1 Projects Built Profile type Anchored Outside tunnel-dia. (m) Water pressure (bar) References for TBM driven tunnels More than 650 tunnel projects worldwide * * projects were carried out between 1969 and 2000 and are not listed here Road Rail Metro Water/Sewer Cable/Service Europe 213 North America 57 South America 8 Africa 7 Asia 94 Middle & Far East 21 Australia & Oceania 14

Upload: vohanh

Post on 15-Aug-2019

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: References for TBM driven tunnels - sealing.datwyler.com · Tunnel Alencon, (ENERTHERM) 2005 M 74 017 3,54 3,0 Sewer TIMA 2, Paris 2007 M 38 392 4,60 Tunnel Alencon, (ENERTHERM) 2008

1

Projects Built Profile type Anchored Outside tunnel-dia. (m)

Water pressure (bar)

References for TBM driven tunnels

More than 650 tunnel projects worldwide *

* projects were carried out between 1969 and 2000 and are not listed here

Road Rail Metro Water/Sewer Cable/Service

Europe 213

North America 57

SouthAmerica 8

Africa 7

Asia 94

Middle & FarEast 21

Australia & Oceania 14

Page 2: References for TBM driven tunnels - sealing.datwyler.com · Tunnel Alencon, (ENERTHERM) 2005 M 74 017 3,54 3,0 Sewer TIMA 2, Paris 2007 M 38 392 4,60 Tunnel Alencon, (ENERTHERM) 2008

2

Projects Built Profile type Anchored Outside tunnel-dia. (m)

Water pressure (bar)

BelgiumTGV „ASDAM“ Tunnel, Antwerp 2002 M 38 527 8,00 2,1

Liefkenshoekspoortunnel, Antwerp 2009 M 38 910 8,10 4,0

Gallerie du Bassin d‘Ukkelbeek 2016 M 38 566 X 5,16 4,0

EUROPE

AustriaMetro Vienna, U2/5 Kagraner Platz 2002 19-916

Metro Vienna Linie 2 „Stadion“ 2004 M 74 023 3,0

Wiental-Sammelkanal WSKE 200419-916, double gasket sealing

Schacht Paiersdorf 2004 1‘001‘681

BEG H8, Jenbachtunnel, Inn Valley 2007 M 38 573 12,63 4,0

BEG H3-4, Münster Wiesing, Inn Valley 2007 M 38 573 12,63 4,0

Koralmtunnel Kat 2 2013 M 38 554a 9,50 1,0

BulgariaMetro Sofia 2006 M 38 541 5,67 3,0

Czech RepublicMetro Prague 2010 M 38 596 5,80

Ejpovice Rail tunnel 2014 M 38 921 X 9,50 5,0

DenmarkHeating Tunnel Copenhagen 2006 M 38 596 4,80 3,4

Metro NH 12 Copenhagen 2016 M 38 903 5,50 4,0

FranceA86 „Coffiroute“, Paris VL 1 + VL 2 2000 M 38 544 11,24

Metro Toulouse, Lot 2 2002 M 38 544 7,48

Metro Toulouse, Lot 3 2002 M 38 392 5,16 1,0

Metro Toulouse, Lot 4 2002 M 38 544 7,48

Metro Toulouse, Lot 5 2002 M 38 550

Franconville II, Lille

Tunnel Tournefeuille, Bordeaux M 38 538a

Tunnel Rue de Chatenay M 38 564 6,90 3,5

Project Siphon de Valenton 2004 M 38 901 4,10

Galerie Puits Bievre

La Blagis Region Parisienne M 38 595

Bordeaux Sewer Ext.

Collecteur Paris, Lot 2

Sewer TIMA 1, Paris 2005 M 38 544 7,48

Metro Marseille 2006 M 38 544 9,45 1,5

Page 3: References for TBM driven tunnels - sealing.datwyler.com · Tunnel Alencon, (ENERTHERM) 2005 M 74 017 3,54 3,0 Sewer TIMA 2, Paris 2007 M 38 392 4,60 Tunnel Alencon, (ENERTHERM) 2008

3

Projects Built Profile type Anchored Outside tunnel-dia. (m)

Water pressure (bar)

FranceTunnel Alencon, (ENERTHERM) 2005 M 74 017 3,54 3,0

Sewer TIMA 2, Paris 2007 M 38 392 4,60

Tunnel Alencon, (ENERTHERM) 2008 M 74 003 3,54 3,0

Metro Paris Line 12 2008 M 38 544 8,80

Bassin de la Laiterie 2008 M 38 533a 2,63

Tunnel Affaire SILA d‘Annecy 2008 M 38 392 2,66

Sewer Paris VL-9, Lot 1 2009 M 38 392 2,88

Flamanville Project 2009 M 38 544 5,80

CPCU - Lot 13 2009 M 38 595 3,54

Metro B, Lyon 2010 M 38 544 9,09

Tunnel de Frejus 2010 M 74 005 9,00 2,0

Collector VL9 Lot 2 2010 M 38 392 3,50

Collecteur Montlucon 2010 M 38 392 2,66

Collecteur de Clichy 2010 M 38 392 4,60

Collecteur VL9 Lot 3 2011 M 38 519 4,60

Tunnel de Saverne 2011 M 38 596 9,70 4,0

LNG Disposal Tunnel Dunkerque 2012 M 38 541a 3,50 5,0

CVV Tramway Tunnel Paris 2013 M 38 923 X 8,80

Metro Rennes 2014 M 38 936 X 9,10 4,2

Paris Ligne 14 - Lot1 2014 M 38 923 X 8,55

Marseille Stradal D3080 2014 M 38 595 3,54

Paris Ligne 14 - Lot 2 2015 M 38 936 X 8,50 3,3

Galerie de Bure 2015 M 38 596 5,70

Nice Tramway 2016 M 38 936 X 8,90 5,0

Galerie de Bure GVA 2 Zone 3 2016 M 38 596 5,70

GermanyADL „Bi-Wa-Tunnel“, Berlin 2002 M 38 558a 3,54 3,0

Herrentunnel Lübeck 2002 M 38 573 11,3 3,6

Metro Hamburg, Airport Link 2005 M 38 573 6,60 3,0

Katzenberg, Railway DB 2006 1‘001‘681 10,8 10,0

North-South Light Rail Tunnel Köln,LosNord 2006 M 38 544 6,55 2,5

North-South Light Rail Tunnel Köln,Los Süd 2006 M 38 587a 8,10 2,5

Tunnel Moosach Line U3, Munich 2007 M 74 023 7,10 2,2

City Tunnel Leipzig 2007 M 38 558a 8,70 3,0

New „Schlüchterner Tunnel“ 2007 M 38 573 9,90 4,0

Finnetunnel, Thüringen 2008 M 38 909a 10,5 6,1

Metro U4 Hafencity Hamburg 2008 M 38 587a 6,30 4,0

Wehrhahnlinie Düsseldorf 2009 M 38 544 9,20 1,8

New „Kaiser-Wilhelm-Tunnel“ 2010 M 38 573 9,80 3,0

Page 4: References for TBM driven tunnels - sealing.datwyler.com · Tunnel Alencon, (ENERTHERM) 2005 M 74 017 3,54 3,0 Sewer TIMA 2, Paris 2007 M 38 392 4,60 Tunnel Alencon, (ENERTHERM) 2008

4

Projects Built Profile type Anchored Outside tunnel-dia. (m)

Water pressure (bar)

GermanyXFEL Tunnel Los 1 und Los 2 2010 M 38 587a 5,90 / 5,20 1,8

Metro U5 Berlin 2013 M 38 596 6,40 3,0

Light Rail Karlsruhe (Kaiserstraße) 2014 M 38 558a 9,00 2,5

Stuttgart 21, Oberer Fildertunnel 2014 M 38 909a 10,5 6,0

Sewer Emscher BA 40 2014 M 38 596 3,10 3,8

Boßlertunnel 2014 M 38 934/38 935 10,94 6,0

Tunnel Rastatt 2016 M 38 573 10,6 4,0

Stuttgart 21, Unterer Fildertunnel 2017 M 38 909a 10,5 6,0

Great BritainAirside Road Tunnel, Heathrow 2002 M 38 554a 8,80 2,5

Hendon to Colindal Cable Tunnel 2007 M 38 392 2,86

Belfast Sewer Tunnel & Shafts 2007 M 38 541a 4,55 / 2,80

Brixton to Honor Oak Water Supply 2008 M 38 541a 3,36 3,0

Sefton Sewer Tank Project 2008 M 38 541a

Lee Tunnel London 2010 M 38 566 X 8,50 4,0

Corrib Onshore Tunne 2012 M 38 587a 4,00 1,9

London Crossrail C 305 2012 M 38 912 6,80 4,0

London Crossrail C 310 2012 M 38 912 6,80 4,0

London Crossrail C 300 2012 M 74 005/74 006 6,80 4,0

Islington & St. Pancras Tunnel 2013 M 38 566 X 4,45

Bridlington Water Tunnel 2013 M 38 566 X 2,43

Wandsworth to Earls Court 2013 M 38 541a 3,36

LU Northern Line Extension 2016 M 38 566 X 5,70 6,0

GreeceMetro Peristeri, Sepolia 2002 M 74 023

Metro Athens, Elliniko Tunnel 2007 M 74 023 9,14 3,0

Metro Thessaloniki 2008 M 74 002 5,90 4,0

Metro Athen Attiko Line 3 2013 M 38 916 9,18

HungaryMetro Budapest Line 4 2006 M 38 596 5,80 3,0

IrlandDublin Airport Tunnel 2002 M 74 014 5,80 3,0

ItalyMonte Zucco 2001 M 74 024

Metro Torino Lot 3&4 2002 M 74 003

Railway network Milano 2003 M 74 017

Metro Torino Lot 5 2003 1‘001‘512

Page 5: References for TBM driven tunnels - sealing.datwyler.com · Tunnel Alencon, (ENERTHERM) 2005 M 74 017 3,54 3,0 Sewer TIMA 2, Paris 2007 M 38 392 4,60 Tunnel Alencon, (ENERTHERM) 2008

5

Projects Built Profile type Anchored Outside tunnel-dia. (m)

Water pressure (bar)

ItalyLinea Lamezia Catanzaro Lidi ITALFERR 2006 1‘001‘623 8,40

Alto Adige-Val Passiria, Bolzano 2007 1‘002‘990 3,70 5,0

Nodo Firenze 2015 M 38 933 X 9,10 4,0

NetherlandsWesterscheldetunnel 2001 M 38 589 11,0 6,5

Pannerdensch Kanaal, Angeren 2001 M 38 544 9,49 3,4

Groene Hart Tunnel, Leiderdoorp 2002 M 38 587a 14,5 4,0

Randstad Rail Tunnel Rotterdam 2005 M 38 544 6,50 3,0

Hubertustunnel, Den Haag 2005 M 38 587a 10,20 2,2

Gasleidingtunnel Eems-Dollard 2009 M 38 587a 3,50 3,0

Sluiskiltunnel 2012 M 38 909a 11,0 3,6

Rotterdamsebaan 2017 M 38 909a 10,95 3,0

NorwayOslo Ski Follo 2016 M 38 928 X 9,55 33,0

PolandWisla Ruver Crossing 2011 M 38 903 5,10

Metro Warsaw 2011 M 74 021 6,00 3,5

RomaniaCluji Napoja Sewer Project 2004 M 38 584 2,63

Metro Bukarest 2012 M 38 544 6,30

RussiaLefortovo Tunnel Moscow 2001 M 38 568 13,75 3,5

Metro St. Petersburg 2001 M 38 564 7,10 6,0

Mini-Metro Moscow 2002 M 38 541a 5,65

Metro Moscow Extension 2002 M 38 544 6,00

Silberwaldtunnel, Moscow 2004 M 38 565 13,75 4,0

Servicetunnel Silberwald, Moscow 2004 M 38 544 6,00 4,0

Metro Moscow, Strogino Line 2005 M 38 544 6,00 3,0

Mini-Metro Extension M 38 541a 5,65

Cable Tunnel Project M-1058, Moscow 2006 M 38 550 3,15

Metro Moscow, Mitino Line 2 2006 M 74 024 6,00

Collector no 5 Service Tunnel, Moscow 2006 M 74 021 3,68

Airport Tunnel Vnoukovo, Moscow 2006 M 74 021 3,68

Metro Moscow, Strogino Line 1 2006 M 74 024 6,00

Collector 22/6 2007 M 74 021 3,68

Escalator Tunnel, Moscow 2007 1‘001‘951 10,60

South Siberia 2007 M 74 014

Fili Sewer, Moscow 2007 M 74 003 4,00 5,0

Page 6: References for TBM driven tunnels - sealing.datwyler.com · Tunnel Alencon, (ENERTHERM) 2005 M 74 017 3,54 3,0 Sewer TIMA 2, Paris 2007 M 38 392 4,60 Tunnel Alencon, (ENERTHERM) 2008

6

Projects Built Profile type Anchored Outside tunnel-dia. (m)

Water pressure (bar)

Russia / CISMetro Moscow Strogino Line 2007 1‘001‘951 6,30

TranstroyTunnel Moscow 2007 M 74 021 3,68 3,5

Cable Tunnel Project M-1153, Moscow 2007 M 38 901 4,10

Sewer Tunnel Project M-1156, Moscow 2007 M 38 901 4,10

Sewer Tunnel Project M-1179, Moscow 2007 M 38 550 3,25

GPR-1/ MTS Perforator Project, Moscow 2007 M 38 541a 3,26

Sewer Tunnel Project M-1127, Moscow 2008 M 38 901 4,10

Cable Tunnel Project M-1154, Moscow 2008 M 38 550 3,25 8,5

Cable Tunnel Project M-1155, Moscow 2008 M 38 550 3,25

Moscow Sewer M-1058 2008 M 38 906 X 3,15

Metro Moscow S-328 Extension 2008 M 38 544

ARES Project Moscow 2008 M 38 543b 4,00

Metro Moscow T-06 Project 2008 M 38 544

HK-M 1360 Collector St. Petersburg 2008 M 38 550 4,30 3,0

HK-M 1152 Sewer Tunnel Moscow 2008 M 38 550

Nishnij Nowgorod 2008 M 38 587a 5,80 4,0

Metro Kazan 2008 M 74 023 5,60

Metro Cheliabinsk 2008 M 74 023 5,60 3,8

Mitino Line Extension, Moscow 2008 1‘001‘951 6,30

Sochi Service Tunnel No. 1 2009 M 74 020 5,60

Sochi Service Tunnel No. 5 2009 M 74 020 4,10

Sochi Railway Tunnel No. 3, Lovat RM394DS 2009 M 74 020 9,70

Sochi Service Tunnel (Lovat 167) 2009 M 38 541a 4,10

Metro Moscow Line 10 Marjino 2009 M 38 544 6,00

Kuznetsovsky Railway Tunnel (Lovat 375) 2009 M 38 554a 9,20

Sochi Railway Tunnel No. 5 2009 M 38 573 10,30

Sochi Road Tunnel No. 3 2009 M 38 753 12,83

Ekaterinburg 2010 M 38 596 5,50

Sochi Service Tunnel (232) 2010 M 38 596 5,65

Metro Moscow, Line 8A Victory Park station 2011 1‘001‘951 6,30 8,0

Metro Moscow, Line 7a (Lovat 242) 2012 M 38 903 5,90

Metro Moscow, Mosmetrostroy 2012 M 74 023

Metro Moscow, Kazanmetrostroy 2012 M 38 544 5,60

Moscow Cable Tunnel extension 2012 M 38 527 5,80

Moscow Transtroy Tunnel 2012 M 38 594 3,68

Metro Moscow, Line 10 (Brateevo) 2012 M 74 024 6,00

Metro Moscow, Line 7a (S 798) 2013 M 38 550 5,90

Metro Moscow, Mosmetrostroy 2013 M 74 023 6,00

Metro Moscow, Mosmetrostroy 2013 M 74 024

Page 7: References for TBM driven tunnels - sealing.datwyler.com · Tunnel Alencon, (ENERTHERM) 2005 M 74 017 3,54 3,0 Sewer TIMA 2, Paris 2007 M 38 392 4,60 Tunnel Alencon, (ENERTHERM) 2008

7

Projects Built Profile type Anchored Outside tunnel-dia. (m)

Water pressure (bar)

SerbiaInterceptor Veliko Usce Belgrade 2008 M 74 021 4,60 8,0

SpainCollecteur Pau Vallecas (Madrid) 2002 M 38 538a 3,54

UTE Aeroporto Barcelona 2004 M 38 587a 9,07

Pajares Railway Tunnels, UTE 1 2005 M 38 540b 9,50 15,0

Pajares Railway Tunnels, UTE 2 2005 M 38 540b 9,70 15,0

Pajares Railway Tunnels, UTE 3 2005 M 38 540b 9,50 15,0

Pajares Railway Tunnels, UTE 4 2005 M 38 540b 9,50 15,0

Le Perthus Railway Tunnel, Pyrenees 2005 M 38 587a/ 38904 9,50 18,0

Canal de Navarra 2006 M 38 519 5,90

Tunel de Sorbas 2010 M 38 573 9,75

Colector del Nalon 2010 M 38 912 2,27

INELFE Project France/Spain 2011 M 38 596 4,00 16,0

SwedenHallandsastunnel 2004 M 38 573 10,12 15,0

Malmö City Tunnel 2006 M 74 017 8,60 2,5

SwitzerlandOenzberg Tunnel, Railway SBB 2002 M 74 021

Axentunnel Brunnen, Railway SBB 2003 19-978

Maroggia Tunnel, Railway SBB, Tessin 2004 19-978

Hochwasserentlastungsstollen, Thun 2007 M 74 024 8,0 1,5

Tunnel Galerie de Choully 2008 M 38 392 2,88

Weinbergtunnel 2009 M 38 527 10,94 3,0

Tunnel Längholz, Biel 2009 M 74 021 12,24 3,0

Eppenbergtunnel 2017 M 38 936 X 12,39 5,0

TurkeyMetro Ankara, Ph. III 2001 M 38 544 5,76 2,0

Metro Istanbul-Otogar-Bagcilar 2005 M 74 021 6,30 4,0

Sewage Tunnel, Ambarli 2006 M 74 024 4,40 4,0

Metro Ankara Keicioren Teil 1 2006 M 74 017 5,76 2,2

Railway Bosporus Cross. Marmaray Lot 1 2006 M 74 002 7,64

Railway Bosporus Cross. Marmaray Lot 2 2006 M 74 002 7,64 6,0

Russia / CISBaikalsky Tunnel 2014 M 74 008 9,70

Metro Moscow, Line2 Petrovsky Park station 2014 M 38 938 5,90

Metro Moscow, Line 8A Rasskazovka 2014 M 38 544 6,00

Metro Moscow (Solntsevo line) 2016 M 38 544 6,00

Tunnel at Sheremetjevo airport 2016 M 38 544 6,00

Page 8: References for TBM driven tunnels - sealing.datwyler.com · Tunnel Alencon, (ENERTHERM) 2005 M 74 017 3,54 3,0 Sewer TIMA 2, Paris 2007 M 38 392 4,60 Tunnel Alencon, (ENERTHERM) 2008

8

Projects Built Profile type Anchored Outside tunnel-dia. (m)

Water pressure (bar)

TurkeyKädikoy-Kartal, Istanbul 2007 M 74 021 6,30 6,0

Tunnel Melen 7 2007 M 74 021 5,81

Metro Ankara Keicioren Teil 2 2008 M 74 017 5,76 3,0

Gerede System 2011 M 38 541a 5,20 / 5,10

Metro Ankara 2012 M 38 544 5,76 2,0

Marmary BC 1 2012 M 74 002 7,00 6,0

Istanbul Strait Crossing 2013 M 38 573 13,2 11,0

UkraineMetro Kiev 2005 1‘000‘119 3,0

Page 9: References for TBM driven tunnels - sealing.datwyler.com · Tunnel Alencon, (ENERTHERM) 2005 M 74 017 3,54 3,0 Sewer TIMA 2, Paris 2007 M 38 392 4,60 Tunnel Alencon, (ENERTHERM) 2008

9

Projects Built Profile type Anchored Outside tunnel-dia. (m)

Water pressure (bar)

North America

USAMinneapolis LRT St. Paul 2001 M 38 541a 6,25 2,2

NOS-ECIS Los Angeles 2001 M 38 572 4,55 3,0

Arrowhead Feeder, Los Angeles 2002 M 38 573 5,54 22,0

NEIS Los Angeles 2003 M 38 572 3,70 4,0

Portland Sewer Westside CSO, North drive 2003 M 38 594 / 38 596 4,88 3,5

Portland Sewer Westside CSO, South drive 2003 M 38 594 4,77 3,5

BWARI Project, Columbus, Ohio 2004 M 74 003

Indy CSO Project Indianapolis 2005 M 74 003 4,14

Beacon Hill Project, Seattle 2005 M 38 596 6,25 8,4

MTA Eastside, LRT Los Angeles 2005 M 38 596 6,27 6,3

Houston Sewer Project 2005 M 38 572 4,55 3,0

Dulles Airport Tunnel, Washington 2005 M 38 527 6,20 5,2

Portland Sewer Eastside CSO 2005 M 38 596 7,42 7,6

Brightwater Central Project, Seattle 2007 M 38 596 5,03 7,0

Brightwater West Project, Seattle 2007 M 38 596 4,47 5,0

Avenue 45th Sewer Los Angeles 2007 M 38 572 2,76 1,5

CMT Brightwater, Seattle 2007 M 74 003 5,58 6,0

Allegheny Tunnel, Pittsburgh 2007 M 74 021 6,65

North Dorchester Bay CSO Tunnel, Boston 2007 M 74 021 5,70

Sacramento Sewer Project 2008 M 38 594 4,11 4,5

Edison Force Station Upgrade Sayreville 2008 M 74 021 4,54 6,0

NYC Line No. 7 Subway Extension 2009 M 38 527 6,55 3,5

Lake Mead Intake Tunnel No. 3 2009 M 38 573 6,81 14,0

CanadaLRT Tunnel, Edmonton 2003 1‘001‘461 6,70

Bathurst Collector, Toronto 2006 M 38 596 3,12 3,0

RAV-Canada Line Intransit BC, Vancouver 2006 M 74 023 5,80 4,0

Toronto Coxwell Tunnel 2010 M 38 596 3,12

York Region SE Collector Project 2010 M 74 020 3,40 6,0

TTC Spadina Line Project 2010 M 74 021 5,87 6,0

TTC Eglinton Crosstown, Toronto 2011 M 74 021 6,25 6,0

Port Mann Tunnel, Vancouver 2016 M 38 587a 3,30 6,0

West Trunk Sewer Mississauga 2016 M 38 920 / 38 596 X 3,40

MexicoEmisor Oriente Part. 3-6 2010 M 38 903 8,60 7,0

PanamaSaneamiento de la Bahia 2010 M 38 596 3,43 3,0

Page 10: References for TBM driven tunnels - sealing.datwyler.com · Tunnel Alencon, (ENERTHERM) 2005 M 74 017 3,54 3,0 Sewer TIMA 2, Paris 2007 M 38 392 4,60 Tunnel Alencon, (ENERTHERM) 2008

10

Projects Built Profile type Anchored Outside tunnel-dia. (m)

Water pressure (bar)

USACountry Ground Tunnel, Milwaukee 2009 M 74 021 5,69

Seattle Sound Transit 2010 M 38 596 6,27

East Side Access 2010 M 38 587a 6,55 3,0

Sunnydale San Francisco 2010 M 38 550 4,12 1,7

Port of Miami Tunnel 2010 M 38 587a 12,50 6,0

San Francisco Bay Tunnel 2010 M 38 596 4,42 3,4

Columbus OARS 2011 M 38 596 6,70 6,0

NYC-DEP BSI Tunnel Project, New York 2011 M 74 021 3,55 4,5

Euclid Creek Tunnel 2012 M 38 596 7,92 6,7

Blue Plains Washington 2012 M 38 921 X 7,72 4,0

San Francisco Central Subway 2013 M 38 566 X 5,99 6,2

Alaskan Way Viaduct Replacement 2013 M 38 925 17,07 7,5

Silver Lake Tunnel 2013 M 38 596 3,43

Seattle Northgate N125 2013 M 38 596 6,25

Anacostia River Tunnel 2014 M 38 933 X 7,62 6,0

1st Street Tunnel, Washington 2015 M 38 596 6,70

LACMTA Regional Conncector 2015 M 38 596 6,27 5,0

LAX Crenshaw Metro 2015 M 38 596 6,27 5,0

LACMTA Westside Extension 2016 M 38 596 6,35 3,5

Akron Ohio Canal Interceptor 2016 M 38 596 8,94 8,0

Blacklick Creek Sewer Ohio 2016 M 38 933 X 3,51 4,0

River Supply Conduit Reach 5&6 2016 M 38 596 3,13 4,0

Dugway Storage Tunnel 2016 M 38 596 7,93 6,7

Page 11: References for TBM driven tunnels - sealing.datwyler.com · Tunnel Alencon, (ENERTHERM) 2005 M 74 017 3,54 3,0 Sewer TIMA 2, Paris 2007 M 38 392 4,60 Tunnel Alencon, (ENERTHERM) 2008

11

Projects Built Profile type Anchored Outside tunnel-dia. (m)

Water pressure (bar)

South America

ArgentiniaRiachuelo 2017 M 38 566 X 3,60 3,2

BrazilMetro Sao Paulo Line 4 Amarela 2006 M 74 023 9,03 3,5

Metro Sao Paulo Line 5 2013 M 38 566 X 6,60 4,0

ColombiaSewer Fucha Tunjuelo, Bogota 2007 M 38 538a 4,25 2,0

EcuadorMetro Quito L1 2017 M 38 594 9,07 4,0

VenezuelaMetro Caracas Line 4 2011 M 38 919 5,60

Metro Caracas Line 5 2012 M 38 919 5,60

Metro Caracas (Guarenas) 2015 M 38 540b 7,80 16,0

Page 12: References for TBM driven tunnels - sealing.datwyler.com · Tunnel Alencon, (ENERTHERM) 2005 M 74 017 3,54 3,0 Sewer TIMA 2, Paris 2007 M 38 392 4,60 Tunnel Alencon, (ENERTHERM) 2008

12

Projects Built Profile type Anchored Outside tunnel-dia. (m)

Water pressure (bar)

Asia

AserbaidschanMetro Baku 2010 M 38 903 6,00 4,0

ChinaSewer Beijing 2001 M 38 584 3,20 1,0

Metro Beijing, Line 5 2001 M 38 578 6,00 1,0

Metro Guangzhou, Line 2 2001 M 38 527 6,00

Wuhan Gas Supply Tunnel 2001 M 38 541a 2,94

Tsuen Wan 20091‘001‘9511‘001‘988

7,00 7,0

Hong KongKai Tak Transfer Scheme 2002 M 38 564 4,90 2,6

CLP Cable Tunnel (Maeda) 2003 M 38 564 3,50 2,0

CLP Cable Tunnel (Dragages) 2003 M 38 594 3,68

KCR KDB 200 Rail Link 2006 M 38 576 7,70

Castle Peak Cable Tunnel 2006 M 38 596 4,98 4,5

Lai Chi Kok 2009 M 38 912 5,42 8,0

DSD West Drainage Tunnel 2009 M 74 020 7,85 5,0

MRT C 825 2011 M 38 903 8,90 4,0

MRT C 820 2011 M 38 596 8,95

MRT C 823 2011 M 38 916 8,91 2,0

C 703 2011 1‘001‘081 6,05 3,9

Harbour Area Treatment Scheme Stage 2A 2011 M 74 002 4,46 3,0

MTR SCL 1103 2013 M 38 596 7,10

Tuen Mun - CLKL 2014 M 38 587a 13,50 / 17,50 6,5

Liantang - Heung Yuen Wai 2014 M 38 587a 13,60 6,0

MTR SCL 1128 2016 M 38 933 X 7,10 4,0

IndiaMetro Delhi BC 18 2007 M 74 020 6,26 2,2

Amel Airport Metro Express Link New Delhi 2008 M 74 002 6,35 3,5

Metro Delhi BC 24 2008 M 74 002 6,35 3,0

Sleemanabad 2010 M 74 003 9,80 2,0

CMC 1, Delhi 2010 M 74 002 4,80 6,0

Kalkota UG 02 2011 M 74 002 6,35 3,0

Metro Bangalore UG 02 2011 M 74 008 6,16 2,5

Metro Delhi CC 01 2011 M 74 002 6,35 3,5

Metro Bangalore UG 01 2011 M 74 008 6,15 4,0

Metro Bangalore UG2 2011 1‘004‘054 6,44

Metro Chennai UG 02 & 03 2012 1‘002‘708 6,35

UG Tunnel Delhi CMC 1 2012 M 74 002

Page 13: References for TBM driven tunnels - sealing.datwyler.com · Tunnel Alencon, (ENERTHERM) 2005 M 74 017 3,54 3,0 Sewer TIMA 2, Paris 2007 M 38 392 4,60 Tunnel Alencon, (ENERTHERM) 2008

13

Projects Built Profile type Anchored Outside tunnel-dia. (m)

Water pressure (bar)

IndiaICEC Subcon 2012 M 74 008

Metro Delhi CC 04 2012 M 74 008 6,35

Metro Chennai UG 01&05 2013 M 74 004 6,35 3,0

DMRC CC 30 2013 M 74 008 6,26

DMRC CC 34 2013 M 74 002 6,35

Jaipur Metro CEC PO 2015 M 38 912 6,35

Metro Kolkata UG 02 2016 M 74 004 6,35 3,0

Metro Lucknow 2017 M 74 008 6,35 3,5

Metro Chennai UG 08 2017 M 74 004 6,35 3,0

JapanMetro Yokohama 2004 M 38 571 5,38

Koishibaru River Water Conveyance Tunnel 2016 M 38 572 12,60 5,0

KazakhstanAlmati Tunnel Project 2005 M 38 544 5,60

Metro Almaty 2006 M 74 023 5,60 4,0

MalaysiaSMART Project, North and South Tunnel, Kuala Lumpur

2005 M 74 023 12,83 5,0

KVMRT Line 1, Kuala Lumpur 2013 M 74 024 6,35 4,0

SingaporeDTSS T 04 „Ang Mo Kio“ 2001 M 74 021

DTSS T 05 „Kranji“ 2001 1‘000‘516

DTSS T 06 „Queensway“ 2001 M 74 021

Marina Line, C 824 2002 M 74 002

Kim Chuang Sewer Link 2002 M 74 021

Marina Line, C 825 2002 M 74 002 3,5

Circle Line C 822 2003 M 74 002

Seraya Cable Tunnel 2003 1‘000‘050

Upper Thomson Link 2003 1‘000‘119

Circle Line 823 2003 M 74002 3,5

Circle Line 852 2004 M 74 002

Circle Line 853 2004 M 74 002

Circle Line 854 2005 M 74 002 4,0

Circle Line 855 2005 M 74 002 5,8

Circle Line 856 2005 M 74 002

Circle Line 828 2006 M 74 002

Downtown Extension C 905 2008 M 74 002 6,74

Downtown Line 902 2009 M 74 002 6,35

Downtown Extension C 919 2010 M 74 002 4,80 4,0

Page 14: References for TBM driven tunnels - sealing.datwyler.com · Tunnel Alencon, (ENERTHERM) 2005 M 74 017 3,54 3,0 Sewer TIMA 2, Paris 2007 M 38 392 4,60 Tunnel Alencon, (ENERTHERM) 2008

14

Projects Built Profile type Anchored Outside tunnel-dia. (m)

Water pressure (bar)

SingaporeDowntown Extension C 916 2010 M 74 002 6,35 3,0

Downtown Extension C 920 2010 M 74 021 6,50 5,0

Downtown Extension C 917 & 918 2011 M 74 002 6,35 3,75

Downtown Line C 913 2011 M 74 002 6,35 3,5

Downtown Line C 915 2011 M 74 002 6,35 3,0

Downtown Line C 921 2011 M 74 002 6,35 4,5

NIPE C4 2011 M 74 002 6,35 4,5

Downtown Line C 929A 2011 M 74 002 6,35 4,5

Downtown Line C 930 2011 M 74 002 6,35 4,5

Downtown Line C 932 2012 M 74 002 6,35 4,5

Downtown Line C 927 2012 M 74002 6,35 4,5

Downtown Line C 926 2012 M 74 002 6,35 4,5

Downtown Line C 923 2012 M 74 002 6,35 4,5

Downtown Line C 937 2012 M 74 002 6,35 4,5

Downtown Line C 933 2012 M 74 002 6,35 4,5

Downtown Line C 923A 2012 M 74 002 6,35 4,5

Downtown Line C 935 2012 M 74 002 6,35 4,5

Downtown Line C 928 2013 M 74 002 6,35 4,5

Downtown Line C 931 2013 M 74 002 6,35 4,5

MCE 485 2014 M 74 006 3,30 5,0

NIPE C 7 2014 M 78 047 4,20 5,5

Cable Tunnels EW 3 2014 M 74 002 6,60 7,0

JIPCT Project 2015 M 74 029 6,60 8,0

South KoreaSK-Cable Tunnels 2002 M 38 564 3,35

Bundang, Seoul 2006 M 74 002 7,80

TurkmenistanAshgabat Tunnels 2002 M 38 544/38 541a 6,00 / 3,50

South KoreaSK-Cable Tunnels 2002 M 38 564 3,35

Bundang, Seoul 2006 M 74 002 7,80

Page 15: References for TBM driven tunnels - sealing.datwyler.com · Tunnel Alencon, (ENERTHERM) 2005 M 74 017 3,54 3,0 Sewer TIMA 2, Paris 2007 M 38 392 4,60 Tunnel Alencon, (ENERTHERM) 2008

15

Projects Built Profile type Anchored Outside tunnel-dia. (m)

Water pressure (bar)

Middle & Far East

IranMetro Esfahan 2003 M 38 544 6,60 2,0

Metro Shiraz 2004 M 38 544 6,60 2,0

Karaj Water Tube 2005 M 38 587a 4,40 14,0

Metro Shiraz 2005 M 74 024

Metro Esfahan 2005 M 74 024

Qoumroud Water Supply Project 2007 M 38 392 / 38 540 4,40 20,0

Metro Ahwaz 2009 M 38 544 6,50 3,45

Metro Tehran 2009 M 38 544 8,85 1,0

Nosood Water Tunnel 2009 1‘001‘081 4,98 10,0

Esfahan 230 KV Cable Tunnel Project 2010 M 38 541a 2,84

Metro Mashhad Line 2 2011 M 38 544 9,10

Tehran Drainage Tunnel 2017 M 38 920 X 3,50

SyriaSouthern Aleppo Lands Project 2007 M 38 541a 5,10 2,5

United Arab EmiratesMetro Dubai LRT „Red Line“ 2006 M 38 527 9,30 4,0

Metro Dubai LRT „Green Line“ 2007 M 38 527 9,30 4,0

Abu Dhabi T-03 2011 M 38 596 6,70 8,0

Abu Dhabi Step 1 2011 M 74 021 4,50 4,0

QatarGreen Line Underground, Doha 2014 M 38 933 X 6,77 4,0

Golden Line Doha 2015 M 38 938 6,83 4,0

IDRIS MTS-02 2016 M 38 566 X 5,60 5,0

Saudi ArabiaMetro Riyadh 2015 M 38 917 9,92 3,7

Page 16: References for TBM driven tunnels - sealing.datwyler.com · Tunnel Alencon, (ENERTHERM) 2005 M 74 017 3,54 3,0 Sewer TIMA 2, Paris 2007 M 38 392 4,60 Tunnel Alencon, (ENERTHERM) 2008

16

Projects Built Profile type Anchored Outside tunnel-dia. (m)

Water pressure (bar)

Australia & Oceania

AustraliaNSBT Brisbane 2007 1‘001‘989 12,00 6,5

Gold Coast Desalination Project 2007 M 38 541a 3,20 7,0

Sydney Blue Water Desaliantion Project 2008 M 38 594 3,85 3,0

NSP Stage 1 Melbourne Sewage Project 2008 M 38 594 2,80 / 3,80

Melbourne Main Sewer Repl. Project 2009 M 38 594 2,80

Brisbane Airport & Busway Link Tunnel 2009 M 38 910 12,14 5,5

Adelaide 2009 M 38 541a 3,20

Melbourne Aqua Sure 2010 M 38 541a 4,46

City East Cable Tunnel 2012 M 38 541a 3,90

NSDP 2012 M 38 596 3,80

Sydney NWRL 2014 M 38 566 X 6,69

New ZealandHobson Bay Wastewater Tunnel 2008 M 38 541a 4,20 3,0

Rosedale Ocean Outfall, Auckland 2008 M 74 021 3,20 6,0

Waterview 2013 M 38 587a 14,00 4,5

Page 17: References for TBM driven tunnels - sealing.datwyler.com · Tunnel Alencon, (ENERTHERM) 2005 M 74 017 3,54 3,0 Sewer TIMA 2, Paris 2007 M 38 392 4,60 Tunnel Alencon, (ENERTHERM) 2008

17

Projects Built Profile type Anchored Outside tunnel-dia. (m)

Water pressure (bar)

Africa

AlgeriaGalerie de Tabellout 2011 M 38 541a 4,00 10,0

Beni Haroun Project 2015 M 38 544 5,81

EgyptMetro Cairo Line 2, Phase II 2003 M 38 544 9,15 3,0

Roadtunnel Cairo

Metro Cairo Line 3 2008 M 38 544 9,15 4,0

Port Said 2016 M 38 573 12,60 5,0

Ismailia Road Tunnel 2016 M 38 573 12,60 5,0