reliability assessment/construction plan evaluation overview and assumptions

29
www.spp.org Reliability Assessment/Construction Plan Evaluation Overview and Assumptions 2007 Transmission Summit July 31, 2007 New Orleans, Louisiana

Upload: angus

Post on 12-Jan-2016

35 views

Category:

Documents


0 download

DESCRIPTION

Reliability Assessment/Construction Plan Evaluation Overview and Assumptions. 2007 Transmission Summit July 31, 2007 New Orleans, Louisiana. Reliability Assessment Assumptions. Reliability assessment used 2006 series models, April 2007 update. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Reliability Assessment/Construction Plan Evaluation Overview and Assumptions

www.spp.org

Reliability Assessment/Construction Plan Evaluation Overview and Assumptions

2007 Transmission SummitJuly 31, 2007

New Orleans, Louisiana

Page 2: Reliability Assessment/Construction Plan Evaluation Overview and Assumptions

www.spp.org

Reliability Assessment Assumptions

• Reliability assessment used 2006 series models, April 2007 update.

• Contingency scans were run on the 2008 Summer, 2008 Winter, 2010 Summer, 2012 Summer, 2012 Winter, and 2015 Summer

• Monitored elements and contingencies• 69 kV and above for: EES, LAGN, LEPA, CNWY, WMUC, DERS• 115 kV and above for: CLEC, LAFA, DENL, SMEP, AEPW, EMDE,

OKGE, SWPA• 230 kV and above for: SOCO, AMRN, AECI, TVA

• Breaker-breaker contingencies simulated• Category C contingencies simulated for Entergy system• 2012 Summer model presented

Page 3: Reliability Assessment/Construction Plan Evaluation Overview and Assumptions

www.spp.org

  SUMMER WINTER

 kV 2008S 2009S 2010S 2012S 2015S 2008W 2012W

               

69 0 0 0 0 2 0 0

115 0 0 0 1 2 0 0

138 0 0 0 0 4 0 0

161 0 0 0 0 2 0 0

230 0 0 0 0 0 0 0

345 0 0 0 0 0 0 0

500 0 0 0 0 0 0 0

TRANSFORMER 1 1 1 1 1 1 1

TOTAL 1 1 1 2 11 1 1

Count of Thermal Overloads Prior to Upgrades Category A

Page 4: Reliability Assessment/Construction Plan Evaluation Overview and Assumptions

www.spp.org

Count of Thermal Overloads Prior to Upgrades Category B

  SUMMER WINTER

 kV 2008S 2009S 2010S 2012S 2015S 2008W 2012W

               

69 15 17 14 19 34 10 15

115 60 60 72 92 119 7 12

138 15 15 21 40 39 3 6

161 11 14 18 20 33 0 4

230 2 3 3 5 4 1 2

345 0 0 0 0 0 0 0

500 0 1 0 0 0 0 0

TRANSFORMER 6 3 6 11 20 2 3

TOTAL 109 113 134 187 249 23 42

Page 5: Reliability Assessment/Construction Plan Evaluation Overview and Assumptions

www.spp.org

Count of Voltage Violations Prior to Upgrades Category A

  SUMMER WINTER

kV 2008S 2009S 2010S 2012S 2015S 2008W 2012W

             

69 0 0 0 0 3 2 4

115 0 1 2 2 4 0 0

138 0 0 0 0 0 1 0

161 1 1 1 1 7 0 0

230 1 0 0 0 0 1 0

345 0 0 0 0 0 0 0

500 0 0 0 0 0 0 0

               

TOTAL 2 2 3 3 15 4 4

Page 6: Reliability Assessment/Construction Plan Evaluation Overview and Assumptions

www.spp.org

Count of Voltage Violations Prior to Upgrades Category B

  SUMMER WINTER

 kV 2008S 2009S 2010S 2012S 2015S 2008W 2012W

             

69 31 35 39 51 37 23 27

115 249 274 258 292 356 48 120

138 27 39 36 46 50 7 23

161 25 28 35 42 87 3 6

230 10 14 14 14 17 1 6

345 0 1 1 0 0 0 0

500 2 2 1 0 1 2 3

               

TOTAL 344 393 384 445 548 84 185

Page 7: Reliability Assessment/Construction Plan Evaluation Overview and Assumptions

www.spp.org

Construction Plan Evaluation

• ICT evaluated Entergy’s draft Construction Plan Projects to determine:• What benefits were provided by the projects• If the projects addressed the reliability issues they were

designed to address• If any changes to the projects are necessary• If the projects comply with the Planning Criteria

• Construction Plan Projects were evaluated on the 2012 Summer model.

Page 8: Reliability Assessment/Construction Plan Evaluation Overview and Assumptions

www.spp.org

Entergy Reliability Assessment and Construction Plan EvaluationTexas ~ Louisiana South

2007 Transmission SummitJuly 31, 2007

New Orleans, Louisiana

Page 9: Reliability Assessment/Construction Plan Evaluation Overview and Assumptions

www.spp.org

Draft Construction Plan ProjectsGSU - Texas• Install Bluewater Cap Bank (2008)• Expand Calvert Cap Bank (2008)• Upgrade Fawil Auto (2008)• Beaumont 69 kV upgrades (2009)• Upgrade L886 Tamina – Conroe (2009)• Western Region Phase 3 (2011)• Upgrade Hartburg – Inland Orange (2012)

Page 10: Reliability Assessment/Construction Plan Evaluation Overview and Assumptions

www.spp.org

Draft Construction Plan ProjectsGSU - Louisiana

• Install Cap Bank at Winn (2008)• Upgrade Lawtag – Jennings (2008)• Install Cap Bank at McManus (2008)• Acadiana Area Voltage Improvement (2009)• Nesser Area Voltage Improvement (2009)• Amite South Import Phase 3 (2009)• Install Cap Bank at Colonial Academy (2010)• Upgrade Alchem – Monochem (2010)• Coly – Hammond (2011)

Page 11: Reliability Assessment/Construction Plan Evaluation Overview and Assumptions

www.spp.org

Draft Construction Plan ProjectsEntergy Louisiana South

• Alliance – Happy Jack (2008)• Amite South Import Phase 2 (2009)• Amite South Import Phase 3 (2009)• WESCO (2009)• Napoleonville Cap Bank (2010)• Peters Rd. – Oakville (2011)• Down Stream of Gypsy Phase 3 (2011)• Coly – Hammond (2011)

Page 12: Reliability Assessment/Construction Plan Evaluation Overview and Assumptions

www.spp.org

Draft Construction Plan ProjectsEntergy New Orleans

• ENOI• Restore Paterson (2008)

Page 13: Reliability Assessment/Construction Plan Evaluation Overview and Assumptions

www.spp.org

Bryan2012 Summer

Expand cap bank at Calvert

Page 14: Reliability Assessment/Construction Plan Evaluation Overview and Assumptions

www.spp.org

Western Region2012 Summer

Upgrade Porter – Conroe (2009)

Western Region Phase

3

Western Region Phase

3

Western Region Phase 3 (2011)

Page 15: Reliability Assessment/Construction Plan Evaluation Overview and Assumptions

www.spp.org

South Texas2012 Summer

Install cap bank at Bluewater (2008)

Upgrade Hartburg –

Inland Orange (2012)

Page 16: Reliability Assessment/Construction Plan Evaluation Overview and Assumptions

www.spp.org

Beaumont/Pt. Arthur2012 Summer

Beaumont area 69 kV Upgrades

Page 17: Reliability Assessment/Construction Plan Evaluation Overview and Assumptions

www.spp.org

Beaumont2012 Summer

Beaumont area 69 kV Upgrades

Beaumont area 69 kV Upgrades

Beaumont area 69 kV Upgrades

Page 18: Reliability Assessment/Construction Plan Evaluation Overview and Assumptions

www.spp.org

East Texas2012 Summer

Upgrade Fawil Auto (2008)

Cut in Line 81 Deweyville to Fawil (2007)

Page 19: Reliability Assessment/Construction Plan Evaluation Overview and Assumptions

www.spp.org

Lake Charles2012 Summer

Page 20: Reliability Assessment/Construction Plan Evaluation Overview and Assumptions

www.spp.org

Southwest LA2012 Summer

Upgrade Lawtag – Jennings (2009)

Install cap bank at Winn

(2008)

Close normally

open switch between Winn and

Lake Arthur

Page 21: Reliability Assessment/Construction Plan Evaluation Overview and Assumptions

www.spp.org

Acadiana2012 Summer

Meaux, Leblanc Cap Bank

additions (2009)

Colonial Academy Cap Bank

(2010)

Page 22: Reliability Assessment/Construction Plan Evaluation Overview and Assumptions

www.spp.org

Feliciana2012 Summer

Expand McManus Cap Bank

Page 23: Reliability Assessment/Construction Plan Evaluation Overview and Assumptions

www.spp.org

Baton Rouge2012 Summer

Port Hudson substation upgrades

(2007) Coly – Hammond 230

kV (2011)

Page 24: Reliability Assessment/Construction Plan Evaluation Overview and Assumptions

www.spp.org

Baton Rouge2012 Summer

Jefferson – Nesser 69 kV

(2009)

Page 25: Reliability Assessment/Construction Plan Evaluation Overview and Assumptions

www.spp.org

Upgrade Alchem – Monochem (2010)

GSU Industrial Corridor2012 Summer

Page 26: Reliability Assessment/Construction Plan Evaluation Overview and Assumptions

www.spp.org

Napoleonville Cap Bank (2010)

Southeast LA2012 Summer

Page 27: Reliability Assessment/Construction Plan Evaluation Overview and Assumptions

www.spp.org

Hammond – Amite convert to 230 kV (2007)

Coly-Hammond 230 kV line

(2011)

Northshore2012 Summer

Page 28: Reliability Assessment/Construction Plan Evaluation Overview and Assumptions

www.spp.org

New Orleans2012 Summer

Restore Patterson to 4-terminal configuration

(2008)

Page 29: Reliability Assessment/Construction Plan Evaluation Overview and Assumptions

www.spp.org

Alliance – Happy Jack

115 kV (2008)

Peters Rd – Oakville 230 kV

(2011)

Oakville

Plaquemines Parish2012 Summer