regional energy account

16
Anil Thomas Asst. Executive. Engineer Southern Regional Power Committee Central Electricity Authority

Upload: barton

Post on 05-Jan-2016

30 views

Category:

Documents


0 download

DESCRIPTION

Regional Energy Account. Anil Thomas Asst. Executive. Engineer Southern Regional Power Committee Central Electricity Authority. Contents. Plant Availability Factor of ISGS. Percentage of Allocated Capacity Share. Share of Beneficiaries in ISGS. Misdeclaration of Declared Capacity. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Regional Energy Account

Anil ThomasAsst. Executive. Engineer

Southern Regional Power CommitteeCentral Electricity Authority

Page 2: Regional Energy Account

Plant Availability Factor of ISGS. Percentage of Allocated Capacity Share. Share of Beneficiaries in ISGS. Misdeclaration of Declared Capacity. Ratio of Fees of SRLDC to be Shared. Ratio in which Transmission Charges to be Shared. Energy Scheduled to the Beneficiaries from ISGS. Details of Scheduled Energy Wheeled to Other Region. Details of Short Term Open Access. Details of Short Term Open Access Through Power

Exchange. Details of Wheeling Charges.

Page 3: Regional Energy Account

PAF-: The Average of the Daily Declared Capacities for all the Days during that period expressed as a percentage of the Installed Capacity in MW reduced by the Normative Auxiliary Consumption.

PAFM/PAFY=10000* DC/(N*IC*(100-AUX) )%

Page 4: Regional Energy Account
Page 5: Regional Energy Account

Allocated Capacity Share – Gadgill Formula. Un Allocated Share (15%)

Page 6: Regional Energy Account

Weighted Average of Percentage Allocation Capacity Decides the Ratio in Which Fixed Capacity Charges

is to be share by Beneficiaries.

Page 7: Regional Energy Account
Page 8: Regional Energy Account

Ratio in Which SRLDC fees are shared is based on Weighted Average of Total Entitlement of a Beneficiaries with Different ISGS and LTOA

Page 9: Regional Energy Account

Postage Stamp Method- Based on Entitlement. Point of Connection Method- Based on Hybrid

Method ( from 1.7.2011)

Page 10: Regional Energy Account

Running Charges of a Station Recovered through Scheduled Energy.

Concept of Un-Requisition Energy (URS Power). Concept of Unscheduled Interchange.

Page 11: Regional Energy Account

From Goa SR-Goa WR From ER-WR Via SR. Jeypore - Gajuwaka (ER) Bhadravati - Chandrapur (WR)

Page 12: Regional Energy Account

Short Term Open Access. Short Term Open Access through Power Exchange PXI & IEX.

Page 13: Regional Energy Account

ISGS Embedded in State Transmission network KAPS & MAPS.

State Transmission network Connecting Different States.

Page 14: Regional Energy Account

Declared Capacity Requisition Schedule Drawl Losses Frequency Least count of 0.02 Hz Freq= 49+Code/50 UI De incentive UI Capped UI (4.03 Rs/kwh) Capping Under APM (4.03 Rs/kwh) Additional UI (49.5-49.2)(49.2-49)

Page 15: Regional Energy Account

No Generators Involved. Penalty for injecting Reactive Energy at 103% of

Voltage Level and Incentive for Drawing . Penalty for drawing Reactive Energy at 97% of

Voltage level and Incentive for Injecting Reactive charges Ps 10.5/KVARH . Payment for Interstate Lines.