refurbishment proposal for menara saas uitm shah alam

3
REFURBISHMENT PROJECT OF MENARA SAAS (ROOM 1014) DESIGN PROPOSAL : STUDENT MEETING ROOM Completed on 1972. Consist of faculties, offices, café, shop, ATM, lecturers room etc. 14 stories high rise building Majority students from Faculty Of Accountancy occupied this building. Always occupied with people from morning till evening. The 2 nd highest building in UiTM. Iconic building in UiTM Shah Alam. Surrounding with other buildings such as Kompleks Budisiswa, Faculty Of Applied Science, Archive and Museum Gallery, Student Affair building and Institute of Science building. Menara Sultan Abdul Aziz Shah, UiTM Shah Alam Key Plan (Not to scale) 10th Floor Layout (Not to scale) Dataran Menara SAAS Bubble Diagram MEETING INFO INFO DISPLAY SCENERY CENTRE OF STUDIES FOR BUILDING SURVEYING PREPARED BY : WAN FAKHRUL AFIFI BIN WAN ISMAIL Floor Plan (Room 1014) (Not to scale) Chosen Room EXISTING ROOM PICTURE SIDE VIEW FRONT VIEW REAR VIEW

Upload: fakhrul-afifi

Post on 12-Apr-2017

195 views

Category:

Design


13 download

TRANSCRIPT

Page 1: Refurbishment proposal for Menara SAAS UiTM Shah Alam

REFURBISHMENT PROJECT OF MENARA SAAS (ROOM 1014) DESIGN PROPOSAL : STUDENT MEETING ROOM

♣ Completed on 1972. ♣ Consist of faculties, offices, café, shop, ATM, lecturers room etc. ♣ 14 stories high rise building ♣ Majority students from Faculty Of Accountancy occupied this building. ♣ Always occupied with people from morning till evening. ♣ The 2

nd highest building in UiTM.

♣ Iconic building in UiTM Shah Alam. ♣ Surrounding with other buildings such as Kompleks Budisiswa, Faculty Of Applied Science, Archive and Museum Gallery, Student Affair building and Institute of Science building.

Me

nara

Su

ltan

Ab

du

l Aziz

S

hah

, UiT

M S

hah

Ala

m

Ke

y P

lan

(No

t to s

ca

le)

10

th F

loo

r La

yo

ut

(No

t to s

ca

le)

Da

tara

n M

en

ara

SA

AS

Bu

bb

le D

iag

ram

M

EE

TIN

G

INFO

INFO

DISPLAY

SC

EN

ER

Y

CE

NT

RE

OF

ST

UD

IES

FO

R B

UIL

DIN

G S

UR

VE

YIN

G

PREPARED BY : WAN FAKHRUL AFIFI BIN WAN ISMAIL

Flo

or P

lan

(Ro

om

101

4)

(No

t to s

ca

le)

Ch

osen

Room

EXISTING ROOM PICTURE

SID

E V

IEW

F

RO

NT

VIE

W

RE

AR

VIE

W

Page 2: Refurbishment proposal for Menara SAAS UiTM Shah Alam

REFURBISHMENT PROJECT OF MENARA SAAS (ROOM 1014) DESIGN PROPOSAL : STUDENT MEETING ROOM

CE

NT

RE

OF

ST

UD

IES

FO

R B

UIL

DIN

G S

UR

VE

YIN

G

PREPARED BY : WAN FAKHRUL AFIFI BIN WAN ISMAIL

DETAILING OF DOOR

DETAILING OF WINDOW

SE

CT

ION

A-A

SE

CT

ION

B-B

Co

nc

ep

t 1

Co

nc

ep

t 2

Co

nc

ep

t 3

The idea and concept of this room is meeting room. Previously, this room is a lecture room for Accountancy student on 10th floor of Menara SAAS. When they move to Puncak Alam campus, this room is abandoned and stored tables,chairs and other furniture. It is located near the lecturers room, toilets, lift lobby and emergency staircase. This room has 3 cassette airconds, 9 set of ceiling lamps, 3 sets of four leaf casement windows, and I unit double leaf timber door. Above pictures are the concept of the new meeting room that are proposed to this room. Estimated about 12-15 peoples that can be occupied in one time in this room, those new concept is very suitable. Furnitures are arranged at the centre of the room, such as table, chairs, display board, etc.

DO

OR

EL

EV

AT

ION

D

OO

R S

EC

TIO

N

CA

SE

ME

NT

WIN

DO

W

Page 3: Refurbishment proposal for Menara SAAS UiTM Shah Alam

REFURBISHMENT PROJECT OF MENARA SAAS (ROOM 1014) DESIGN PROPOSAL : STUDENT MEETING ROOM

CE

NT

RE

OF

ST

UD

IES

FO

R B

UIL

DIN

G S

UR

VE

YIN

G

PREPARED BY : WAN FAKHRUL AFIFI BIN WAN ISMAIL

ILLUSTRATION OF REFURBISHED ROOM SELECTION OF MATERIALS

WALL

DOOR

WINDOWS

FLOOR FINISHES

PE

RS

PE

CT

IVE

VIE

W 1

PE

RS

PE

CT

IVE

VIE

W 2

PE

RS

PE

CT

IVE

VIE

W 5

PE

RS

PE

CT

IVE

VIE

W 6

250mm thick brick wall includ-ing 25mm thick layer of paint on both side of the brickwall

Swing glass door with steel framed tinted on both side.

Double leaf casement windows

Carpet as a materials of floor finishes

PE

RS

PE

CT

IVE

VIE

W 3

PE

RS

PE

CT

IVE

VIE

W 4