registration guide for contractors

Upload: alicarlos13

Post on 04-Jun-2018

227 views

Category:

Documents


1 download

TRANSCRIPT

  • 8/13/2019 Registration Guide for Contractors

    1/11

    Samsung C TPartners PortalRegistration Guide

    (for contractors)

  • 8/13/2019 Registration Guide for Contractors

    2/11

    1

    2

    1. The portal can be accessed through the URL : www.secc-partners.co.kr

    2. To log-into the portal:

    A User ID should be created prior to logging in.Click Sign up to create your ID and Password.

    http://www.secc-partners.co.kr/http://www.secc-partners.co.kr/http://www.secc-partners.co.kr/http://www.secc-partners.co.kr/
  • 8/13/2019 Registration Guide for Contractors

    3/11

    2

    3. Please read through the Terms of Service carefully.

    4. Click Agree to register your company

    4

    3

  • 8/13/2019 Registration Guide for Contractors

    4/11

    5. Click Outside Korea

    6. Choose Major Business Type of a company to be registered

    7. Click Next Button to proceed to the next step.

    5

    6

    7

  • 8/13/2019 Registration Guide for Contractors

    5/11

    7. Create an ID for your company & insert Users information.

    Please check the availability of User ID & email for authentication.

    8. Fill in all information regarding your company:

    9. Click "Add Contact Person" button to input the Contact Person information

    10. Click Next Button to proceed to the next step.

    The yellow fields are required(including Mobile Number), as well as the columns at the tables with

    red marks on the right top.

    7

    8

    9

    10

  • 8/13/2019 Registration Guide for Contractors

    6/11

    11. Put in the company's Work Disciplines by clicking "Add" button & tick all work types.(multiple selection is possible)

    12. Among selected Work Disciplines, choose only ONE discipline that your company does the best.

    13. Please upload the Financial Reports for the last 3 years in PDF File or JP(E)G File

    14. After clicking "Add" button, you can write down the year, currency & turn over of each year

    15. Click Next Button to proceed to the next step

    The yellow fields are required, as well as the columns at the tables with red marks on the right top.

    12

    11

    13

    14

    15

  • 8/13/2019 Registration Guide for Contractors

    7/11

    16. Provide information about the company's Manpower & Equipment availability

    17. Click Next Button to proceed to the next step

    The yellow fields are required, as well as the columns at the tables with red marks on the right top.

    17

    16

  • 8/13/2019 Registration Guide for Contractors

    8/11

    18. Please upload the Equipment List owned by your company

    19. If the company owns fabrication/production facilities, you have to input the size (area)of the facility & the production capacity of each product in the table provided.(after clicking the "Add" button)

    The yellow fields are required, as well as the columns at the tables with red marks on the right top.

    19

    18

  • 8/13/2019 Registration Guide for Contractors

    9/11

    20. Click "Add" button & select the applicable QA/QC certificate. If you do not have any, choose "n/a

    21. Attach the scanned version of the certificates.

    The yellow fields are required, as well as the columns at the tables with red marks on the right top.

    20

    21

  • 8/13/2019 Registration Guide for Contractors

    10/11

    22. Click "Add" button & select the applicable HSE certificate. If you do not have any, choose "n/a".

    23. Attach the scanned version of the certificates.

    The yellow fields are required, as well as the columns at the tables with red marks on the right top.

    22

    23

  • 8/13/2019 Registration Guide for Contractors

    11/11

    24. Write down the past major projects that your company has done. Click "Add" button & insert

    project information. And then Upload the completed Project List

    25. If you have experiences working with Samsung C&T, please specify the project names, contract

    values, etc.

    26. Click "Save" button and make sure that all the information is saved correctly

    The yellow fields are required, as well as the columns at the tables with red marks on the right top.

    24

    25