Reliability Assessment Assumptions
• Reliability assessment used 2006 series models, April 2007 update.
• Contingency scans were run on the 2008 Summer, 2008 Winter, 2010 Summer, 2012 Summer, 2012 Winter, and 2015 Summer
• Monitored elements and contingencies• 69 kV and above for: EES, LAGN, LEPA, CNWY, WMUC, DERS• 115 kV and above for: CLEC, LAFA, DENL, SMEP, AEPW, EMDE,
OKGE, SWPA• 230 kV and above for: SOCO, AMRN, AECI, TVA
• Breaker-breaker contingencies simulated• Category C contingencies simulated for Entergy system• 2012 Summer model presented
www.spp.org
SUMMER WINTER
kV 2008S 2009S 2010S 2012S 2015S 2008W 2012W
69 0 0 0 0 2 0 0
115 0 0 0 1 2 0 0
138 0 0 0 0 4 0 0
161 0 0 0 0 2 0 0
230 0 0 0 0 0 0 0
345 0 0 0 0 0 0 0
500 0 0 0 0 0 0 0
TRANSFORMER 1 1 1 1 1 1 1
TOTAL 1 1 1 2 11 1 1
Count of Thermal Overloads Prior to Upgrades Category A
www.spp.org
Count of Thermal Overloads Prior to Upgrades Category B
SUMMER WINTER
kV 2008S 2009S 2010S 2012S 2015S 2008W 2012W
69 15 17 14 19 34 10 15
115 60 60 72 92 119 7 12
138 15 15 21 40 39 3 6
161 11 14 18 20 33 0 4
230 2 3 3 5 4 1 2
345 0 0 0 0 0 0 0
500 0 1 0 0 0 0 0
TRANSFORMER 6 3 6 11 20 2 3
TOTAL 109 113 134 187 249 23 42
www.spp.org
Count of Voltage Violations Prior to Upgrades Category A
SUMMER WINTER
kV 2008S 2009S 2010S 2012S 2015S 2008W 2012W
69 0 0 0 0 3 2 4
115 0 1 2 2 4 0 0
138 0 0 0 0 0 1 0
161 1 1 1 1 7 0 0
230 1 0 0 0 0 1 0
345 0 0 0 0 0 0 0
500 0 0 0 0 0 0 0
TOTAL 2 2 3 3 15 4 4
www.spp.org
Count of Voltage Violations Prior to Upgrades Category B
SUMMER WINTER
kV 2008S 2009S 2010S 2012S 2015S 2008W 2012W
69 31 35 39 51 37 23 27
115 249 274 258 292 356 48 120
138 27 39 36 46 50 7 23
161 25 28 35 42 87 3 6
230 10 14 14 14 17 1 6
345 0 1 1 0 0 0 0
500 2 2 1 0 1 2 3
TOTAL 344 393 384 445 548 84 185
www.spp.org
Construction Plan Evaluation
• ICT evaluated Entergy’s draft Construction Plan Projects to determine:• What benefits were provided by the projects• If the projects addressed the reliability issues they were
designed to address• If any changes to the projects are necessary• If the projects comply with the Planning Criteria
• Construction Plan Projects were evaluated on the 2012 Summer model.
www.spp.org
Entergy Reliability Assessment and Construction Plan EvaluationTexas ~ Louisiana South
2007 Transmission SummitJuly 31, 2007
New Orleans, Louisiana
www.spp.org
Draft Construction Plan ProjectsGSU - Texas• Install Bluewater Cap Bank (2008)• Expand Calvert Cap Bank (2008)• Upgrade Fawil Auto (2008)• Beaumont 69 kV upgrades (2009)• Upgrade L886 Tamina – Conroe (2009)• Western Region Phase 3 (2011)• Upgrade Hartburg – Inland Orange (2012)
www.spp.org
Draft Construction Plan ProjectsGSU - Louisiana
• Install Cap Bank at Winn (2008)• Upgrade Lawtag – Jennings (2008)• Install Cap Bank at McManus (2008)• Acadiana Area Voltage Improvement (2009)• Nesser Area Voltage Improvement (2009)• Amite South Import Phase 3 (2009)• Install Cap Bank at Colonial Academy (2010)• Upgrade Alchem – Monochem (2010)• Coly – Hammond (2011)
www.spp.org
Draft Construction Plan ProjectsEntergy Louisiana South
• Alliance – Happy Jack (2008)• Amite South Import Phase 2 (2009)• Amite South Import Phase 3 (2009)• WESCO (2009)• Napoleonville Cap Bank (2010)• Peters Rd. – Oakville (2011)• Down Stream of Gypsy Phase 3 (2011)• Coly – Hammond (2011)
www.spp.org
Draft Construction Plan ProjectsEntergy New Orleans
• ENOI• Restore Paterson (2008)
www.spp.org
Bryan2012 Summer
Expand cap bank at Calvert
www.spp.org
Western Region2012 Summer
Upgrade Porter – Conroe (2009)
Western Region Phase
3
Western Region Phase
3
Western Region Phase 3 (2011)
www.spp.org
South Texas2012 Summer
Install cap bank at Bluewater (2008)
Upgrade Hartburg –
Inland Orange (2012)
www.spp.org
Beaumont/Pt. Arthur2012 Summer
Beaumont area 69 kV Upgrades
www.spp.org
Beaumont2012 Summer
Beaumont area 69 kV Upgrades
Beaumont area 69 kV Upgrades
Beaumont area 69 kV Upgrades
www.spp.org
East Texas2012 Summer
Upgrade Fawil Auto (2008)
Cut in Line 81 Deweyville to Fawil (2007)
www.spp.org
Lake Charles2012 Summer
www.spp.org
Southwest LA2012 Summer
Upgrade Lawtag – Jennings (2009)
Install cap bank at Winn
(2008)
Close normally
open switch between Winn and
Lake Arthur
www.spp.org
Acadiana2012 Summer
Meaux, Leblanc Cap Bank
additions (2009)
Colonial Academy Cap Bank
(2010)
www.spp.org
Feliciana2012 Summer
Expand McManus Cap Bank
www.spp.org
Baton Rouge2012 Summer
Port Hudson substation upgrades
(2007) Coly – Hammond 230
kV (2011)
www.spp.org
Baton Rouge2012 Summer
Jefferson – Nesser 69 kV
(2009)
www.spp.org
Upgrade Alchem – Monochem (2010)
GSU Industrial Corridor2012 Summer
www.spp.org
Napoleonville Cap Bank (2010)
Southeast LA2012 Summer
www.spp.org
Hammond – Amite convert to 230 kV (2007)
Coly-Hammond 230 kV line
(2011)
Northshore2012 Summer
www.spp.org
New Orleans2012 Summer
Restore Patterson to 4-terminal configuration
(2008)
www.spp.org
Alliance – Happy Jack
115 kV (2008)
Peters Rd – Oakville 230 kV
(2011)
Oakville
Plaquemines Parish2012 Summer