installation and final removal.

3/30/2017 FDEP-PRP 34

Page 35: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

ATC Contract System size is defined by the blower size (or water flow), number of legs, and air flow capacity

3/30/2017 FDEP-PRP 35

Page 36: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

ATC Contract Carbon Off-Gas Treatment Add-On size is defined by pounds of carbon.

3/30/2017 FDEP-PRP 36

Page 37: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Schedule of Pay Items Section 18 in the SPI lists the holding tanks and systems per month, per term, and per size.

3/30/2017 FDEP-PRP 37

Page 38: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Schedule of Pay Items Section 18 in the SPI lists the off gas treatment per month, per term, and per size.

3/30/2017 FDEP-PRP 38

Page 39: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

RAC SPI Well Installation

3/30/2017 FDEP-PRP 39

Page 40: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

RAC SPI Construction

3/30/2017 FDEP-PRP 40

Page 41: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

RAC SPI Baseline & Startup

3/30/2017 FDEP-PRP 41

Page 42: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

RAC SPI Example O&M Task

3/30/2017 FDEP-PRP 42

Page 43: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Soil Excavation

3/30/2017 FDEP-PRP 43

Page 44: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Large Diameter Auger (LDA)

3/30/2017 FDEP-PRP 44

Page 45: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Excavation, Dewatering and Sheet Piling

3/30/2017 FDEP-PRP 45

Page 46: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Source Removal Table

3/30/2017 FDEP-PRP 46

Page 47: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Source Removal Example

3/30/2017 FDEP-PRP 47

Page 48: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Source Removal Example

3/30/2017 FDEP-PRP 48

Page 49: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Source Removal Example

3/30/2017 FDEP-PRP 49

Page 50: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Source Removal Example

3/30/2017 FDEP-PRP 50

Page 51: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Source Removal SPI Example

3/30/2017 FDEP-PRP 51

Page 52: Remedial Action Construction · 2019-12-19 · Trenching Calculation Exercise • Open your books to Construction Drawing 1 and Drawing 4. • Fill out the trenching workbook. •

Source Removal SPI Example

3/30/2017 FDEP-PRP 52