regular council - 11 jun 2018
TRANSCRIPT
Canal Flats
Agenda
Regular Council Meeting
Monday, June 11, 2018 @ 6:30 PM
Columbia Discovery Centre
Page
1. CALL TO ORDER 2. APPROVAL OF AGENDA a) Introduction of late items b) Adoption of Agenda (with possible late items) 3. ADOPTION OF MINUTES a) Adoption of Minutes from Regular Council Meeting held on May 28, 2018
THAT the Minutes from the Regular Council Meeting held May 28, 2018 be adopted. Regular Council - 28 May 2018 - Minutes - Pdf
4 - 8
4. QUESTION PERIOD REGARDING ITEMS ON THE AGENDA 5. PUBLIC AND STATUTORY HEARINGS 6. PRESENTATIONS, DELEGATIONS AND PETITIONS 7. CORRESPONDENCE (RECEIVE & REPLY) 1) Receive Only 2) For Council Resolution or Action 8. REPORTS 1) Receive Only 1)1. CAO Report
THAT the CAO Update Report for April and May, 2018 be received for information.
Report - CAO Update Apr May, 2018
9 - 10
1)2. Public Works Report
THAT the Public Works Report, prepared by Bill Doroshuk, Public Works Coordinator, be received for information. Public Works Report
11
2) For Council Resolution or Action 2)1. Statement of Financial Information Report for 2017
THAT the 2017 Statement of Financial Information (SOFI) report be
12 - 15
Page 1 of 85
approved and that the Mayor and Director of Finance be authorized to sign the approval form. Statement of Financial Information 2017
2)2. Village Staff 2018 Workplans
THAT the Village of Canal Flats 2018 staff workplans be received for information. 2018 Staff Workplans
16 - 42
2)3. Highway Attraction Signage Change
THAT Council authorize staff to instruct the Ministry of Transportation and Infrastructure to change the signage on Highway 93/95 as outlined below.
Report - Highway Signage
43 - 44
2)4. Resurfacing of Beatty Avenue west of Shaunessy Street
THAT Council authorize staff to enter into contract with Kootenay Paving for $66,420 plus GST for repaving of a portion of Beatty Avenue west of Shaughnessy Street. Report - Beatty Ave Paving
45
2)5. 2017 Annual Report
THAT Council adopt the Annual Report for January 1, 2017 to December 31, 2017. Annual Report Jan - Dec 2017
46 - 81
2)6. COTW Meeting with Eagles Nest Neighbourhood Residents
THAT a Committee of the Whole Meeting be organized with Eagle's Nest neighbourhood residents pending adoption of Bylaw 176.
Report - Midden Road Docks
82
2)7. Flow Meter Kiosk Project Budget
THAT Council authorize withdrawal of up to $30,000 additional dollars (above the budgeted amount of $80,000) from Gas Tax Fund Account to complete the Flow Meter Kiosk Project.
Report - Flow Meter Kiosk
83 - 85
3) Mayor and Council Reports 9. BYLAWS 10. NEW BUSINESS, MOTIONS AND NOTICES OF MOTION 11. CONVENE IN CAMERA MEETING a) Section 90 (1)(g) - Legal 12. ADJOURNMENT
Page 2 of 85
a)
b) Resolutions listed above are recommendations only and are subject to Council approval.
Page 3 of 85
MINUTES
Regular Council Meeting
Monday, May 28, 2018 @6:30 PM
Columbia Discovery Centre
COUNCIL PRESENT: Mayor Ute Juras, Councillor Erin Gornik, Councillor Marie Delorme, Councillor Paul Marcil, and Councillor Karl Sterzer
COUNCIL ABSENT:
STAFF PRESENT: Chief Administrative Officer Adrian Bergles and Corporate Officer Sylvie Hoobanoff
PUBLIC PRESENT: 5
1. CALL TO ORDER
2. APPROVAL OF AGENDA
INTRODUCTION OF LATE ITEMS
2018-8608 Moved by Councillor Sterzer seconded by Councillor Marcil
THAT attendance at the TechDev101 Workshop be added to Item 2-2-6.
CARRIED.
ADOPTION OF AGENDA (WITH POSSIBLE LATE ITEMS)
2018-8609 Moved by Councillor Sterzer seconded by Councillor Gornik
THAT the agenda be adopted as amended.
CARRIED.
3. ADOPTION OF MINUTES
ADOPTION OF MINUTES FROM REGULAR MEETING HELD ON MAY 14, 2018.
2018-8610 Moved by Councillor Sterzer seconded by Councillor Marcil
Page 1 of 5
AGENDA ITEM #a)
Adoption of Minutes from Regular Council Meeting held on May 28, 2018 Page 4 of 85
Canal Flats
Regular Council Minutes – May 28, 2018
THAT the Minutes from the Regular Council Meeting held May 14, 2018 be adopted.
CARRIED.
4. QUESTION PERIOD REGARDING ITEMS ON THE AGENDA
Mr. Pickering asked if a decision on Eagles Nest Dock Society is on the agenda. Mayor Juras responded.
5. PUBLIC AND STATUTORY HEARINGS
6. PRESENTATIONS, DELEGATIONS AND PETITIONS
CHRIS FIELDS, ECONOMIC DEVELOPMENT UPDATE
Mr. Fields made a presentation on the status of the economic development projects.
7. CORRESPONDENCE (RECEIVE & REPLY)
7.1. RECEIVE ONLY
7.2. FOR COUNCIL RESOLUTION OR ACTION
8. REPORTS
8.1. RECEIVE ONLY
BUILDING PERMIT REPORT - MARCH AND APRIL
2018-8608 Moved by Councillor Sterzer seconded by Councillor Gornik
THAT the Building Permit Report for March and April 2018 prepared by Sylvie Hoobanoff, Corporate Officer be received for information.
CARRIED.
FIRE CHIEF REPORT
2018-8609 Moved by Councillor Sterzer seconded by Councillor Gornik
THAT the Fire Department Report for April 2018, prepared by Fire Chief David Ferguson, be received for information.
CARRIED.
Page 2 of 5
AGENDA ITEM #a)
Adoption of Minutes from Regular Council Meeting held on May 28, 2018 Page 5 of 85
Canal Flats
Regular Council Minutes – May 28, 2018
EXTERNAL FUNDING TRACKER - MAY 2018
2018-8610 Moved by Councillor Sterzer seconded by Councillor Marcil
THAT the External Funding Tracker to May 2018 be received for information.
CARRIED.
VILLAGE SIGNAGE PROJECT REPORT
2018-8611 Moved by Councillor Sterzer seconded by Councillor Marcil
THAT the the Village Signage Projects Report be received for information.
CARRIED.
FINANCIAL REPORT TO APRIL 30, 2018
2018-8612 Moved by Councillor Sterzer seconded by Councillor Gornik
THAT the April 30, 2018 Financial Report be accepted.
CARRIED.
8.2. FOR COUNCIL RESOLUTION OR ACTION
ADDITION OF ANDRE CHAMPAGNE, DOG CONTROL OFFICER TO MIA POLICY
2018-8613 Moved by Councillor Gornik seconded by Councillor Marcil
THAT Council authorize the addition of Andre Champagne, Dog Control Officer as named insured to the Minicipal Insurance Association Liability Policy.
CARRIED.
CLIMATE ACTION REVENUE INCENTIVE PROGRAM (CARIP) 2017 REPORTING TEMPLATE
2018-8614 Moved by Councillor Sterzer seconded by Councillor Gornik
THAT the 2017 CARIP Reporting Template be received for information.
CARRIED.
MIXED USE REVITALIZATION - CONTRACT AWARD
2018-8615 Moved by Councillor Sterzer seconded by Councillor Marcil
Page 3 of 5
AGENDA ITEM #a)
Adoption of Minutes from Regular Council Meeting held on May 28, 2018 Page 6 of 85
Canal Flats
Regular Council Minutes – May 28, 2018
THAT Council authorize staff to contract with WSP $20,000 for development of Streetscape Visualization of Mixed Use Revitalization of Central Canal Flats
CARRIED.
INDUSTRIAL LAND STRATEGY - CONTRACT AWARD
2018-8616 Moved by Councillor Sterzer seconded by Councillor Gornik
THAT Council authorize staff to contract with B&A Planning Group for $59,891.16 for Industrial Land Strategy development.
CARRIED.
HOTEL STUDY - CONTRACT AWARD
2018-8617 Moved by Councillor Gornik seconded by Councillor Sterzer
THAT Council authorize staff to contract with CBRE Hotels for $15,000 for Hotel Economic Feasibility Study - Canal Flats.
CARRIED.
VILLAGE OF CANAL FLATS AMENDMENT BYLAW NO. 176, 2016 (WATER ZONES) - RESCIND SECOND AND THIRD READINGS
2018-8618 Moved by Councillor Sterzer seconded by Councillor Gornik
THAT second and third readings of "Village of Canal Flats Bylaw No. 45, 2008 - Amendment Bylaw No. 176, 2016 (Water Zones)" be rescinded.
CARRIED.
TECHDEV101 WORKSHOP
2018-8619 Moved by Councillor Sterzer seconded by Councillor Gornik
THAT Councillor Delorme and Councillor Marcil be authorized to attend the TechDev101 Workshop in Invermere on June 7, 2018.
CARRIED.
8.3. MAYOR AND COUNCIL REPORTS
9. BYLAWS
VILLAGE OF CANAL FLATS AMENDMENT BYLAW NO. 176, 2016 - SECOND READING
Page 4 of 5
AGENDA ITEM #a)
Adoption of Minutes from Regular Council Meeting held on May 28, 2018 Page 7 of 85
Canal Flats
Regular Council Minutes – May 28, 2018
2018-8611 Moved by Councillor Sterzer seconded by Councillor Gornik
THAT "Village of Canal Flats Bylaw No. 45, 2008 - Amendment Bylaw No. 176, 2016 (Water Zones)" be read a second time.
CARRIED.
2018-8612 Moved by Councillor Marcil seconded by Councillor Sterzer
THAT a Public Hearing be scheduled for June 18, 2018 at 6:30pm
CARRIED.
10. NEW BUSINESS, MOTIONS AND NOTICES OF MOTION
11. CONVENE IN CAMERA MEETING
SECTION 90 (1)(G) LEGAL
2018-8613 Moved by Councillor Sterzer seconded by Councillor Delorme
THAT the meeting be adjourned to In-Camera at 7:32pm.
CARRIED.
12. ADJOURNMENT
2018-8614 Moved by Councillor Sterzer seconded by Councillor Gornik
THAT the Regular Council Meeting of May 28, 2018 be adjourned at 8:26pm.
CARRIED.
Mayor Ute Juras Sylvie Hoobanoff, Corporate Officer
Page 5 of 5
AGENDA ITEM #a)
Adoption of Minutes from Regular Council Meeting held on May 28, 2018 Page 8 of 85
The Village of Canal Flats Report to Council
Meeting Type and Date: Regular Meeting – June 11, 2018 From: Adrian Bergles, Chief Administrative Officer
Prepared By: Adrian Bergles, Chief Administrative Officer Subject: CAO Update, April, May, 2018 Recommendation: That the CAO Update Report for April and May, 2018 be
received for information
Request for Decision ☐ Department Report ☐ Information Report X
Implications of Recommendation:
Financial: Y
Policy: Y
Strategic Plan: Y
SUMMARY INFORMATION
Met with members of the public, when requested
Attended Council meetings on April 9, 23, May 14, 28
Began PADM 240 – Administrative Law course at Camosun College
Engaged trail crew to plan trail route from Source trail to Granger and Grainger to beach
Participated in five-year financial planning process and all day COTW meeting with Council April
7. Worked with Council to adopt five-year financial plan and tax rates bylaws
Oversaw forest fuel reduction work on lands adjacent to village
Met with members of Columbia Valley Fire Rescue on various occasions
Coordinated several phone calls and site visits with contracted economic development officer
Oversaw and executed publication of four RFPs – OCP/Zoning bylaw, Industrial land strategy,
Visualization of mixed use revitalization downtown, Hotel feasibility study
AGENDA ITEM #1)1.
CAO Report Page 9 of 85
Commenced OCP project with B&A Planning Group
Staff meeting held April 12
Attended meeting with representatives of Council, staff, landowner and provincial dike
regulation authority April 16
Attended Local Government Management Association of BC Chapter AGM in Invermere April 26
and 27
Led staff work plan workshop
Met with local land developers/entrepreneurs
Met with Council and provincial staff, May 2
Posted, interviewed, and hired new janitor for CDC, Fire Hall, Public Works
Oversaw Arena improvement project commencement
Dealt with HR matter
Assisted, and attended a location with, bylaw enforcement officer
Met with organizer who would like to bring a trail running race to Canal Flats area
Met with contractors about mural for north exterior wall of CDC
Developed policy for vendors in Village municipal buildings
Respectfully submitted:
Adrian Bergles
Chief Administrative Officer
AGENDA ITEM #1)1.
CAO Report Page 10 of 85
Villaqe "r- ICana¡FlatsThe Village of Canal Flats
Report to CouncÍl
Meeting Type and Date:From:Prepared By:
Subject:
Regular Meeting - June I1./20L8Bill DoroshukPublic Works CoordinatorPublic Works Report
Recommendation: For information
Request for Decision I Department Report I Information Report E
lmplications of Recommendation:Financial: Y/NPolicy: Y/NStrategic Plan: Y/N
SUMMARY INFORMATION
-Paving at Bighorn Estates completed-Paving and pot holes will begin in July-Clean up of the east side of Grainger near completion / grass cutting underway-deep service for the water metering in now completed, apertures and Kiosk will be our finalstep for the construction end of the project.-Lift station pumps repaired-Power to the Rec property underway, Permit and design, also the pole is in place.-abatement of contaminates at the curling rink completed-lnterface fire protection at our Water reservoir completed- Draft Park Plan completed, work plan completed, various planning / subdivision/ servicingin discussion.
Respectfu lly subm itted
Bill DoroshukPublic Works Coordinator
AGENDA ITEM #1)2.
Public Works Report Page 11 of 85
V*il.:*.l *f hCanalFiats
The Village of Canal FlatsReport to Council
Meeting Type and Date:From:
Prepared By:
Subject:
Regular Council Meeting of June L1.,20L8Adrian Bergles, Chief Administrative OfficerCheryl Otting, Financial ConsultantStatement of Financial lnformation Report for 2OL7
Recommendation: THAT, the 2017 Statement of Financial lnformation (SOFI)
report be approved and that the Mayor and Director ofFinance be authorized to sign the approval form.
Request for Decision ! Department Report ! lnformation Report E
SUMMARY INFORMATION
Each year the municipal finance department is required to prepare a Statement of Financial
lnformation (SOFI) report that shows a reconciliation of vendors paid in the prior year with theannual audited financial statements total expenditures. We must also report on employee
salaries and related expenses, Council indemnities and related expenses and severance
agreements paid out in the prior year.
A Statement of Financial lnformation Approval must also be signed and forwarded to theMinistry of community, Sport and Cultural Development along with the SOFI report.
The SOFI report is also attached to the Annual Report of the Village which mustl be made
available to the public prior to June 30th, 2Ot8.
Respectfu lly subm itted :
CherylOttingFinancial Consu nt
AGENDA ITEM #2)1.
Statement of Financial Information Report for 2017 Page 12 of 85
Villaq e of Ganal Flats
STATEMENT OF FINANCIAL I NFORMATION APPROVAL
The undersigned, as authorized by the Financial lnformationRegulation, Schedule 1, subsection 9(2), approves all the statementsand schedules included in this Statement of Financial lnformation,produced under the Financial lnformation Act.
Adrian BerglesDirector of Financial ServicesJune ,2018
Ute JurasMayorJune ,2018
AGENDA ITEM #2)1.
Statement of Financial Information Report for 2017 Page 13 of 85
STATEMENT OF FINANCIAL INFORMATION .2017
Financial lnformation Act - Section 6 (2Xbl
Salaries over $75,000W. Doroshuk - PW Co-ordinator
Total salaries over $75,000
Total Salaries under $75,000
Total salaries and expenses(includes volunteer firemen)
VILLAGE OF CANAL FLATS
FOR YEAR ENDED DECEMBER 31, 2OI7
Salaries Taxable Benefits ExpensesBCL/PBC/MPP/WCB/CPP/EI
95,612.62 2,174.70 1,237 .68 18,403.69
95,612.62
509,262.63
2,174.70
20,323.34
1,237.68
22,002.25
18,403.69
91,879.18
604,875.25 22,498.04 23,239.93 110,282.87
Financial lnformation Act - Section 6 (2Xa)
Council Remuneration & Expenses
Councillor Marie DelormeCouncillor Erin GornikMayor Ute JurasCouncillor Paul MarcilCouncillor Karl Sterzer
Remuneration
Expense Allowanceincluded in
Remuneration ExpensesTaxableBenefits
3,792.283,792.296,216.883,792.283,792.28
1,264.091,264j02,072.291,264.091,264.09
1,485.02
3,767.43204.30
4,380.10
21,386.01 7,128.67 9,836.85
Financial Information Act Requlation - Section 6(7Xa & b)There were two severance agreements paid out in 2017 for compensation periods of 4 months plus related benefits foreach.
AGENDA ITEM #2)1.
Statement of Financial Information Report for 2017 Page 14 of 85
VILLAGE OF CANAL FLATS
FOR YEAR ENDED DECEMBER 3I, 2Of7
Financial Information Act - Section 7 (1Xa & b)
Venders Over $25,000
BC HydroBlackline Paving LtdCervus AG Equipment LPDenham Ford (BC) LtdFairbank Architects LtdMinister of Finance - School taxMunicipal Pension PlanMunicipal lnsurance Association of BCOtting, CherylPacific Blue CrossRascalMillworkReceiver GeneralRegional District of East KootenayRBC - VisaSummit Valley Contracting LtdTayntonBay Electrical LtdThunderhill Sand & GravelTrainor Mechanical Contractors LtdUrban Systems LtdTotal over $25,000
Total VendersCouncil, staff & firemen remunerationLess: 2016 accounts payablesAdd: 2017 accounts payablesLess: other government tax paymentsLess: MPP employee portionLess: Receiver General employee portionAdd: 2016 prepaid expensesLess: 2017 prepaid expensesLess: capital expenditures paidLess: refunds for taxes & securitiesLess: employee payroll advances & RRSP paymentsAdd: lease & loan pmts interest direct through bankAdd: services charges through bankAdd: other direct payments through bankLess: GST ITC's and rebatesAdd: other miscellaneousAdd: amortization & gain/loss
Totalexpenses per F/S alDec31l17
114,323.6042,310.5443,680.0048,776.7237,500.96
145,701.7080,667.7634,594.0046,769.6428,244.7026,767.65
184,767.38108,720.0039,097.9583,389.1758,276.7135,768.24
135,253.9151,309.42
1,345,920.05
Venders under $25,000 - total 714 176.11
TotalVenders 2,060,096.16
Reconciliation to Consolidated Statement of Operations at December 31 . 2017 - Financiallnformation Act Requlation Section 7 (1Xc)
2,060,096.r6636,264.15
(433,708.00)433,745.00
(280,831.00)(32,842.34)
(118,165.96)37,461.00
(24,156.00)(657,333.00)
(4,168.02)(10,400.00)73,126.00
3,864.00
(60,739.00)25,050.01
1,095,988.00
2,743,251.00 2,743,251.00
AGENDA ITEM #2)1.
Statement of Financial Information Report for 2017 Page 15 of 85
The Village of Canal Flats Report to Council
Meeting Type and Date: Regular Meeting – June 11, 2018 From: Adrian Bergles, Chief Administrative Officer Prepared By: Adrian Bergles, Chief Administrative Officer Subject: Village staff 2018 workplans Recommendation: That the Village of Canal Flats 2018 staff workplans be
accepted for information
Request for Decision ☐ Department Report ☐ Information Report X
Implications of Recommendation: Financial: Y Policy: Y Strategic Plan: Y
SUMMARY INFORMATION Working with staff we have come up with a list of workplans for all permanent staff presently at work at the village office (staff on leave have not done 2018 workplans). These workplans encapsulate the major elements of the various employees’ jobs. They are a tool to help staff remain on track with their work and to provide transparency around the various jobs in the Village organization. Workplans are public documents and not confidential. They are presented for information. Respectfully submitted: Adrian Bergles Chief Administrative Officer
AGENDA ITEM #2)2.
Village Staff 2018 Workplans Page 16 of 85
cäääràt,Department: Admin Pos¡t¡on: CAO Work Plan Year: 2018
Goal: Support of Council in their Priorities
OBJECTIVE STRATEGTES/ACflVlTrES RESOURCES PARTNERSHIPS TIME FRAME MEASURABTE OUTCOME COMPLETION
DATE (rF
APPt¡CABtEICarry out goals
in Council's 2018
"PriorityProjects" list
Work with all staffand manycontractors tocomplete tasks onlist
Budget, grants Staff, contractors,other levels ofBovernment
2018 Items on "priorityprojects list completed"
Dec.31,2018
Support 2018election as
deputy electoralofficer
Support electoralofficer in completionof all election-relatedtasks
Elections BC September 4to oct. 20,2018
Successful electionheld, five Councillors inplace
Oct.20,2018
Training for newCouncil
Trainingopportun¡t¡es
Budget, grants LGMA, UBCM,facilitator,electoral officer
Nov. - Dec.,
2018 (and
ongoing into2019)
Facilitated workshopfor new Council onroles
Dec.31,2018
{but could beongoing toearly 2019)
Village of Canal Flats Work Plan
AG
END
A ITEM #2)2.
Village Staff 2018 Workplans
Page 17 of 85
cääãrät,Department: Admin Pos¡t¡on: CAO Work Plan Year: 2018
Goal: Continued improvement of planning (community, financial, etc.) processes
OBJECTIVE STRATEGT ES/ACTrVrTr ES RESOURCES PARTNERSHIPS TIME FRAME MEASURABTE OUTCOME COMPLETION
DATE (rF
APPTICABTE)
To do five-yearfinancial plan as
early as possible
on20t8lt9
And continueddevelopment ofTaxation strategy
Budget, grants Council, FinancialConsultant
Fall2018 Five year financial plan
and tax strategyinitiated before end ofthe year.
Dec.31,2018
Development ofOCP and ZoningBylaw
Contracting withplanning firm fordevelopment of newvillage OCP/ZoningBylaw
Grants Council,community, staff,planningcontractor
May 2018through endof year
Draft OCP and Zoningbylaws prepared andready for adoption inearly 2019
Dec. 31, 2018
Ongoing workwith contractedEconomicDevelopmentOfficer
-Tax incentive bylaw-lndustriallandstrategy-Hotel study-Visualization ofmixed userevitalizationdowntown CanalFlats
EDO, PlanningContractor(s), BC
RuralDividendgrant
EDO, PlanningContractor(s)
20t8 Development of all taxincentive, lndustr¡alland strategy, hotelstudy, visualization ofmixed use downtown
Dec.31,2018
Strategicplanning
Development ofCouncil strategic plan
- can be part oftraining for newCouncil
budget facilitator Nov. - Dec.,
20t8(possibly in2019 early)
Fac¡l¡tated strategyworkshop
Dec.31,2019(possibly in2019 early)
Village of Canal Flats Work Plan
AG
END
A ITEM #2)2.
Village Staff 2018 Workplans
Page 18 of 85
cääåràt,Department: Position: Work Plan Year: 2018
Goal: Strengthen community engagement
OBJECTIVE STRATEGT ES/ACT|VrTr ES RESOURCES PARTNERSHIPS TIME FRAME MEASURABLE OUTCOME COMPTETION
DATE (rF
APPLICABLE)
Community wellinformed onmunicipal issues
Engagement with keydecision makers inbusiness community,local stakeholders,first nations, MLA,MP
Personalcommunication,newsletter,webpage, OCP
projectoutreach, openhouses as
needed
Businesscommunity, othergovernments,planningcontractor
2018 Continued strongrelationships
Dec.31,2018
Village of Canal Flats Work Plan
AG
END
A ITEM #2)2.
Village Staff 2018 Workplans
Page 19 of 85
cäxåràt,Department: Admin Position: CAO Work Plan Year: 2018
Goal: Effective Management of Village Staff
OBJECTIVE STRATEGT ES/ACTrVrTr ES RESOURCES PARTNERSHIPS TIME FRAME MEASURABLE OUTCOME COMPLETION
DATE (rF
APPLICABLE}
High functioningteam withconfident,qualified staffand contractors
Develop staffworkplans/reviewjob descriptions
Review organizationcapabilities {staffinganalysis)
Encourageprofessionaldevelopment forstaff (within budgets)
HR Downloads,training budget
Staff 2018 Workplans done andjob descriptionsreviewed
Dec.31,2018
Village of Canal Flats Work Plan
AG
END
A ITEM #2)2.
Village Staff 2018 Workplans
Page 20 of 85
cääärät,Sylvie Hoobanoff Department: Administration Pos¡t¡on: Corporate Officer Work Plan Year: 2018
Goal: High Quality Adm¡n¡strat¡on and Governance Support
OBJECTIVE STRATEGT ES/ACT|VrTr ES RESOURCES PARTNERSHIPS TIME FRAME MEASURABTE OUTCOME COMPTETION
DATE (IF
APPLICABLE)
Election 2018 - Advertisements- Preparedocuments/forms
- Hire staff- Manage electionopportunities
- Report to applicableagencies
ElectionsBC
CiviclnfoRDEK (school
trustee)2018 lnformed candidates
and 5 elected membersof council
January 201-9
Council Supportand lnformation
-To continue learningiCompass program foragenda preparationand minute taking
-Train Denise in theprogram
iCompass Administrativestaff
On going All members ofAdministrationDepartment to be ableto prepare agendasand minutes
December20t8
Signage(cemetery,arena,directional)
- Completion of signprojects from2OtT
-lssue RFP for Cemeterysign
cAoCouncil
Sign Contractor May/une -advertiseRFP
Constructionin summermonthsCBT signs tobe
completedMav 3L't
lmproved signage inthe village
October 31,
2018
Village of Canal Flats Work Plan
AG
END
A ITEM #2)2.
Village Staff 2018 Workplans
Page 21 of 85
cärårät,OBJECTIVE STRATEGT ES/ACT|VrTr ES RESOURCES PARTNERSHIPS TIME FRAME MEASURABTE OUTCOME COMPTETION
DATE (rF
APPLICABLE)
Mappingprogram review
To update existingmapping or toinvestigate using adifferent program
Pitney BowesWeb basedprograms
On going An accurate andefficient mappingprogram for staff
Dec. 31 2018
BylawPreparation
Bylaws to prepare:- Procedures- Officers- Dog Control- OCP/Zoning
Review- R-1(s)- Tax Exemption- Sewer
Frontage/Waterparcel
CiviclnfocAoCommunityCharterLocal
Government Act
Council On going Adopted bylaws Dec. 31- 20L8
FundingOpportunitiesand Reporting
To complete grantapplications andprepare applicablereports as required
cAoFinance
Department
Funding PartnerscAoFinance
Public WorksCouncil
On going Successful fundingapplications and finalreports submitted as
scheduled.
Dec.31 2018
Village of Canal Flats Work Plan
AG
END
A ITEM #2)2.
Village Staff 2018 Workplans
Page 22 of 85
cääärät,OBJECTIVE STRATEGt ES/ACT|VrTr ES RESOURCES PARTNERSHIPS TIME FRAME MEASURABLE OUTCOME COMPTETION
DATE (rF
APPTICABTE)
OfficeProcedures
-Supervise filingsystem
- Property taxpreparation
- Front desk training &procedures (cash
receipting, customerservice)
cAoFinance
LGMA
CiviclnfoVadim
On going Excellent customerservice providingaccurate and informedinformation
Dec. 31 2018
Village of Canal Flats Work Plan
AG
END
A ITEM #2)2.
Village Staff 2018 Workplans
Page 23 of 85
cäääràt,Department: Admin Position: Admin Assistant Work Plan Year: 2018
Goal: To continue to become more knowledgeable on Village and other government policies
OBJECTIVE STRATEGT ES/ACTrVrTr ES RESOURCES PARTNERSHIPS TIME FRAME MEASURABTE OUTCOME COMPLETION
DATE (rF
APPLICABTE}
To get filingprojectscompleted
Filing LGMARecords
ManagementBinderFellow Staff
CAO - AdrianCO - Sylvie
Ongoing To stay on top and notfeel overwhelmed
Ongoing
Give bestcustomer servicepossible.
Get more info onCanal Flats fortourists
To be informed re:Bylaws and touristattraction
TouringGettinginformation fromlong termresidents
Co-workers Ongoing When public comes andwant info re: our villagetourist attraction I cangive them direction
End of 20L8
Familiarizemyself with taxregulations andHOG
Property Tax
Home Owners GrantDeferment Payment
CAO - AdrianCO- Sylvie
Governmentwebsites
Tax season
and beforethat timeframe
When property ownerscome in askingquestions regards theirtaxes I can fellcomfortable answeringthem.
End of 2018
Village of Canal Flats Work Plan
AG
END
A ITEM #2)2.
Village Staff 2018 Workplans
Page 24 of 85
cäiüràt,Department: Admin Position: Bylaw Enforcement Work Plan Year: 2018
Goal: EFFECTIVE ENFORCEMENT OF VILLAGE BYLAWS
OBJECTIVE STRATEGT ES/ACT|VrTr ES RESOURCES PARTNERSHIPS TIME FRAME MEASURABLE OUTCOME COMPTETION
DATE (IF
APPLICABLE)
Respond tobylaw infractionsas directed bysenior staff andcomplaint formhanded by public
Weekly patrol tour ofvillage
Communication ofbylaw to community
Bylaws Other localgovernment
Senior staff
Council
Ongoing, Compliance with bylaws Dec 3L, 201.8,
ongoing
To be moreknowledgeablein bylawenforcement
Educate myselfthrough training,weather online orattend classes
Attend workshopWebinar
Workshops
Courses on lineor going toschool
JIBC (Justice
lnstitute of BC)
CommunityCollege
GovernmentProgram
Ongoing For me to continue togrow in and bestunderstand my role as
the Bylaw EnforcementOfficer
Dec 31, 2018
Village of Canal Flats Work Plan
AG
END
A ITEM #2)2.
Village Staff 2018 Workplans
Page 25 of 85
Vrll¿rõ.ôl \CanalFlatsDepartment: ADMIN Position: EMERGENCY PROGRAM COORDINATOR Work Plan Year: 2018
Goal: TO BE ABLE TO RUN AN EFFECTIVE EMERGENCY OPERATIONS CENTRE
OBJECTIVE STRATEGT ES/ACTtVtTr ES RESOURCES PARTNERSHIPS TIME FRAME MEASURABLE OUTCOME COMPLETION
DATE (rF
APPTICABLE}
Respond to allsort ofemergency
Continue going toEMBC workshops.
Attend any EMBC
table top emergencytraining.
Want to Attend theyearly province wideconference inVancouver.
EMBC
SAR
RCMP
FIRE DEPARTMENT
RDEK
Other localEmergencygroup
RDEK
Public Works
cAo
On-going To properly work welland know my role ifever we needed to openan EOC in case of an
emergency in theVillage
On-going
For staffto beable to knowtheir role in case
of an emergency
To hold an
emergency table-topworkshop for staffand council.
Workshop
Gov. sites
Gary Burford (EPC
for Columbia Valley)
RDEK
Anita Charest
Terry Balan (RDEK)
Sharon Pasowisty(ESS)
CAO- Adrian
Other local
EmergencyGroup
On- going An emergency table-topworkshop for staff andcouncil
Before theend of 2018
Village of Canal Flats Work Plan
AG
END
A ITEM #2)2.
Village Staff 2018 Workplans
Page 26 of 85
cänårät,Department: Parks / Rec Position: Manager Work Plan Year: 2018
Goal: lmprove, protect and maintain Village Rec Property assets in an ongoing and timely manner
OBJECTIVE STRATEG r Es/ACTtVtTt ES RESOURCES PARTNERSHIPS TIME FRAME MEASURABLE OUTCOME COMPTETION
DATE (IF
APPLICABLE)-Operation ofQUALIW BEACH FOR
ENJOYMENT OF
Visitors and Villagers
-Cleaning and weeding-Building ma¡ntenance-Docks and swim lines-irrigation-playground and tablemaintenance
-Beach staff-Public works
-cLss May 13t to Oct1st 2018
-Clean and well-maintainedbeach
Ongo¡ngthroughout thebeach season
-Repair reta¡n¡ngwall at the beach
-undermine ex¡stingfootings-epoxy rebar to footing-Pour concrete
Parks and rec staff-concrete provider
May lst to June1st
Reta¡n¡ng repaired at beach June lst
Provlde safe andclean arena facilitiesto staff and public
-Prideful janitorial work-quality ice maintenance-safe work environmentmeet¡ng all relevantsafety requirements
-Rec staff -Cimco-MlA inspector-Bu¡lding lnspector
-On going
during hockeySeason
-Clean and well maintainedarena
-Ongoing
Dressing room 3&4improvements
Re-construction of showerand washroom-removing and replacingflooring
-Rec staff-contractors
Building inspector June 1 to Sept 1 Project completed Oct 1
Village of Canal Flats Work Plan
AG
END
A ITEM #2)2.
Village Staff 2018 Workplans
Page 27 of 85
cäiåràt,OBJECTIVE STRATEGT ES/ACTlVtTt ES RESOURCES PARTNERSHIPS TIME FRAME MEASURABLE OUTCOME COMPTETION
DATE (IF
APPTICABLEI
Maintaining of parks
and equipment
-Weekly playgroundinspection-Weekly groundmaintenance includingmowing and irr¡tationinstall and repairs
-Rec staff-public works
-MlA inspectors Ongoing fromApr¡l 1to Oct 1
Create a safe environmentfor the public to enJoy
Ongoingthroughout theseason
Village of Canal Flats Work Plan
AG
END
A ITEM #2)2.
Village Staff 2018 Workplans
Page 28 of 85
cääåràt,Department: Public works/Arena Position: Grounds keeper/Arena Operator Work Plan Year: 2018
Goal: Achieve and maintain a high standard of appearance and functlonality in all public parks, buildings, and operating systems
OBJECTIVE STRATEGT ES/ACT|VrTr ES RESOURCES PARTNERSHIPS TIME FRAME MEASURABTE OUTCOME COMPTETION
DATE (rF
APPTICABLE)Arena plant safetyupdatescompleted(Ammonialnitiatives)
Ammonia relief stacksensorSafety shower/eyewashPersonal Gas monitorEmergency responseplan
Work Safe BC ctMcoContractors
Dec 17-Oct 18 All initiatives complied with
Proper icemaintenance andarena appearance
Zamboni maintenancescheduleRegular ice maintenanceand ice tap scheduleArena HousekeepingProper supply ¡nventoryCoordinate with team
Josh, Mathieu On going Housekeeping records keptZamboni log sheet updatedlce tap records keptReturn guests
Fewer/ Lack of complaints
Optimumrefrigeration plantoperat¡on
Daily checks andrecording in log bookRegular ma¡ntenanceschedule followedProper parts/Supplies
used
crMco clMco On going log book always kept up todateNo unscheduled down timeReduced number of calloutsNo leaks
Village of Canal Flats Work Plan
AG
END
A ITEM #2)2.
Village Staff 2018 Workplans
Page 29 of 85
cääåràt,
OBJECTIVE STRATEGT ES/ACT|VrTr ES RESOURCES PARTNERSHIPS TIME FRAME MEASURABLE OUTCOME COMPTETION
DATE (rF
APPLICABTE)
Maintainappearance ofcommunity parksand gardens
Clean up yard waste,branches, rocks,garbageTrim bushes and prunetreesPlant & tend flowergardens
Public works On going fromspring to fall
Keep log books of lawn andpark carelmpeccable appearance ofparks and other publicfacilities
Maintainirrigation systems
Testing properoperation of irrigationsystemsReplace broken partsand water lines as
needed
TORO Public workscAo
Ongoing fromspring to fall
Regular watering schedulesfollowedLeaks and issues resolvedlrrigation system sprinklersturn and water properly
Maintain lawncare equ¡pment
Filter, fluid changesGreased as necessary
Machines kept cleanBlades changed atprope( intervals
John DeereMowers/Lawntools
Public workscAo
Ongoing Proper log book recordingof maintenanceNo machine breakdownsEquipment issues identifiedand resolved
Village of Canal Flats Work Plan
AG
END
A ITEM #2)2.
Village Staff 2018 Workplans
Page 30 of 85
\cääálrlátsDepartment: Public Works Pos¡t¡on: Operators Work Plan Year: 2018
Goal: Safe, passable, road network for Village
OBJECTIVE STRATEGT ES/ACTrVrTr ES RESOURCES PARTNERSHIPS TIME FRAME MEASURABLE OUTCOME COMPLETION
DATE (rF
APPLICABTE)
Plow and Sand
allVillage roadsand HeadwatersWalkway inwintertime
-Plowing and sanding -Public worksdept. machinery-Public worksstaff-Backup
'replacement'drivers-Sand and gravel
-Sand and gravelcompany
Wintertimeas needed
-Bus routes clearedbefore school-FD cleared top of list-Roads/paths cleared ina safe and passable
condition
Dec.31,2018
Daily visualinspections ofroadwayconditions(asphalt andsignage)
-Daily visualinspections, repair asneeded on roadwaysand signs
-Public Worksstaff
-Pavingcontractors
Ongoing, as
needed-Safe, passable, roadswith good appearance
Dec.31,2018
Spring streetsweeping
-Street sweeping -Public Worksstaff-Public Worksequipment
Spring,dependenton springmelt
Roads cleaned to agood standard
May 15,2018
Ditching alongroadways invillage
-Brushing/contouringbeside roadways
-Public Worksstaff-Public Worksequipment
Ongoing,mostlysummer,some winterwork
-lmproved waterdrainage off roads-Less maintenancerequired on roadways-Village beautification
Dec.31,2018
Village of Canal Flats Work Plan
AG
END
A ITEM #2)2.
Village Staff 2018 Workplans
Page 31 of 85
cärå¡àt,Department: Public Works Pos¡t¡on: Operators Work Plan Year: 2018
Goal: Provide quality water/sewer seruice for the village
OBJECTIVE STRATEGt ES/ACT|VrTr ES RESOURCES PARTNERSHIPS TIME FRAME MEASURABLE OUTCOME COMPTETION
DATE (rF
APPLICABTE}
-WeeklySampling ofwater forquality/safety
-Weekly samplingfrom three locationsin Village
-ALS -Public Worksstaff-lnterior Health
-Ongoing -Weekly test results-Safe water withouttreatment-lHA continuedcompliance
Dec.31,2018
-Monthly lineflushing at mainline dead ends
-Once per monthflushing of non-looped water mains
-Public WorksStaff
-Ongoing -Maintain clean, safewater throughout thewater mains
Dec.31,2018
-Repair of curbstop/line leaksas needed
-leak detection-responding toquestions/complaintsfrom public
-Public Worksstaff-Water systemrepaircontractors as
needed
-Public -Ongoing Timely repair ofleaks/curb stops
Dec.31,2018
-Dailyinspections ofwater system
-Check pumps dailyand log records ofreservoir level-Daily visits to Watercompound boosterstat¡ons and logrecords of flowmetre/hourmetre/start metre
-Public Worksstaff
-Electrician as
needed-Ongoing -Continued reliable
operations of watersystem
Dec.31,2018
Village of Canal Flats Work Plan
AG
END
A ITEM #2)2.
Village Staff 2018 Workplans
Page 32 of 85
cääãrät,-Dailyinspections oflift stations 1,2
and sewerlagoons
-Daily visits and logbook record keepingof hours on pumps atlift stations / recordsheet checklist forsewage lagoons
-Public Worksstaff
-Public (providesinput on theeffectiveness ofsewer drainage)
-Ongoing -Continued reliableoperat¡on of l¡ftstations and sewerlagoons
Dec.31,2018
-Maintenance ofsewer mains
-Checking of manholecovers and recordingof conditions-Flushing of sewermains
-Village staff -Annually oras needed
-Continued goodoperations of sewermains
Oct. 15, 2018
Cleaning of liftstat¡onswetwells
-Pressure washingand vacuuming ofdebris at liftstat¡ons/wet wells
-Public Worksstaff
-Vac Truckcontractor
-Biannual(spring andfall)
-Reliable operations oflift stations
Oct. 15.2018
Village of Canal Flats Work Plan
AG
END
A ITEM #2)2.
Village Staff 2018 Workplans
Page 33 of 85
cäxålàtuDepartment: Public Works Position: Operators Work Plan Year: 2018
Goal: Reliable, Safe, equipment for public works department
OBJECTIVE STRATEGT ES/ACT|VtTt ES RESOURCES PARTNERSHIPS TIME FRAME MEASURABLE OUTCOME COMPTETION
DATE (rF
APPLICABTE)-Regularmaintenance ofpublic worksmachinery
-Major service doneat/by dealer-Minor maintenancedone by PublicWorks Staff
-Public WorksStaff-MaintenanceBudget
-EquipmentDealers
Ongoing, as
needed-Safe, reliable, publicwork departmentmachinery
Dec.31,2018
Village of Canal Flats Work Plan
AG
END
A ITEM #2)2.
Village Staff 2018 Workplans
Page 34 of 85
cäråràt,Department: PublicWorks Pos¡t¡on Public Works Coordinator Work Plan Year: 2018
Goal: Roadways that are safe and reliable including a long term plan for Repair and Maintenace
OBJECTIVE STRATEGt ES/ACTtVtTt ES RESOURCES PARTNERSHIPS TIME FRAME MEASURABTE OUTCOME COMPTETION
DATE (rF
APPLICABLE)
Continue toimprove drainagethrough brushingand clearing
-remove brush andcreate swales topromote drainage offroadways-long term goal isreducedmaintenancerequirements
-public workscrew
-localresidents(input/feedback)-Top Crop(grasses andtrees)-Parks andRecreation Crew(additionallabour)
Ongoing All ditches areconverted to swalesimproving drainage androadway longevity,sight lines improved as
bush is cleared
Dec.31,2018
Street surfacesthat are 40 years
and older havethe utilities (mainLine)water/sewerinspected beforerepaving
-excavate certainareas of water/sewerlines to inspectcurrent condition-replace our uratermains that do notmeet the standardsof village bvlaws
-water workscontractors (leakdetection/ironanalysisf-Public workscrew
-water worksretailers-engineers
Ongoing,prioritized insome, older,areas
-streetsrepairs/rebuilds withdeep services as part ofthe overall projectconsiderations.
Dec.31,2018
lmplementationof Asset
Managementlnvestment Plan
(AMrP)
-Apply the Road
Condition Survey(2011)
-Applythe AMIP
-Council (budgetsett¡ng)-Chief FinancialOfficer-Public Worksstaff-Gas Tax andother grants
-Engineers Ongoing,each budgetseason
Village roadinfrastructure that is
wellfunded
Dec. 31,2018
Village of Canal Flats Work Plan
AG
END
A ITEM #2)2.
Village Staff 2018 Workplans
Page 35 of 85
v,ll¿úcôt \
CanálFlatsDepartment: PublicWorks Pos¡t¡on : Public Works Coordinator Work Plan Year: 2018
Goal: Effective Management of Village sewer lnfrastructure
OBJECTIVE STRATEGT ES/ACTrVtTt ES RESOURCES PARTNERSHIPS TIME FRAME MEASURABLE OUTCOMT COMPLETION
DATE (rF
APPTICABLE)
Video analysis ofsewer maincondition
-document andrecord the overallcondition of oursewer system byremote camera
-Public Workscrew- contractors
-McGill'sIndustrial Services-Urban Systems-SNC Lavalin
Finished byOctober 31,
2018
-video data of ourentire sewer mainSystem
October 31,2018
Analysis of liftstat¡ons 1 and 2
-lift station study-man hole repair- lagoonrevitalization
- engineeringcontractor
-Urban Systems Finished byOctober 31,
2018
lift station studycompleted and shelfready for grantavailability
October 31,2018
To maintain andupgrade theVillage Sewersystem
-Effectivemanagement ofpublic worksoperators-Effectivemanagement ofcontractors
-Public Workscrew- contractors
- McGill'slndustr¡al Services-Urban Systems-SNC Lavalin
Ongoing -cont¡nued goodoperation our sewersystem
Dec.31,2018
Village of Canal Flats Work Plan
AG
END
A ITEM #2)2.
Village Staff 2018 Workplans
Page 36 of 85
cääårät,lmplementationof AssetManagementlnvestment Plan(AMrP)
-Applythe AMIP -Council (budget
sett¡ng)
-Chief Financial
Officer
-Public Worksstaff
-Grants
-Engineers-sewercontractors
Ongoing,each budgetseason
Village sewerinfrastructure that iswellfunded
Dec.31,2018
Village of Canal Flats Work Plan
AG
END
A ITEM #2)2.
Village Staff 2018 Workplans
Page 37 of 85
cäxärät,Department: Public Works -Water Position: Public Works Coordinator Work Plan Year: 2018
Goal: To continue to supply high quality drinking water to the Residents of the V¡llage of Canal Flats
OBJECTIVE STRATEGT ES/ACT|VrTr ES RESOURCES PARTNERSHIPS TIME FRAME MEASURABTE OUTCOME COMPLETION
DATE (rF
APPLICABLE)
To implementmonitoring toregulate andprotect theVillage's watersupply
-implement final stepof well head andaquifer protect¡onplan (monitoringquality and metering)
-public workscrew-lnterior Health
-lnterior Health- EngineeringContractor- Buildingcontractor-VillageAdministration
October 31,2018
- Continued safe andreliable source ofuntreated water - toIHA standard, withoutboil water advisory
October 31,2018
BatterCommunityawareness /education ofaquifer
- Use
communicationsmethods (newsletter,Facebook) to ¡nformpublic of protectionof this valuableresource
-lnterior Health-VillageAdministration
-Public-lnterior Health
Ongoing - Continued safe andreliable source ofuntreated water - toIHA standard, withoutboil water advisory(and betterunderstanding ofpublic's role in meetingthis coal)
Dec.31,2018
To collect andstore applicabledata on thelocation of ourmain lines
- Recovery of oldmaps and drawings- New records andphotos in the field
- past operators- Engineers- public works- General public
- Surveyors- contractors
on8orng -accurate records ofwhat is in the ground-a reliable way toretrieve thatinformation (paper fornow, digital in thefuture)
Dec.31,2018
Village of Canal Flats Work Plan
AG
END
A ITEM #2)2.
Village Staff 2018 Workplans
Page 38 of 85
cääåràt,- Continuingeducation forOperators
- continuingeducation throughclass room and fieldwork- work experiencegained 'in the field'
- EnvironmentalOperatorsCertificationProgram- otherMunicipalities
- EnvironmentalOperatorsCertificationProgram- Water worksContractors(Teal'sl
ongoing - Confident, competent,well trained operatorslearning and improvingat all times
Dec.31,2018
lmplementationof AssetManagementlnvestment Plan(AMtPl
-Applythe AMIP -Council (budget
sett¡ng)
-Chief Financial
Officer
-Public Worksstaff
-Grants
-Engineers-Water workscontractors
Ongoing,each budgetseason
Village waterinfrastructure that is
safe and well-funded
Dec.31,2018
Village of Canal Flats Work Plan
AG
END
A ITEM #2)2.
Village Staff 2018 Workplans
Page 39 of 85
cäääràt,Department: PublicWorks Position: Public Works Coordinator Work Plan Year: 2018
Goal: Subdivision and rezoning as a resource for Strategic development of the village
OBJECTIVE STRATEGT ES/ACTrVrTr ES RESOURCES PARTNERSHIPS TIME FRAME MEASURABLE OUTCOME COMPTETION
DATE (rF
APPLICABLE)
Effective landplanning anduse in the village
-street networkingplan-welldesignatedZoning-OCP compat¡b¡l¡tv
- Local Residence-Planners-Administration-Engineers
-otherMunicipalities-Developers
Ongoing,New OCP
development
A well-planned Villageprepared for growth
Dec.31,2018
To provide andapply a usablebuilding andservicing bylawsto assistDevelopers intheir projects
-continue torecommend bylawamendments to bestmeet needs withinthe village
-Council-Administration
-Lawyers (as
needed)-Other ApprovingOfficers-BC
Hydro/MOTI/MOE
Ongoing, as
neededComprehensive bylawsthat are simple yetprecise
Dec.31,2018
Village of Canal Flats Work Plan
AG
END
A ITEM #2)2.
Village Staff 2018 Workplans
Page 40 of 85
V'1,.,"".,1 \CanalFlatsDepartment: Buildings Position: Public Works Coordinator Work Plan Year: 2018
Goal: That our Buildings continue to be an asset to the Village
OBJECTIVE STRATEGt ES/ACT¡VtTt ES RESOURCES PARTNERSHIPS TIME FRAME MEASURABLE OUTCOME COMPTETION
DATE (rF
APPLICABTE)
Work to reducethe amount ofmaintenanceneeded for eachbuilding eachyear
-keeping the weatherout-when repairing orreplacing items use
only high-qualityhardware-Record allreplacements(Furnace to Roofing)
-Public WorksStaff-Buildinglnspector- MIABC- people whowork in thebuilding on a
regular basis(Village Staff)
-Contractors(Carpenters,
Electricians,Roofers,Plumbers)-Village staff
Ongoing, as
needed
-Village-ownedbuildings that requireless maintenance overtime
Dec. 31,2018
Provide safe,comfortablebuildings forusers (public,council, staff)
-Assess buildings toant¡c¡pate potentialproblems-considermold/lead/asbestoson reno projects-Assess and mitigatebest as possibleflood/fire hazard
-Public worksstaff-Engineer (as
needed)-Health andSafety Officials-Fire ControlMaintenance
-Contractors (pest
control,carpenters,Electricians,Roofers,Plumbers, etc.)-Buildinginspector-Fire Chief
ongoing -insuring a safe andhealthy environmentwith each building
Dec.31,2018
lmplementationof AssetManagementlnvestment Plan(AMrP)
-Apply the AMIP -Council(budgetsett¡ng)
-Chief Financial
Officer
-Engineers-Buildingcontractors
Ongoing,each budgetseason
Village buildinginfrastructure that ¡s
wellfunded
Dec.31,2018
Village of Canal Flats Work Plan
AG
END
A ITEM #2)2.
Village Staff 2018 Workplans
Page 41 of 85
cäxå¡ät,-Public Works
staff
-Grants
Village of Canal Flats Work Plan
AG
END
A ITEM #2)2.
Village Staff 2018 Workplans
Page 42 of 85
The Village of Canal Flats Report to Council
Meeting Type and Date: Regular Meeting – June 11, 2018 From: Adrian Bergles, Chief Administrative Officer Prepared By: Adrian Bergles, Chief Administrative Officer Subject: Highway attraction signage change Recommendation: That Council authorize staff to instruct the Ministry of
Transportation and Infrastructure to change the signage on Highway 93/95 as outlined below.
Request for Decision X Department Report ☐ Information Report ☐
Implications of Recommendation: Financial: N Policy: N Strategic Plan: Y: Economic Development
SUMMARY INFORMATION In February, 2018 two members of Council and the CAO met with MOTI staff and changing the Highway 93/95 signage 2 kms north and south of Canal Flats to the modern MOTI standard was discussed. MOTI has been in touch with Village staff and proposed some possibilities and a willingness to implement changes. Working with Contracted EDO Chris Fields, staff recommends the following new sign format:
AGENDA ITEM #2)3.
Highway Attraction Signage Change Page 43 of 85
The key community amenities suggested for the sign: -Source of the Columbia Trail -Arena (doesn’t need to say Canal Flats given Header) -Tilley Memorial Park (Lake Access) “Lake Access” would be requested to be included (in brackets) because everyone loves lake access. The five essential services are suggested to be (minus the anchor):
If promoting the launch is problematic given parking capacity at the lake, we could use a grocery sign:
But the recommendation is to promote the lake (given it’s not visible from highway) and entice people into town. This signage does not relate to proposed wooden community entrance signs. Respectfully submitted: Adrian Bergles Chief Administrative Officer
AGENDA ITEM #2)3.
Highway Attraction Signage Change Page 44 of 85
The Village of Canal Flats Report to Council
Meeting Type and Date: Regular Council Meeting June 11,2018 From: Adrian Bergles – Chief Administrative Officer
Prepared By: Bill Doroshuk – Public Works Coordinator Subject: Resurfacing of Beatty Avenue west of Shaughnessy Street Recommendation: To authorize staff to enter into
contract with Kootenay Paving for $66,420 plus GST for repaving of a portion of Beatty Avenue West of Shaughnessy Street.
Request for Decision X Department Report ☐ Information Report ☐
Implications of Recommendation:
Financial: Y: Budgeted for in 2018 (budgeted amount is $75,000)
Policy: Y/N
Strategic Plan: Y/N
SUMMARY INFORMATION
This project was budgeted for completion in 2018 ($75,000) and is part of the planned repaving
program for 2018.
The village asked for and received three quotes for this work, Kootenay Paving, 66,420.00 plus
GST is the lowest bidder on this project.
Contracting with Kootenay Paving on this project is recommended by Village staff.
Respectfully submitted:
Name: Bill Doroshuk
Title: Public Works Coordinator
AGENDA ITEM #2)4.
Resurfacing of Beatty Avenue west of Shaunessy Street Page 45 of 85
Phone: 250-349-5462
Fax: 250-349-5460
Email: [email protected]
PO Box 159
8866 Grainger Road
Canal Flats, BC
V0B 1B0
Village of Canal Flats
Annual Report for the Village of Canal Flats January 1, 2017 to December 31, 2017
AGENDA ITEM #2)5.
2017 Annual Report Page 46 of 85
2
Table of Contents
Message from the Mayor …...….………………….…… Page 3 2018 Council ………………….…………………….…… Page 4 2018-2022 Financial Plan Policy Statement ………… Page 5 Statement of Property Tax Exemptions ……………… Page 7 Report Respecting Municipal Services Operations a) For the prior year 2017 - Annual Plan .…..... Page 8 b) Current year 2018 - Annual Financial Plan .. Page 9 c) Future Year 2019 ……………………..………. Page 10 Consolidated Financial Statements Year Ended December 31, 2017 …………………….……. Page 11 Statement of Financial Information 2017 …………….. Page 36
AGENDA ITEM #2)5.
2017 Annual Report Page 47 of 85
3
3
An open letter to the Citizens of the Village of Canal Flats from Mayor Ute Juras
On behalf of Council, I am very pleased to present the Village of Canal Flats Annual Report for 2017. The Annual Report highlights Council’s objectives and achievements for the prior year, works in progress including objectives and measures for the current year and plans respecting objectives for the upcoming year. The Annual Report is one means of reporting our activities and efforts and being accountable to the public. 2017 was another busy year for the Village. Council and staff continue to work very hard at future planning to preserve and enhance municipal facilities and infrastructure. Economic Development continues to be one of our main priorities. In July 2017, the Economic Development Officer placed development of a new Canal Flats Visual identity as a priority. The rationale is that to change the conversation about the community for residents, investors and tourists, and to position it for a new future, a refreshed, positive image is an importa-tion foundation. Canal Flats is beginning the process of rewriting a new Official Community Plan. Our existing OCP has served the community since 2005. Since this time, the Village of Canal Flats has seen extensive new build-ing occur, significant infrastructure projects undertaken and, of course, big changes in the economic base of the community with the closure of the sawmill in 2015. A new OCP will help the Village become a sustainable community be being one that is economically, environmentally and socially healthy and resilient. A new Zoning Bylaw will be written to align with the new Official Community Plan. The review, re-write and update project will provide the basis for ensuring consistency within existing plans and policies by determin-ing current gaps and inconsistencies. Tilley Memorial Park upgrades have long been a priority for Council. The Village started the process in 2016 and over a two year span new washrooms with a septic system was built, new playground, upgraded picnic tables, and new docks were installed. The parking area was repainted to allow for more parking stalls. We are very proud of our Park and were so excited about showcasing the new improvements at a Grand Open-ing Celebration on June 30, 2017. The much needed upgrades at the Canal Flats Arena will begin in the spring 2018. The facility itself is very well maintained, second to none in communities of our size, however there was a need to expand change rooms to accommodate female hockey teams and tournaments. As well, exterior insulation and cladding will make the facility usable for additional activities when the ice is out. The project will be finished prior to the 2018 hockey season. As you will see through reading the 2017 Annual Report, Council has many more initiatives on the go and big plans for the future. On behalf of Council, I would like to thank you for placing your confidence in us and we will continue to work hard to meet your expectations. We welcome your input, either informally on the street or as a delegation at a Council meeting. By working together we can ensure that Canal Flats continues to thrive and grow and that we all have a community that we are proud to call home.
Message from the Mayor
AGENDA ITEM #2)5.
2017 Annual Report Page 48 of 85
4
Council consists of a Mayor and four Councillors who were elected for a four year term expiring in October 2018. The Community has the opportunity to provide input to Council on various issues such as: budgets, taxes, development and community needs. Council’s powers are exercised through the adoption of resolutions or bylaws or by setting policy. Council meetings are regularly scheduled for the second and fourth Monday of each month at 6:30pm at the Columbia Discovery Centre at 8866 Grainger Road and are open to the public. Agendas are published on the website at www.canalflats.ca Thursday afternoons prior to the meetings. The public can address Council at these meetings regarding items on the agenda during the public question period. If a member of the public wishes to address Council about other items, arrangements should be made in writing, using the Delegation Request Form prior to noon on the Wednesday before the meeting. The Council Meeting Schedule for the year can be found in the Meeting Calendar section of the Village website.
Left to right: Councillor Marie Delorme, Councillor Paul Marcil, Councillor Erin Gornik, Councillor Karl Sterzer, Mayor Ute Juras
AGENDA ITEM #2)5.
2017 Annual Report Page 49 of 85
5
2018-2022 FINANCIAL PLAN POLICY STATEMENT
The Community Charter requires that municipalities provide explicit policy and objective statements as part of the financial plan that relate specifically to the proportions of revenue proposed to come from the various funding sources, the distribution of property taxes among property classes, and the use of permissive exemptions.
Requirement: the proportion of total revenue proposed to come from each funding source
It is the objective of Council to operate an efficient and self-sufficient municipality while maintaining a well-serviced, safe and livable community. Council’s focus is providing for maximum efficiency with minimal taxation, while also making provision for future infrastructure and service needs.
With respect to the proportions of revenue proposed to come from the various funding sources, the following applies:
a. Council will attempt to mitigate the impacts of market change on the residential tax burden. The rate of taxation will be held as stable as possible.
b. The revenue from water parcel taxes and sewer frontage taxes will be used towards capital projects of the respective utilities and to provide part of the services of the respective utilities.
c. The revenue from road frontage taxes will be used towards the transportation section of the financial plan in relation to roads operating costs and roads capital costs.
d. The Village supports fee for service and will be increasing fees on a graduated basis over a period of time. Demand for service largely dictates projected fee revenues.
e. Revenue from other services is largely dependent on senior government grants and transfers. The municipality will be opportunistic in pursuit of such funding when the funding serves the Village’s purposes. f. The municipality will borrow when necessary to achieve its objectives, while being cognizant of the additional costs imposed by borrowing, and of how these costs get transferred to the future users of infrastructure financed through borrowing.
Table 1 shows the proportion of total revenue proposed to be raised from each funding source in 2017. The Village is a relatively young municipality with its property tax base mainly residential, causing the Village to be very dependent upon borrowing and government grants for major capital projects.
Other income and user fees and charges form the third largest portion of planned revenue. Many municipal services, such as water and sewer usage, can be measured and charged for on a user-pay basis while devel-opment service fees are dependent on the ongoing growth of the municipality. This basis attempts to fairly apportion the value of a municipal service to those who make use of it.
AGENDA ITEM #2)5.
2017 Annual Report Page 50 of 85
6
2018-2022 FINANCIAL PLAN POLICY STATEMENT - Continued
Table 1: proportions of total revenue
Requirement: the distribution of property taxes among the property classes
Table two provides the distribution of property tax revenue among the property classes. The practice of Coun-cil has been to set tax rates in order to maintain tax stability yet be cognizant of the economic uncertainty of the day.
Table Two: distribution of property taxes
Requirement: the use of permissive tax exemptions
Permission tax exemptions granted for 2018 shall amount to $2,207 in exempted municipal taxes.
Revenue Source % Total Revenue
Property value taxes 19.0%
Parcel and frontage taxes 7.2%
User fees and charges 12.9%
Government grants 42.6%
Other sources 16.3%
Proceeds from borrowing 2.0%
TOTAL 100.0%
Property Class % of Total Assessment
% of Property Taxes
Residential (1) 92.8% 84.8%
Utilities (2) .9% 4.2%
Major Industry (4) 0% 0%
Light Industry (5) .4% 1.6%
Business (6) 5.6% 9.1%
Managed Forests (7) 0% 0%
Recreational (8) .2% .2%
Farm (9) .1% .1%
TOTAL 100.0% 100.0%
AGENDA ITEM #2)5.
2017 Annual Report Page 51 of 85
7
Statement of Property Tax Exemptions
In accordance with Section 98(2)(b) of the Community Charter, we disclose that the following properties were provided permissive property tax exemptions. Permissive tax exemptions are those exemptions granted by bylaw in accordance with Section 224 of the Community Charter.
Roll Number Organization Address
0002000.000 Nature Trust of BC 8390 Bighorn Sheep Lane
0004884.000 Nature Trust of BC Grainger Road
0001878.226 Headwaters Arts Society 8866 Grainger Road
0001878.227 Invermere Family Resource Centre 8866 Grainger Road
AGENDA ITEM #2)5.
2017 Annual Report Page 52 of 85
8
Report Respecting Municipal Services and Operations Progress Report for the prior year 2017
1. The Village completed the Tilley Memorial Park Upgrade Project. New docks were installed, the
parking lot was repainted to allow for more stalls and an engineered parking lot expansion study was
completed. A basket swing was added to the playground area. An accessible washroom with flush
toilets was constructed. A community event was held on June 30th to celebrate the grand opening of
the upgrades, washroom and Canada 150.
2. The Village received a Columbia Basin Trust Recreation Grant and Enabling Accessibility Fund for up-
grades to the arena. The project will include exterior insulation and cladding, construction of additional
dressing rooms and a new accessible entrance to the arena. A consultant was retained to provide con-
sulting services and the project will begin in 2018.
3. Doors and a deck to the Civic Centre were installed to allow for outdoor access to the washrooms.
4. The demolition of the curling rink was deferred to 2018.
5. The Village received a CBT Initiatives Grant to hire a trail planner to prepare a plan to expand the trail
system at the south end of Columbia Lake and connecting to Tilley Memorial Park. The project was
deferred to 2018.
6. A contractor was hired in 2016 to complete Phase 3 of the Interface Fire Protection. This phase is
expected to be completed in 2018 and is funded through the Strategic Wildfire Prevention Initiative
and the Columbia Basin Trust.
7. The Village proceeded with recommendations in the economic development plan adopted in 2016. A
new application to the BC Rural Dividend was prepared for a Mixed Use Revitalization project.
8. The fleet was increased through the purchase of a new service truck for Public Works and a used
Ambulance for the First Aid Association.
9. A new pump was installed in the Sewer Lift Station #1 which replaced the confined space pump. This
provides a safer work environment for public works.
10. A second dedicated pipeline from the compound to the water reservoir per the 20 year capital plan was
deferred indefinitely.
11. A wifi communications line from the water compound to the reservoir was installed due to buried line
problems.
AGENDA ITEM #2)5.
2017 Annual Report Page 53 of 85
9
1. Construction on the Canal Flats Arena Upgrade Project will begin. The project will include exterior
insulation and cladding, construction of additional dressing rooms and a new accessible entrance to
the arena. The construction to be completed prior to the hockey season in September.
2. As part of the demolition of the curling rink, it was discovered that asbestos remediation was required.
The asbestos work has been completed. Demolition of the building has been deferred.
3. The Directional Signage Project was completed. The project consisted of new wording for the
directional signs, additions to the signs and a new Source of the Columbia Trail sign. A visitor map will
be installed at the Canal Flats Arena after the upgrade project is complete. An RFP for a new
Cemetery sign will be issued and a contractor hired.
4. A contractor was hired in 2016 to complete Phase 3 of the Interface Fire Protection. This phase is
expected to be completed in 2018 and is funded through the Strategic Wildfire Prevention Initiative
and the Columbia Basin Trust.
5. The Village will continue with the implementation of the economic development plan adopted in 2016
by the Economic Development Consultant. A new logo has been adopted, an Investment Guide pre
pared and new website designed. A Revitalization Tax Exemption Bylaw and Residential Small Lot
Zone bylaw amendments have been written and will be adopted.
6. The Village received a grant of $100,000 from the BC Rural Dividend fund for a Visualization of Mixed
Use Revitalization in Downtown Canal Flats project. The project will consist of a 1) Visualization of
Mixed Use Revitalization in a cross-section of downtown Canal Flats; 2) Industrial Land Strategy; 3)
Hotel Feasibility Study. RFP’s will be issued and contracts awarded. The project is to be completed
November 2018.
7. The Village received a grant in the amount of $110,000 through the Gas Tax Strategic Priorities Fund
for a new Official Community Plan and Zoning Bylaw Update. An RFP will be issued and a contract
awarded. The project is to be completed by October 1, 2019.
8. A Sewage Lift Station Assessment received funding through the Infrastructure Planning Grant in the
amount of $7,450. The project is to be completed by September 30, 2018.
9. A Canal Flats Trail Plan will be adopted in principle. The plan will assist in obtaining funding to expand
the trail system.
10. A turbidity flow meter will be installed in the spring/summer of 2018.
11. A newer dump truck with a snow plow will be purchased.
Current year 2018—Annual Financial Plan
AGENDA ITEM #2)5.
2017 Annual Report Page 54 of 85
10
Future Year of 2019
1. The Village will continue with the implementation of the economic development plan. Reports and stud-ies will be completed regarding Mixed Use Revitalization in Downtown Canal Flats and the recommen-dations will be implemented.
2. A newly elected Council and staff will retreat to determine strategic short and long term goals,
objectives and priorities. 3. A new Official Community Plan and Zoning Bylaw will be adopted. 4. Interface Fire Protection will continue through the Strategic Wildfire Prevention Initiative and the Columbia Basin Trust.
AGENDA ITEM #2)5.
2017 Annual Report Page 55 of 85
AGENDA ITEM #2)5.
2017 Annual Report Page 56 of 85
AGENDA ITEM #2)5.
2017 Annual Report Page 57 of 85
AGENDA ITEM #2)5.
2017 Annual Report Page 58 of 85
AGENDA ITEM #2)5.
2017 Annual Report Page 59 of 85
AGENDA ITEM #2)5.
2017 Annual Report Page 60 of 85
AGENDA ITEM #2)5.
2017 Annual Report Page 61 of 85
AGENDA ITEM #2)5.
2017 Annual Report Page 62 of 85
AGENDA ITEM #2)5.
2017 Annual Report Page 63 of 85
AGENDA ITEM #2)5.
2017 Annual Report Page 64 of 85
AGENDA ITEM #2)5.
2017 Annual Report Page 65 of 85
AGENDA ITEM #2)5.
2017 Annual Report Page 66 of 85
AGENDA ITEM #2)5.
2017 Annual Report Page 67 of 85
AGENDA ITEM #2)5.
2017 Annual Report Page 68 of 85
AGENDA ITEM #2)5.
2017 Annual Report Page 69 of 85
AGENDA ITEM #2)5.
2017 Annual Report Page 70 of 85
AGENDA ITEM #2)5.
2017 Annual Report Page 71 of 85
AGENDA ITEM #2)5.
2017 Annual Report Page 72 of 85
AGENDA ITEM #2)5.
2017 Annual Report Page 73 of 85
AGENDA ITEM #2)5.
2017 Annual Report Page 74 of 85
AGENDA ITEM #2)5.
2017 Annual Report Page 75 of 85
AGENDA ITEM #2)5.
2017 Annual Report Page 76 of 85
AGENDA ITEM #2)5.
2017 Annual Report Page 77 of 85
AGENDA ITEM #2)5.
2017 Annual Report Page 78 of 85
AGENDA ITEM #2)5.
2017 Annual Report Page 79 of 85
STATEMENT OF FINANCIAL INFORMATION .2017
Financial lnformation Act - Section 6 (2Xb)
Salaries over $75,000W. Doroshuk - PW Co-ordinator
VILLAGE OF CANAL FLATS
FOR YEAR ENDED DECEMBER 31, 2017
Salaries Taxable Benefits Expenses
95,612.62 2,174.70 1,237 .68 18,403.69
BCL/PBC/MPP/WCB/CPP/EI
Total salaries over $75,000
Total Salaries under $75.000
Total salaries and expenses(includes volunteer firemen)
Financial lnformation Act - Section 6 (2Xa)
Council Remuneration & Expenses
Councillor Marie DelormeCouncillor Erin GornikMayor Ute JurasCouncillor Paul MarcilCouncillor Karl Sterzer
604,875.25 22,498.04 23,239.93 110,282.87
95,612.62
509,262.63
2,174.70
20.323.s4
1,237.68
22,O02.25
18,403.69
91,879.18
Remuneration
Expense Allowanceincluded in
RemunerationTaxableBenefits Expenses
3,792.283,792.296,216.883,792.283,792.28
1,264.091,264.102,072.291,264.091,264.09
1,485.02
3,767.43204.30
4,380.10
21,386.01 7,128.67 9,836.85
Financial Information Act Requlation - Section 6íXa & blThere were two severance agreements paid out in 2017 for compensation periods of 4 months plus related benefits foreach.
AGENDA ITEM #2)5.
2017 Annual Report Page 80 of 85
VILLAGE OF CANAL FLATS
FOR YEAR ENDED DECEMBER 31. 2017
Financial lnformation Act - Section 7 llXa & b)
Venders Over $25,000
114,323.6042,310.5443,680.0048,776.7237,500.96
145,701.7080,667.7634,594.0046,769.6428,244.7026,767.65
184,767.38108,720.0039,097.9583,389.1758,276.7135,768.24
135,253.9151 309.42
1,345,920.05
Venders under $25,000 - total 714,176.11
Total Venders 2,060,096.16
Reconciliation to Gonsolidated Statement of Operations at December 31. 2017 - Financiallnformation Act Requlation Section 7 (lXc)
BC HydroBlackline Paving LtdCervus AG Equipment LPDenham Ford (BC) LtdFairbank Architects LtdMinister of Finance - School taxMunicipal Pension PlanMunicipal lnsurance Association of BCOtting, CherylPacific Blue CrossRascal MillworkReceiver GeneralRegional District of East KootenayRBC - VisaSummit Valley Contracting LtdTayntonBay Electrical LtdThunderhill Sand & GravelTrainor Mechanical Contractors LtdUrban Systems LtdTotal over $25,000
Total VendersCouncil, staff & firemen remunerationLess: 2016 accounts payablesAdd: 2O17 accounts payablesLess: other government tax paymentsLess: MPP employee portionLess: Receiver General employee portionAdd: 2016 prepaid expensesLess: 2017 prepaid expensesLess: capital expenditures paidLess: refunds for taxes & securitiesLess: employee payroll advances & RRSP paymentsAdd: lease & loan pmts interest direct through bankAdd: services charges through bankAdd: other direct payments through bankLess: GST ITC's and rebatesAdd: other miscellaneousAdd: amortization & gain/loss
Total expenses per F/S atDec31l17
2,060,096.16636,264.15
(433,708.00)433,745.00
(280,831.00)(32,842.34)
(118,165.96)37,461.00
(24,156.00)(657,333.00)
(4,168.02)(10,400.00)73,126.00
3,864.00
(60,739.00)25,050.01
1,095,988.00
2,743,251.00 2,743,251.00
AGENDA ITEM #2)5.
2017 Annual Report Page 81 of 85
The Village of Canal Flats Report to Council
Meeting Type and Date: Regular Meeting – June 11, 2018 From: Adrian Bergles, Chief Administrative Officer Prepared By: Adrian Bergles, Chief Administrative Officer Subject: COTW Meeting with Eagles Nest Neighbourhood Residents Recommendation: That a Committee of the Whole meeting be
organized with Eagle’s Nest neighbourhood residents pending adoption of bylaw 176
Request for Decision X Department Report ☐ Information Report ☐
Implications of Recommendation: Financial: N Policy: N Strategic Plan: N
SUMMARY INFORMATION Further to previous presentations to council by delegations, staff suggests a COTW meeting with neighbourhood residents at Eagles Nest pending adoption of bylaw 176 – Water Zone Amendment. Respectfully submitted: Adrian Bergles Chief Administrative Officer
AGENDA ITEM #2)6.
COTW Meeting with Eagles Nest Neighbourhood Residents Page 82 of 85
The Village of Canal Flats Report to Council
Meeting Type and Date: Regular Meeting – June 11, 2018 From: Adrian Bergles, Chief Administrative Officer Prepared By: Adrian Bergles, Chief Administrative Officer Subject: Flow Meter Kiosk Project Budget Recommendation: That Council authorize withdrawal of up to $30,000
additional dollars (above the budgeted amount of $80,000) from Gas Tax Fund Account to complete the Flow Meter Kiosk Project
Request for Decision X Department Report ☐ Information Report ☐
Implications of Recommendation: Financial: Yes: $30,000 from gas tax Policy: N Strategic Plan: N
SUMMARY INFORMATION The previously budgeted amount was based on a “Class C” engineering estimate. Current cost estimate of $106,725 is based on work completed to date and quote to get project to completion. This is $26,725 over the amount budgeted for this project in 2018. Staff does not recommend having village staff complete part of the install, as contemplated in the attached memo. Use of Gas Tax funds does not affect municipal taxation. At the beginning of the year the Village’s Gas Tax Fund account was at $225,235. Including this suggested amount $130,000 of this may be spent this year. The Village will receive $86,720 from the Federal Gas Tax this year. Respectfully submitted: Adrian Bergles Chief Administrative Officer
AGENDA ITEM #2)7.
Flow Meter Kiosk Project Budget Page 83 of 85
WSP Canada Inc.
303-535 Victoria Avenue North Cranbrook, BC, Canada V1C 6S3 Tel.: +1 250 489-8025 Fax : +1 250 489-8053
wsp.com
May 28, 2018 File No: 171-13528-00
The Village of Canal Flats 8866 Grainger Road Canal Flats, BC V0B 1B0 Attention: Bill Doroshuk via email: [email protected] Public Works Coordinator RE: Construction Budget Review – Flow Meter Kiosk – Project to Completion Canal Flats, BC Further to the completion of the installation of the below ground infrastructure in May 2018, relating to the Village of Canal Flats well compound above ground flow meter kiosk, we have compiled the following table of total expenditures. Flow Meter Kiosk – Expenditures to Date
Project Item Description Construction Cost Contract Items to Install water valves and tees to isolate the supply system to the reservoir from the kiosk
$19,666.50
Supply and Install DI riser pipes, vertical 90 degree bends, structural fill, floor drain and rock pit, 200mm thick concrete slab on grade, and electrical conduits
$20,290.73
Engineering Fees To Date $6,513.93 Total Expenditure (Excluding GST): $46,471.16
In addition to the above, we have received two quotes from suppliers to supply and install the kiosk, piping/fittings/instrumentation inside the kiosk and the supply and installation of the turbidity meter inside the newly construction concrete block walled well compound building, complete with commissioning and onsite training/calibration of the instrumentation provided by the turbidity meter and flow meter suppliers. The two quote totals are summarized in the table on the following sheet.
AGENDA ITEM #2)7.
Flow Meter Kiosk Project Budget Page 84 of 85
Page 2
Flow Meter Kiosk – Cost to Complete Supplier Provided Quote for Remainder of Kiosk and
Instrumentation (Excluding GST) Mearls Machine Works Ltd $59,054 Venture Mechanical Systems Ltd $71,719
We understand that the available project budget is $95,000, plus GST. With the lowest price to complete provided above, plus the remaining estimated engineering fees of $1,200, the estimated total project cost is $106,725, plus GST. This was based on a Class C construction cost estimate (prior to design) provided in May 2017 by WSP Canada Inc. The project bid pricing has increased in several areas due to market changes, including the turbidity meter and flow meter supply costs, which added up to an additional $8,000. Mearls Maching Works Ltd (Mearls) provided the lowest supply bid price for the remaining project and they have also offered that the installation of the works can be removed from their contract, should the Village staff elect to proceed with the install by their own forces. This was discussed with Village staff and staff have agreed this is something they can proceed with. Should the remainder of the work proceed in 2018, we suggest obtaining a final quote from Mearls to supply the materials to the site, based on the work now completed, with the understanding that Village staff will complete the install. The install cost provide by Mearls was $14,980, plus GST. This full amount can be deducted from the above total for an estimated cost to complete of $91,750, pending Village staff completing the remainder of the install. Should you have any questions regarding the above, please do not hesitate to call and discuss. We look forward to your direction on the next steps for this project. Sincerely, WSP Canada Inc Jean Horton, PEng Cranbrook Branch Engineering Manager /jh
AGENDA ITEM #2)7.
Flow Meter Kiosk Project Budget Page 85 of 85