Pocket Install Guide Reference Guide and Installation Instructions 1604 Athens Highway · Gainesville, Georgia 30507 · Toll Free 866.595.4064 · Fax 678.343.2916 · www.WahooDecks.com Congratulations and Thank You for your purchase! DryJoistEZ is an easy to install structural aluminum joist, that also provides a watertight deck drainage system. Provided are general instructions for the installation of the system and additional engineering details. If there are any questions along the way please don’t hesitate to call Customer Service @ (877) 270-9387 or visit the “Resource Library” at www.wahoodecks.com . Please read these instructions in their entirety before you start your project. Please follow these steps closely to read these instructions in their entirety before you start your project. Please follow these steps closely to ensure the durability and safety of your deck. Deck Structure Requirements: -The structural frame drawings in this guide are intended to illustrate the support requirements of DryJoistEZ, and are not to be considered as a recommendation for actual deck construction. Important! Ensure that the ledger board and flashing have been secured properly and are free from debris such as protruding nails or screws. DryJoistEZ should be installed perpendicular to the structure, this allows water Always consult a professional engineer to ensure code compliance. -DryJoistEZ shall be fastened directly to the perimeter framing on all sides and mid span beams. -Framing shall be built with a minimum pitch toward the drainage end of no less than 1/8” per foot drop. -Refer to page 7 for load ratings and maximum joist to flow AWAY from the structure and foundation. Wahoo Flashing - Kynar spans. Sample Framing 10’ x 12’ General tools needed for proper installation: General tools needed for proper installation: 9 Tape Measure 9 Drill & 5/16 Hex Drive Bit 9 Skill Saw and/or Compound Saw 9 Framing Square 9 Safety Glasses and Gloves 9 Carbide Tip Blades: 7¼@ 62 teeth (skill saw) – 10”@ 80 teeth (table saw) – 12” 96 t th ( d ) 12”@ 96 teeth (compound saw) 9 Caulking Gun and Exterior Flashing Sealant 9 Hammer / Rubber Mallet Page 1

Upload: others

Post on 26-Aug-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Reference Guide and Installation Instructions · Gutter Sealant. Any water that runs back under the bottom of the DryJoistEZ will hit the Hd Fl hi dHeader Flashing and then drop into

Pocket Install Guide

Reference Guide andInstallation Instructions

1604 Athens Highway · Gainesville, Georgia 30507 · Toll Free 866.595.4064 · Fax 678.343.2916 · www.WahooDecks.com

Congratulations and Thank You for your purchase! DryJoistEZ is an easy to install structural aluminum joist, that also provides a watertight deck drainage system. Provided are general instructions for the installation of the system and additional engineering details. If there are any questions along the way please don’t hesitate to call Customer Service @ (877) 270-9387 or visit the “Resource Library” at www.wahoodecks.com. Please read these instructions in their entirety before you start your project. Please follow these steps closely toread these instructions in their entirety before you start your project. Please follow these steps closely to ensure the durability and safety of your deck.

Deck Structure Requirements:-The structural frame drawings in this guide are

intended to illustrate the support requirements ofDryJoistEZ, and are not to be considered as arecommendation for actual deck construction.

Important! Ensure that the ledger boardand flashing have been secured properly and are free from debris such as protruding nails or screws. DryJoistEZ should be installed perpendicular to the structure, this allows water

Always consult a professional engineer to ensurecode compliance.

-DryJoistEZ shall be fastened directly to theperimeter framing on all sides and mid span beams.

-Framing shall be built with a minimum pitch towardthe drainage end of no less than 1/8” per foot drop.

-Refer to page 7 for load ratings and maximum joist

p p ,to flow AWAY from the structure and foundation.

Wahoo Flashing - Kynar

p g g jspans.

Sample Framing 10’ x 12’

General tools needed for proper installation:General tools needed for proper installation:9 Tape Measure9 Drill & 5/16 Hex Drive Bit9 Skill Saw and/or Compound Saw9 Framing Square9 Safety Glasses and Gloves9 Carbide Tip Blades: 7¼”@ 62 teeth (skill saw) – 10”@ 80 teeth (table saw) –

12” 96 t th ( d )12”@ 96 teeth (compound saw)9 Caulking Gun and Exterior Flashing Sealant9 Hammer / Rubber Mallet Page 1

Page 2: Reference Guide and Installation Instructions · Gutter Sealant. Any water that runs back under the bottom of the DryJoistEZ will hit the Hd Fl hi dHeader Flashing and then drop into
Page 3: Reference Guide and Installation Instructions · Gutter Sealant. Any water that runs back under the bottom of the DryJoistEZ will hit the Hd Fl hi dHeader Flashing and then drop into

Pocket Install Guide

STEP 4: Secure the 6” Main-Joist Illustration G

our DryJoistEZ joists ha e a hook recei er on one edge and a hook on the opposing edge. o install your irst or main joist tilt the joist at an angle and slide the hook edge up into the hook recei er o the starter multi joist. See Illustration G)

n longer runs you will need three people two positioned in rom the ends and one in the center. ou must per orm this operation in unison.

ecure the or main joist to the raming o your deck use he head seldrilling asteners. ne astener should be used at e ery point where DryJoistEZ passes o er a joist or beam. (See Illustration H)

STEP 5: Continue with Install

After the first 4” or 6” main-joist has been installed and fastened down, continue installing the remaining joists by repeating either 6” main-joists or 4” multi-joists profiles.

Illustration H

Illustration I

STEP 6: Outer Multi-Joist

Install a 4” multi-joist as the end/edge profile to give the substructure a finished appearance.

Installation is identical to 6” panels with the exception of the fastening method – use 1-½” SS hex head self-drilling fasteners. The fasteners should be be dri en at an angle when securiing the outer lange to the rim joist. ee llustration

STEP 7: Top Mount Railing

Illustration J

y installing rail anchors most standard top‐mount rail posts can be integrated into DryJoistEZ s structural design no penetration through the waterproo barrier is necessary to add railing . See Illustrations

lide the rail anchors into the water channels be ore you install your trim and deck boards. rim is le t o in photos ter the deck s sur ace boards ha e been installed asten your rail mounts using the . stainless steel ag olts. re-drilling o rail

anchors is re uired.

lternati ely two multi joists can also bebe used to mount railing. e er attach rail posts to main joists without using a rail mount. See Illustration

Illustration K

Optional Post Mount Location

Page 3

Page 4: Reference Guide and Installation Instructions · Gutter Sealant. Any water that runs back under the bottom of the DryJoistEZ will hit the Hd Fl hi dHeader Flashing and then drop into

Pocket Install Guide1604 Athens Highway · Gainesville, Georgia 30507 · Toll Free 866.595.4064 · Fax 678.343.2916 · www.WahooDecks.com

Sealing to the Ledger Flashing

Ledger Flashingg gIt is important to have an even and clean flashing surface to seal the DryJoistEZ to. It is also ideal to have the vertical side of the flashing installed behind the first course of siding.

Using an exterior flashing sealant, seal the profile of each joist to the flashing. *Make sure the aluminum is clean and free of debris before sealing.

Add a second layer of flashing to the top side of the DryJoistEZ Again make sure the flashing isthe DryJoistEZ. Again, make sure the flashing isbehind a course of siding and/or is sealed to the exterior of the home.

Rain water is now collecting in the DryJoistEZ gutter channels and is following gravity toward the sloped, drainage side.

Page 4

Page 5: Reference Guide and Installation Instructions · Gutter Sealant. Any water that runs back under the bottom of the DryJoistEZ will hit the Hd Fl hi dHeader Flashing and then drop into

Pocket Install Guide1604 Athens Highway · Gainesville, Georgia 30507 · Toll Free 866.595.4064 · Fax 678.343.2916 · www.WahooDecks.com

Sealing to the Header Flashing

Install the Wahoo Decks Header Flashing on top of all beams at the drainage end. The drip ledge should be facing down.

Seal the seam where the DryJoistEZ sits on the Header Flashing with Gutter Sealant.

Any water that runs back under the bottom of the DryJoistEZ will hit the H d Fl hi dHeader Flashing and then drop into the gutter.

Page 5

Page 6: Reference Guide and Installation Instructions · Gutter Sealant. Any water that runs back under the bottom of the DryJoistEZ will hit the Hd Fl hi dHeader Flashing and then drop into

Pocket Install Guide

Installing Profile Trim and Decking

Install the supplied neoprene channelInstall the supplied neoprene channelplugs into each dry channel before installing the Profile Trim.

installed before the decking. Use rivets or temporary screwsp yto hold in place. The decking boardswill be fastened through the trim holding the trim permanently in place. *Make surethe rail anchors are in place before installing the trim and decking.

at the drainage end to allow water and debris to drain out freely.

The decking can be secured via surfacemounting or with hidden fasteners.

All cut jointsAll cut joints in the deck board should be aligned on top of a Multi Board. These Multi Boards will need to be placed in desired locations at thetime of installation. Page 6

Page 7: Reference Guide and Installation Instructions · Gutter Sealant. Any water that runs back under the bottom of the DryJoistEZ will hit the Hd Fl hi dHeader Flashing and then drop into

Pocket Install Guide

Joist SpacingFraming samples are not intended for construction.Consult a professional engineer to ensure your deck framing complies with local and national codes.

Single-Span, Total Load (PSF)Span Length, ft. TL (PSF)Joist Spacing L/180 L/240 L/360

1604 Athens Highway · Gainesville, Georgia 30507 · Toll Free 866.595.4064 · Fax 678.343.2916 · www.WahooDecks.com

6’ deep x 24’ wide Sample Framing

4’ 447.58 335.68 223.79

5’ 229.16 171.87 114.58

6’ 123.29 99.46 66.31

7’ 66.55 62.64 41.76

8’ 39 01 39 01 27 97

Double-Span, Total Load (PSF)Span Length, ft. TL (PSF)

L/180 L/240 L/360

8 39.01 39.01 27.97

9’ 24.35 24.35 19.65

10’ 15.98 15.98 14.32

12’ deep x 24’ wide Sample FramingJoist Spacing L/180 L/240 L/3604’ 828.26 808.62 539.08

5’ 454.50 414.01 276.01

6’ 219.18 219.18 159.73

7’ 118.31 118.31 100.59

8’ 69.35 69.35 67.38

9’ 43.30 43.30 43.30

10’ 28.41 28.41 28.41

Multi-Span, Total Load (PSF)Span Length ft TL (PSF) 18’ deep x 24’ wide Sample FramingSpan Length, ft. TL (PSF)Joist Spacing L/180 L/240 L/3604’ 1397.69 1397.69 1118.95

5’ 766.96 766.96 572.90

6’ 369.87 369.87 331.54

7’

18 deep x 24 wide Sample Framing

7’ 199.65 199.65 199.65

8’ 117.03 117.03 117.03

9’ 73.06 73.06 73.06

10’ 47.94 47.94 47.94 Page 7