rekap gaji hatchery rembang mei kirim ke korlap
DESCRIPTION
Rekap GajiTRANSCRIPT
REKAPITULASI GAJI PT TRIMEGAH CIPTA MANDIRILOKASI : PT. CPJF REMBANGPERIODE : 21 APRIL - 20 MEI 2013
UNIT : HATCHERY REMBANG SEDAN
NO NAMA NIK BAG STS HK GPJam
Lembur
1 HABIB 15.10.12 Pullchick K 26 931,840 30.0
2 KUSANTO 15.10.12 Pullchick L 26 931,840 28.0
3 MOH RONGGIB 15.10.12 Holding L 27 967,680 20.0
4 AHMAD NAILUL LABIB 15.10.12 Holding L 29 1,039,360 19.5
5 MOH LABIB 15.10.12 Holding L 26 931,840 18.5
6 MOH FAIZIN 08.02.13 Transfer L 26 931,840 18.5
7 MUDRIK 08.02.13 Transfer L 26 931,840 20.0
8 ALI MUSTOFA 08.02.13 Holding L 21 752,640 21.0
9 ALFI 15.02.13 Setterman L 15 537,600 5.0
10 FIAN USTADI 15.02.13 Pullchick K 26 931,840 37.5
11 SUPRABTIYO 24.02.13 Holding K 28 1,003,520 26.0
12 SONGEB 24.02.13 Pullchick K 25 896,000 23.5
13 SOBIRIN 24.02.13 Transfer K 26 931,840 10.0
14 ISHA ANDRIYANA 15.03.13 Transfer L 26 931,840 24.5
15 AHMAD ROZIM 15.03.13 Pullchick L 26 931,840 22.5
16 MOHAMMAD WAHIDI 15.03.13 Transfer L 24 860,160 29.5
17 QIWAMUDDIN 21.03.13 Holding L 27 967,680 39.0
18 AHMAD MUSAFAK 12.04.13 Pullchick L 25 896,000 46.5
19 SITI SETIANING JATI 30.04.13 Grading L 17 609,280 9.0
20 ZUMMAROTUN NI'MAH 30.04.13 Grading L 17 609,280 9.0
21 KLISAB BUDI SANTOSO 30.04.13 Pullchick L 17 609,280 8.0
22 SUSDIANTO 15.10.12 Pullchick L 25 896,000 22.5
23 HERU PRASETIYO 01.05.13 Transfer L 16 573,440 18.5
24 ARIF'AN 01.05.13 Transfer L 16 573,440 18.5
25 MOH ABDUL KHALIM 02.05.13 Pullchick L 15 537,600 8.0
26 ALI NUR SYAFIQ 15.10.12 Mekanik L 26 931,840 9.0
27 AHMAD NURUS SHOFA 15.10.12 Mekanik L 26 931,840 8.0
28 MOH ICHROM 15.10.12 Mekanik L 26 931,840 22.5
29 WAHYU UTOMO 15.10.12 Mekanik K 26 931,840 15.0
30 MINANULLAH 15.03.13 Boiler L 26 931,840 13.5
31 SUYITNO 15.03.13 Boiler K 26 931,840 14.5
32 AINUN AFRIDDA 25.03.13 Godown L 26 931,840 3.0
33 MIFTACHUN NAFIAH 03.05.13 Washer K 16 573,440 3.0
34 NUR SHOLIKHIN 01.05.13 Boiler L 17 609,280 18.5
35 KIKIT TEGUH WALUYO 15.10.12 Korlap K 25 1,500,000 0.0
TOTAL 818 818 #VALUE!
LemburTunjangan SUB Pot Jmst TOTAL
TTDKeahlian TOTAL 2% DITERIMA
287,445 - 1,219,285 17,920 1,201,300 1
264,139 - 1,195,979 17,920 2,427,797 2
186,451 - 1,154,131 17,920 2,344,102 3
183,861 - 1,223,221 17,920 2,482,283 4
176,092 - 1,107,932 17,920 2,251,705 5
168,324 - 1,100,164 17,920 2,236,167 6
186,451 - 1,118,291 17,920 2,272,422 7
194,220 - 946,860 17,920 1,929,559 8
44,023 - 581,623 17,920 1,199,086 9
347,006 - 1,278,846 17,920 2,593,532 10
243,422 - 1,246,942 17,920 2,529,724 11
222,705 - 1,118,705 17,920 2,273,250 12
85,457 - 1,017,297 17,920 2,070,433 13
233,064 - 1,164,904 17,920 2,365,647 14
212,347 - 1,144,187 17,920 2,324,214 15
269,318 - 1,129,478 17,920 2,294,796 16
347,006 - 1,314,686 17,920 2,665,212 17
424,694 - 1,320,694 17,920 2,677,227 18
88,046 - 697,326 17,920 1,430,492 19
88,046 - 697,326 17,920 1,430,492 20
77,688 - 686,968 17,920 1,409,776 21
217,526 - 1,113,526 17,920 2,262,892 22
173,503 - 746,943 17,920 1,529,726 23
173,503 - 746,943 17,920 1,529,726 24
77,688 - 615,288 17,920 1,266,416 25
82,867 134,400 1,149,107 17,920 2,468,454 26
80,277 134,400 1,146,517 17,920 2,463,275 27
212,347 134,400 1,278,587 17,920 2,727,414 28
139,838 1,071,678 17,920 2,179,196 29
129,480 1,061,320 17,920 2,158,480 30
137,249 1,069,089 17,920 2,174,017 31
23,306 89,600 1,044,746 17,920 2,214,933 32
23,306 596,746 17,920 1,229,333 33
173,503 782,783 17,920 1,601,406 34
- 1,500,000 30,000 3,060,000 35
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
REKENINGNAMA
8010104084167 HABIB
8010104094162 KUSANTO
8010104090168 MOH RONGGIB
8010104088161 AHMAD NAILUL LABIB
8010104092160 MOH LABIB
8010104198160 MOH FAIZIN
8010104182169 MUDRIK
8010104183165 ALI MUSTOFA
8010104196168 ALFI
8010104197164 FIAN USTADI
8010103999165 SUPRABTIYO
8010104000163 SONGEB
6010100843165 SOBIRIN
8010104130162 ISHA ANDRIYANA
8010104132164 AHMAD ROZIM
8010104128165 MOHAMMAD WAHIDI
6010100844161 QIWAMUDDIN
8010104273164 AHMAD MUSAFAK
TUNAI
TUNAI
TUNAI
8010104093166 SUSDIANTO
TUNAI
TUNAI
TUNAI
8010104089167 ALI NUR SYAFIQ
8010104284165 AHMAD NURUS SHOFA
8010104087165 MOH ICHROM
8010104086169 WAHYU UTOMO
8010104133160 MINANULLAH
8010104134166 SUYITNO
8010104142169 AINUN AFRIDDA
8010104533166 MIFTACHUN NAFIAH
TUNAI
8010104072160 KIKIT TEGUH WALUYO
- 35,747,200
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : HABIBNIK : 15.10.12 1Jabatan : Pullchick
Total Hari : 26Gaji : Rp. 931,840 Lembur : 30 Rp. 287,445 Uang Karantina : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. - +Sub Total : Rp. 1,219,285 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 1,201,365 Terima 1,201,300
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
HABIB Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : KUSANTONIK : 15.10.12 2Jabatan : Pullchick
Total Hari : 26Gaji : Rp. 931,840 Lembur : 28 Rp. 264,139 Tunj. Keahlian : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. - +Sub Total : Rp. 1,195,979 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 1,178,059 Terima 1,178,000
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
KUSANTO Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : MOH RONGGIBNIK : 15.10.12 3Jabatan : Holding
Total Hari : 27Gaji : Rp. 967,680 Lembur : 20 Rp. 186,451 Tunj. Keahlian : Rp. - Insentif DOC Rp. -
Tunj. Keahlian : Rp. - +Sub Total : Rp. 1,154,131 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 1,136,211 Terima 1,136,200
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
MOH RONGGIB Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : AHMAD NAILUL LABIBNIK : 15.10.12 4Jabatan : Holding
Total Hari : 29Gaji : Rp. 1,039,360 Lembur : 19.5 Rp. 183,861 Tunj. Keahlian : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. - +Sub Total : Rp. 1,223,221 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 1,205,301 Terima 1,205,300
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
AHMAD NAILUL LABIB Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : MOH LABIBNIK : 15.10.12 5Jabatan : Holding
Total Hari : 26Gaji : Rp. 931,840 Lembur : 18.5 Rp. 176,092 Tunj. Keahlian : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. - +
Sub Total : Rp. 1,107,932 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 1,090,012 Terima 1,090,000
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
MOH LABIB Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : MOH FAIZINNIK : 08.02.13 6Jabatan : Transfer
Total Hari : 26Gaji : Rp. 931,840 Lembur : 18.5 Rp. 168,324 Uang Karantina : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. - +Sub Total : Rp. 1,100,164 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 1,082,244 Terima 1,082,200
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
MOH FAIZIN Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : MUDRIKNIK : 08.02.13 7Jabatan : Transfer
Total Hari : 26Gaji : Rp. 931,840 Lembur : 20 Rp. 186,451 Uang Karantina : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. - +Sub Total : Rp. 1,118,291 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 1,100,371 Terima 1,100,300
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
MUDRIK Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : ALI MUSTOFANIK : 08.02.13 8Jabatan : Holding
Total Hari : 21Gaji : Rp. 752,640 Lembur : 21 Rp. 194,220 Uang Karantina : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. - +Sub Total : Rp. 946,860 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 928,940 Terima 928,900
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
ALI MUSTOFA Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : ALFINIK : 15.02.13 9Jabatan : Setterman
Total Hari : 15Gaji : Rp. 537,600 Lembur : 5 Rp. 44,023 Uang Karantina : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. - +Sub Total : Rp. 581,623 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 563,703 Terima 563,700
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
ALFI Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI
Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : FIAN USTADINIK : 15.02.13 10Jabatan : Pullchick
Total Hari : 26Gaji : Rp. 931,840 Lembur : 37.5 Rp. 347,006 Uang Karantina : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. - +Sub Total : Rp. 1,278,846 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 1,260,926 Terima 1,260,900
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
FIAN USTADI Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : SUPRABTIYONIK : 24.02.13 11Jabatan : Holding
Total Hari : 28Gaji : Rp. 1,003,520 Lembur : 26 Rp. 243,422 Uang Karantina : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. - +Sub Total : Rp. 1,246,942 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 1,229,022 Terima 1,229,000
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
SUPRABTIYO Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : SONGEBNIK : 24.02.13 12Jabatan : Pullchick
Total Hari : 25Gaji : Rp. 896,000 Lembur : 23.5 Rp. 222,705
Uang Karantina : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. - +Sub Total : Rp. 1,118,705 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 1,100,785 Terima 1,100,700
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
SONGEB Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : SOBIRINNIK : 24.02.13 13Jabatan : Transfer
Total Hari : 26Gaji : Rp. 931,840 Lembur : 10 Rp. 85,457 Uang Karantina : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. - +Sub Total : Rp. 1,017,297 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 999,377 Terima 999,300
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
SOBIRIN Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : ISHA ANDRIYANANIK : 15.03.13 14Jabatan : Transfer
Total Hari : 26Gaji : Rp. 931,840 Lembur : 24.5 Rp. 233,064 Uang Karantina : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. - +Sub Total : Rp. 1,164,904
Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 1,146,984 Terima 1,146,900
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
ISHA ANDRIYANA Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : AHMAD ROZIMNIK : 15.03.13 15Jabatan : Pullchick
Total Hari : 26Gaji : Rp. 931,840 Lembur : 22.5 Rp. 212,347 Uang Karantina : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. - +Sub Total : Rp. 1,144,187 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 1,126,267 Terima 1,126,200
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
AHMAD ROZIM Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : MOHAMMAD WAHIDINIK : 15.03.13 16Jabatan : Transfer
Total Hari : 24Gaji : Rp. 860,160 Lembur : 29.5 Rp. 269,318 Uang Karantina : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. - +Sub Total : Rp. 1,129,478 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 1,111,558 Terima 1,111,500
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
MOHAMMAD WAHIDI Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : QIWAMUDDINNIK : 21.03.13 17Jabatan : Holding
Total Hari : 27Gaji : Rp. 967,680 Lembur : 39 Rp. 347,006 Uang Karantina : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. - +Sub Total : Rp. 1,314,686 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 1,296,766 Terima 1,296,700
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
QIWAMUDDIN Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : AHMAD MUSAFAKNIK : 12.04.13 18Jabatan : Pullchick
Total Hari : 25Gaji : Rp. 896,000 Lembur : 46.5 Rp. 424,694 Uang Karantina : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. - +Sub Total : Rp. 1,320,694 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 1,302,774 Terima 1,302,700
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
AHMAD MUSAFAK Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit Hatchery
Nama : SITI SETIANING JATINIK : 30.04.13 19Jabatan : Grading
Total Hari : 17Gaji : Rp. 609,280 Lembur : 9 Rp. 88,046 Uang Karantina : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. - +Sub Total : Rp. 697,326 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 679,406 Terima 679,400
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
SITI SETIANING JATI Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : ZUMMAROTUN NI'MAHNIK : 30.04.13 20Jabatan : Grading
Total Hari : 17Gaji : Rp. 609,280 Lembur : 9 Rp. 88,046 Uang Karantina : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. - +Sub Total : Rp. 697,326 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 679,406 Terima 679,400
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
ZUMMAROTUN NI'MAH Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : KLISAB BUDI SANTOSONIK : 30.04.13 21Jabatan : Pullchick
Total Hari : 17Gaji : Rp. 609,280 Lembur : 8 Rp. 77,688 Uang Karantina : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. - +Sub Total : Rp. 686,968 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 669,048 Terima 669,000
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
KLISAB BUDI SANTOSO Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : SUSDIANTONIK : 15.10.12 22Jabatan : Pullchick
Total Hari : 25Gaji : Rp. 896,000 Lembur : 22.5 Rp. 217,526 Uang Karantina : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. - +Sub Total : Rp. 1,113,526 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 1,095,606 Terima 1,095,600
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
SUSDIANTO Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : HERU PRASETIYONIK : 01.05.13 23Jabatan : Transfer
Total Hari : 16Gaji : Rp. 573,440 Lembur : 18.5 Rp. 173,503 Uang Karantina : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. - +Sub Total : Rp. 746,943 Pot Absen : Rp. -
Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 729,023 Terima 729,000
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
HERU PRASETIYO Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : ARIF'ANNIK : 01.05.13 24Jabatan : Transfer
Total Hari : 16Gaji : Rp. 573,440 Lembur : 18.5 Rp. 173,503 Uang Karantina : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. - +Sub Total : Rp. 746,943 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 729,023 Terima 729,000
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
ARIF'AN Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : MOH ABDUL KHALIMNIK : 02.05.13 25Jabatan : Pullchick
Total Hari : 15Gaji : Rp. 537,600 Lembur : 8 Rp. 77,688 Uang Karantina : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. - +Sub Total : Rp. 615,288 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 597,368 Terima 597,300
Semarang, Mei 2013
Yang Menerima, Dibuat, Diketahui,
MOH ABDUL KHALIM Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : ALI NUR SYAFIQNIK : 15.10.12 26Jabatan : Mekanik
Total Hari : 26Gaji : Rp. 931,840 Lembur : 9 Rp. 82,867 Uang Karantina : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. 134,400 +Sub Total : Rp. 1,149,107 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 1,131,187 Terima 1,131,100
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
ALI NUR SYAFIQ Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : AHMAD NURUS SHOFANIK : 15.10.12 27Jabatan : Mekanik
Total Hari : 26Gaji : Rp. 931,840 Lembur : 8 Rp. 80,277 Uang Karantina : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. 134,400 +Sub Total : Rp. 1,146,517 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 1,128,597 Terima 1,128,500
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
AHMAD NURUS SHOFA Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : MOH ICHROM
NIK : 15.10.12 28Jabatan : Mekanik
Total Hari : 26Gaji : Rp. 931,840 Lembur : 22.5 Rp. 212,347 Uang Karantina : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. 134,400 +Sub Total : Rp. 1,278,587 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 1,260,667 Terima 1,260,600
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
MOH ICHROM Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : WAHYU UTOMONIK : 15.10.12 29Jabatan : Mekanik
Total Hari : 26Gaji : Rp. 931,840 Lembur : 15 Rp. 139,838 Uang Karantina : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. - +Sub Total : Rp. 1,071,678 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 1,053,758 Terima 1,053,700
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
WAHYU UTOMO Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : MINANULLAHNIK : 15.03.13 30Jabatan : Boiler
Total Hari : 26Gaji : Rp. 931,840
Lembur : 13.5 Rp. 129,480 Uang Karantina : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. - +Sub Total : Rp. 1,061,320 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 1,043,400 Terima 1,043,300
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
MINANULLAH Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : SUYITNONIK : 15.03.13 31Jabatan : Boiler
Total Hari : 26Gaji : Rp. 931,840 Lembur : 14.5 Rp. 137,249 Uang Karantina : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. - +Sub Total : Rp. 1,069,089 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 1,051,169 Terima 1,051,100
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
SUYITNO Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : AINUN AFRIDDANIK : 25.03.13 32Jabatan : Godown
Total Hari : 26Gaji : Rp. 931,840 Lembur : 3 Rp. 23,306 Uang Karantina : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. 89,600 +Sub Total : Rp. 1,044,746 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 1,026,826 Terima 1,026,800
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
AINUN AFRIDDA Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : MIFTACHUN NAFIAHNIK : 03.05.13 33Jabatan : Washer
Total Hari : 16Gaji : Rp. 573,440 Lembur : 3 Rp. 23,306 Uang Karantina : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. - +Sub Total : Rp. 596,746 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 578,826 Terima 578,800
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
MIFTACHUN NAFIAH Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : NUR SHOLIKHINNIK : 01.05.13 34Jabatan : Boiler
Total Hari : 17Gaji : Rp. 609,280 Lembur : 18.5 Rp. 173,503 Uang Karantina : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. - +Sub Total : Rp. 782,783 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 764,863 Terima 764,800
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
NUR SHOLIKHIN Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRI Gaji Periode 21 April - 20 Mei 2013 ; Lokasi : PT.CPJF Rembang Unit HatcheryNama : KIKIT TEGUH WALUYONIK : 15.10.12 35Jabatan : Korlap
Total Hari : 25Gaji : Rp. 1,500,000 Lembur : 0 Rp. - Uang Karantina : Rp. - Insentif DOC Rp. - Tunj. Keahlian : Rp. - +Sub Total : Rp. 1,500,000 Pot Absen : Rp. - Pot Jamst 2 % : Rp. 30,000 - Total Gaji : Rp. 1,470,000 Terima 1,470,000
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
KIKIT TEGUH WALUYO Krist S.Irfan
35,747,200
8
1,201,300 -
9
2,427,797 ###
10
2,344,102 ###
11
2,482,283 ###
12
2,251,705 ###
13
2,236,167 ###
14
2,272,422 ###
15
1,929,559 ###
16
1,199,086 (635,386)
17
2,593,532 ###
18
2,529,724 ###
REKAPITULASI GAJI PT TRIMEGAH CIPTA MANDIRILOKASI : PT. CPJF REMBANGPERIODE : 21 APRIL - 20 MEI 2013
UNIT : HATCHERY REMBANG SEDAN ; GAJI TUNAI
NO NAMA NIK BAG STS HK GPJam
Lembur
1 SITI SETIANING JATI 30.04.13 Grading L 17 609,280 9.0
2 ZUMMAROTUN NI'MAH 30.04.13 Grading L 17 609,280 9.0
3 KLISAB BUDI SANTOSO 30.04.13 Pullchick L 17 609,280 8.0
4 HERU PRASETIYO 01.05.13 Transfer L 16 573,440 18.5
5 ARIF'AN 01.05.13 Transfer L 16 573,440 18.5
6 MOH ABDUL KHALIM 02.05.13 Pullchick L 15 537,600 8.0
7 NUR SHOLIKHIN 01.05.13 Boiler L 17 609,280 18.5
TOTAL #REF! #REF! #VALUE!
LemburTunjangan SUB Pot Jmst TOTAL
TTDKeahlian TOTAL 2% DITERIMA
88,046 - 697,326 17,920 1,430,492 1
88,046 - 697,326 17,920 1,430,492 2
77,688 - 686,968 17,920 1,409,776 3
173,503 - 746,943 17,920 1,529,726 4
173,503 - 746,943 17,920 1,529,726 5
77,688 - 615,288 17,920 1,266,416 6
173,503 782,783 17,920 1,601,406 7
#REF! #REF! #REF! #VALUE! #REF! #REF!
REKENINGNAMA
TUNAI
TUNAI
TUNAI
TUNAI
TUNAI
TUNAI
TUNAI
- 4,847,900
REKAPITULASI GAJI PT TRIMEGAH CIPTA MANDIRILOKASI : PT. CPJF REMBANGPERIODE MEI 2013
UNIT : HATCHERY
NO NAMA N I K BAG STS GPTunjangan Lembur
Jabatan Nasional
1 DIDIX EXWANTO 01.15.10.12 SATPAM K 896,000 20,000 67,329
2 SUJATI 02.15.10.12 SATPAM K 896,000 20,000 67,329
3 RISWANTO 03.15.10.12 SATPAM K 896,000 20,000 67,329
4 KHABIB 04.01.05.13 SATPAM K 896,000 20,000 67,329
TOTAL 3,584,000 80,000 269,318
Lembur SUB Pot Jmst Pot. GARDA TOTALTTD
Biasa TOTAL 2% PRATAMA DITERIMA
178,682 1,162,012 17,920 200,000 944,000 1
178,682 1,162,012 17,920 200,000 944,000 2
178,682 1,162,012 17,920 200,000 944,000 3
178,682 1,162,012 17,920 - 1,144,000 4
714,728 4,648,046 71,680 600,000 3,976,000 366
REKENING
8010104049167 8010104049167
8010104027165 8010104027165
8010104256162 8010104256162
TUNAI 8010104036164
- 3,976,000
PT. TRIMEGAH CIPTA MANDIRIGaji Satpam Periode Mei 2013 ; Lokasi : PT.CPJF Unit Hatchery RembangNama : DIDIX EXWANTONIK : 01.15.10.12 1 ###Jabatan : SATPAM
Gaji Pokok : Rp. 896,000 Tunjangan Jab. : Rp. 20,000 Lembur Nasional : Rp. 67,329 Lembur Biasa Rp. 178,682 Rapel : Rp. - +Sub Total : Rp. 1,162,012 Pot Absen : Rp. - Pot.Atm : Rp. 200,000 Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 944,092 Terima 944,000
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
DIDIX EXWANTO Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRIGaji Satpam Periode Mei 2013 ; Lokasi : PT.CPJF Unit Hatchery RembangNama : SUJATINIK : 02.15.10.12 2 ###Jabatan : SATPAM
Gaji Pokok : Rp. 896,000 Tunjangan Jab. : Rp. 20,000 Lembur Nasional : Rp. 67,329 Lembur Biasa Rp. 178,682 Rapel : Rp. - +Sub Total : Rp. 1,162,012 Pot Absen : Rp. - Pot.Atm : Rp. 200,000 Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 944,092 Terima 944,000
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
SUJATI Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRIGaji Satpam Periode Mei 2013 ; Lokasi : PT.CPJF Unit Hatchery RembangNama : RISWANTONIK : 03.15.10.12 3 ###Jabatan : SATPAM
Gaji Pokok : Rp. 896,000 Tunjangan Jab. : Rp. 20,000 Lembur Nasional : Rp. 67,329 Lembur Biasa Rp. 178,682 Rapel : Rp. - +
Sub Total : Rp. 1,162,012 Pot Absen : Rp. - Pot.Atm : Rp. 200,000 Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 944,092 Terima 944,000
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
RISWANTO Krist S.Irfan
PT. TRIMEGAH CIPTA MANDIRIGaji Satpam Periode Mei 2013 ; Lokasi : PT.CPJF Unit Hatchery RembangNama : KHABIBNIK : 04.01.05.13 4 ###Jabatan : SATPAM
Gaji Pokok : Rp. 896,000 Tunjangan Jab. : Rp. 20,000 Lembur Nasional : Rp. 67,329 Lembur Biasa Rp. 178,682 Rapel : Rp. - +Sub Total : Rp. 1,162,012 Pot Absen : Rp. - Pot.Atm : Rp. - Pot Jamst 2 % : Rp. 17,920 - Total Gaji : Rp. 1,144,092 Terima 1,144,000
Semarang, Mei 2013Yang Menerima, Dibuat, Diketahui,
KHABIB Krist S.Irfan
3,976,000
REKAPITULASI GAJI PT TRIMEGAH CIPTA MANDIRILOKASI : PT. CPJF REMBANGPERIODE MEI 2013
UNIT : HATCHERY ; TUNAI
NO NAMA N I K BAG STS GPTunjangan Lembur
Jabatan Nasional
1 KHABIB 04.01.05.13 SATPAM K 896,000 20,000 67,329
TOTAL 896,000 20,000 67,329
Lembur SUB Pot Jmst Pot. GARDA TOTALTTD
Biasa TOTAL 2% PRATAMA DITERIMA
178,682 1,162,012 17,920 - 1,144,000 1
178,682 1,162,012 17,920 - 1,144,000 92
REKENING
TUNAI 8010104036164
- 1,144,000