![Page 1: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/1.jpg)
Regents Committee on Grounds and BuildingsPreliminary Review of DesignNovember 18, 2008
UCSDHEALTH SCIENCES NEIGHBORHOODGRADUATE AND PROFESSIONAL HOUSING
![Page 2: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/2.jpg)
• 225 (2 bedroom apartment units), 450 Beds for Unmarried Graduate Students and Professionals
• Design-Build Methodology – 3 design teams participated in design “competition” based on established project program and fixed budget of $67,100,000
• As part of “competition” the project was presented at various times to group consisting of members of the BAC, Design Review Board and UCSD staff
• Based on best value points, Webcor Builders and Valerio Train Dewalt and Associates were selected as the winning design-build team in June 2008
• 219,287 gross square feet/164,454 assignable square feet
• 225 (2 bedroom apartment units), 450 Beds for Unmarried Graduate Students and Professionals
• Design-Build Methodology – 3 design teams participated in design “competition” based on established project program and fixed budget of $67,100,000
• As part of “competition” the project was presented at various times to group consisting of members of the BAC, Design Review Board and UCSD staff
• Based on best value points, Webcor Builders and Valerio Train Dewalt and Associates were selected as the winning design-build team in June 2008
• 219,287 gross square feet/164,454 assignable square feet
Project Background
![Page 3: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/3.jpg)
Site Location
![Page 4: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/4.jpg)
2004 LRDP AND 1989 UCSD MASTER PLAN
Site
![Page 5: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/5.jpg)
Phar
mac
y Ph
arm
acy
Build
ing
Build
ing
La Jolla Village DriveLa Jolla Village Drive
Villa
La Jo
lla D
rive
Villa
La Jo
lla D
riveOsler LaneOsler Lane
UCSD Gilman Entry
UCSD Gilman Entry
P608P608
P604P604
P603P603
• Approximately 4.5 acres
• 25’ to 30’ grade change from north to south
• Located in surface parking lot P608
• Protect and preserve adjacent landscape screening
Project Site
![Page 6: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/6.jpg)
Site PhotosSite Photos
![Page 7: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/7.jpg)
Site Photos
![Page 8: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/8.jpg)
Site PhotosSite Photos
![Page 9: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/9.jpg)
Pharmacy
AMAM--66
AMAM--77
Academ
ic Mall
Health SciencesNeighborhood Planning Study
![Page 10: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/10.jpg)
ACADEMIC MALL
Health Sciences Neighborhood Planning StudyAcademic Mall Vision
![Page 11: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/11.jpg)
UNIT DESIGNPLAN
![Page 12: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/12.jpg)
UNIT DESIGNEND UNIT PLAN
Virtual Balcony
![Page 13: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/13.jpg)
OUTDOOR ACCESS BIKE ROOM
RECYCLING CENTERSECURITY PERIMETER
BUILDING PLANSLEVEL 1
![Page 14: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/14.jpg)
BUILDING PLANSLEVEL 2
MAIN ENTRANCERESIDENT SERVICES
OUTDOOR COURTYARDSECURITY PERIMETER
![Page 15: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/15.jpg)
NATURAL LIGHTINGIN CORRIDORS
BUILDING PLANSLEVEL 3
![Page 16: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/16.jpg)
BUILDING PLANSLEVEL 4
LAUNDRY ROOMFITNESS ROOMVENDING AREA
VIEW OF GREEN ROOF
![Page 17: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/17.jpg)
BUILDING PLANSLEVEL 5
![Page 18: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/18.jpg)
BUILDING PLANSLEVEL 6
![Page 19: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/19.jpg)
BUILDING PLANSLEVEL 7
![Page 20: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/20.jpg)
BUILDING PLANSLEVEL 8
TOWER PLAN
56% UNITS WITH CROSS VENTILATION
![Page 21: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/21.jpg)
BUILDING PLANSLEVEL 9
![Page 22: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/22.jpg)
ACADEMIC MALLVIEW FROM THE NORTH
![Page 23: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/23.jpg)
VIEW FROM NORTHWESTACADEMIC MALL
![Page 24: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/24.jpg)
FROM NORTHEASTOVERVIEW
![Page 25: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/25.jpg)
OVERVIEWFROM SOUTHWEST
![Page 26: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/26.jpg)
CAMPUS EDGEVIEW FROM LA JOLLA VILLAGE DRIVE
![Page 27: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/27.jpg)
OVERVIEWVIEW FROM GREEN ROOF TERRACE
![Page 28: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/28.jpg)
OVERVIEWCOURTYARD
![Page 29: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/29.jpg)
OVERVIEWMAIN ENTRY WALKWAY
![Page 30: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/30.jpg)
FROM NORTHWEST
OVERVIEW
![Page 31: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/31.jpg)
MATERIALS
![Page 32: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/32.jpg)
UNIT DESIGNINTERIORS
![Page 33: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/33.jpg)
UNIT DESIGN
![Page 34: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/34.jpg)
VENTILATIONNATURAL AND MECHANICAL
![Page 35: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/35.jpg)
SUSTAINABILITY• Integrated landscape design for storm water
filtration and drainage• Water efficient landscaping• Green roofs/high albedo roof materials to
diminish “heat island” effect• Optimized energy performance systems• Construction waste management• Regional materials use• Maximized natural ventilation• Low emitting volatile organic compound
materials• Maximized use of daylighting opportunities
![Page 36: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/36.jpg)
The following slides are not in presentation…
![Page 37: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/37.jpg)
UCSD Health Sciences Graduate & Professional Housing Silver = 33-38 points
Current Target Points - Silver 36 Gold = 39-51 points
Additional Target Points Needed - Gold 6 as a minimum
Sustainable Strategy Options for Consideraton # of LEED Points Cost Premium Payback Period
EA 2: On-Site Renewable Energy (2.5%)
Opt A: 5000 sf of PV cells $601,020 54 yrs
Opt B: Thermal Solar (hot water) Panels 1 $329,430 100 yrs
MR 4.2: Recycled Content (20%) 1 $15,000 n/a
MR 5.2: Regional Materials (20%) 1 $15,000 n/a
SS 5.1: Site Develp, Protect Habitat 1 $25,000 n/a
SS 7.1: Heat Island Effect, Non-roof
Opt A: White Concrete Paving $87,173 n/a
Opt B: Sun Shades at Parking area 1 $64,800 n/a
SS 8: Light Pollution Reduction 1 $30,000 n/a
Option Totals 6
![Page 38: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/38.jpg)
ACADEMIC MALLNORTH ELEVATION
![Page 39: Regents Committee on Grounds and Buildings Preliminary ......EA 2: On-Site Renewable Energy (2.5%) Opt A: 5000 sf of PV cells $601,020 54 yrs Opt B: Thermal Solar (hot water) Panels](https://reader035.vdocuments.site/reader035/viewer/2022071210/6021efd0e2c9d557cd6da550/html5/thumbnails/39.jpg)
MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS For the Meeting of November 18, 2008
BACKGROUND INFORMATION FOR
PRELIMINARY REVIEW OF DESIGN HEALTH SCIENCES NEIGBOORDHOOD GRADUATE & PROFESSIONAL HOUSING
SAN DIEGO CAMPUS
• The Health Sciences Neighborhood Graduate & Professional Housing project will be located on approximately 4.5 acres located within the south-central portion of the UCSD main campus within the School of Medicine Neighborhood.
• The project complies with the 1989 UCSD Master Plan and the 2004 Long Range Development Plan. The design of the
project is in conformance with the vision guidelines articulated in the 2000 School of Medicine (now known as Health Sciences) Neighborhood Planning Study.
• The project will be delivered utilizing the Design/Build construction delivery methodology. The Design/Build team
consists of Webcor Builders, Inc (Contractor)./Valerio Dewalt Train Associates, Inc. (Architect)
• Provides 225 two-bedroom apartments which will accommodate 450 graduate students, and 1 three-bedroom staff unit.
• In addition to the housing units, the project will provide a centralized reception area, administrative offices, conference and meeting rooms, fitness and laundry areas, mail areas, maintenance and custodial spaces.
• The project design consists of a single building composed of two backwards “L” shaped wings (7 and 9 stories
respectively).
• The project is proposed to be completed for fall 2011 occupancy.
• The project will achieve USGBC LEED Silver rating.
• The proposed Health Sciences Neighborhood Graduate and Professional Housing apartments project would encompass 164,454 assignable square feet (asf) and 219,287 gross square feet (ogsf) of building space.
• Total project costs are $67,100,000 at CCCI 5555
• The construction cost is $265.24 per ogsf.