regular meeting of the mcag governing board

108
Regular Meeting of the MCAG Governing Board Merced County Association of Governments Transit Joint Powers Authority for Merced County Merced County Regional Waste Management Authority LOCATION: County of Merced County Admin Building Board of Supervisors Chambers 2222 M Street Merced, CA 95340 (209) 723-3153 Date: Thursday, December 21, 2017 Time: 3:00 P.M. Governing Board Members Director Rodrigo Espinoza, Chairperson Merced County Supervisor Director Alex McCabe, Vice Chairperson Council Member, City of Livingston Director April Hogue Mayor, City of Dos Palos Director Lee Lor Merced County Supervisor Director Daron McDaniel Merced County Supervisor Director Mike Murphy Mayor, City of Merced Director Jerry O’Banion Merced County Supervisor Director Joe Oliveira Council Member, City of Gustine Director Lloyd Pareira Merced County Supervisor Director Jim Price Mayor, City of Atwater Director Mike Villalta Mayor, City of Los Banos 001

Upload: others

Post on 03-May-2022

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Regular Meeting of the MCAG Governing Board

Regular Meeting of the MCAG Governing Board

Merced County Association of Governments

Transit Joint Powers Authority for Merced County Merced County Regional Waste Management Authority

LOCATION:

County of Merced County Admin Building

Board of Supervisors Chambers 2222 M Street

Merced, CA 95340 (209) 723-3153

Date:

Thursday, December 21, 2017

Time: 3:00 P.M.

Governing Board Members

Director Rodrigo Espinoza, Chairperson Merced County Supervisor Director Alex McCabe, Vice Chairperson Council Member, City of Livingston Director April Hogue Mayor, City of Dos Palos Director Lee Lor Merced County Supervisor Director Daron McDaniel Merced County Supervisor Director Mike Murphy Mayor, City of Merced Director Jerry O’Banion Merced County Supervisor Director Joe Oliveira Council Member, City of Gustine Director Lloyd Pareira Merced County Supervisor Director Jim Price Mayor, City of Atwater Director Mike Villalta Mayor, City of Los Banos

001

Page 2: Regular Meeting of the MCAG Governing Board

AGENDA

At least 72 hours prior to each regular MCAG Governing Board meeting, a complete agenda packet is available for review on the MCAG website at www.mcagov.org or at the MCAG office, 369 W. 18th Street, Merced, CA 95340. All public records relating to an open session item and copies of staff reports or other written documentation relating to items of business referred to on the agenda are on file at MCAG. Persons with questions concerning agenda items may call MCAG to make an inquiry regarding the nature of items described on the agenda.

TRANSLATION SERVICES

Translation Services are not provided at MCAG’s public meeting unless requested at least three (3) business days in advance. Please contact Eva Garibay at (209) 723-3153 x 108 during regular business hours to request translation services. Servicios de interpreté no son ofrecidos en las juntas públicas de MCAG al menos de que se soliciten tres (3) días de negoción en anticipación. Para solicitas estos servicios por favor contacte a Eva Garibay al (209) 723-3153 x 108 durante horas de oficina.

INDIVIDUALS WITH DISABILITIES

Representatives or individuals with disabilities should contact MCAG at (209)723-3153 at least three (3) days in advance of the meeting to request auxiliary aids or other accommodations necessary to participate in the public meeting.

PUBLIC COMMENT

Members of the public wishing to address agenda items or comment on any item not on the agenda may do so during agenda item 5 – Public Comment. Persons may also address any item on the agenda during consideration of that item. Comments are limited to three (3) minutes per person. Please state your name and city or community of residence for the record. For items not on the agenda, no action will be taken. If it requires action, the item will be referred to staff and/or placed on the next agenda.

ADDITIONAL INFORMATION

Merced County Association of Governments (209)723-3153 www.mcagov.org Transit Joint Powers Authority for Merced County (209)723-3100 www.mercedthebus.com Merced County Regional Waste Authority (209)723-4481 www.mcrwma.org

Merced Data Special Services (209)723-3153 www.mcaggis.com

Welcome to the MCAG Governing Board Meeting!

002

Page 3: Regular Meeting of the MCAG Governing Board

ITEM ACTION STAFF Pg. #

# Attachment + Enclosure

1. Pledge of Allegiance

2. Invocation TBD

3. Roll Call

4. Approval of Agenda Action

5. Public Comment

6. 2017 Excellence in Commuter Options Award -Presentation

Presentation Kari McNickle

7. Dibs Annual Report - Presentation Presentation Kari McNickle

# 8. Minutes Action Pg. 7

a. Regional Waste Management Authority Board meetingfor November 16, 2017

b. Transit Joint Powers Authority for Merced Countymeeting for November 16, 2017

c. Merced County Association of GovernmentsGoverning Board meeting for November 16, 2017

# 9. Citizens Advisory Committee Report Info Jack Jackson Pg. 14

The Citizens Advisory Committee is part of the MercedCounty Association of Governments. Its mission is to be theeyes, ears and the voice of the Citizens of Merced Countyand to make recommendations to the Governing Boardconcerning all areas of transportation.

MERCED COUNTY ASSOCIATION OF GOVERNMENTS

10. Caltrans Report Info Tom Dumas

11. Information/Discussion Only

# a. MCAG Newsletter - December 2017 Pg. 16 # b. Dibs Quarterly Activity Report July - September 2017 Pg. 21 # c. MCAG Governing Board 2018 Meeting Schedule Pg. 26 # d. State Clearinghouse Letter for Central Valley

Opportunity CenterPg. 28

# e. MCAG Financial Report for July 2017 - September 2017(unaudited)

Pg. 39

# f. One Voice Update Pg. 43 # g. Technical Review Board meeting minutes for

December 13, 2017Pg. 46

003

Page 4: Regular Meeting of the MCAG Governing Board

ITEM ACTION STAFF Pg. #

# Attachment + Enclosure

12. Consent Agenda Action

# a. 2017 Federal Transportation Improvement Program(FTIP) Formal Amendment No. 10: RepurposedEarmarks, Highway Bridge Program, FederalEmergency Management Agency (FEMA) Funding forMariposa Park and Ride Lot Repair

Pg. 52

b. Authorization to Award Contract for Multi-Use PathFeasibility Studies

Pg. 58

c. Authorization to Award Contract to Spriggs Inc. forMCAG Copier Equipment and Maintenance Services

Pg. 61

13. Authorization to Award Contract for PavementManagement System Services

Action Ty Phimmasone Pg. 63

Authorize the Executive Director to enter into a contract forpavement management services with Dynatest NorthAmerica, Inc. for $501,381.

14. Transportation Planning Priorities FY 2018-19 Info Stacie Dabbs Pg. 67

For information only.

15. Regional Transportation Impact Fee (RTIF) Update Info Patrick Pittenger Pg. 70

For information only.

16. Social Services Transportation Advisory CouncilRecruitment

Info Natalia Austin Pg. 74

For information only.

TRANSIT JOINT POWERS AUTHORITY FOR MERCED COUNTY

# 17. TJPA Financial Report for July 2017 – September 2017(unaudited)

Info Nav Bagri Pg. 77

For information only.

# 18. Authorization to Award Contract for Architectural andEngineering Services for The Bus Maintenance Facility

Action Artis Smith Pg. 80

Authorize the Executive Director to enter into a contractwith Golden Valley Engineering for Architectural,Engineering and Surveying Services for The BusMaintenance Facility in an amount not to exceed $65,000.

004

Page 5: Regular Meeting of the MCAG Governing Board

ITEM ACTION STAFF Pg. #

# Attachment + Enclosure

19. Approve the Purchase of Solar Powered Lights for BusStop Posts

Action Artis Smith Pg. 83

Approve the purchase of solar powered lighting equipmentthrough a CalACT Purchasing Cooperative Agreement withTolar Manufacturing Company, Inc.

MERCED COUNTY REGIONAL WASTE MANAGEMENT AUTHORITY

# 20. Oral Report - Merced County Regional Waste ManagementAuthority Monthly Update

Info Brooks Stayer Pg. 85

# 21. Merced County Regional Waste Management AuthorityFinancial Reports

Info Nadia Gonzalez Pg. 88

For information only.

# 22. Modification to Amended Contract No. WMA2011-05 withRemy, Moose, Manley LLC (RMM)

Action Brooks Stayer Pg. 92

Authorize the MCAG Executive Director to execute ContractNo. WMA2011-05 with the modified insurance section.

23. Authorization to Award Contract for Fixed-Wing DroneSystem Purchase

Action Brooks Stayer Pg. 107

Authorize the Executive Director to enter into a contract withRDO Integrated Controls, Sacramento, CA for the purchase of afixed-wing drone and peripherals at a cost not to exceed$41,769.34.

OTHER REPORTS

24. Executive Director’s Report Info Patrick Pittenger

25. Directors’ Reports Info

Next Meeting: The next MCAG Governing Board meeting will be held on January 18 , 2017 at 3:00 p.m. at the

City of Livingston.

I certify under penalty of perjury under the laws of the State of California that the foregoing agenda was posted at the Merced County Association of Governments not less than 72 hours prior to the meeting.

______________________________ Dated this December 14, 2017 Joy Young, Administrative Assistant II

005

002

Page 6: Regular Meeting of the MCAG Governing Board

ITEM 8

006

Page 7: Regular Meeting of the MCAG Governing Board

ITEM 8

MCAG Governing Board Regional Waste Management Authority Board

Transit Joint Powers Authority Board MINUTES

DATE Thursday, November 16, 2017

The regular meeting of the Merced County Association of Governments Governing Board held on Thursday, November 16, 2017, at the City of Dos Palos, City/County Admin Building, 1546 Golden Gate Avenue, Dos Palos, CA was called to order by Chair Espinoza at 3:00 P.M.

DIRECTORS PRESENT MCAG STAFF PRESENT Director Rodrigo Espinoza, Chair Stacie Dabbs, Deputy Executive Director Director Alex McCabe, Vice Chair Matt Fell, Senior Transportation Planner Director April Hogue Nadia Gonzalez, Financial Services Manager Director Lee Lor (left at 3:30pm) Emily Haden, Legal Counsel Director Daron McDaniel Jennifer Halpin, Diversion Program Manager Director Mike Murphy Patrick Pittenger, Executive Director Director Jerry O’Banion Brooks Stayer, Regional Waste Authority Director Director Lloyd Pareira (arrived at 3:15pm) Marty Yerrick, Landfill Operations Manager Director Mike Villalta Joy Young, Administrative Assistant II

DIRECTORS ABSENT Director Jim Price Director Joe Oliveria

GUESTS AND MEMBERS OF THE PUBLIC Jose Delgadillo, CAC Representative Patti Dossetti, League of Women Voters Tom Dumas, Chief, Office of Metropolitan Planning, Caltrans, District 10 Darrell Fonseca, City Manager, Dos Palos Dan Leavitt, Manager of Regional Initiatives , San Joaquin Rail Commission

007

Page 8: Regular Meeting of the MCAG Governing Board

1. Pledge of Allegiance 2. Invocation At this time, Michael McGlynn led the invocation. 3. Roll Call 4. Approval of agenda Director McDaniel moved to approve the November 16, 2017, MCAG Governing Board agenda. Seconded by Director O’Banion. Ayes – Directors Espinoza, Hogue, Lor, McCabe, McDaniel, Murphy, O’Banion, Pareira, Villalta Noes - None MOTION CARRIED UNANIMOUSLY. 5. Public Comment No public comments were received. 6. ACE Presentation Dan Leavitt of the San Joaquin Rail Commission gave a presentation on ACE forward which

included extensions and service improvements. 7. Minutes a. Regional Waste Management Authority Board meeting for October 19, 2017 b. Transit Joint Powers Authority for Merced County Board meeting for October 19, 2017 c. Merced County Association of Governments Governing Board meeting for October 19, 2017 Director O’Banion moved to approve the minutes of the Regional Waste Management Authority,

the Transit Joint Powers Authority and the Merced County Association of Governments Governing Board meeting.

Seconded by Director Pareira. Ayes – Directors Espinoza, Hogue, Lor, McCabe, McDaniel, Murphy, O’Banion, Pareira, Villalta Noes - None MOTION CARRIED UNANIMOUSLY. 8. Citizens Advisory Committee Report Jose Delgadillo gave the Citizens Advisory Committee report. MERCED COUNTY REGIONAL WASTE MANAGEMENT AUTHORITY 9. Oral Report – Merced County Regional Waste Management Authority Monthly Update Brooks Stayer gave the Merced County Regional Waste Management Authority monthly update

which included closure fund estimates, revenue sources based on tonnage and the current recycling contract, capital projects and projected future expenses.

008

Page 9: Regular Meeting of the MCAG Governing Board

10. Quarterly Diversion Programs Update Jennifer Halpin gave an update on household hazardous waste (HHW) events, HHW that is

accepted daily at the landfills, a searchable recycling guide on the website with an address-specific platform coming to the website soon, and the mattress recycling program.

11. Excess Revenue Cash Transfers Director McDaniel moved to authorize staff to transfer $4.6 million from the RWA operating fund

to the RWA capital projects fund. Seconded by Director O’Banion. Ayes – Directors Espinoza, Hogue, McCabe, McDaniel, Murphy, O’Banion, Pareira, Villalta Noes - None MOTION CARRIED UNANIMOUSLY. 12. Highway 59 Landfill Conservation Easement Cattle Grazing Contract No. WMA2017-10 Director O’Banion moved to authorize execution of Contract No. WMA2017-10 for cattle grazing

services. Seconded by Director McCabe. Ayes – Directors Espinoza, Hogue, McCabe, McDaniel, Murphy, O’Banion, Pareira, Villalta Noes - None MOTION CARRIED UNANIMOUSLY. 13. Property Damage Claim Director McDaniel moved to reject the property damage claim of $4,500 due to an eye witness

account of roof damage to vehicle prior to loading, lack of plausibility for window damage in conjunction with a delay in reporting the damage.

Seconded by Director McCabe. Ayes – Directors Espinoza, Hogue, McCabe, McDaniel, Murphy, O’Banion, Pareira, Villalta Noes - None MOTION CARRIED UNANIMOUSLY. TRANSIT JOINT POWERS AUTHORITY FOR MERCED COUNTY

14. Oral Report – Transit Joint Powers Authority for Merced County Monthly Update Patrick Pittenger gave the Transit Joint Powers Authority for Merced County monthly update and

announced Artis Smith as the new Transit Director at MCAG. Anthony Alves, Maintenance Manager for National Express Transit, presented information on

maintenance of transit vehicles. He noted that the maintenance facility operations have recently become nationally certified and that a surprise inspection by CHP went well.

009

Page 10: Regular Meeting of the MCAG Governing Board

15. Amendment to Contract for Project Management Services for Operations and Maintenance

Facility Director O’Banion moved to authorize the Executive Director to amend the contract with CSCE,

Inc. for Project Management Services to an increased amount of $229,642.35 of the total cost of $629,378.59.

Seconded by Director McDaniel. Ayes – Directors Espinoza, Hogue, McCabe, McDaniel, Murphy, O’Banion, Pareira, Villalta Noes - None MOTION CARRIED UNANIMOUSLY. MERCED COUNTY ASSOCIATION OF GOVERNMENTS

16. Caltrans Report Tom Dumas gave the Caltrans report and informed the board of the construction happening on

Highway 165. Director Pareira asked about the status of the bridges on Highway 59 and stated that a petition

drive is being led by a constituent. Chair Espinoza asked about the sign in Planada that has been taken down. Tom stated he will

look into it. Tom Dumas stated that Highway 99 in Madera County has a short portion that is widened, but it

is too short to open to the public. A larger project for widening is in design and funds are being sought for construction.

17. Information/Discussion Only a. MCAG Newsletter – November 2017 b. MCAG 50th Anniversary Open House Flyer c. Support Letter for Kern COG’s Sustainable Transportation Planning Grant Proposal d. One Voice Letter of Support for Merced Irrigation District’s Sustainable Groundwater

Planning Grant Application e. Letter of Support for San Joaquin Regional Rail Commission’s INFRA Grant Application for

San Joaquin Valley Rail Enhancement Project f. RTIF Quarterly Report for July 2017 – September 2017 So noted. 18. Consent Agenda Director Villalta moved to approve the Consent Agenda. a. Final Draft 2018 Regional Transportation Improvement Program (RTIP) for Adoption b. 2017 Federal Transportation Improvement Program (FTIP) Formal Amendment No. 9 Seconded by Director McCabe. Ayes – Directors Espinoza, Hogue, McCabe, McDaniel, Murphy, O’Banion, Pareira, Villalta Noes - None MOTION CARRIED UNANIMOUSLY. 010

Page 11: Regular Meeting of the MCAG Governing Board

19. SB 375 Greenhouse Gas Emission Reduction Targets - Update Matt Fell gave an update on the SB 375 Greenhouse Gas Emission Reduction targets stating that

the Regional Transportation Plan is moving forward. The California Air Resources Board was scheduled to adopt new targets at their November meeting, but they postponed taking action and have not set a new date for the target yet.

20. Regional Transportation Plan - Scenarios Matt Fell gave an update on the Regional Transportation Plan stating that meetings were held

and comments have been received. He stated that this item will come back to the board in the future for approval of a preferred scenario.

21. Oral Report – Measure V Update Stacie Dabbs gave an update on Measure V stating that the financials have been sent to everyone

and will continue to circulate as information is updated. Stacie stated that the true-up amounts have been more than the projected amounts. She stated that local projects are underway and that signs have been distributed to jurisdictions to post at project sites. Magnetic signs have been provided for vehicles as well.

22. 2018 Anna Maria Fuentes Scholarship Stacie Dabbs gave an update on the 2018 Anna Maria Fuentes Scholarship program stating that

this program was in memory of and is a tribute to Anna Maria Fuentes who was a Grants Program Manager at MCAG. She stated that the scholarship application form is now available and has been shared with all high schools in Merced County and is posted on the MCAG website.

23. Citizens Advisory Committee Representative Appointment Director Villalta moved to appoint Paul Ward as the Commerce/Finance Representative to the

Citizens Advisory Committee. Seconded by Director O’Banion. Ayes - Directors Espinoza, Hogue, McCabe, McDaniel, O’Banion, Pareira, Villalta Noes - None Abstain - Director Murphy MOTION CARRIED. 24. Executive Director’s Report Patrick invited the board to MCAG’s 50th Anniversary on Thursday, December 21st from 5:30 to

7:30 p.m. and invited the board to attend the Board Retreat on November 17th from 9:00 to 3:00 p.m. in Merced. Patrick noted staffing changes within MCAG and announced Artis Smith as the new Transit Director. MCAG currently has an open position for a Financial Analyst and interviews have been held.

011

Page 12: Regular Meeting of the MCAG Governing Board

25. Directors’ Report Director McCabe stated that the City of Livingston passed a resolution supporting DACA. Director Pareira thanked the City of Dos Palos for hosting the MCAG Governing Board meeting. Director Villalta invited everyone to their Downtown Christmas Parade on December 1, 2017. Director Hogue invited everyone to their Downtown Christmas Parade on December 7, 2017. Chair Espinoza stated the importance of videotaping the MCAG Governing Board meetings at all

locations. THERE BEING NO FURTHER BUSINESS OF THE MCAG GOVERNING BOARD, THE MEETING

WAS ADJOURNED AT 4:15 P.M.

____________________/s/______________ Joy Young

Administrative Assistant II

012

Page 13: Regular Meeting of the MCAG Governing Board

ITEM 9

013

Page 14: Regular Meeting of the MCAG Governing Board

ITEM 9

Citizens Advisory Committee Meeting Highlights

DATE Friday, December 1, 2017

CAC Representative to Governing Board items:

The committee recommended approval of the MCAG Governing Board action items presented.

Action items: • Minutes of the November 3, 2017 Citizens Advisory Committee meeting• 2017 Federal Transportation Improvement Program (FTIP) Formal Amendment No. 10:

Repurposed Earmarks, Highway Bridge Program, Federal Emergency Management Agency(FEMA) Funding for Mariposa Park and Ride Lot Repair

• Authorization to Award Contract for Pavement Management System Services• Contract for Multi-Use Path Feasibility Studies• Award Contract for MCAG Copier Equipment and Maintenance Services

Information items: • Transportation Planning Priorities FY 2018-19• Regional Transportation Impact Fee (RTIF) Update• Social Services Transportation Advisory Council Recruitment• One Voice Update• MCAG Newsletter – November 2017• Dibs Annual Report FY 16-17• Dibs Quarterly Activity Report July – September 2017• 2017 Excellence in Commuter Options (ECO) Award Winner

Stacie Dabbs invited the committee and their families to MCAG’s 50th Anniversary Open House which will take place at MCAG on December 21, 2017 at 5:30pm. She added there will be various booths including ACE/Amtrak, YARTS/Transit, Caltrans, and Valley Takes Charge. Electric cars will also be available to test drive.

Robert McLaughlin informed the committee that four out of the six hospital electric car charging stations are now set up.

Harlan Dake commented that he saw a couple of individuals in Chowchilla taking signatures to repeal SB1.

Jose Delgadillo noted that the CAC representative sign-up sheet for 2018 was missing in the agenda.

014

Page 15: Regular Meeting of the MCAG Governing Board

ITEM 11a

015

Page 16: Regular Meeting of the MCAG Governing Board

369 W. 18th Street,

Merced, CA 95340 (209)723-3153

www.mcagov.org

December 2017

The Yosemite Area Regional Transportation System (YARTS) was awarded $165,000 from the Federal Lands Access Program (FLAP) to provide FREE transit service to Yosemite and the surrounding communities on all free National Park Service (NPS) gate days.

The first free days were November 11 and 12, 2017. YARTS transported 1007 passengers over those two days. Cindy Kelly, Assistant Transit Manager for YARTS, was at Merced Amtrak and Merced Transpo to provide passen-gers “goodie bags” with hand warmers, hand sanitizer, flashlights, Clif protein bars, hiking maps and other items provided by Merced The Bus and YARTS.

“We had a hugely successful weekend with five of our eight buses leaving Merced full on Saturday and four of eight buses leaving Merced full on Sunday,” said Kelly. “It was especially great to see so many children on the buses as we need to get today’s youth involved in taking pride in and care of our outdoor spaces. We want to teach them to be good stewards of our park,” Kelly said.

The free service days are funded through the Federal Lands Access Program, which will allow YARTS to operate free buses to Yosemite on all free NPS gate days through September 2020. The next free day will be January 15, 2018 and schedules will be posted online at www.Facebook.com/rideyarts by the first week of December. Reservations will not be accepted, and the service will be based on a first-come, first-served policy.

For more information on the free days project or general YARTS information visit YARTS www.yarts.com

YARTS kicks off free service over veterans day holiday

SAN JOAQUIN VALLEY NEWS

SAVE THE DATE! San Joaquin Valley Policy Conference

The 2018 San Joaquin Valley Policy Conference will be held in Modesto on May 9-11, 2018. The 2018 confer-ence is being hosted and organized by the Stanislaus Council of Governments and will build on the strong tra-dition of great speakers and workshops, fun and informa-tive tours, and great food! Sponsorships and early regis-tration information will be available soon. Contact Cindy Malekos at (209) 525-4634 or for more information.

San Joaquin Valley Goods Movement Planning

The San Joaquin Valley produces 25 percent of the na-tion's food supply, and much of our economy is based on goods movement dependent industries. State Route 99, Interstate 5, and other east-west corridors play a critical role in supplying commodities to the global market place. The eight MPOs of the San Joaquin Valley have recently completed two Caltrans funded goods move-ment studies that feature extensive data and information about freight movement throughout the Valley:

• San Joaquin Valley I-5/SR 99 Goods MovementCorridor Study

• San Joaquin Valley Goods Movement SustainableImplementation Plan

Both of these studies can be found at the link below:

http://sjvcogs.org/valleywide_activities/good-movement/

Passengers patiently waiting at Merced Amtrak for the

YARTS bus on Saturday, November 11, 2017

ITEM 11a

016

Page 17: Regular Meeting of the MCAG Governing Board

MCAG is pleased to welcome two new staff members to the team.

Navneet Mattu joined the MCAG team in October as a Transit Adminis-trative Assistant. She received her Bachelors of Science degree in Applied Mathematics from UC Merced with an emphasis in Econom-ics. She is a first generation college graduate. Navneet was born in India and raised in Merced and is a Merced High School graduate.

Navneet enjoys spending time with family and friends and especially her nephews, listening to music, partici-pating in outdoor activities and baking. She is excited to be starting her career with MCAG.

Artis Smith joined MCAG in November as the agency’s Transit Director—overseeing both The Bus and YARTS transit services.

Artis began his career in transit over twenty years ago working as a coach operator for Monterey Salinas Transit. During his career in transit he managed the Stanford University

Transit system, The Marguerite shuttle which provided free transit to the Stanford community and the public, utilizing a fleet that includes electric and hybrid diesel-electric buses to take riders to campus locations, regional transit systems, Stanford Hospital and Clinics, and local shopping, dining, and entertainment destinations.

Artis studied at Monterey Peninsula College in Business Administration, where he also received a California Teachers Credential. Artis and his wife live in Los Banos with their five daughters. He is looking forward to work-ing to improve our transit system for the communities that we serve.

Welcome to MCAG, Navneet and Artis!

Staff spotlight: Navneet Mattu & Artis Smith

Congratulations!

The MCAG team would like to congratulate the follow-ing employees for their recent promotions: • Nav Bagri, Finance Director • Cindy Kelly, Assistant Transit Manager– YARTS • Alicia Ochoa-Jones, Purchasing and Contracts Manager. MCAG is lucky to have such a hardworking and dedicated staff!

The Bus honors local veterans in the Merced Veteran’s day parade

Caltrans has completed a $2.8 million project that has improved and repaved the roadway, shoulders and portions of on and off-ramps on State Route 59 (SR-59), from SR-152 south of El Nido in Madera County to near Vassar Avenue in Merced. This 13 mile-long project will extend the service life of the pavement that was already in place and improve efficiency and safety for motorists traveling in Merced County.

This is just one of many accelerated fix-it-first projects due to begin across the state to improve roadways, including several that began before Senate Bill 1 even takes effect. Caltrans broke ground on 13 pavement projects this summer and is expediting the design of an additional 50 projects that will break ground over the next year. By the end of October, Caltrans and the Cali-fornia Transportation Commission (CTC) will have advanced approximately $5 billion in “fix-it-first” pro-jects for earlier completion because of SB 1 funding.

SB 1 provides an ongoing funding increase of approxi-mately $1.8 billion annually for the maintenance and rehabilitation of the state highway system, including $400 million specifically for bridges and culverts. SB 1 funds will enable Caltrans to fix more than 17,000 lane miles of pavement, 500 bridges and 55,000 culverts by 2027. Caltrans will also fix 7,700 traffic operating sys-tems, like ramp meters, traffic cameras and electric highway message boards that help reduce highway congestion.

Caltrans is committed to conducting its business in a ful-ly transparent manner and detailing its progress to the public. For complete details on SB 1, visit: http://www.rebuildingca.ca.gov/

MERCED HIGHWAY 59

PAVING PROJECT

017

Page 18: Regular Meeting of the MCAG Governing Board

DECEMBER Meetings & Events:

MCAG

12/01 Citizen’s Advisory Committee Meeting, MCAG

12/13 Technical Review Board Meeting, MCAG

12/21 Governing Board Meeting, County Admin Bldg.

12/21 MCAG’s 50th Anniversary Open House, MCAG

12/22-25 MCAG offices closed in observance of Christmas

12/25 Highway 59 & Billy Wright landfills closed

12/29-1/1 MCAG offices closed in observance of New Year’s Day

Livingston

12/8 Annual Light Christmas parade & gift fair; For more information call 209-394-8830

Merced

12/2 A Storybook Christmas parade; 3:00 pm For more information visit: https://www.mercedchristmasparade.com

Atwater

12/1 A Christmas Story parade; 7:00 pm For more information visit: http://www.atwaterchamberofcommerce.com

Los Banos

12/1 Downtown Christmas parade; 6:00 pm For more information visit: http://losbanos.com

Dos Palos

12/7 Downtown Christmas Parade For more information visit: http://dospaloscity.wixsite.com/dospalos

For more information about these events, or if your City or Com-munity has public events you would like published in our news-letter, contact Eva Garibay at [email protected]

Highway 59 Landfill 7040 N Highway 59 Merced, CA 95348

Phone: 209-723-4481

Monday - Friday: 7:00 am - 3:30 pm

Saturday: 8:00 am - Noon

1st Saturday of each month:

7:00 am - 3:30 pm

Billy Wright Landfill 17173 S Billy Wright Road

Los Banos, CA 95348 Phone: 209-826-1163

Monday - Friday:

8:00 am - 3:30 pm Saturday: 8:00 am - Noon

1st Saturday of

each month: 8:00 am - 3:30 pm

The Regional Waste Authority has contracted with the Mattress Recycling Council (MRC) to offer free mattress recycling throughout Merced County.

The MRC was formed by the mattress industry to operate recycling programs (known as bye bye mattress) to enact mattress recycling laws in California.

This mattress recycling contract will allow both the Billy Wright Landfill (Los Banos) and Highway 59 Landfill (Merced) to accept mattresses for recycling. Residents can bring up to four mattresses to either of the landfill sites at no cost. Contractors and other commercial loads will continue to be charged the $5 fee per mattress.

For more information on the mattress recycling pro-gram, please visit: byebyemattress.com.

For more information about Merced County Regional Waste Authority including hours of operations and rates please visit www.mcrwma.org or call (209)723-4481.

Regional Waste Authority to offer free mattress recycling

As a reminder, the Merced County Regional Waste Authority Highway 59 and Billy Wright landfills are open every Saturday from 8:00 am to Noon. In addition, both landfill locations have extended hours to 3:30 pm during the first Saturday of the month and on any Saturday follow-ing a closed holiday. For more information about the land-fill hours and days of operation see the schedule below .

018

Page 19: Regular Meeting of the MCAG Governing Board

Measure V, Merced County’s ½ cent transportation sales tax, was passed by Merced County voters with 71% approval in November 2016 and went into effect April 1, 2017. In an effort to keep the community informed about this transformative measure, MCAG will feature monthly updates in this news-letter. You can also check out www.measurev-mcag.com for the latest news and updates!

Revenue Update

Measure V has generated $6.8 million of revenue in the first 6 months of the 30 year measure. This is new revenue for the cities and county of Merced to address our local and regional transportation needs. Each month, this funding is allocated across four categories as prescribed in the expenditure plan.

Local Projects Revenue

Per the expenditure plan, 50% of the revenue is allocated directly to the 6 cities and the County of Merced. This funding is being used to address local transportation needs such as repairing potholes and bridges, repaving streets, replacing traffic signals and improving sidewalks and bicycle facili-ties. To date, $3.4 million has been allocated directly to local jurisdictions. Visit www.measurev-mcag.com/local-projects.html to check out the list of Measure V projects by city and the County of Merced.

Regional Projects Revenue

To date, more than $3 million has been received for regional projects which are projects located in or directly benefiting more than one jurisdiction. This funding is allocated to two accounts – 27% to eastside and 17% to Westside of the San Joaquin River. Projects eligible for this regional funding are being identified and prioritized by the Eastside and Westside Regional Projects Committees. For more information about this process and com-mittees, please visit www.measurev-mcag.com/regional-projects.html.

Transit Revenue

The Transit Joint Powers Authority for Merced County has received $341,501 of revenue from Measure V in the first 6 months. These funds are currently being used to provide free fares on The Bus’s fixed route system for seniors, veterans and ADA eligible individuals with disabilities. For more information, contact The Bus at (209)723-3100.

Administration Revenue

MCAG receives 1% for the administration of Measure V for staffing, auditing and oversight. To date, MCAG has received $68,300.

DECEMBER 2017—Update

Fixing our roads! Stacie Dabbs at 723.3153 x 109 [email protected]

HAVE YOU SPOTTED MEASURE V AT WORK IN MERCED COUNTY?

Snap a picture and send it to [email protected] or tag us on

Facebook @mcag.merced or Twitter #MercedCAG

Measure V magnet on a City of Living-ston vehicle spotted by a local resident.

Measure V at work on the West Side of Merced County near Gustine: Jenson Road—Bambauer Road—Canal School Road. Photo courtesy of Ellen Hasness—Gustine City Council

019

Page 20: Regular Meeting of the MCAG Governing Board

ITEM 11b

020

Page 21: Regular Meeting of the MCAG Governing Board

Call dibs on our

Program Success

July – September 2017 Activity Report

TOTAL MEMBERS 8,273

TOTAL VANPOOLS 122

ALT. TRIPS LOGGED 13,801

DOLLARS SAVED $181,990

CO2 SAVINGS 125 TONS

USER SESSIONS

1,274

PAGEVIEWS

2,605

NEW VISITORS

67%

RETURNING VISITORS

31%

Dibs Day is on the Way!

For the first annual Dibs Day, we were so

excited, we wanted to shout it from the

rooftops! Utilizing Facebook, in order to

reach the most people at once, we made

the announcement via Facebook Live and

it was full speed ahead!

On the docket were 2 different postcards, one to employ-

ers and the other to commuters, a slew of new promo-

tional items, targeted ads to get the Dibs Day word out

there, and an amazing giveaway. Stay tuned for next

quarter’s report to see what we came up with and how

Dibs Day panned out!

Direct

42%

Referral

28%

Organic26%

Social 4%

0

200,000

400,000

600,000

800,000

1,000,000

Goal ReachedOrganic = search engine/paid ads

ITEM 11b

021

Page 22: Regular Meeting of the MCAG Governing Board

New Efforts for a New Brand

With an established employer base in San Joaquin County, the Dibs team

seeks creative ways to access new and existing employers and energize

Smart Travelers. This quarter, one of these efforts included participating in

Stockton’s first ever PARK(ing) Day, in which the Dibs team challenged

visitors to see how many things they could do in a parking space if there

was one less car around. In addition, we also participated in planning the

annual Industrial Technology Barbeque with the Chamber of Commerce.

The event helps us build direct relationships with key employers, while

also recognizing their efforts to do business in the region. The next step?

Strengthening those relationships to help launch Dibs on their sites!

Activity Highlights

Attended Green Team San Joaquin meeting and provided an update on Dibs upcoming events

Attended FRESH meetings

Provided Dibs overview to San Joaquin Joint Powers Authority staff and discussed upcoming Amtrak

service changes and marketing opportunities.

Served on planning committee for annual Chamber Industrial Technology Barbeque recognizing new and

expanding businesses in San Joaquin County.

Conducted REACON team visits to Masonite, Salvation Army, Eagle Roofing, Le Tote, and Fleenor Paper

Company

Met with ACE staff to address parking challenges at Manteca/Lathrop station

Delivered employer toolkit and materials to Amazon Tracy Fulfillment Center in advance of fall program

relaunch to seasonal employees.

Attended annual PG&E Employee Safety & Wellness fair in Stockton

Attended Costco Distribution Center employee event in Tracy

Participated in first PARK(ing) Day Event in Downtown Stockton

July—Sept 2017

Activity Report

ADDED FY 17-18

JULY AUGUST SEPTEMBER

25 31 21 77 4,637

1 1 1 3 82

202 86 136 424 8,360

2.1 .8 2 4.9 72.1

$3,194 $1,152 $3,119 $7,465 $103,884

dibsmyway.com

Briana V. of Amazon

022

Page 23: Regular Meeting of the MCAG Governing Board

ADDED FY 17-18

JULY AUGUST SEPTEMBER

14 6 3 23 2,216

0 0 0 0 33

147 155 105 407 4,739

1.6 .6 .2 2.4 46.7

$2,488 $493 $168 $3,149 $71,478

Stanislaus’ Winners

Each year, for Bike Month, we get some amazing winners.

Although, this year s took the cake! This year’s most notable

winner’s story to come out of Bike to Work Month arrived

via Ann from Turlock. Ann used Bike to Work Month to try

biking and ended up falling in love with it. She decided to

park her car and primarily use her bike for trips to and from

work, as well as around town. Not only did she make a

change, she got a group of coworkers to ditch their cars and

ride in! Now she meets up with a group and they all ride in

together; sparing the air and reducing traffic, one group

ride at a time!

Activity Highlights

Delivered Dibs toolkit materials to Frito Lay

Attended the Green Team Stanislaus meeting

Presented Bike Month grand prize winner with a new bicycle

Presented Bike Month results to StanCOG committees

Attended Green Team Stanislaus meeting and made a brief presentation on Dibs upcoming events

Met with Opportunity Stanislaus to provide an update on new branding and discuss collaboration

opportunities.

Supported MAX in a photography shoot for enhanced transit branding

Discussed Dibs Day strategies and ideas with StanCOG

July—Sept 2017

Activity Report

dibsmyway.com

023

Page 24: Regular Meeting of the MCAG Governing Board

Supporting Excellence in Merced

With a plethora of new materials in hand, the Dibs team is working

to spread the word about the new brand in Merced County. This

includes delivering our new toolkits to employer partners both new

and old. Included in these toolkits are digital versions of every tool

needed to launch a Dibs program at an employer site—a valued

asset as more companies transition to paperless communications.

This quarter also saw the launch of the Excellence in Commuter

Options(ECO) Award in Merced County. The ECO Award seeks to

recognize employers who go above and beyond in encouraging

Smart Travel (including, of course, using the tools provided by

Dibs!). The selected company will be recognized for their efforts in

December at the MCAG Governing Board meeting.

Activity Highlights

Project scope meeting with MCAG staff to advanced pilot Vanpool program

Dibs toolkit delivery to UC Merced and new school year kickoff meeting

Met with Quad/Graphics to deliver toolkit and launch new branding on site

Delivered Dibs toolkit to McLane Pacific

Launched Excellence in Commuter Options (ECO) Award in Merced County

Gave informational interview with Streetsblog regarding transit options in Merced County

July—Sept 2017

Activity Report

ADDED FY 17-18

JULY AUGUST SEPTEMBER

2 4 2 8 527

0 0 0 0 8

52 70 38 160 1,615

.1 .2 .1 .4 4.7

$158 $245 $150 $553 $6,457

dibsmyway.com

James Nardello of UC Merced

024

Page 25: Regular Meeting of the MCAG Governing Board

ITEM 11c

025

Page 26: Regular Meeting of the MCAG Governing Board

P a r t n e r i n g f o r R e g i o n a l S o l u t i o n s

Merced County Association of Governments

2018

Governing Board Meeting Schedule

The 3rd Thursday of each month 3:00 p.m.

Date Location

January 18 City of Livingston

February 15 County of Merced – Administration Building

March 22 City of Los Banos

April 19 County of Merced – Administration Building

May 17 City of Merced

June 21 County of Merced – Administration Building

July 19 City of Atwater

August 16 County of Merced – Administration Building

September 20 City of Gustine

October 18 County of Merced – Administration Building

November 15 City of Dos Palos

December 20 County of Merced – Administration Building

ITEM 11c

026

Page 27: Regular Meeting of the MCAG Governing Board

ITEM 11d

027

Page 28: Regular Meeting of the MCAG Governing Board

ITEM 11d

028

Page 29: Regular Meeting of the MCAG Governing Board

029

Page 30: Regular Meeting of the MCAG Governing Board

030

Page 31: Regular Meeting of the MCAG Governing Board

031

Page 32: Regular Meeting of the MCAG Governing Board

032

Page 33: Regular Meeting of the MCAG Governing Board

033

Page 34: Regular Meeting of the MCAG Governing Board

034

Page 35: Regular Meeting of the MCAG Governing Board

035

Page 36: Regular Meeting of the MCAG Governing Board

036

Page 37: Regular Meeting of the MCAG Governing Board

037

Page 38: Regular Meeting of the MCAG Governing Board

ITEM 11e

038

Page 39: Regular Meeting of the MCAG Governing Board

PH: 209.723.3153 FAX: 209.723.0322

www.mcagov.org 369 W. 18th Street Merced, CA 95340

P a r t n e r i n g f o r R e g i o n a l S o l u t i o n s

ITEM 11e MEMORANDUM

DATE: December 14, 2017

TO: MCAG Governing Board

FROM: Nav Bagri, Finance Director

RE: MCAG Financial Report for July 2017 – September 2017 (Unaudited)

DISCUSSION

Attached for your review is the Profit and Loss Budget versus Actual Report for the period July 2017 through September 2017. Also attached is the Pooled Investment Summary Report for the period ending September 30, 2017.

Also attached is the 1st Quarter Check Register.

If you have any questions regarding this staff report, please contact Nav Bagri at 723.3153 x 154 or [email protected]

REQUESTED ACTION

For information only.

Attachments: Profit and Loss Budget vs. Actual report for the period July 20176 through September 2017 Pooled Investment Summary Report for the period ending September 30, 2017 1st Quarter Check Register

039

Page 40: Regular Meeting of the MCAG Governing Board

MERCED COUNTY ASSOCIATION OF GOVERNMENTS

P L Budget vs. Actual

1st Quarter FY 2017-18

Unaudited

Actual

7/1/17-9/30/17

Budget

July -June 18

Variance

Remaining

Balance

Remaining

Budget %

Income

Other Revenue 668 (668) 0.0%

Measure V 29,360 150,000 120,640 80.43%

LTF Planning 397,298 397,298 100.0%

FHA-Metro Plan (PL) 145,799 1,722,558 1,576,759 91.54%

FHA-Metro Plan (Current Yr's allocation) 149,648 149,648 100.0%

PPM/RIP 393,000 393,000 100.0%

SAFE 9,526 9,526 100.0%

TDA Admin 94,010 94,010 100.0%

RTIF 12,892 12,892 100.0%

Caltrans Sustainable transportation Planning

Grant 5304 350,000 350,000 100.0%

Fed Transit Adm-Sec 5303 89,142 89,142 100.0%

RWMA 768,676 3,914,594 3,145,918 80.36%

TJPA 334,726 1,628,935 1,294,209 79.45%

Membership Dues 132,200 132,200 - 0.0%

MDSS 11,297 11,297 100.0%

YARTS 53,632 431,228 377,596 87.56%

AVA 11,026 11,026 100.0%

Total Income 1,465,061 9,497,354 8,032,293 84.57%

Gross Profit 1,465,061 9,497,354 8,032,293 84.57%

Expense

Salary & Benefits 1,258,876 6,863,128 5,604,252 81.66%

Professional Services 137,729 1,792,380 1,654,651 92.32%

Professional Serv.Audit 24,000 24,000 100.0%

Maint. & Fuel Equip.Auto 151 1,500 1,349 89.91%

Data/IS Service 4,000 138,000 134,000 97.1%

Legal 29,129 55,000 25,871 47.04%

Maint Structure 2,307 5,600 3,293 58.8%

Utilities 599 6,800 6,201 91.19%

Solar 9,500 9,500 100.0%

Insurance Other 32,316 47,000 14,684 31.24%

Membership 2,950 6,890 3,940 57.18%

Training and Travel 17,028 61,850 44,822 72.47%

Unallowed Training & Travel 6,500 6,500 100.0%

Special Dept Expense 3,815 159,606 155,791 97.61%

Publications 200 500 300 60.0%

Office Expense/General 6,366 29,000 22,634 78.05%

Communications 6,845 20,300 13,455 66.28%

Household Expense-Janitorial 200 17,000 16,800 98.82%

Misc. Expense 2,500 2,500 100.0%

Interest Expense 1,200 1,200 100.0%

Rents & Leases-Equip. 3,903 18,000 14,097 78.32%

Fixed Asset 3,000 231,100 228,100 98.7%

Total Expense 1,509,414 9,497,354 7,987,940 84.11%

Net Ordinary Income (Loss) (44,353) 0 44,353

040

Page 41: Regular Meeting of the MCAG Governing Board

% Rate of % Rate of

Account Balance Return QTD Return YTD

Wells Fargo Bank - General Checking 1,458,417$ 0.350 0.350

Wells Fargo Bank -YARTS 463,411 0.350 0.350

Wells Fargo Bank -TJPA 4,915,066 0.350 0.350

Wells Fargo Bank-Saving Account 2,518,725 0.150 0.150

LAIF Investment 1,533,129 0.920 0.920

County of Merced Investment 29,195,911 1.333 1.200

Total Bank and Investment Balances 40,084,658$

MERCED COUNTY ASSOCIATION OF GOVERMENTS

Pooled Bank and Investment Balances

September 30, 2017

1%0%

0%

11%

12%

6%

0%

3%

3%24%

26%

3% 10%

1%

POOLED INVESTMENTS

MCAG - General Fund

STAF

SEF

LTF

RTIF

SAFE

AVA

Measure V East/West

YARTS - General

Transit - General

Transit - LTF

Transit- LTF Capital

Transit - PTMISEA

041

Page 42: Regular Meeting of the MCAG Governing Board

ITEM 11f

042

Page 43: Regular Meeting of the MCAG Governing Board

PH: 209.723.3153

FAX: 209.723.0322 www.mcagov.org

369 W. 18th Street Merced, CA 95340

ITEM 11f MEMORANDUM DATE:

December 14, 2017

TO: MCAG Governing Board

FROM: Stacie Dabbs, Deputy Executive Director

RE: 2018 One Voice Program Development Update

BACKGROUND One Voice is a legislative advocacy program for the Merced County region that promotes issues of regional significance to federal legislators and agencies through an annual advocacy trip to Washington, DC. The purpose of the program is to advocate for increased funding and/or new or amended legislation. Merced County Association of Governments contracts with Townsend Public Affairs to support the planning process, coordinate the trip itinerary and assist with post-meeting action items. The 2018 One Voice trip to Washington, DC is scheduled for May 1-4, 2018. 2018 PLATFORM OF ISSUES/PROJECTS The 2018 One Voice planning committee is comprised of representatives from the County of Merced, City of Merced, City of Gustine, City of Los Banos, City of Atwater, City of Livingston, Merced City School District, Merced County Office of Education, Merced Irrigation District, UC Merced, Merced Boosters, Lyons’ Investments, community members, and MCAG staff. Over the course of several meetings, the committee has developed the following list of messages and projects for consideration. This list will be further refined in the coming weeks and be presented to the Citizens Advisory Committee, Technical Review Board and Governing Board in January as a draft program list for adoption. Water

• Water Storage – Temperance Flat Dam and Exchequer Spillway Project • Thank you for Black Rascal funding

Public Safety

• Support continued funding for the COPS grant program • Seek funding for the establishment of Emergency Response Centers at locations such as County

Fairgrounds

043

Page 44: Regular Meeting of the MCAG Governing Board

Homelessness/Housing • Support more affordable housing programs • Community Development Block Grant funding

Economic and Community Development

• Support Small Business financing programs; modernization programs • Support downtown revitalization programs • Advocate for grant programs and policy flexibility to benefit economic development needs of

small/rural communities. • Address Protected Migratory Bird (Cattle Egret) overpopulation problem (Gustine) • Support programs to provide/upgrade digital infrastructure for commercial/industrial

Education

• Income Eligibility Limits for Subsidized Child Care Programs: Advocate for a higher income limit for subsidized childcare, including HeadStart. Minimum wage increases and low-income limits for these programs have resulted in families losing eligibility for child care assistance long before they achieve financial self-sufficiency.

Transportation • Advocate for grant funding opportunities for Farm to Market routes (goods movement) • Support safe routes to school programs • Create a category for mid-sized regions to compete for transportation funding

FISCAL IMPACT The FY 17-18 OWP includes element 550 – One Voice Legislative Program. This element budget includes costs associated with professional services, travel and staff time associated with the development and implementation of the One Voice and Valley Voice programs. REQUESTED ACTION For information only.

044

Page 45: Regular Meeting of the MCAG Governing Board

ITEM 11g

045

Page 46: Regular Meeting of the MCAG Governing Board

ITEM 11g

Technical Review Board MINUTES

DATE Wednesday, December 13, 2017

The regular meeting of the Technical Review Board, held at the Merced County Association of Governments Office, Front Conference Room, 369 W. 18th Street, Merced, CA was called to order by Chair Doug Dunford at 12:10 P.M.

MEMBERS PRESENT John Bramble, Interim City Manager of Atwater Jim Brown, Deputy CEO of Merced County Scott McBride for Steve Carrigan, City Manager of Merced Doug Dunford, City Manager of Gustine Darrell Fonseca, City Manager of Dos Palos Jose Antonio Ramirez, City Manager of Livingston Alex Terrazas, City Manager of Los Banos

MEMBERS ABSENT None

OTHERS PRESENT Nav Bagri, Finance Director Stacie Dabbs, Deputy Executive Director Blake Dunford, City of Atwater Nadia Gonzalez, Financial Services Manager Matt Fell, Senior Planner Jennifer Halpin, Diversion Program Manager Steven Martinez, Transportation Planner, Caltrans, Dist. 10 Kristina Meraz, Human Resources and Risk Manager Patrick Pittenger, Executive Director Ty Phimmasone, Associate Planner Artis Smith, Transit Director Brooks Stayer, Regional Waste Authority Director Jarrad Tramp, Landfill Project Manager Marty Yerrick, Landfill Operations Manager

046

Page 47: Regular Meeting of the MCAG Governing Board

1. Introductions So noted. 2. Public Comment No public comments were received. 3. Minutes of the November 8, 2017, Technical Review Board meeting Scott McBride moved to approve the minutes of the November 8, 2017, Technical Review Board

meeting. Seconded by Alex Terrazas. MOTION CARRIED UNANIMOUSLY. 4. Minutes of the November 16, 2017, Regional Waste Management Authority, Transit Joint

Powers Authority and the Merced County Association of Governments Governing Board meeting

So noted. MERCED COUNTY ASSOCIATION OF GOVERNMENTS

5. Information/Discussion Only a. MCAG Newsletter – December 2017 b. Dibs Annual Report FY 16-17 c. Dibs Quarterly Activity Report July – September 2017 d. 2017 Excellence in Commuter Options (ECO) Award Winner e. Technical Review Board 2018 Meeting Schedule f. State Clearinghouse Letter for Central Valley Opportunity Center g. MCAG Financial Report for July 2017 – September 2017 (unaudited) So noted. 6. 2017 Federal Transportation Improvement Program (FTIP) Formal Amendment No. 10:

Repurposed Earmarks, Highway Bridge Program, Federal Emergency Management Agency (FEMA) Funding for Mariposa Park and Ride Lot Repair

Jim Brown moved to recommend the MCAG Governing Board adopt the 2017 FTIP Formal

Amendment No. 10. Seconded by John Bramble. MOTION CARRIED UNANIMOUSLY.

047

Page 48: Regular Meeting of the MCAG Governing Board

7. Authorization to Award Contract for Pavement Management System Services John Bramble moved to recommend the MCAG Governing Board authorize the Executive Director

to enter into a contract for pavement management services with Dynatest North America, Inc. for $501,381.

Seconded by Jim Brown. MOTION CARRIED UNANIMOUSLY. 8. Transportation Planning Priorities FY 2018-19 Stacie Dabbs gave an update on the Transportation Planning Priorities for FY 2018-19. 9. Regional Transportation Impact Fee (RTIF) Update Patrick Pittenger gave an update on the Regional Transportation Impact Fee (RTIF). 10. Authorization to Award Contract for Multi-Use Path Feasibility Studies John Bramble moved to recommend the MCAG Governing Board authorize the Executive Director

to enter into a contract for consultant services to prepare two regional multi-use path feasibility studies in the amount not to exceed $100,000.

Seconded by Alex Terrazas. MOTION CARRIED UNANIMOUSLY. 11. Authorization to Award Contract for MCAG Copier Equipment and Maintenance Services John Bramble moved to recommend the MCAG Governing Board authorize the Executive Director

to enter into a contract with Spriggs, Inc. for copier equipment and maintenance services in the amount not to exceed $54,000 for 36 months.

Seconded by Darrell Fonseca. MOTION CARRIED UNANIMOUSLY. 12. Social Services Transportation Advisory Council Recruitment Stacie Dabbs gave an update on the Social Services Transportation Advisory Council recruitment. 13. One Voice Update Stacie Dabbs gave an update on the development of the 2018 One Voice Program. 14. MCAG Governing Board Meeting Recording Equipment Stacie Dabbs reported on the request for MCAG Governing Board meeting recording equipment. TRANSIT JOINT POWERS AUTHORITY FOR MERCED COUNTY

15. Oral Report - Transit Joint Powers Authority for Merced County Monthly Update Artis Smith gave the Transit Joint Powers Authority for Merced County monthly update.

048

Page 49: Regular Meeting of the MCAG Governing Board

16. TJPA Financial Report for July 2017 – September 2017 (unaudited) Nav Bagri reported on the TJPA Financial Report for July 2017 – September 2017. 17. Authorization to Award Contract for Architectural and Engineering Services for the Bus

Maintenance Facility Jose Antonio Ramirez moved to recommend the Transit Joint Powers Authority Board authorize

the Executive Director to enter into a contract with Golden Valley Engineering for Architectural, Engineering and Surveying Services for the Bus Maintenance Facility in an amount not to exceed $65,000.

Seconded by Scott McBride. MOTION CARRIED UNANIMOUSLY. MERCED COUNTY REGIONAL WASTE MANAGEMENT AUTHORITY 18. Oral Report - Merced County Regional Waste Management Authority Monthly Update Brooks Stayer gave the Merced County Regional Waste Management Authority monthly update. 19. Merced County Regional Waste Management Authority Financial Reports Nadia Gonzalez gave an update on the Merced County Regional Waste Management Authority

Financial Reports. 20. Modification to Amended Contract No. WMA2011-05 with Remy, Moose, Manley LLC (RMM) John Bramble moved to recommend the Merced County Regional Waste Management Authority

authorize the MCAG Executive Director to execute Contract No. WMA2011-05 with the modified insurance section.

Seconded by Scott McBride. MOTION CARRIED UNANIMOUSLY. 21. Authorization to Award Contract for Fixed-Wing Drone System Purchase Jose Antonio Ramirez moved to recommend the Merced County Regional Waste Management

Authority authorize the Executive Director to enter into a contract with RDO Integrated Controls, Sacramento, CA for the purchase of a fixed-wing drone and peripherals at a cost not to exceed $41,769.34.

Seconded by Alex Terrazas. MOTION CARRIED UNANIMOUSLY. OTHER REPORTS 22. Caltrans Report Steven Martinez gave the Caltrans report.

049

Page 50: Regular Meeting of the MCAG Governing Board

23. Oral Report - League of California Cities Update No report was given. 22. Oral Report - Jurisdictions So noted. THERE BEING NO FURTHER BUSINESS, THE MEETING WAS ADJOURNED AT 1:50 P.M.

050

Page 51: Regular Meeting of the MCAG Governing Board

ITEM 12a

051

Page 52: Regular Meeting of the MCAG Governing Board

PH: 209.723.3153

FAX: 209.723.0322 www.mcagov.org

369 W. 18th Street Merced, CA 95340

ITEM 12a MEMORANDUM DATE:

December 14, 2017

TO: MCAG Governing Board

FROM: Ty Phimmasone, Associate Planner

RE: 2017 Federal Transportation Improvement Program (FTIP) Formal Amendment No. 10: Repurposed Earmarks, Highway Bridge Program, Federal Emergency Management Agency (FEMA) Funding for Mariposa Park and Ride Lot Repair

BACKGROUND The MCAG Governing Board adopted the Final 2017 Federal Transportation Improvement Program (FTIP) on September 22, 2016. The 2017 Federal Statewide Transportation Improvement Program (FSTIP), which incorporated MCAG’s 2017 FTIP, was officially approved by the federal agencies on December 16, 2016. Projects and programs, which are federally-funded, must be programmed in the FTIP in order to have access to these funds. Any updates or changes to these federally-funded projects/programs for 2017 FTIP Federal Fiscal Years (FFYs: 2016/17 – 2019/20) must be “amended” into the FTIP. Any updates or changes in years beyond FFY 2019/20, considered outer years, will be addressed in the 2019 FTIP. 2017 FTIP FORMAL AMENDMENT No. 10 MCAG staff has prepared Formal Amendment No. 10 (Type No. 3 – Exempt Projects) to address the following programmatic changes to the 2017 FTIP. Repurposing of Federal Earmarks The Consolidated Appropriations Act 2016 allowed states to repurpose earmarks, with approval from the Federal Highway Administration (FHWA), that were designated on or before September 30, 2005. The 2017 FTIP Formal Amendment 10 programs the following two projects, which are funded with repurposed federal earmarks: • The County of Merced will signalize the intersection of Campus Parkway Segment 2 and Childs

Avenue. The repurposed federal earmark amount is $367,196, which requires the local match of $47,574. These funds are programmed in FFY 2017/18.

• The County of Merced will make pedestrian improvements in the Community of Hilmar. The repurposed federal earmark amount is $797,519, which requires the local match of $103,327. These funds are programmed in FFY 2018/19.

052

Page 53: Regular Meeting of the MCAG Governing Board

Highway Bridge Program (HBP) Caltrans manages the Highway Bridge Program (HBP). The FTIP must be amended to reflect the changes in Caltrans’ updated HBP, dated October 26, 2017. These changes include: • Pushing out construction to outer year for Burchell Avenue Bridge;

• Advancing right-of-way to FFY 2018/19 for Jorgensen Road Bridge;

• Pushing out construction to outer year for Los Cerritos Road Bridge; and

• Advancing construction to FFY 2016/17 for Moraga Road Bridge.

Given available funding, Caltrans has the flexibility to advance projects utilizing Expedited Project Selection Procedures (EPSP). Advancing the construction of Moraga Road Bridge is an example of this. Federal Emergency Management Agency (FEMA) Funds for Yosemite Area Regional Transportation System (YARTS) Mariposa Park and Ride Lot Repair The Yosemite Area Regional Transportation System (YARTS) was awarded Federal Emergency Management Agency (FEMA) funding to repair the Mariposa Park and Ride Lot, which was damaged by last winter’s storms. This FEMA funding was previously approved for programming in MCAG’s FTIP Formal Amendment 8. Recently, through State consultation with the Federal Highway Administration, it was determined that FTIP programming was not required for projects funded at 100 percent with FEMA funds. This amendment acts to delete the prior programming. FISCAL IMPACT The fiscal impacts of the repurposed federal earmarks are $414,770 and $900,846. The net change to the Caltrans HBP for the Merced Region is -$4,964,400. YARTS has already accessed the $339,297 FEMA funds for the repair of the Mariposa Park and Ride Lot. If you have any questions regarding this staff report, please contact Ty Phimmasone at 723-3153 x 123 or [email protected]. The Citizens Advisory Committee concurs with the requested action. The Technical Review Board concurs with the requested action. REQUESTED ACTION Adopt the 2017 FTIP Formal Amendment No. 10. Attachments: 2017 FTIP Formal Amendment 10 Summary of Changes Resolution No. 2017/12-21-01

053

Page 54: Regular Meeting of the MCAG Governing Board

Summary of Changes MCAG 2017 Formal Amendment 10

Existing/ New

CTIPS ID PROJECT TITLE DESCRIPTION OF CHANGE  PhaseFundType

PRIORCTIPS Amt.

CURRENTCTIPS Amt.

FFYFund SourceCategory

NetChange

% Comments

2016 Earmark Repurposing

0 367,1962016 Earmark Repurposing

$367,196

Local 0 47,574 Local $47,574

2016 Earmark Repurposing

0 797,5192016 Earmark Repurposing

$797,519

Local 0 103,327 Local $103,327

HBP 5,602,044 8,220,044 HBP $2,618,000

Local 699,892 699,892 Local $0

HBP 2,618,000 0 HBP ($2,618,000)

Local 0 0 Local $0

HBP 5,014,400 150,000 HBP ($4,864,400)

Local 0 0 Local $0

HBP 577,060 477,060 HBP ($100,000)

Local 22,940 22,940 Local $0

FEMA 339,297 0 Other: FEMA ($339,297)

Local 0 0 Local $0

=Sum of Net Increases/Decreases by Fiscal Year 16/17 17/18 18/19 19/20 Totals ($3,988,081)

2016 Earmark Repurposing $0 $367,196 $797,519 $0 $1,164,715HBP $2,618,000 ($2,618,000) ($4,864,400) ($100,000) ($4,964,400)

FEMA $0 ($339,297) $0 $0 ($339,297)Local $0 $47,574 $103,327 $0 $150,901Total $2,618,000 ($2,542,527) ($3,963,554) ($100,000) ($3,988,081)

NOTE: The 2016 Consolidated Appropriations Act allows States to repurpose earmarks designated on or before September 30, 2005. 

17/18 ‐100%

The Federal Emergency Management Agency (FEMA) will fund the repair of the Yosemite Area Regional Transportation System (YARTS) Park and Ride Lot in Mariposa, California, which was damaged by the winter storms in February 2017.

Existing 205‐0000‐0273 YARTS: FEMA for Mariposa Park & Ride Lot Repair

DELETE! FTIP programming is NOT REQUIRED! CON

NEW 205‐0000‐0271Campus Parkway Segment 2 Childs Ave Intersection Signalization

The repurposed Campus Parkway Segment 2 was approved by FHWA.

CON

100%

The County of Merced will make pedestrian improvements in the Community of Hilmar. The funding is programmed in FFY 2018/19.Total participating cost = $900,846 (Repurp. Earmark = $797,519; Local = $103,327).

17/18 100%

The County of Merced will signalize the intersection of Campus Parkway Segment 2 and Childs Avenue. The funding is programmed in FFY 2017/18. Total participating cost = $414,770 (Repurp. Earmark = $367,196; Local = $47,574).

Existing 205‐0000‐0037 Grouped Projects for Bridge Rehab./Recon. (HBP)

Update grouped projects programming per 10/26/2017 updated HBP listing.

18/19NEW 205‐0000‐0270 Hilmar Community Pedestrian Improvements

The repurposed Hilmar Community Pedestrian Improvements project was approved by FHWA.

CON

CON 16/17

‐34.2%

Changes to projects:* Push out CON to outer year for Burchell Avenue Bridge;* Advance RW to FFY 18/19 for Jorgensen Road Bridge;* Push out CON to outer year for Los Cerritos Road Bridge;* Advance CON to FFY 16/17 for Moraga Road Bridge;

Original Grouped Listing Total = $14,534,336;Net Change $ = -$4,964,400;Net Change % = -34.2%

CON 17/18

CON 18/19

CON 19/20

054

Page 55: Regular Meeting of the MCAG Governing Board

BEFORE THE

MERCED COUNTY ASSOCIATION OF GOVERNMENTS RESOLUTION NO. 2017/12-21-01

In the Matter of: RESOLUTION ADOPTING the Merced County Association of Governments 2017 Federal Transportation Improvement Program (FTIP) Amendment 10

WHEREAS, the Merced County Association of Governments (MCAG) is a Regional Transportation

Planning Agency and a Metropolitan Planning Organization, pursuant to State and Federal designation; and

WHEREAS, federal planning regulations require Metropolitan Planning Organizations to prepare and adopt a long range Regional Transportation Plan (RTP) for their region; and

WHEREAS, federal planning regulations require that Metropolitan Planning Organizations prepare and

adopt a Federal Transportation Improvement Program (FTIP) for their region; and

WHEREAS, the 2017 Federal Transportation Improvement Program (FTIP) Amendment 10 has been prepared to comply with Federal and State requirements for local projects and through a cooperative process between the Federal Highway Administration (FHWA), the Federal Transit Administration (FTA), the State Department of Transportation (Caltrans), principal elected officials of general purpose local governments and their staffs, and public owner operators of mass transportation services acting through the Merced County Association of Governments forum and general public involvement; and

WHEREAS, the 2017 FTIP Amendment 10 listing is consistent with: 1) the 2014 Regional

Transportation Plan Amendment 1; 2) the 2016 State Transportation Improvement Program; and 3) the Corresponding Conformity Analysis; and

WHEREAS, the 2017 FTIP Amendment 10 contains the MPO’s certification of the transportation

planning process assuring that all federal requirements have been fulfilled; and

WHEREAS, the 2017 FTIP Amendment 10 meets all applicable transportation planning requirements per 23 CFR Part 450; and

WHEREAS, projects submitted in the 2017 FTIP Amendment 10 must be financially constrained and

the financial plan affirms that funding is available; and

WHEREAS, the 2017 FTIP Amendment 10 is consistent with the adopted Conformity Analysis for the 2017 FTIP and the 2014 RTP; and

WHEREAS, the 2017 FTIP Amendment 10 does not interfere with the timely implementation of the Transportation Control Measures; and

WHEREAS, the 2017 FTIP Amendment 10 conforms to the applicable SIPs; and

WHEREAS, the documents have been widely circulated and reviewed by MCAG advisory

committees representing the technical and management staffs of the member agencies; representatives of

055

Page 56: Regular Meeting of the MCAG Governing Board

other governmental agencies, including State and Federal; representatives of special interest groups; representatives of the private business sector; and residents of Merced County consistent with public participation process adopted by MCAG; and

NOW, THEREFORE, BE IT RESOLVED, that MCAG adopts the 2017 FTIP Amendment 10. BE IT FURTHER RESOLVED, that MCAG finds that the 2017 FTIP Amendment 10 is in

conformity with the requirements of the Federal Clean Air Act Amendments and applicable State Implementation Plans for air quality.

The foregoing resolution was passed and adopted by MCAG this 21st day of December, 2017. AYES: NOES: ABSTAIN: ABSENT: ATTEST: I hereby certify that the foregoing is a true copy of a resolution of the Merced County Association of Governments duly adopted at a regular meeting thereof held on the 21st day of December, 2017. Signed: Signed: ______________________________________ ______________________________________ Patrick Pittenger, Executive Director Rodrigo Espinoza, Chair Merced County Association of Governments Merced County Association of Governments

056

Page 57: Regular Meeting of the MCAG Governing Board

ITEM 12b

057

Page 58: Regular Meeting of the MCAG Governing Board

PH: 209.723.3153

FAX: 209.723.0322 www.mcagov.org

369 W. 18th Street Merced, CA 95340

ITEM 12b MEMORANDUM DATE:

December 14, 2017

TO: MCAG Governing Board

FROM: Natalia Austin, GIS Analyst

RE: Authorization to Award Contract for Multi-Use Path Feasibility Studies

BACKGROUND At the September Governing Board meeting, staff was directed to procure consultant services to prepare scoping documents for multi-use path concepts to connect Atwater and Merced through the community of Franklin-Beachwood, and along Highway 152 connecting the Merced College campus to the City of Los Banos. DISCUSSION A Request for Proposals was released on November 6, 2017 for professional services to complete feasibility studies for regional multi-use paths in two proposed locations in Merced County. Under a single contract, the selected firm will complete the feasibility studies in consultation with MCAG, and potentially in collaboration with staff from the City of Atwater, the City of Merced, the City of Los Banos, and the County of Merced. The proposed contract is for one year with a six-month extension option. The scope of work includes a comprehensive inventory and analysis of existing facilities, identification of potential alignment alternatives, cost analysis, and a project implementation schedule. An optional task of providing a Mini-Preliminary Environmental Analysis Report (Mini-PEAR) for each proposed project location is not a requirement but highly desired. Two separate feasibility studies with equal level of detail for both concept locations will be produced. The studies will provide the information and planning necessary for the conceptual projects to compete for state and federal alternative/active transportation funding. Proposals were due December 6, 2017 and were evaluated by a team consisted of staff from MCAG, the City of Atwater, Merced County, the City of Los Banos, and the City of Merced. The evaluation team arrived at a unanimous decision to select Mark Thomas. The proposed contract execution date will be in January 2018. If you have any questions regarding this staff report, please contact Natalia Austin at 723-3153 x 127 or [email protected]. The Citizens Advisory Committee concurs with the requested action. The Technical Review Board concurs with the requested action.

058

Page 59: Regular Meeting of the MCAG Governing Board

FISCAL IMPACT This contract will be funded with PPM funds from the FY17-18 budget. The contract amount for consultant services is not to exceed $105,000. REQUESTED ACTION Authorize the Executive Director to enter into a contract for consultant services to prepare two regional multi-use path feasibility studies in the amount not to exceed $105,000.

059

Page 60: Regular Meeting of the MCAG Governing Board

ITEM 12c

060

Page 61: Regular Meeting of the MCAG Governing Board

PH: 209.723.3153

FAX: 209.723.0322 www.mcagov.org

369 W. 18th Street Merced, CA 95340

ITEM 12c MEMORANDUM DATE:

December 14, 2017

TO: MCAG Governing Board

FROM: Nav Bagri, Finance Director

RE: Authorization to Award Contract to Spriggs Inc. for MCAG Copier Equipment and Maintenance Services

BACKGROUND MCAG staff issued a Request for Proposals (RFP) for new copier equipment and maintenance services on September 22, 2017 and the deadline to submit proposals was October 20, 2017. A total of five (5) proposals were received and the evaluation committee selected Caltronics Business Systems. Caltronics Business Systems declined MCAG’s Notice of Intent to Award (NOIA) therefore; a new NOIA was issued to Spriggs, Inc on November 16, 2017. The proposed contract for leasing two (2) digital copiers and for copier maintenance services is for a 36-month term with two one-year extension options. A request to authorize the Executive Director to enter into contract for copier and maintenance services will be made to the Governing Board at the December 21, 2017 meeting. The proposed contract execution is January 2018. If you have any questions regarding this staff report, please contact Nav Bagri at 209.723.3153 x 154 or [email protected]. The Citizens Advisory Committee concurs with the requested action. The Technical Review Board concurs with the requested action. FISCAL IMPACT The annual budgeted cost for two (2) digital copiers and maintenance services is under rent and lease equipment in the Overall Work Program. Fiscal year 17/18 budgeted amount for copiers is $18,000. The new proposed annual cost is approximately $14,500. This is an annual savings of $3,500. REQUESTED ACTION Authorize the Executive Director to enter into a contract with Spriggs, Inc. for copier equipment and maintenance services in the amount not to exceed $54,000 for 36 months.

061

Page 62: Regular Meeting of the MCAG Governing Board

ITEM 13

062

Page 63: Regular Meeting of the MCAG Governing Board

PH: 209.723.3153

FAX: 209.723.0322 www.mcagov.org

369 W. 18th Street Merced, CA 95340

ITEM 13 MEMORANDUM DATE:

December 14, 2017

TO: MCAG Governing Board

FROM: Ty Phimmasone, Associate Planner

RE: Authorization to Award Contract for Pavement Management System Services

BACKGROUND With the availability of Measure V and SB 1 funding, the member agencies have the opportunity to implement additional transportation projects, including pavement preservation and replacement projects. There is a need to assure the public that those responsible for selecting and implementing projects are doing so efficiently and effectively. Pavement management systems have been used as a tool to assist decision-makers in developing project lists. The system is based on condition data of the pavement – multiple distresses are measured and composite indices like PCI (pavement condition index) are measured. The data is used by pavement management software which considers the conditions, available funds, and treatment options to provide information to decision-makers. The system rates roadway pavement condition, establishes a maintenance and repair schedule, and evaluates the effectiveness of maintenance strategies. SCOPE OF WORK Working with the member jurisdictions, MCAG prepared the scope of work for the Request for Proposals (RFP). The consultant will be responsible for: • Automated pavement condition data collection and post-processing; • Working with the member jurisdictions to define maintenance and rehabilitation strategies and

decision tree; • Setting up budget needs and funding scenarios; • Setting up seven jurisdictional and one countywide pavement management systems; • Providing hands-on training; and • Providing technical support and refresher training sessions for three years. Advertising the RFP resulted in seven proposals. The evaluation committee, made up of staff of Merced County, cities of Merced, Los Banos, Atwater, Livingston, and MCAG, scored the seven proposals and selected Dynatest North America, Inc.

063

Page 64: Regular Meeting of the MCAG Governing Board

COST-SHARING To help with the cost of this endeavor, MCAG shall contribute $200,000 towards the pavement data collection cost. The balance of the pavement data collection cost shall be apportioned amongst the seven member jurisdictions based on collected pavement miles per jurisdiction. The cost for the pavement management systems shall be apportioned amongst the seven member jurisdictions based on the average of collected pavement miles and population per jurisdiction. The eight licenses for the pavement management software, PAVER, for the first year shall be covered by the contract. After the first year, the licensing costs, about $1,000 per license, will be the responsibilities of MCAG and seven member jurisdictions individually. MCAG provided the member jurisdictions with funding agreements, which identify the cost-sharing amounts. MCAG will not award the contract until after receiving the fully-executed funding agreements from all seven member jurisdictions.

AGENCY COST SHARE City of Atwater 18,817.59 City of Dos Palos 3,802.75 City of Gustine 3,656.76 City of Livingston 8,588.71 City of Los Banos 26,921.52 City of Merced 56,770.96 Merced County 182,822.71 SUBTOTAL $301,381.00 MCAG $200,000.00 TOTAL COST $501,381.00

After deducting MCAG’s $200,000 contribution to this effort, the remaining balance of $301,381 was apportioned amongst the seven (7) member jurisdictions based on collected pavement miles and population per jurisdiction. CONTIGENCIES FOR CHANGE ORDERS Any additional costs associated with the Project shall be apportioned between the seven (7) jurisdictions pursuant to the cost-sharing mechanisms. Per the MCAG Purchasing Policy, the Executive Director can approve change orders up to 10% of the original contract amount. Any additional services specific to a member jurisdiction shall be the financial responsibility of the member jurisdiction making the request. These jurisdiction-specific additional costs may be up to an additional 10% of the original contract amount and will not count against the 10% discretionary contingency authorized to the Executive Director.

064

Page 65: Regular Meeting of the MCAG Governing Board

SCHEDULE December 2017 MCAG Board to authorize contract award January 2018 Contract execution / notice to proceed January – February 2018 GIS integration and data collection plan January 2018 Project kickoff meeting February 2018 Automated pavement condition data collection will begin August 2018 Training September 2018 Pavement software setup The Citizens Advisory Committee concurs with the requested action. The Technical Review Board concurs with the requested action. FISCAL IMPACT MCAG shall contribute $200,000 towards the pavement data collection cost. The balance of the pavement data collection cost and the cost for the pavement management systems shall be apportioned amongst the seven member jurisdictions. REQUESTED ACTION Authorize the Executive Director to enter into a contract for pavement management services with Dynatest North America, Inc. for $501,381.

065

Page 66: Regular Meeting of the MCAG Governing Board

ITEM 14

066

Page 67: Regular Meeting of the MCAG Governing Board

PH: 209.723.3153

FAX: 209.723.0322 www.mcagov.org

369 W. 18th Street Merced, CA 95340

ITEM 14 MEMORANDUM DATE:

December 14, 2017

TO: MCAG Governing Board

FROM: Stacie Dabbs, Deputy Executive Director

RE: Transportation Planning Priorities FY 18-19

BACKGROUND

Each year, MCAG is required to develop an Overall Work Program (OWP) to outline the transportation planning work elements and related budget for the fiscal year. The OWP is developed in compliance with federal and state requirements and once adopted, serves as the workplan for all transportation planning activities for MCAG.

As staff begins to develop the FY 18-19 OWP for adoption in spring 2018, there is value in establishing transportation planning priorities that will direct the development of the workplan and provide staff with a framework to support policies and projects that will help achieve those goals as opportunities arise throughout the year.

At the November 17, 2017, Special Meeting of the MCAG Governing Board, staff proposed a draft list of transportation planning goals for the FY 18-19 OWP. Once adopted, these priorities will ultimately serve two main purposes:

1) Serve as the foundation for work to be included in the FY 18-19 OWP.

2) Serve as a board-approved framework from which staff can reference throughout the year as requests to support programs, projects and policies arise.

DISCUSSION

Following the input received from the Governing Board at the special meeting, staff is proposing five transportation planning priorities for FY 18-19:

1) Utilize local funding sources to leverage greater state and federal investments.

2) Support the development of passenger rail in Merced County and the San Joaquin Valley, including connections to Sacramento and the Bay Area (Amtrak San Joaquins, Altamont Corridor Express, and High Speed Rail).

067

Page 68: Regular Meeting of the MCAG Governing Board

3) Support improvements to goods movement corridors (Highways 33, 59, 140, 152, 165) in Merced County and throughout the San Joaquin Valley.

4) Support improvements to Highway 99 in Merced County and throughout the San Joaquin Valley.

5) Support the San Joaquin Valley Blueprint smart growth principles, including projects and programs that promote implementation of the principles:

• Create a range of housing opportunities and choices; • Create walkable neighborhoods; • Encourage community and stakeholder collaboration; • Foster distinctive, attractive communities with strong sense of place; • Make development decisions predictable, fair and cost-effective; • Mix land uses; • Preserve open space, farmland, natural beauty and critical environmental areas; • Provide a variety of transportation choices; • Strengthen and direct development towards existing communities; • Take advantage of compact building design; • Enhance the economic vitality of the region; • Support actions that encourage environmental resource management.

At this time, staff is seeking further discussion and input on the draft priorities. The item will be taken to the committees and Governing Board for action in January 2018. Should you have any questions about the content of this staff report, please contact Stacie Dabbs at [email protected] or (209)723-3153 x 109. REQUESTED ACTION For information only.

068

Page 69: Regular Meeting of the MCAG Governing Board

ITEM 15

069

Page 70: Regular Meeting of the MCAG Governing Board

PH: 209.723.3153

FAX: 209.723.0322 www.mcagov.org

369 W. 18th Street Merced, CA 95340

ITEM 15 MEMORANDUM DATE:

December 14, 2017

TO: MCAG Governing Board

FROM: Patrick Pittenger, Executive Director

RE: Regional Transportation Impact Fee (RTIF) Update

BACKGROUND The Regional Transportation Impact Fee (RTIF) program collects one-time fees from new development to mitigate their impact on the regional road network. The purpose of the program is to ensure that adequate transportation facilities will be available to meet the projected needs of Merced County as it grows, and that the facilities planned are consistent with the Regional Transportation Plan. The Regional Transportation Impact Fee (RTIF) program was established in 2005 when each of the seven jurisdictions in Merced County entered into an implementation agreement authorizing MCAG to manage and administer the fee program. Participation in the collection of the RTIF has varied since its inception. As the region began to recover from the recession, MCAG procured a consultant to prepare a comprehensive update on the RTIF program. The 2016 RTIF Study was accepted by the Governing Board in December 2016 but has not been adopted for implementation. At the November 17, 2017 special meeting of the Governing Board, the status and future of the RTIF program was discussed. No decisions were made and the topic was continued for further discussion at a future meeting. More specifically, staff was directed to identify a menu of options on how to move forward with the RTIF – ranging from the dissolution of the program, to full adoption and implementation of the 2016 study. This information was to also include a variety of options on how to allocate the remaining fund balance should the board decide to dissolve the program. The attached document reflects those options and is intended to serve as information to further discussion with the Governing Board on how to move forward with the RTIF. The document is comprehensive but not exhaustive. Additional options may be added or modified as directed by the Governing Board. DISCUSSION At this time, staff is providing the information on options as requested by the Governing Board for consideration. Staff will bring the item back for further discussion and/or action at a later date per the direction of the Governing Board. REQUESTED ACTION For information only. Attachment: RTIF Alternatives for Consideration – December 2017

070

Page 71: Regular Meeting of the MCAG Governing Board

11/29/17

Regional Transportation Impact Fee (RTIF) Alternatives for Consideration by the Merced County Association of

Governments Governing Board December 2017

This document contains a list of options for how to proceed regarding the RTIF. While this is an extensive list, additional variations could be developed and considered. The MCAG Governing Board has considerable discretion regarding the RTIF, but some options would require actions by individual jurisdictions for implementation.

Option 1: Status quo The Board could act at any time to allocate existing funds to eligible projects. As the 2016 study was not fully implemented, projects would need to be selected from the approved 2008 list. If projects from the 2016 study were desired, each of the seven jurisdictions would need to adopt the 2016 study. The continued collection of RTIF by selected jurisdictions is up to the jurisdictions.

Option 2: Re-commitment to RTIF and adopt the 2016 study All jurisdictions approve the 2016 study and those jurisdictions which have suspended collections resume doing so. Current and future funds would be available throughout the county for projects on the 2016 list at the discretion of the Board. A new study could be conducted in the future as an update to the 2016 study as needed.

Option 3: Termination of the RTIF and distribution of available funds by the Board Without all jurisdictions participating, all jurisdictions cease collecting RTIF. While the RTIF implementation could terminate with withdrawal of jurisdictions, that would render any jurisdiction which withdrew ineligible for funding. Rescission of the 2005 implementation agreement by all jurisdictions would terminate the RTIF and leave all jurisdictions eligible to receive some of the remaining available RTIF funds. Under this option there are many possibilities for the distribution and use of funds.

• Option 3A: Allocation of funds to eligible projectsLike Option 1, the Board could act to allocate existing funds to eligible projects. As the2016 study was not fully implemented, projects would need to be selected from theapproved 2008 list. If projects from the 2016 study were desired, each of the sevenjurisdictions would need to adopt the 2016 study.

• Option 3B: Allocation of funds to east and west regionsWhile final authority remains with the Board, the Board could elect to allocate theremaining funds to the east and west sides of the county as geographically defined inthe Measure V Transportation Expenditure Plan. The available funding could then be

071

Page 72: Regular Meeting of the MCAG Governing Board

11/29/17

considered by the Measure V Eastside and Westside Regional Projects Committees for recommendations to be made to the full board. Projects would need to be selected from the 2008 list unless all jurisdictions adopt the 2016 study.

o Option 3B-1: Allocate funds by Measure V formulaDivide the funds between the east and west based only on the Measure Vmethod (50% by percentage of population and 50% by percentage of roadmileage)

o Option 3B-2: Allocate funds by contribution of jurisdictionDivide the funds between the east and west based on the contributions byindividual jurisdictions. Amount of contributions by each city could be used todetermine city-related contributions for each side of the county. The County’sportion of contribution would still need to be split between the east andwest regions. The allocation of the County’s portion could be done by theMeasure V formula or another method.

o Option 3B-3: Allocate funds by other considerationsFunds could be allocated using other considerations includingcontinued collection of funds, previous use of funds, or any other applicableconsideration.

Option 3C: Allocate remaining funds to all jurisdictions based on contributions Under this option, the funds would be allocated to all seven jurisdictions based on the amount of funds each contributed to the RTIF over the entire length of the program. This would account for jurisdictions which did and did not continue to collect RTIF funds. As a majority of all funds collected have already been expended, each jurisdiction would receive a pro-rated amount of the remaining funds. An estimated $4.9 million is available of the total net revenue of $14.2 million from the life of the program. That means that each jurisdiction would receive about 34.5 percent of the funds which were contributed. The Board has the ability to allocate funds to eligible projects, which is currently the 2008 list. The 2016 study would need to be adopted by all jurisdictions to make the 2016 projects available.

While the Board could allocate funds to each jurisdiction in this manner, the funds could only be used for eligible projects. This could result in some jurisdictions receiving amounts of funds that would not be meaningful compared to the costs of eligible projects. Options would need to be pursued by jurisdictions and the Board to ensure that final allocations would be made to jurisdictions in amounts that could be utilized effectively.

072

Page 73: Regular Meeting of the MCAG Governing Board

ITEM 16

073

Page 74: Regular Meeting of the MCAG Governing Board

PH: 209.723.3153 FAX: 209.723.0322

www.mcagov.org 369 W. 18th Street Merced, CA 95340

ITEM 16 MEMORANDUM

DATE: December 14, 2017

TO: MCAG Governing Board

FROM: Natalia Austin, GIS Analyst

RE: Social Services Transportation Advisory Council Recruitment

BACKGROUND

California’s Transportation Development Act (TDA) requires Merced County Association of Governments (MCAG) to have a Social Services Transportation Advisory Council (SSTAC) in place to oversee the annual Unmet Transit Needs Process.

Prior to making any allocation of TDA funds not directly related to public transportation services, specialized transportation services, or facilities provided for the exclusive use of pedestrians and bicycles, the transportation planning agency shall annually go through an assessment of unmet transit needs.

The process begins with the establishment of a SSTAC under the strict guidelines of the TDA, as defined by the Public Utilities Code. The SSTAC shall consist of the following nine members (1-6):

1. One representative a potential transit user who is 60 years of age or older;2. One representative a potential transit user who is disabled;3. Two representatives of the local service providers for seniors, including one representative of

a social service transportation provider, if one exists;4. Two representatives of local service providers for the disabled, including one representative of

a social service transportation provider, if one exists;5. One representative of a local social service provider for persons of limited means; and6. Two representatives from the local consolidated transportation service agency, including one

representative from an operator, if one exists.

074

Page 75: Regular Meeting of the MCAG Governing Board

The following table identifies current SSTAC members and vacancies:

Name Agency TDA (PUC) Representative Area

2018-19 Chair &

Vice Chair

Appoint. Date

Term Expires

1 a Alexandra PierceAdult and Aging Services - Human Services Agency

Local service provider for seniors, including one representative of a social service transportation provider, if one exists

Feb-15 1st term - 2018

b VACANT

Local service provider for seniors, including one representative of a social service transportation provider, if one exists

2Margaret Buchmann-Garcia COVE

Transit user who is 60 years of age or older 2011

1st term - 2014 ; 2nd term - 2018

3 Allen Norris COVE Disabled transit rider 17-Feb-17 1st term - 2020

4 a Artis SmithTransit Manager - Merced County Transit The Bus

Local consolidated transportation service agency representative , including one representative from an operator, if one exists

C NA NA

b Albert Perez National Express

Local consolidated transportation service agency, including one representative from an operator, if one exists

NA NA

5 aLynn Downum-Hanzal

Resources for Independence Central Valley (RICV)

Local social service provider for the disabled, including one representative of a social service transportation provider, if one exists.

VC Oct-121st term - 2015; 2nd

term - 2019

b VACANT

Local social service provider for the disabled, including one representative of a social service transportation provider, if one exists.

6 VACANTLocal social service provider for persons of limited means

Rep

Currently, the SSTAC has three vacancies. MCAG staff would welcome any suggestions from the Board regarding potential applicants to fill the vacant positions. Meanwhile, staff will continue to advertise to the public and reach out to various county organizations that may have candidates that fit the criteria as outlined by the TDA. If you have any questions about this agenda item, please contact Natalia Austin at (209)723-3153 x 127 or [email protected]. FISCAL IMPACT None. REQUESTED ACTION For information only.

075

Page 76: Regular Meeting of the MCAG Governing Board

ITEM 17

076

Page 77: Regular Meeting of the MCAG Governing Board

The Public Transportation Services of the Transit Joint Powers Authority for Merced County 369 W. 18th Street, Merced, CA 95340 .. (209) 723-3100 .. (209) 723-0322 fax .. mercedthebus.com

ITEM 17 MEMORANDUM DATE:

December 14, 2017

TO: Transit Joint Powers Authority for Merced County

FROM: Nav Bagri, Finance Director

RE: TJPA Financial Report for July 2017 – September 2017 (unaudited)

DISCUSSION Attached for your review is the Profit and Loss Budget versus Actual report for the period July 2017 through September 2017. If you have any questions regarding this staff report, please contact Nav Bagri at 723.3153 x 154 or [email protected] REQUESTED ACTION For information only. Attachment: Profit and Loss Budget vs. Actual report for the period July 20176 through September 2017

077

Page 78: Regular Meeting of the MCAG Governing Board

Transit JPA

P L Budget vs. Actual

1ST Quarter FY 2017-18

Unaudited

Actual

7/1/17-9/30/17

Budget

July -June 18

Variance

Remaining

Balance

Remaining

Budget %

Income

State Transit Assistance 262,813 2,575,666 2,312,853 89.8%

Local Transp. Funds 3,293,899 3,293,899 100.0%

Interest 22,327 7,000 (15,327) -218.95%

Federal Agencies

CMAQ 100,000 100,000 100.0%

LCTOP 189,587 125,925 (63,662) 0.0%

FTA - 0.0%

FTA Cec 5311 - Rural 507,341 507,341 100.0%

FTA 5307-Merced 2,658,901 2,658,901 100.0%

FTA 5307-Turlock 230,010 230,010 100.0%

Subtotal - Federal Agencies 474,727 3,622,177 3,432,590 94.77%

Farebox Revenues 69,034 1,461,113 1,392,079 95.28%

UC Route Revenues 106,621 360,600 253,979 70.43%

Senior/Veteran Fares 24,689 150,000 125,311 83.54%

Misc Other-Asset Sale - - #DIV/0!

Misc Revenue 992 - (992) #DIV/0!

Transfer In - PTMISEA & CalEMA funds - 0 #DIV/0!

Total Income 676,063 11,470,455 10,794,392 94.11%

Gross Profit 676,063 11,470,455 10,794,392 94.11%

Expense

Prof & Special Svc $1,154,688 7,280,385 6,125,697 84.14%

Communications - IS $21,175 125,800 104,625 83.17%

Janitorial Expense $1,266 2,350 1,084 46.13%

Insurance - Gen Liability $44,235 44,000 (235) -0.53%

Maint Equipment $279,916 1,406,880 1,126,964 80.1%

Maint - Equip Fuel $274,846 1,821,150 1,546,304 84.91%

Maint-Structures $1,158 37,030 35,872 96.87%

Membership $201 4,300 4,099 95.33%

Marketing & Promotions (CMAQ) $24,577 100,000 75,423 75.42%

Office Expense $3,832 8,500 4,668 54.92%

Rents & Leases - Struct $28,975 142,760 113,785 79.7%

Trans & Travel $896 23,500 22,604 96.19%

Utilities $4,055 25,600 21,545 84.16%

Special Department $98,092 448,200 350,108 78.11%

Total Expense $1,937,912 11,470,455 9,532,543 83.11%

Net Operating Profit (Loss)

Fixed Asset-Capital Costs $313,951 7,449,615 7,135,664 95.79%

Net Income (1,575,800) -7,449,615 5,873,815

Page 1 078

Page 79: Regular Meeting of the MCAG Governing Board

ITEM 18

079

Page 80: Regular Meeting of the MCAG Governing Board

The Public Transportation Services of the Transit Joint Powers Authority for Merced County 369 W. 18th Street, Merced, CA 95340 (209) 723-3100 (209) 723-0322 fax www.mercedthebus.com

ITEM 18 MEMORANDUM

DATE: December 14, 2017

TO: Transit Joint Powers Authority for Merced County

FROM: Patrick Pittenger, Executive Director

RE: Authorization to Award Contract for Architectural and Engineering Services for The Bus Maintenance Facility

BACKGROUND

The Transit Joint Powers Authority for Merced County (TJPAMC) is in the process of building a new Operations and Maintenance Facility. The construction contract with Acme Construction Company, Inc. is valued at $6,549,000. Golden Valley Engineering is currently under contract to provide design input during construction through December 2017.

DISCUSSION

TJPAMC has been in contract with Golden Valley Engineering since April 2016. Continued Architectural, Engineering and Surveying services are needed until the facility is completed and fully operational.

If you have any questions regarding this staff report, please contact Patrick Pittenger at 209.330.9067 or [email protected].

The Technical Review Board concurs with the requested action.

FISCAL IMPACT

Transit will use available transit funds.

REQUESTED ACTION

Authorize the Executive Director to enter into a contract with Golden Valley Engineering for Architectural, Engineering and Surveying Services for The Bus Maintenance Facility in an amount not to exceed $65,000.

Attachment: Cost Summary for new Contract for Architectural, Engineering and Surveying Services

080

Page 81: Regular Meeting of the MCAG Governing Board

081

Page 82: Regular Meeting of the MCAG Governing Board

ITEM 19

082

Page 83: Regular Meeting of the MCAG Governing Board

The Public Transportation Services of the Transit Joint Powers Authority for Merced County 369 W. 18th Street, Merced, CA 95340 (209) 723-3100 (209) 723-0322 fax www.mercedthebus.com

ITEM 19 MEMORANDUM DATE:

December 14, 2017

TO:

Transit Joint Powers Authority for Merced County

FROM:

Patrick Pittenger, Executive Director

RE:

Approve the Purchase of Solar Powered Lights for Bus Stop Posts

BACKGROUND

The Transit Joint Powers Authority for Merced County (TJPAMC) applied for and received a California Office of Emergency Services (CalOES) Safety Grant for the purpose of purchasing and installing solar powered lights at bus stop posts. Upon further research on solar light options, it was determined that there were sufficient vendors that supplied solar light kits that could be easily installed by staff. This would allow us to maximize the number of solar lights to purchase with the available budget. TJPAMC is a member of the California Association for Coordinated Transportation (CalACT), which allows the utilization of the CalACT Purchasing Cooperative. The Cooperative provides a federal and California State compliant purchasing solution that allows members to select, not settle for the equipment that best meets their transit safety needs. Staff has reviewed the CalACT Purchasing Cooperative and recommends the 5 Watt PV Solar Powered Lighting with push button activation through Tolar Manufacturing Company, Inc. If you have any questions regarding this staff report, please contact Malee Unruh at 209.723.3100 x 502 or [email protected]. The Technical Review Board concurs with the requested action. FISCAL IMPACT TJPAMC’s Fiscal Year 17/18 budgeted $168,304 for solar powered lights. The actual cost by implementing a CalACT Purchasing Cooperative would be $125,775, a savings of $42,529 which can be utilized for a future safety and security project.

REQUESTED ACTION Approve the purchase of solar powered lighting equipment through a CalACT Purchasing Cooperative Agreement with Tolar Manufacturing Company, Inc.

083

Page 84: Regular Meeting of the MCAG Governing Board

ITEM 20

084

Page 85: Regular Meeting of the MCAG Governing Board

PH: 209.723.4481 FAX: 209.384.3109

7040 N. Highway 59 Merced, CA 95348

ITEM 20 MEMORANDUM DATE:

December 14, 2017

TO:

Merced County Regional Waste Management Authority

FROM:

Brooks Stayer, Director

RE:

Oral Report – Monthly Tonnage Update

SUMMARY In order to keep the Technical Review Board (TRB) and Merced County Regional Waste Management Authority Board (MCRWMAB) informed, Director of Merced County Regional Waste Management Authority Brooks Stayer will provide a monthly update to the Board on RWA activities and revenue. Discussion: Brooks Stayer will give a presentation on landfill tonnage revenue generated at the Highway 59 and Billy Wright Landfills, as well as other monthly updates from RWA. FISCAL IMPACT None; increase in revenue. REQUESTED ACTION For information only. Attachment: Chart: November Comparisons 2013-2017

085

Page 86: Regular Meeting of the MCAG Governing Board

19,08621,434

16,702

21,019

25,845

3,716 3,385

6,495

10,167

14,310

22,80124,820

23,197

31,186

40,155

0

3,000

6,000

9,000

12,000

15,000

18,000

21,000

24,000

27,000

30,000

33,000

36,000

39,000

42,000

45,000

Nov '13 Nov '14 Nov '15 Nov '16 Nov '17

Tons

Disposed Tons For Highway 59 and Billy Wright LandfillsNovember Comparison: 2013 - 2017

H59 DisposedTons

BWL DisposedTons

TotalDisposedTons

Billy Wright Landfill

Highway 59 Landfill

Total Tons Both Landfills

086

Page 87: Regular Meeting of the MCAG Governing Board

ITEM 21

087

Page 88: Regular Meeting of the MCAG Governing Board

PH: 209.723.4481 FAX: 209.384.3109

7040 N. Highway 59 Merced, CA 95348

ITEM 21 MEMORANDUM DATE:

December 14, 2017

TO:

Merced County Regional Waste Management Authority

FROM:

Nadia Gonzalez, Financial Services Manager

RE:

Merced County Regional Waste Management Authority Financial Reports

BACKGROUND Attached for your review is the Profit and Loss Budget vs. Actual Report for the first quarter ending September 30, 2017. The Pooled Investment Summary Report for the period ending September 30, 2017 is likewise included. These numbers are preliminary and unaudited. If you have any questions regarding this staff report, please contact Nadia Gonzalez at 723-4481 x 219 or [email protected]. FISCAL IMPACT None. REQUESTED ACTION For information only. Attachments: Profit and Loss Budget vs Actual Report for the First Quarter ended September 30, 2017 Pooled Investment Summary Report for the period ended September 30, 2017

088

Page 89: Regular Meeting of the MCAG Governing Board

MCRWMAProfit/Loss Budget vs Actual

For the Three Months Ended Saturday, September 30, 2017

Variance7/1/2017 - Budget Remaining Remaining9/30/2017 07/01/17 - 06/30/18 Balance Budget %

RevenueFacility Fees-Disp $4,854,999 $10,700,000 $5,845,001 54.63%Reimbursed Services 37,876 48,700 $10,824 22.23%Other Sales 32,366 50,000 $17,634 35.27%Misc. Revenue 31,164 50,000 $18,836 37.67%Interest 3,017 100,000 $96,983 96.98% Total Revenue 4,959,422 10,948,700 $5,989,278 54.70%

Operating Expenses

Employee-Related Expenses 724,032 3,301,085 $2,577,053 78.07%

Other Operating ExpensesGeneral Liability Ins 127,000 241,100 $114,100 47.32%Clothing/Personal Supply 6,296 20,600 $14,304 69.44%Janitorial Expense 996 18,000 $17,004 94.47%Equipment Maintenance/Repair 85,769 325,400 $239,631 73.64%Equipment Fuel/Oil/Supplies 91,800 492,500 $400,700 81.36%Structures & Grounds Maintenance 26,308 277,000 $250,692 90.50%Tools & Instruments 475 9,000 $8,525 94.72%Dues, Subscriptions & Membership 2,721 6,955 $4,234 60.88%Operations - Cash Over/Short (254) 500 $754 150.80%Operations - Bank Charges 281 9,000 $8,719 96.88%Office Expense - General 9,158 50,500 $41,342 81.87%Professional/Special Svcs 186,980 925,260 $738,280 79.79%Information Services 10,389 50,000 $39,611 79.22%Interest Expense 223 375 $152 40.53%Testing Lab/Medical/Misc 1,690 5,500 $3,810 69.27%Publications/Advertise 24,000 $24,000 100.00%Equipment Lease/Rent 70,056 106,625 $36,569 34.30%Rent Expense:Grounds/Imprvmt/Structure 2,829 6,800 $3,971 58.40%Special Department Expense:Other 65,000 $65,000 100.00%Software 16,814 50,000 $33,186 66.37%State Solid Waste Fees 185,704 385,000 $199,296 51.77%Travel Expense 3,888 25,000 $21,112 84.45%Training 5,587 15,500 $9,913 63.95%Communication 4,132 33,100 $28,968 87.52%Electric Utility Service 17,882 83,000 $65,118 78.46%Closure and postclosure expense* 80,000 $80,000 100.00% Total Other Operating Expenses 856,724 3,305,715 $2,448,991 74.08%

Total Operating Expenses 1,580,756 6,606,800 5,026,044 76%

Additional Expense SectionPrincipal Pymt/2007 Bond 1,668,000 $1,668,000 100.00%Interest Pymt/2007 Bond 503,242 $503,242 100.00%Fixed Assets 71,210 115,000 $43,790 38.08% Total Additional Expense Section 71,210 2,286,242 2,215,032 96.89%

TOTAL OPERATING AND ADDITIONAL EXPENSES 1,651,966 8,893,042 7,241,076 81.42%

Net Income (Loss) $3,307,456 $2,055,658 ($1,251,798) (60.90%)

089

Page 90: Regular Meeting of the MCAG Governing Board

% Rate of % Rate ofAccount Balance Return QTD Return YTD

Wells Fargo Bank - Operating Fund 7,004,018$ 1.050 1.050County of Merced Investment 25,996,933 1.390 1.390

Total Bank and Investment Balances 33,000,951$

MERCED COUNTY REGIONAL WASTE MANAGEMENT AUTHORITYPOOLED BANK AND INVESTMENT BALANCES

09/30/2017

21.22%2.46%

10.57%

1.55%

0.48%6.07%

2.76%

54.89%

POOLED INVESTMENTS

Operating

JPA Operations

Fleet

Contingency

Liab. Ins.

59 Closure

BW Closure

Capital

090

Page 91: Regular Meeting of the MCAG Governing Board

ITEM 22

091

Page 92: Regular Meeting of the MCAG Governing Board

PH: 209.723.4481 FAX: 209.384.3109

7040 N. Highway 59 Merced, CA 95348

P a r t n e r i n g f o r R e g i o n a l S o l u t i o n s

ITEM 22 MEMORANDUM

DATE: December 14, 2017

TO: Merced County Regional Waste Management Authority

FROM: Brooks Stayer, Director

RE: Modification to Amended Contract No. WMA2011-05 with Remy, Moose, Manley LLC (RMM)

SUMMARY

Amended contract WMA2011-05 was approved by the Governing Board on October 16, 2017. Remy Moose, Manley LLC (RMM) had reviewed and approved the amended contract prior to it being placed on the October agenda. Before signing, however, the RMM office manager noticed an issue with the insurance requirements. RMM has General Liability Insurance coverage of $1,000,000 per occurrence with an annual aggregate of $2,000,000, not the $5,000,000 per occurrence provided for in the contract. It is therefore requested, that the General Liability Insurance limits be lowered from $5,000,000 to $1,000,000 per occurrence with an annual aggregate of $2,000,000. Professional liability limits remain at $5,000,000.

Given the fact that RMM staff never come onto landfill property and that professional liability limits remain unchanged, Authority Counsel has determined that the reduction in General Liability Insurance does not present a major issue and recommends moving forward with the amended contract.

REQUESTED ACTION

Authorize the MCAG Executive Director to execute Contract No. WMA2011-05 with the modified insurance section.

Attachment: Merced County Regional Waste Management Authority amended Contract No. WMA2011- 05 Agreement for Specialized Legal Services

092

Page 93: Regular Meeting of the MCAG Governing Board

Page 1 of 12

MERCED COUNTY REGIONAL WASTE MANAGEMENT AUTHORITY

AMENDED CONTRACT NO. WMA2011-05

AGREEMENT FOR SPECIALIZED LEGAL SERVICES

THIS Amended AGREEMENT (hereafter “Agreement”) is made and entered into this 21st day of December

2017, by and between the MERCED COUNTY REGIONAL WASTE MANAGEMENT AUTHORITY, a California joint

powers authority pursuant to Government Code Section 6500 et seq, (hereafter “AUTHORITY”), and the law firm of Remy

Moose Manley, LLP, located at 555 Capitol Mall, Suite 800, Sacramento, California 95814 (hereafter "ATTORNEY").

RECITALS

WHEREAS, AUTHORITY from time to time has the need for special legal counsel with expertise in

environmental law matters and for advice and representation concerning such legal issues; and,

WHEREAS, the AUTHORITY wishes to engage the specialized legal services of outside counsel; and

WHEREAS, ATTORNEY represents that it is specially trained and experienced and that it possesses such

expertise; and

NOW, THEREFORE, in consideration of the mutual covenants and promises herein contained, the parties hereby

agree as follows:

AGREEMENT

1. Employment of Attorney.

AUTHORITY hereby hires ATTORNEY as its special counsel with respect to matters the AUTHORITY

specifically refers to ATTORNEY. ATTORNEY shall provide legal services as reasonably required to represent

AUTHORITY in such matters, take reasonable steps to keep AUTHORITY informed of significant developments,

and respond to AUTHORITY’S inquiries regarding those matters. AUTHORITY hereby hires ATTORNEY as an

independent contractor through the services of the following key person(s): Andrea K. Leisy, Attorney at Law,

Partner and such other partners , associate attorneys, of-counsel, and staff members employed by ATTORNEY, as

ATTORNEY deems necessary and which the AUTHORITY general counsel, or its designee, approves. It is

understood that ATTORNEY may not replace any of the aforementioned key persons named above and listed in

Exhibit A of this Agreement without the prior, express, and written approval of the AUTHORITY general counsel

or its designee. In case of death, illness or other incapacity of any of the foregoing key persons, ATTORNEY shall

093

Page 94: Regular Meeting of the MCAG Governing Board

Page 2 of 12

provide a replacement of at least equal professional ability and experience.

A. Scope of Services:

ATTORNEY shall provide legal services to AUTHORITY in a competent and professional manner, including

all the usual and customary activities of an attorney that are reasonable and necessary to performance of the scope of

work herein and to assist and advise the AUTHORITY in the following manner:

1. Provide oral and written advice concerning environmental law;

2. Attend meetings and/or communicate with AUTHORITY staff or the AUTHORITY BOARD

upon request by the AUTHORITY general counsel or its designee;

3. Perform such other legal services as may be requested from time to time by the AUTHORITY

general counsel or its designee; and

4. Apprise AUTHORITY general counsel, in writing, of any significant developments related to

work performed under this Agreement and obtain authorization from AUTHORITY general

counsel before entering into any agreement related to any such developments

B. Authorization to Proceed With Work:

ATTORNEY shall commence performance of services upon receiving authorization to proceed with work from

the AUTHORITY Executive Director or designee.

2. Performance by Attorney.

ATTORNEY agrees to avoid any unnecessary or duplicative efforts on the part of ATTORNEY and

ATTORNEY's partners, associate attorneys, and staff members in ATTORNEY's performance of services for the

AUTHORITY hereunder.

AUTHORITY shall not be obligated to compensate ATTORNEY for intra-office conferences between or among

ATTORNEY's partners, associate attorneys, and staff members, unless such intra-office conferences promote efficiency in

the performance of ATTORNEY's work on a matter or a reduction in the amount of compensation paid or reimbursement

094

Page 95: Regular Meeting of the MCAG Governing Board

Page 3 of 12

made for related, actual, reasonable and necessary out-of-pocket expenses to ATTORNEY, or both.

In the performance of the tasks identified in paragraph 1 under this Agreement, ATTORNEY shall provide only

those services which are necessary to carry out such tasks in an efficient and effective manner.

3. Compensation of ATTORNEY.

AUTHORITY shall be obligated to compensate ATTORNEY pursuant to the terms and conditions of this

Agreement only for the performance of those tasks, to the reasonable satisfaction of the AUTHORITY, identified in

paragraph 1 of this Agreement performed during the term of this Agreement. It is understood that AUTHORITY shall not

be obligated to compensate ATTORNEY for any work, services, or functions performed by ATTORNEY which do not

arise directly from the performance of tasks identified in paragraph 1 of this Agreement, including, but not limited to, work,

services or functions performed by ATTORNEY: (a) in seeking to obtain AUTHORITY’s business or negotiating with the

AUTHORITY to enter into this Agreement or, (b) in providing AUTHORITY with documentation, explanations, or

justifications concerning the adequacy or accuracy of its invoices for the performance of services under this Agreement and

resolving same to the reasonable satisfaction of AUTHORITY.

A. Attorney Fees.

AUTHORITY agrees to pay and ATTORNEY agrees to accept as full compensation for performance of tasks

under this Agreement the stated billing rate per hour, and billed in 6 minute increments (10ths of an hour), per person

updated by this contract amendment and identified in Exhibit A, attached hereto and incorporated herein by this

reference, based upon the actual time expended by ATTORNEY in rendering legal services under this Agreement to

AUTHORITY.

ATTORNEY shall provide AUTHORITY with the necessary representation by staff qualified to perform the legal

tasks at the least costly billing category. ATTORNEY shall assign only competent personnel to perform services under this

Agreement at the billing rate per hour identified in Exhibit A. In the event AUTHORITY, in its sole discretion, at any time

during the term of this Agreement, desires the removal of any person assigned by ATTORNEY, ATTORNEY shall remove

such person.

095

Page 96: Regular Meeting of the MCAG Governing Board

Page 4 of 12

ATTORNEY may be called upon to travel outside of Merced County on a matter covered by this Agreement. In

such event, ATTORNEY shall bill AUTHORITY at the hourly rate set forth in Exhibit A.

B. Reimbursement for Costs and Expenses.

In addition to attorney fees, AUTHORITY shall reimburse ATTORNEY for all reasonable out-of-pocket costs

and expenses which may be incurred by ATTORNEY with respect to the services to be performed under this

Agreement, as set forth in Exhibit A.

It is understood that ATTORNEY shall not be reimbursed for its secretarial, clerical, word processing or typist

services (including overtime hours worked), or normal office operating expenses, with the exception of those charges and

expenses stated in Exhibit A.

C. Maximum Amounts Paid.

IN NO EVENT SHALL THE MAXIMUM AMOUNT PAID TO ATTORNEY AS COMPENSATION AND AS

REIMBURSEMENT FOR RELATED, ACTUAL, REASONABLE, AND NECESSARY OUT-OF-POCKET EXPENSES

EXCEED SEVENTY-FIVE THOUSAND DOLLARS ($75,000.00), NOR SHALL COMPENSATION EXCEED, IN ANY

SINGLE FISCAL YEAR PERIOD, TWENTY-FIVE THOUSAND DOLLARS ($25,000.00).

In the event aggregate billings for compensation and expenses reach the amount of $25,000.00 in any single

fiscal year period, AUTHORITY and ATTORNEY agree to meet and confer regarding the legal services and budget.

ATTORNEY shall not proceed with work that will result in billings in excess of $25,000.00 in any single fiscal year

period, or in exceedance of the $75,000 total limit, without the express written approval of AUTHORITY.

4. Payment and Record-keeping.

Subject to paragraph 3 of this Agreement, payment of compensation for the services provided and reimbursement

for related, actual, reasonable, and necessary out-of-pocket expenses incurred by ATTORNEY in the performance of

services under this Agreement shall be made by AUTHORITY only after submission of an itemized invoice by

096

Page 97: Regular Meeting of the MCAG Governing Board

Page 5 of 12

ATTORNEY to the AUTHORITY no later than the fifteenth (15th) day of the month following the month services are

rendered.

All such invoices shall have sufficient detail as may be required by the AUTHORITY Auditor, including,

but not limited to:

A. The specific nature of each task performed under this Agreement;

B. The name of the partner or associate attorney performing such task;

C. The number of hours worked by each person on such task;

D. The hourly rate for each such person performing each task; and

E. The related, actual, reasonable, and necessary out-of-pocket expenses incurred in the performance of each

such task.

In addition to the requirements of this paragraph 4, each invoice shall set forth a summary of hours worked by

each partner and associate attorney for the applicable billing period. Each invoice shall set forth the product of such

summary of hours worked by each person multiplied by each such person's billing rate, as set forth herein.

In preparing invoices, ATTORNEY shall segregate each task performed on a daily basis. If AUTHORITY general

counsel or its designee requests that ATTORNEY not combine unrelated tasks as a single entry in lieu of setting forth the

hours of work performed by a partner or associate attorney in each specific task, then ATTORNEY shall comply with such

request unless and until otherwise advised by AUTHORITY general counsel or its designee.

ATTORNEY shall prepare its invoices in an organized manner that facilitates an efficient review of the services

performed and the expenses incurred in order to provide AUTHORITY with a clear and complete picture of how much time

was devoted to specific tasks and projects and the cost associated therewith.

ATTORNEY shall keep complete records of the services provided, as described in this paragraph 4, together

with all related actual, reasonable, and necessary out-of-pocket expenses applicable to the work provided under this

Agreement. The AUTHORITY Auditor or duly authorized representative shall be given reasonable access to all of these

records for the purposes of an audit of this Agreement. In addition, ATTORNEY shall be subject to the examination and

audit of such records by the State Auditor for a period of three (3) years after final payment under this Agreement under

097

Page 98: Regular Meeting of the MCAG Governing Board

Page 6 of 12

Government code section 8546.7, if applicable.

5. Term of Agreement; Termination.

This Agreement shall become effective December 21, 2017, (the "Effective Date") and shall continue in full force

and effect until June 30, 2020, unless the term hereof is extended by both parties pursuant to a written amendment to this

Agreement or is earlier terminated under the terms of this Agreement.

AUTHORITY may terminate this Agreement at any time upon reasonable notice to ATTORNEY. ATTORNEY

may withdraw its services with AUTHORITY’s consent or as allowed or required by law upon reasonable notice to

AUTHORITY. During the notice period, ATTORNEY shall continue to work under this Agreement and act in the best

interests of AUTHORITY. At the end of the notice period, all work by ATTORNEY shall cease and, in order to avoid any

prejudice to AUTHORITY, ATTORNEY shall promptly deliver to AUTHORITY general counsel all files relating to the

matters undertaken by ATTORNEY. In the event of termination, the AUTHORITY’s rights under any pending matter

which may arise from ATTORNEY's services hereunder shall not be prejudiced due to such termination, as required by the

Rules of Professional Conduct of the State Bar of California. Subject to paragraph 3 above, ATTORNEY shall be paid for

all services performed to the date of termination of this Agreement which are performed to the reasonable satisfaction of

AUTHORITY.

6. Independent Contractor.

In performance of the work, duties and obligations assumed by ATTORNEY under this Agreement, it is

mutually understood and agreed that ATTORNEY, including any and all of ATTORNEY's partners, officers, agents, and

employees, will at all times be acting and performing as an independent contractor and shall act in an independent

capacity and not as an officer, agent, servant, employee, joint venturer, partner, or associate of the AUTHORITY.

Furthermore, AUTHORITY shall have no right to control or supervise or direct the manner or method by which

ATTORNEY shall perform its obligations under this Agreement. However, AUTHORITY shall retain the right to

098

Page 99: Regular Meeting of the MCAG Governing Board

Page 7 of 12

administer this Agreement so as to verify that ATTORNEY is performing its obligations in accordance with the terms

and conditions hereof. ATTORNEY and AUTHORITY shall comply with all applicable provisions of law and the rules

and regulations, if any, of governmental authorities having jurisdiction over the subject matter of this Agreement.

Because of its status as an independent contractor, ATTORNEY shall have absolutely no right to employment

rights and benefits available to AUTHORITY employees. ATTORNEY shall be solely liable and responsible for providing

its employees all legally required employee benefits. In addition, ATTORNEY shall be solely responsible and hold

AUTHORITY harmless from all matters related to payment of ATTORNEY's employees, including compliance with social

security, withholding, and all other regulations governing such matters. It is acknowledged that during the term of this

Agreement, ATTORNEY may be providing services to others unrelated to the AUTHORITY or to this Agreement.

7. Waiver of Conflicts.

AUTHORITY retains ATTORNEY for the purposes provided in paragraph I. ATTORNEYS existing clients

include River West Investments ("River West") and the Santa Nella County Water District ("SNCWD") [collectively

"EXISTING CLIENTS"). River West is the proponent of the Villages Project, which also seeks land use entitlements from

the County Board of Supervisors. River West also owns property within the Santa Nella Community Specific Plan

("SNCSP") area. In consideration of waivers granted to ATTORNEYS by these EXISTING CLIENTS permitting

ATTORNEYS to contract with the AUTHORITY, the AUTHORITY, by signing this agreement, hereby waives any

objections it might otherwise have to ATTORNEYS’ continued representation of these clients, including in proceeding

before the County Board of Supervisors.

8. Hold Harmless.

ATTORNEY shall hold AUTHORITY, its officers, agents, and employees harmless and indemnify and defend

AUTHORITY, its officers, agents, and employees against payment of any and all costs and expenses, claims, suits, losses,

damages, and liability arising from ATTORNEY’s performance under this Agreement or arising out of any negligent or

wrongful acts or omissions of ATTORNEY, including its partners, officers, agents, and employees, in performing or failing

to perform the services provided herein. The AUTHORITY’s receipt of any insurance endorsements and certificates

099

Page 100: Regular Meeting of the MCAG Governing Board

Page 8 of 12

required herein does not in any way relieve the ATTORNEY from its obligations under this paragraph 7 of this Agreement.

At the same time, AUTHORITY recognizes that the environmental laws are complex and difficult to interpret and that even

the most experienced environmental attorneys can at most make educated predictions regarding how courts or regulatory

agencies will apply or interpret existing statutes, regulations, or court precedents to new sets of facts not yet addressed in

case law or elsewhere. For these reasons, the fact that a court or regulatory agency may not ultimately agree with advice

provided by ATTORNEY to AUTHORITY shall not create a presumption that ATTORNEY was negligent in providing

such advice.

9. Insurance.

Without limiting the AUTHORITY’s rights under paragraph 8 of this Agreement, ATTORNEY, at its sole

expense, shall maintain in full force and effect the following insurance policies throughout the entire term of this

Agreement:

A. One or more policies of professional liability insurance with limits of coverage of not less than Five

Million Dollars ($5,000,000.00) per occurrence with an annual aggregate of Five Million Dollars ($5,000,000.00);

B. A policy of commercial general liability insurance with limits of coverage of not less than One Million

Dollars ($1,000,000.00) per occurrence; and annual aggregate of Two Million Dollars ($2,000,000.00); and

C. A policy of workers compensation insurance as is required by the California Labor Code,

providing full statutory coverage.

All such insurance policies shall be issued by California admitted insurers acceptable to AUTHORITY’s general

counsel. This insurance shall not be cancelled, reduced, or changed without a minimum of thirty (30) calendar days'

advanced, written notice given to AUTHORITY at the following addresses:

Brooks Stayer, Solid Waste DirectorMERCED COUNTY REGIONAL WASTE MANAGEMENT AUTHORITY7040 N. Highway 59Merced CA 95348

100

jlawrie
Highlight
Page 101: Regular Meeting of the MCAG Governing Board

Page 9 of 12

Haden Law Office2241 N StreetMerced, CA 95340

ATTORNEY shall obtain endorsements to the Commercial General Liability insurance naming the AUTHORITY,

its officers, agents, and employees, individually and collectively, as additional insured, but only insofar as the operations

under this Agreement are concerned. Such coverage for additional insured shall apply as primary insurance and any other

insurance, or self-insurance, maintained by AUTHORITY, its officers, agents and employees shall be excess only and not

contributing with insurance provided under ATTORNEY's policies herein.

In addition to the foregoing obligations, ATTORNEY agrees that it shall maintain, at its sole expense, in full force

and effect for a period of three (3) years following the termination of this Agreement, one or more policies of professional

liability insurance with limits of coverage of not less than Five Million Dollars ($5,000,000.00) per occurrence; provided,

however, in the event that ATTORNEY does not maintain such policy(ies) of insurance for such entire three (3) year

period, ATTORNEY shall maintain, at its sole expense, in full force and effect extended claims reporting coverage

insurance in lieu thereof in the amount of not less than Five Million Dollars ($5,000,000.00).

Before the date ATTORNEY commences performing services under this Agreement, ATTORNEY shall provide

certificates of insurance and endorsements as stated above for all of the foregoing policies, as required herein, to the

AUTHORITY at 369 West 18th Street, Merced, CA 95340.

10. Agreement is Binding Upon Successors.

This Agreement shall be binding upon AUTHORITY and ATTORNEY and their successors, executors,

administrators, legal representatives, and assigns with respect to all the covenants and conditions set forth herein.

11. Assignment and Subcontracting.

Neither party hereto shall assign, transfer, or sub-contract this Agreement nor its rights or duties hereunder without

the written consent of the other.

101

Page 102: Regular Meeting of the MCAG Governing Board

Page 10 of 12

12. Amendments.

This Agreement may not be modified, changed or amended except by written agreement properly and duly

executed by AUTHORITY’s Executive Director and ATTORNEY, except that ATTORNEY may notify AUTHORITY of

proposed rate increases 30 days before such increases would take effect. After receiving such notice, AUTHORITY may

agree to such increases or choose to terminate this Agreement.

13. Conflict of Interest.

Except as provided in Section 7 ("Waiver of Conflicts") above, ATTORNEY promises, covenants, and warrants

that the performance of its services and representation to AUTHORITY under this Agreement do not result in a "conflict of

interest" as that term is used in the Rules of Professional Conduct of the State Bar of California. In the event a "conflict of

interest" occurs, ATTORNEY will request AUTHORITY’s Governing Board to waive such "conflict of interest" on a case-

by-case basis, provided however, AUTHORITY’s Governing Board is not obligated to grant any such waiver of "conflict

of interest."

14. Further Assurances by ATTORNEY:

ATTORNEY represents that attorneys providing services under this Agreement are duly admitted to practice law

in the State of California, are in good standing, and have special experience and expertise in employment law claims,

administrative hearings and litigation. ATTORNEY further represents that it has read and is familiar with Government

Code sections 1090 et seq. and sections 87100 et seq. ATTORNEY promises, covenants, and warrants that the performance

of services under this Agreement shall not result in or cause a violation by it of Government Code sections 1090 et seq. or

sections 87100 et seq.

15. Compliance With Laws.

ATTORNEY shall comply with all federal, state, and local laws and regulations applicable to the performance of

its obligations under this Agreement.

16. Notices. The persons and their addresses having authority to give and receive notices under this Agreement are the

following:

102

Page 103: Regular Meeting of the MCAG Governing Board

Page 11 of 12

MCRWMA7040 N. Highway 59 555 Capitol Mall, Suite 800

Sacramento, CA 95814Merced CA 95348

With Copy to: AUTHORITY GENERAL COUNSELHaden Law Office2241 N St.Merced, CA 95340-3614

Any and all notices between AUTHORITY and ATTORNEY provided for or permitted under this Agreement or

by law shall be in writing and shall be deemed duly served when personally delivered to one of the parties, or in lieu of

such personal service, when deposited in the United States Mail, postage prepaid, addressed to such party. Any notices to

be given or provided for under this Agreement are not modifications or changes of this Agreement.

17. Venue and Governing Law.

The parties agree that for purposes of venue, this Agreement is made in Merced County, California, that

performance under this Agreement shall be in Merced County, California, and that the proper venue for any action between

the parties shall be in the Superior Court for Merced County, California. The rights and obligations of the parties and all

interpretations and performance of this Agreement shall be governed in all respects by the laws of the State of California.

18. Entire Agreement.

This Agreement, including Exhibit A hereto, constitutes the entire agreement between AUTHORITY and

ATTORNEY with respect to the specialized legal services to be provided herein and supersedes any previous agreement

concerning the subject matter hereof, negotiations, proposals, commitments, writings, or understandings of any nature

whatsoever unless expressly included in this Agreement.

If any part of this Agreement is found violative of any law or is found to be otherwise legally defective,

ATTORNEY and AUTHORITY shall use their best efforts to replace that part of this Agreement with legal terms and

conditions most readily approximating the original intent of the parties.

AUTHORITY Brooks Stayer

ATTORNEY Andrea K. LeisyRemy Moose Manley, LLP

103

Page 104: Regular Meeting of the MCAG Governing Board

Page 12 of 12

IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed as of the day and year

first above written.

REMY MOOSE MANLEY, LLP

Dated: __________________ By: ______________________________Andrea Leisy

Title ___Partner___________

MERCED COUNTY REGIONAL WASTE MANAGEMENT AUTHORITY

Dated: __________________ By: ______________________________Patrick Pittenger

Title __Executive Director____________

AUTHORITY COUNSEL

Dated: __________________ By: ______________________________Emily Haden

Title __Authority Legal Counsel________

104

Page 105: Regular Meeting of the MCAG Governing Board

Exhibit A

RMM Hourly Rates/Billing (2017)

RMM bills on a monthly basis and in tenth-hour intervals. Our standard rates for public agencies (which are less than our rates for private entities) are set forth below:

James G. Moose $400.00 Whitman F. Manley $400.00 Brian J. Plant $400.00 Andrea K. Leisy $375.00

Tiffany K. Wright $375.00 Sabrina V. Teller $375.00 Howard F. Wilkins $375.00 Laura M. Harris $350.00 Elizabeth Pollock $350.00 Christina L. Berglund $350.00 Christopher L. Stiles $325.00 L. Elizabeth Sarine $325.00 Nathan O. George $325.00 Sara F. Dudley $300.00 Other Associates $300.00 Paralegal $150.00 Law Clerks $150.00

The above rates include all administrative and overhead costs. RMM does not bill for secretarial or word processing time. RMM does not charge for in-house copying or faxing. RMM does typically charge for travel, including travel time, air fare and hotel charges at rates consistent with the agency’s allowable charges.

Andrea K. Leisy [email protected]

105

Page 106: Regular Meeting of the MCAG Governing Board

ITEM 23

106

Page 107: Regular Meeting of the MCAG Governing Board

PH: 209.723.4481 FAX: 209.384.3109

7040 N. Highway 59 Merced, CA 95348

ITEM 23 MEMORANDUM DATE:

December 14, 2017

TO:

Merced County Regional Waste Management Authority

FROM:

Brooks Stayer, Director

RE:

Authorization to Award Contract for Fixed-Wing Drone System Sole-Source Purchase

BACKGROUND The RWA routinely performs manual field surveys using traditional surveying equipment to determine the effective density of landfilled waste at the Billy Wright & Highway 59 Landfills. This process is hazardous and time consuming. It requires the technician to walk across exposed waste and prevents staff and equipment from working in the area during the 4.0 hrs required to obtain the 500 data points used in creating an approximate topography. A fixed-wing drone system will perform the same task from an elevation of 300’, in 15 minutes, and produce a precise surface with over 1.5m data points. The FY17-18 approved budget includes $44,750 for the purchase of a drone system (drone-$32,500, peripherals-$12,250.) The peripherals include software, camera, spare parts, batteries, training, etc. The complete estimate for a fixed-wing drone system, including taxes, is $41,769.34. The density of waste (how tightly waste is packed into the landfill) is one of the most important factors used to calculate the operational efficiency, profitability, and life of a landfill. For example, Hwy 59 Phase 6A has a volume of 3,050,000 yd3. In 2013 the average waste density in this phase was 1,200 lbs/yd3 meaning it could accept ~250,000 tons of waste per year and last 7.32 years (2012-2019.) However, since 2013 staff has increased density to 1,450 lbs/yd3. This has resulted in placing more waste (up to ~300,000 tons/yr) into the same space. Thus it is on-track to yield an additional $12,740,000 in revenue over the same 7-yr life span. A fixed-wing drone system will aid in performing density surveys in a safer, more efficient and accurate manner and allow supervisors and managers to make operational adjustments to ensure density goals are met. This will ultimately extend the life of each landfill phase and the entire life of the sites. Additionally, the drone can and will be used to survey, map, and photograph the sites and calculate volumes of stockpiles of mulch, compost, concrete etc. to more accurately manage these resources. The RWA is requesting to purchase a fixed-wing drone system for the purpose of performing aerial surveying, mapping, and photography. Staff has identified only one company that can provide the equipment, software, training, and support of these products (RDO Integrated Controls, Sacramento, CA.)

107

Page 108: Regular Meeting of the MCAG Governing Board

FISCAL IMPACT $26,990 Fixed Assets, $8,490 Software & Licensing, $2,300 Training, $806 General Office Expense (All before tax) REQUESTED ACTION Recommend the Merced County Regional Waste Management Authority authorize the Executive Director to enter into a contract with RDO Integrated Controls, Sacramento, CA for the purchase of a fixed-wing drone and peripherals at a cost not to exceed $41,769.34.

108