2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 1
Rehabilitation of St. Marys Wycliffe Bridge in British Columbia, Canada
2nd International Conference on Timber Bridges Las Vegas, Nevada
2013 Sep 30 – Oct 02
Murray M. Johnson, P.Eng., PE
Buckland & Taylor Ltd.
Existing Bridge
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 2
Existing Bridge
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 3
Existing Bridge
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 4
Howe Truss Detail
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 5
Existing Bridge
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 6
Inspection: Deck Level Deterioration
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 7
Inspection: Deck Level Deterioration
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 8
Inspection: Deck Level Deterioration
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 9
Inspection: Deck Level Deterioration
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 10
Inspection: Deck Level Deterioration
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 11
Inspection: Deck Level Deterioration
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 12
Inspection: Deck Level Deterioration
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 13
Inspection: Queenpost Truss Deterioration
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 14
Inspection: Queenpost Truss Deterioration
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 15
Inspection: Queenpost Truss Deterioration
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 16
Inspection: Substructure Deterioration
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 17
Inspection: Substructure Deterioration
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 18
Inspection: Substructure Deterioration
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 19
Inspection: Substructure Deterioration
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 20
Inspection: South Slope Movement
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 21
Inspection: South Slope Movement
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 22
Inspection: South Slope Movement
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 23
Inspection: Howe Truss
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 24
Inspection: Howe Truss
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 25
Inspection: Main Piers
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 26
Inspection: Main Piers
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 27
Bridge Rehabilitation Design
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 28
Required:
Double load limit to 36 tonnes
Pedestrians and cyclists to share roadway
Drastically reduce maintenance requirements
Mitigate south slope movement problem
Solution:
Remove entire deck and barrier system
Keep main Howe truss span (55m), from floorbeams down
Keep existing concrete piers
Remove both queenpost spans and all trestle spans
Build new concrete abutments and new north bent
New 28 m and 18m/18m glulam girder spans
Select truss strengthening
Complete new deck system and crash-rated barriers, cyclist height
Bridge Rehabilitation Design
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 29
New Cross-section: Howe Truss Span
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 30
New Cross-section: Glulam Girder Approach Spans
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 31
New Deck System
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 32
New Crash-rated Barrier (cyclist height)
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 33
Construction
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 34
Construction
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 35
Supplemental Floorbeams
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 36
Ready for Deck
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 37
North Glulam Spans
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 38
Construction
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 39
Stringer Installation
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 40
Decking
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 41
Glulam Girders
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 42
Glulam Spans
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 43
Truss Rehabilitation & Strengthening
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 44
Truss Rehabilitation & Strengthening
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 45
Truss Rehabilitation & Strengthening
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 46
Truss Rehabilitation & Strengthening
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 47
Truss Rehabilitation & Strengthening
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 48
Completed Bridge
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 49
Completed Bridge
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 50
Completed Bridge: Barriers
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 51
Completed Bridge
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 52
Completed Bridge
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 53
2013 OCTOBER 01
2ND INTERNATIONAL CONFERENCE ON TIMBER BRIDGES 54
Thank You For Your Attention Questions?