reference: bi-sc procurement directive 60-70 dated 22
TRANSCRIPT
NATO UNCLASSIFIED
NATO UNCLASSIFIED
SUPREME HEADQUARTERS ALLIED POWERS
EUROPE
GRAND QUARTIER GÉNÉRAL DES PUISSANCES ALLIÉES EN EUROPE
B-7010 SHAPE, BELGIUM
Date:
J8 Finance Division Acquisition Management Branch BP 27/A, Bld/bât 101 7010 SHAPE 30 August 2013
Tel: Fax: POC: Email:
0032-(0)65-44-2240 0032-(0)65-44-3542 Giuseppe COL [email protected]
SUBJECT: IFIB-ACO-SH-13-11
INVITATION FOR INTERNATIONAL BIDDING (IFIB) FOR THE SUPPLY AND DELIVERY OF SANITARY, HEATING AND PLUMBING ITEMS/ACCESSORIES.
REFERENCE: Bi-SC Procurement Directive 60-70 dated 22 December 2004.
Dear Madam or Sir, Your company is hereby invited to participate in the Invitation For International Bidding for the Allied Command Operations (ACO) for Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities. Partial bidding is not authorised. The Bid Closing date for this IFIB shall be on 17 October 2013 at 16.00 hours (Central European time). In accordance with the Bi-SC Procurement Directive at reference, the bid opening is not public. The following documents are integral part of the present IFIB: a. Acknowledgement of Receipt (which is enclosed hereto); b. The Invitation for Bid IFIB-ACO-SH-13-11, containing: Part I: Bidding Instructions Part II: General Provisions Part III: Special Provisions, Technical Specifications and Statement of Work and the reference, which will be posted on the SHAPE Internet Site at the following link: http://www.aco.nato.int/page136374522.aspx Your attention is drawn to Part I, Bidding Instructions, which specifies the procedures to be followed when submitting your bid. You are requested to complete and return the attached - ACKNOWLEDGEMENT OF RECEIPT Sincerely, (Original signed) Giuseppe COL Chief, Contract Management
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
NATO UNCLASSIFIED
ACKNOWLEDGEMENT OF RECEIPT
(To be completed and returned by email [email protected] and
PLEASE COMPLETE CLEARLY. DO NOT USE COMPANY STAMP
FROM: Company: .......................................................................................................................... Address: ............................................................................................................................
..........................................................................................................................................
..........................................................................................................................................
Email address: ...................................................................................................................
Internet site:.......................................................................................................................
Telephone: ........................................................................................................................
Facsimile: ..........................................................................................................................
Point of Contact: ................................................................................................................
TO: SUPREME HEADQUARTERS ALLIED POWERS EUROPE
J8 Finance Division, Acquisition Management Branch REF: IFIB-ACO-SH-13-11 – Contract for Supply and delivery of sanitary, heating
and plumbing items/accessories for the SHAPE compound facilities. SUBJECT: Acknowledgement of Receipt of Invitation for Bid We hereby advise that we have received IFIB-ACO-SH-13-11 on (date) ............................................... CHECK ONE: ( ) As of this date and without commitment on our part, we do intend to participate in the
bidding. ( ) We do not intend to participate in the bidding and our company may be deleted from
the IFIB's mailing list. NOTE: Only bidders indicating their intention to participate in the bidding will continue to receive all further correspondence related to this IFIB. Unless specified differently, it will be mailed to the above-mentioned address. Date: ............................................................. Signature: .......................................................... Name and Title: .......................................................................................................................
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part I - Page 1 of 50
NATO UNCLASSIFIED
SUPREME HEADQUARTERS ALLIED POWERS
EUROPE
GRAND QUARTIER GÉNÉRAL DES PUISSANCES ALLIÉES EN EUROPE
B-7010 SHAPE, BELGIUM
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities
PART I BIDDING INSTRUCTIONS
IFIB-ACO-SH-13-11
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part I - Page 2 of 50
NATO UNCLASSIFIED
TABLE OF CONTENTS
TABLE OF CONTENTS ...................................................................................................................... 2
PART I BIDDING INSTRUCTIONS..................................................................................................... 5
1. GENERAL .............................................................................................................................. 5
2. DEFINITIONS ......................................................................................................................... 5
3. ELIGIBILITY ........................................................................................................................... 5
4. DURATION OF THE CONTRACT .......................................................................................... 6
5. EXEMPTION FROM TAXES .................................................................................................. 6
6. AMENDMENT OR CANCELLATION OF IFIB ......................................................................... 6
7. BIDDERS REQUEST FOR CLARIFICATION ......................................................................... 6
8. BID CLOSING DATE .............................................................................................................. 7
9. EXTENSION OF BID CLOSING DATE ................................................................................... 7
10. BID VALIDITY ........................................................................................................................ 7
11. CONTENT OF PROPOSAL .................................................................................................... 7
12. PROPOSAL SUBMISSION .................................................................................................... 8
13. LATE PROPOSALS ............................................................................................................... 8
14. BID WITHDRAWAL ................................................................................................................ 9
15. BID EVALUATION .................................................................................................................. 9
16. CLARIFICATION OF PROPOSALS ........................................................................................ 9
17. AWARD .................................................................................................................................. 9
18. DEBRIEFING ......................................................................................................................... 9
19. COMMUNICATIONS ............................................................................................................ 10
Enclosure 1 to Part I Content of proposal / checklist................................................................... 11 Enclosure 2 to Part I – SHAPE contractor/Supplier Registration ................................................ 12 Enclosure 3 to Part I Compliance Statement ............................................................................. 14 Enclosure 4 to Part I - References of current or recent contracts............................................... 15 Enclosure 5 to Part I - Price Proposal ......................................................................................... 17 Enclosure 6 to Part I Mailing Label ............................................................................................ 29
PART II GENERAL PROVISIONS .................................................................................................... 31
1. DEFINITIONS ....................................................................................................................... 31
2. APPLICABLE LAW AND REGULATIONS ............................................................................ 31
3. ORDER OF PRECEDENCE ................................................................................................. 32
4. AUTHORITY ......................................................................................................................... 32
5. CONTRACTOR STATUS ..................................................................................................... 32
6. CONSUMER PROTECTION ................................................................................................ 32
7. CONTRACTOR RESPONSIBILITY ...................................................................................... 32
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part I - Page 3 of 50
NATO UNCLASSIFIED
8. SECURITY ........................................................................................................................... 32
9. ACCESS CONTROL ............................................................................................................ 33
10. INSURANCE ........................................................................................................................ 33
11. HEALTH, SAFETY AND ACCIDENT PREVENTION ............................................................ 33
12. LABOUR AND MATERIAL STANDARDS ............................................................................. 34
13. PREFERRED CUSTOMER .................................................................................................. 34
14. PRICES ................................................................................................................................ 34
15. TAXES AND CUSTOMS CHARGES .................................................................................... 34
16. CONTRACT EFFECTIVE DATE ........................................................................................... 35
17. DURATION OF CONTRACT ................................................................................................ 35
18. OPTIONS ............................................................................................................................. 35
19. CHANGES ............................................................................................................................ 35
20. CONTRACTOR’ S NOTICE OF DELAY ............................................................................... 35
21. LIQUIDATED DAMAGES ..................................................................................................... 36
22. SHAPE DELAY OF WORK ................................................................................................... 36
23. DISPUTES ........................................................................................................................... 36
24. TERMINATION FOR DEFAULT ........................................................................................... 37
25. TERMINATION FOR CONVENIENCE OF SHAPE ............................................................... 38
26. SPECIAL TERMINATION CLAUSE ...................................................................................... 39
27. TECHNICAL BROCHURES AND MAINTENANCE PLANNING ........................................... 39
28. MARKING AND LABELING .................................................................................................. 40
29. NOTICE OF SHIPMENT ....................................................................................................... 40
30. SAFETY TESTS AND INSPECTIONS .................................................................................. 40
31. VARIATION IN QUANTITY ................................................................................................... 41
32. ACCEPTANCE ..................................................................................................................... 41
33. TITLE TO PROPERTY AND RISK OF LOSS ....................................................................... 42
34. WARRANTY ......................................................................................................................... 42
35. SERVICE PARTS AND AVAILABILITY ................................................................................ 43
36. INVOICES ............................................................................................................................ 43
37. PAYMENTS .......................................................................................................................... 44
38. ASSIGNMENT OF CLAIM .................................................................................................... 44
39. AUDIT .................................................................................................................................. 44
40. CORRUPTION AND ILLICIT GRATUITIES .......................................................................... 44
41. RELEASE OF NEWS/INFORMATION .................................................................................. 44
42. INCONSISTENCY BETWEEN ENGLISH VERSION AND TRANSLATION OF CONTRACT 45
43. CONTRACT ADMINISTRATION AND COMMUNICATIONS ................................................ 45
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part I - Page 4 of 50
NATO UNCLASSIFIED
PART III SPECIAL PROVISIONS, TECHNICAL SPECIFICATIONS, SOW ..................................... 47
1. PURPOSE ............................................................................................................................ 47
2. DURATION OF THE CONTRACT ........................................................................................ 47
3. NON-EXCLUSIVE RIGHTS .................................................................................................. 47
4. ORDERING OFFICER.......................................................................................................... 47
5. EXTENT OF OBLIGATION ................................................................................................... 48
6. PRICE PROPOSAL .............................................................................................................. 48
7. REVISION FORMULA .......................................................................................................... 48
8. PROCESSING OF ORDERS ................................................................................................ 48
9. DELIVERY TERMS .............................................................................................................. 48
10. MARKING, LABELING, PACKAGING .................................................................................. 49
11. INSPECTION AND ACCEPTANCE OF GOODS .................................................................. 49
12. PROCESSING OF INVOICES/PAYMENTS ......................................................................... 49
13. CONSUMER PROTECTION ................................................................................................ 50
14. LANGUAGES ....................................................................................................................... 50
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part I - Page 5 of 50
NATO UNCLASSIFIED
PART I
BIDDING INSTRUCTIONS
1. GENERAL
The scope of this IFIB is to award an Indefinite Delivery, Requirements type of contract for the supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities located in Belgium on the basis of the Statement Of Work (SOW) outlined in Part III hereto.
2. DEFINITIONS
2.1. The term "Prospective Bidder" shall refer to the entity that has completed and returned the Enclosure of the transmittal letter of this IFIB, and has indicated thereon its intention, without commitment, to participate in the bidding;
2.2. The term "Bidder" shall refer to the bidding entity that has submitted a bid in response to this IFIB;
2.3. The term "Contractor" shall refer to the bidder to whom the contract is awarded;
2.4. The term "Contracting Officer" designates the official executing this invitation for bids on behalf of the NATO Supreme Headquarters Allied Powers Europe (SHAPE);
2.5. The term “Contracting Officer’s Technical Representative” (COTR) designates the staff element that has the authority to coordinate, monitor and control Contractor’s performance;
2.6. The term “SHAPE” shall refer to the Supreme Headquarters Allied Powers Europe, located at 7010 SHAPE, Belgium;
2.8. The term “ACO” shall refer to the Allied Command for Operations;
2.9. The term “NATO” shall refer to the North Atlantic Treaty Organisation;
2.10. The term "days" as used in this IFIB shall, unless otherwise stated, be interpreted as meaning calendar days.
3. ELIGIBILITY
This IFIB is open to bids from firms that: • originate and are chartered/incorporated within any of the NATO-member nations (28)1; • maintain a professionally active facility (office/factory/laboratory, etc) within NATO-member
nations (28).
1 The eligible countries are: Albania, Belgium, Bulgaria, Canada, Croatia, Czech Rep, Denmark, Estonia, France,
Germany, Greece, Hungary, Iceland, Italy, Latvia, Lithuania, Luxembourg, The Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Turkey, United Kingdom and United States of America.
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part I - Page 6 of 50
NATO UNCLASSIFIED
• work in the field of required services and are legally authorised to operate at the time of bidding;
• have performed at least three contracts within the last five years substantially similar in scope and magnitude to the requirements described in this solicitation.
4. DURATION OF THE CONTRACT
4.1. The contract awarded through this IFIB will be effective on 1 January 2014.
4.2. It will be in force for one (1) year with the possibility, subject to funds availability, of up to four one-year extension options.
4.3. Renewal is also dependent upon certification of satisfactory performance, during the previous year. Ratings reported through the Contractor’s Performance Evaluation System will play a key role in the award of the aforementioned extension options
4.4. The Contracting Officer will provide notice of extension in writing no later than 15 days before the expiration date of the contract or subsequent extensions (as applicable).
5. EXEMPTION FROM TAXES
According to the agreements (Article VIII of the Paris Protocol dtd 28 Aug 1952, Article 15.10 of the EC Directive 77/388/CEE), goods and services under the contract are exempt from taxes, duties and similar charges. Where notwithstanding, these are imposed by national regulations, bidders shall enclose the list and the amounts of taxes, duties and similar charges which have been included in their bid, with a justification.
6. AMENDMENT OR CANCELLATION OF IFIB
6.1. SHAPE reserves the right to amend or delete any one or more of the terms, conditions or provisions of the IFIB prior to the date set for the bid closing. An amendment or amendments to this IFIB shall announce such action;
6.2. SHAPE reserves the right to cancel, at any time, this IFIB partially or in its entirety. No legal
liability on the part of SHAPE for payment of any sort shall arise and in no event shall a cause of action lie with any bidder for the recovery of any costs incurred in connection with preparing or submitting a bid in response hereto. All effort initiated or undertaken by the bidder shall be done considering and accepting this fact. If this IFIB is cancelled prior to the bid opening, the bids already received shall be returned un-opened to the senders upon their request.
7. BIDDERS REQUEST FOR CLARIFICATION
7.1. Prospective bidders should seek clarification as soon as possible. Any explanation desired by a bidder regarding the meaning or interpretation of this IFIB, clauses, specifications etc., must be requested in writing (letter or facsimile) from the Contracting Officer. The Contracting Officer must receive such requests for clarification no later than 28 calendar days before the bid closing date;
7.2. Information given to a prospective bidder shall be furnished to all prospective bidders, as an
amendment to this IFIB, only if such information is necessary to bidders in submitting offers
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part I - Page 7 of 50
NATO UNCLASSIFIED
or if the lack of such information would be prejudicial to other bidders. Oral explanations or instructions shall not be binding unless confirmed in writing by the Contracting Officer.
8. BID CLOSING DATE
Bids must be received at SHAPE no later than Thursday, 17th October 2013 at 16.00 hours (Central European Time) as indicated on the transmittal letter of this IFIB, or the authorised extension thereof. At that date and time the bidding shall be closed.
9. EXTENSION OF BID CLOSING DATE
Any bidder may request directly to the SHAPE Contracting Officer an extension of the bid closing date. However, the request must reach the Contracting Officer, in writing (facsimile is acceptable), not later than 14 calendar days prior to the bid closing date and must include a strong justification for the request. The SHAPE Contracting Officer may, at his/her own discretion, grant an extension of the bid closing date.
10. BID VALIDITY
Bids submitted shall remain valid for a period of one hundred and twenty (120) calendar days counted from the bid closing date. SHAPE reserves the right to request an extension of validity if a decision cannot be made within this time. Bidder shall be entitled to either grant or deny this extension of validity; SHAPE shall automatically consider a denial as a withdrawal of the bid.
11. CONTENT OF PROPOSAL
The proposal shall consist of the following minimum paper documents and electronic media:
a. A table of contents for the entire proposal (please see and tick the checklist provided at Enclosure 1 hereto);
b. The SHAPE Contractor Registration form (Enclosure 2 hereto);
c. Compliance Statement for the intended contract (Enclosure 3 hereto);
d. Provision of administrative, financial and technical documents (selection criteria):
1) The indication of at least three contracts (Enclosure 4 hereto) the bidder has performed for other customers within the last five years, substantially similar in scope and magnitude to the requirements described in this solicitation.
2) Appropriate technical information to determine whether Bidder’s proposed services, terms, and conditions comply with all the requirements of the IFIB;
3) Price Proposal. The Price Proposal shall be submitted in EURO currency on the attached PRICE FORMAT (Enclosure 5 hereto) or a similar format. Although bidders are authorised to adapt the format according to their needs, they must keep in mind that basic presentation must not change. Bidders must note that partial bidding is not authorised. The price proposal shall be placed in a sealed envelope.
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part I - Page 8 of 50
NATO UNCLASSIFIED
12. PROPOSAL SUBMISSION
12.1. The whole proposal, to include any submittals, shall be written in English.
12.2. The submission package shall consist of a sealed envelope / package whose size shall not exceed 10x30x37cm. The sealed envelope / package shall contain all the documents listed in Enclosure 1 to Part I hereto. Amongst these documents, the “Price proposal” shall be placed in a sealed envelope. The submission package shall be labelled with the mailing label at Enclosure 6 hereto.
12.3 Bids may be submitted through the postal system no later than five (5) calendar days before the Bid Closing Date, or by courier or hand-carried. Bids can be dropped at any time before the Bid Closing Date into the secured “Bid Box” placed in the Pass Office building which is located near the SHAPE Berlin Gate. Bids can also be handed over to a representative of the SHAPE Contract Management Section, if available, located in Building 101 (SHAPE telephones: 4110 or 2240) during working days and this between 09.00 to 11.45 hrs and 13.30 to 16.30 hrs (on Fridays, 15.00 hrs). In case there is no representative from the SHAPE Contract Management Section available, then bids shall be dropped into the secured “Bid Box”.
12.4 To reach SHAPE: take exit Nr. 23 on E 19 (Brussels-Paris), near MONS, follow the “SHAPE” and “P VISITOR” signs on the “Chaussée de Bruxelles/Rue Grande” (RN6). Enter SHAPE compound through the “P VISITOR” and report to Pass Office Building near the SHAPE Berlin Gate.
13. LATE PROPOSALS
13.1. The bidder must make every effort to ensure that his bid reaches SHAPE before or on the exact date and time set for the bid closing. Any Bid received after this time is considered a late bid. Late bids shall be considered only before the Contract has been awarded and on condition that their failure to arrive on time is solely the result of:
- A delay in the government channels, i.e., governmental courier service or mail for which
the bidder was not responsible. However the bid should have been sent not later than five (5) calendar days before the bid closing, by Registered Mail or by Certified Mail, for which an official Post Office date stamp or the receipt for certification has been obtained. Note: commercial courier or parcel-delivery companies are not considered to be government channels;
- Mishandling by SHAPE personnel upon or after receipt; 13.2. Other late proposals cannot be considered for award; 13.3. Late bids shall be held unopened (unless opened for identification) until after award and
then retained with other unsuccessful bids.
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part I - Page 9 of 50
NATO UNCLASSIFIED
14. BID WITHDRAWAL
A bidder may withdraw his bid up to the date and time specified for the bid closing, by written or facsimile notice to the SHAPE Contracting Officer. The bid shall be returned un-opened to the bidder, at his expense.
15. BID EVALUATION
15.1. The evaluation of Bids and the determination as to the responsiveness and technical adequacy of the services, products and materials offered shall be the responsibility of SHAPE and shall be based on information provided by the bidders. SHAPE is not responsible for seeking any information that is not easily identified and available in the bid package;
15.2. Bids will be evaluated in accordance with the following process whose aim is to select the lowest technically compliant bidder:
a. Financial evaluation of the received bids in order to rank them (from lowest price to highest), based upon the Price Format (Enclosure 5 hereto).
b. Thorough administrative and technical evaluation of the lowest price bidder to
ensure its compliance with the SHAPE Terms & Conditions (Part I, Part II and Part III of this Invitation For Bidding). This step will also include the determination of the bidder’s responsibility, to make sure that he: • has adequate financial resources to perform the contract; • is able to comply with the required or proposed delivery or performance
schedule, • has a satisfactory past performance record.
c. If the lowest bid is deemed administratively/technically noncompliant it will be
disqualified. Then, the next lowest price bid will be considered for administrative and technical evaluation. This procedure will continue until a bidder is selected.
16. CLARIFICATION OF PROPOSALS
During the entire bid evaluation process SHAPE reserves the right to clarify any bid with the bidders in order to clearly identify what is being offered and to resolve any potential areas of non-compliance.
17. AWARD
SHAPE Contract Award Committee (CAC) will award the contract to the Bidder whose conforming proposal represents the lowest technically compliant solution for SHAPE, and demonstrates that the Bidder can fully accomplish the IFIB requirements.
18. DEBRIEFING
Bidders are eligible to receive a debriefing on the Contract Award Committee’s decision. To obtain that, bidders shall submit a written request to the Contracting Officer within 5 working days of the date on which they receive notification of the aforementioned decision.
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part I - Page 10 of 50
NATO UNCLASSIFIED
19. COMMUNICATIONS
19.1. Any communication related to this IFIB, between a prospective bidder or a bidder and SHAPE shall only be through the SHAPE Contracting Officer in the first instance. Designated SHAPE personnel shall assist the Contracting Officer in the administration of this IFIB. There shall be no contact with other SHAPE personnel. This is to maintain all bidders on equal and competitive footing;
20.2 POINTS OF CONTACT:
Mr. Giuseppe COL Chief, Contract Management - SHAPE Telephone: +32+(0)65-44.22.40 Facsimile: +32+(0)65-44.35.42 Email address: [email protected] or Mrs. Carina RUBENS Contract Administrator - SHAPE Telephone: +32+(0)65-44.41.10 Facsimile: +32+(0)65-44.35.42 Email address: [email protected]
19.3. All correspondence will be forwarded to:
J8 FINANCE FINANCE DIVISION Acquisition Management Branch
IFIB-ACO-SH-13-11 POST BOX 27/A, Bldg 101 B - 7010 SHAPE, BELGIUM
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part I - Page 11 of 50
NATO UNCLASSIFIED
Enclosure 1 to Part I Content of proposal / checklist
The SHAPE Contractor Registration form (Enclosure 2 hereto);
Compliance Statement for the intended contract (Enclosure 3 hereto);
Provision of administrative, financial and technical documents (selection criteria):
The indication of at least three contracts (Enclosure 4 hereto) the bidder has performed for other customers within the last five years, substantially similar in scope and magnitude to the requirements described in this solicitation.
Any technical information about the proposed products to demonstrate that the Bidder’s proposal complies with all terms, and conditions of this IFIB.
Price Proposal (Enclosure 5 hereto) to be placed in a sealed envelope.
1 This enclosure is meant to help you ascertain that you are providing SHAPE with all
documents/information required. For more information regarding these titles, please refer to detailed description previously provided in Part I.
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part I - Page 12 of 50
NATO UNCLASSIFIED
Enclosure 2 to Part I – SHAPE contractor/Supplier Registration
SUPREME HEADQUARTERS ALLIED POWERS EUROPE
FINANCE & ACQUISITION DIRECTORATE Acquisition Management Branch
B-7010 SHAPE, BELGIUM
Contractor/Supplier Registration
(*) = Mandatory field. Data must be entered for registration to be complete.
A) General Information DUNS Number1 (*): CAGE Code2: Tax ID3 (* If in EU): Legal Business Name (*): Doing Business As (DBA Name): Core business (*): Corporate Web Page URL (Company website address)4: Physical Address (*):City (*): Zip/Postal Code (Country): Mailing Address (X): Check if same as physical address Business Name (*): Mailing Address (PO Box is acceptable) (*): City (*): Zip/Postal Code (*): Country (*): General Tel Number: General Fax Number: E-mail: Business Start Date (*): (dd/mm/yyyy) Number of Employees (*): Annual Revenue (*):
B) Goods and Services: SIC ( ) / UNSPS Codes (*) United Nations Standard Products and Services Codes identify what type of activity your business performs (2 to 8 digit numeric). Search on http://www.siccode.com/ or http://www.unspsc.org/ . At least one UNSPS code will be required for registration. SIC / UNSPS Code: SIC / UNSPS Code: SIC / UNSPS Code: SIC / UNSPS Code: SIC / UNSPS Code: SIC / UNSPS Code:
1 Data universal Numbering System (DUNS) – Call Dun & Bradstreet at http://www.dnb.com/ or call + 32 2 481 83 00 if unsure.
2 NATO manufacturer identification code, if available.
3 VAT number mandatory for EU firms and independent contractors.
4 Example: http://www.example.com or http://example.com
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part I - Page 13 of 50
NATO UNCLASSIFIED
C) Corporate Information
Type of Organization5 (*):
Incorporation (* if you selected “corporate entity” as type of organization):
Country of Incorporation:
D) Registration Acknowledgement and Points of Contact (POC) Primary POC (*):
Name: Position:
Address:
City: Zip Code: Country:
Phone: Fax: E-mail:
Alternate POC:
Name: Position:
Address:
City: Zip Code: Country:
Phone: Fax: E-mail:
Note: The Registrant acknowledges that the information provided is current, accurate, and complete.
For registration assistance call +32 (0) 6544 4110 - FAX: +32 (0) 6544 3542
address e-mail: [email protected]
5 Choose one among the following types: Corporate Entity / Sole Proprietorship / Governmental Entity / NATO Entity / Partnership
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part I - Page 14 of 50
NATO UNCLASSIFIED
Enclosure 3 to Part I Compliance Statement1
It is hereby stated that we have read and understand all documentation issued as part of IFIB-ACO-SH-13-11. Our proposal submitted in response to the referred solicitation is fully compliant with the provisions of the IFIB and the intended contract with the following exception(s): Clause Description of Deviation ........................ .....................................................................................................................
........................ .....................................................................................................................
........................ .....................................................................................................................
........................ .....................................................................................................................
........................ .....................................................................................................................
........................ .....................................................................................................................
........................ .....................................................................................................................
........................ .....................................................................................................................
........................ .....................................................................................................................
........................ .....................................................................................................................
(if necessary, add another page)
Date : ...................................................... Signature : ......................................................
Company : ............................................... Name & Title : ................................................
Company Bid Reference:
1 Bidders’ response to this IFIB must be based on full compliance with the terms, conditions, and
requirements of the IFIB and its future clarifications and/or amendments. The bidder may only offer variations in specific implementation and operational details, provided that the functional and performance requirements are fully satisfied. In case of conflict between the compliance statement and the detailed evidence or explanations/comments furnished, the detailed evidence/comments shall take precedence for the actual determination of compliance. SHAPE reserves the right to not accept the variations offered by the Bidder and, therefore, disqualify the Bidder from this IFIB.
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part I - Page 15 of 50
NATO UNCLASSIFIED
Enclosure 4 to Part I - References of current or recent contracts
SUBSTANTIALLY SIMILAR IN SCOPE AND MAGNITUDE TO THE REQUIREMENTS 1
For each contract/agreement, please indicate : 1.
Contract reference (if applicable)
Starting date of contract
End date of contract
Value of contract
Customer’s name
Customer’s Point of Contact capable of providing information giving name, telephone and fax numbers.
2.
Contract reference (if applicable)
Starting date of contract
End date of contract
Value of contract
Customer’s name
Customer’s Point of Contact capable of providing information giving name, telephone and fax numbers.
1 Contracts listed may include those entered into by the Federal Government, agencies of state and
local governments, non-profit entities, and commercial concerns. The Bidder may also provide information on problems encountered on the identified contracts and the Bidder's corrective actions.
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part I - Page 16 of 50
NATO UNCLASSIFIED
3. Contract reference (if applicable)
Starting date of contract
End date of contract
Value of contract
Customer’s name
Customer’s Point of Contact capable of providing information giving name, telephone and fax numbers.
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part I - Page 17 of 50
NATO UNCLASSIFIED
Enclosure 5 to Part I - Price Proposal
IFIB-ACO-SH-13-11 PRICE PROPOSAL
Mr.________________________________________ on behalf of the firm ________________________________________ proposes
to offer the following unit prices1 for sanitary, heating and plumbing items/accessories contained in the “SHAPE Core List” below:
NR SHAPE Stock ID English Description French Description Issue
Unit Average Qty
Unit Price Total price
1 4510-3020
clamp GEBERIT GIS 461.015.00.1 ATTACHE GEBERIT GIS N° 461.015.00.1 PC 38
2 5640-5009
self adhesive tape DENZO for heating
BANDE adhésive auto-collante DENZO, pour le chauffage, bande rouge de 10mt x 100mm JITRAKOR
RL 18
3 5640-5007
self adhesive aluminium tape 50 mm
BANDE d'aluminium auto-collante, 50 mm de largeur, MACTAC AF 145 (1 boite = 6 rouleaux) RL 16
4 4510-2010
shower bar GROHE euphoria 27232 001
BARRE de douche chromée GROHE EUPHORIA 27232 001 (barre + flexible + douchette + porte savon 27206)
PC 22
5 4730-9088
clamp with coupling GEBERIT 362.839.00.1
BRIDE avec manchon 1/2", GEBERIT N° 362.839.00.1 PC 24
6 4510-3047
bride GEBERIT GIS 461.022.00.1
BRIDE d'assemblage, GEBERIT GIS N° 461.022.00.1 PC 85
1 For the sake of clarity, it is to be noted that the determination of the "lowest compliant Bid" will exclusively be based on the lowest "TOTAL
Offer" for the "core list" hereunder.
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part I - Page 18 of 50
NATO UNCLASSIFIED
NR SHAPE Stock ID English Description French Description Issue
Unit Average Qty
Unit Price Total price
7 4610-2N11
catridge for water SOGEFILTRE RWSSC5
CARTOUCHE filtrante pour eau potable SOGEFILTRE RWSSC5 PC 11
8 4510-1023 cartridge GROHE 47450 CARTOUCHE pour AUTOMATIC 2000,
FRIEDRICH GROHE 47450 PC 19
9 4820-4N27
non return valve GROHE 14116
CLAPET anti-retour complet, GROHE N° 14116 (en boîte de 2 pièces) ST 11
10 8040-3005 glue for pvc HT 110, GRIFFON COLLE pvc, HT 110, GRIFFON EUPEN N°
2680950 (en bidon de 0.250 kg) BD 20
11 8040-2N15 glue, white, TEC7 COLLE TEC7, blanche pour joint NOVATECH PC 32
12 4730-8012
clamp clicquick 25-28, Walraven 0854028
COLLIER "CLICQUICK" de 25-28, WALRAVEN N° 0854028 PC 150
13 4730-8031 clamp GEBERIT 365.831.00.1 COLLIER de 75 M10, GEBERIT N° 365.843.00.1 PC 48
14 4730-8102 clamp BIFIX 19-23 1/2 M8 COLLIER galvanisé avec isolation BIFIX 19-23 1/2
M8 PC 85
15 4730-8106
galvanized clamp BIFIX 30-35 4/4 M8
COLLIER galvanisé avec isolation BIFIX 30-35, 4/4, M8 PC 57
16 4730-8063
clamp GEBERIT 361.831.00.1 M 10, dia 50
COLLIER galvanisé avec manchon M 10 x 50, GEBERIT N° 361.843.00.1 PC 53
17 4730-8088
clamp M10 dia. 56 mm GEBERIT 363.843.00.1
COLLIER galvanisé avec manchon M10 Ø 56 mm, GEBERIT N° 363.843.00.1 PC 56
18 4730-8083
4730-8087d clamp M 10 GEBERIT 367.831.00.1
COLLIER galvanisé avec manchon M10, Ø de 110, GEBERIT N° 367.843.00.1 PC 54
19 4510-3046
connection GEBERIT GIS 461.200.00.1
CONNECTEUR profilé, GEBERIT GIS N° 461.200.00.1 PC 1010
20 4730-1063
elbow 90° GEBERIT 612.271.00.1
COUDE à 90° de 20 mm, GEBERIT MEPLA N° 622.271.00.1 PC 103
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part I - Page 19 of 50
NATO UNCLASSIFIED
NR SHAPE Stock ID English Description French Description Issue
Unit Average Qty
Unit Price Total price
21 4730-1073 elbow GEBERIT 613.271.00.1 COUDE à 90° de 26 mm, GEBERIT MEPLA N°
623.271.001 PC 25
22 4730-1031
Elbow PE/HD dia. 110 GEBERIT 367.045.16.1
COUDE de 110 à 45° en HDPE, GEBERIT N° 367.045.16.1 PC 30
23 4730-1004
plastic elbow 110 GEBERIT 367.055.16.1
COUDE de 110 à 90° grand rayon en HDPE, GEBERIT N° 367.055.16.1 PC 29
24 4730-1072 elbow GEBERIT 612.256.00.1 COUDE de 20 x 1/2" F avec filetage intérieur,
GEBERIT MEPLA N° 612.256.00.1 PC 14
25 4730-1028
elbow pvc, dia. 75, GEBERIT 365.045.16.1
COUDE de 75 à 45° en HDPE, GEBERIT N° 365.045.16.1 PC 36
26 4730-1009 plastic elbow 32 mm, RA1B HT COUDE en PVC de 32, à 90°, RA1B HT N°
4024200 PC 51
27 4510-2011 trap 5/4" CREPINE pour lavabo, 5/4", avec vis et bouchon PC 38
28 4730-2N68 part GEBERIT 612.296.00.5 CULASSE 1/2F, 7.8 cm, GEBERIT MEPLA N°
612.296.00.5 PC 21
29 4730-2020
part 20 x 1/2, 3.6 cm, GEBERIT 612.289.00.1
CULASSE T. courte 20 x 1/2, 3.6 cm, GEBERIT MEPLA 612.289.00.1 PC 29
30 4510-3037 WC white D-CODE 22090900 CUVETTE de WC suspendue, blanche, DURAVIT
D-CODE 220909002 PC 11
31 4130-2009
filter pad for dryer DRYMASTER A 16597
DESHYDRATEUR, briquette N° A16597, DRYMASTER, CCY 48HP2 PC 20
32 4510-1055 shower head GROHE 28172 DOUCHE à main 1/2" chromée TEMPESTA TRIO,
FRIEDRICH GROHE N° 28578 PC 41
33 4510-1A11
part for GROHE automatic 2000, GROHE ref. 05111
DOUILLE pour robinet GROHE automatic 2000, GROHE réf. 05111 PC 12
34 4510-1A12
part for GROHE automatic 2000, GROHE ref. 05971
DOUILLE pour robinet GROHE automatic 2000, GROHE réf. 05971 PC 12
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part I - Page 20 of 50
NATO UNCLASSIFIED
NR SHAPE Stock ID English Description French Description Issue
Unit Average Qty
Unit Price Total price
35 4320-3001
electrovalve GEBERIT 240.523.00.1 ELECTROVANNE GEBERIT N° 240.523.00.1 PC 23
36 4510-3N56
protect GIS GEBERIT 464.015.00.1
ENDUIT pour plaque, GEBERIT GIS, 464.015.00.1 (en 5 kg) PQ 12
37 4510-3N53
entretoise GEBERIT GIS 461.003.00.1 ENTRETOISE, GEBERIT GIS 461.003.00.1 PC 129
38 4510-3052
elbow GEBERIT GIS 461.002.00.1
EQUERRE de montage, GEBERIT GIS N° 461.002.00.1 PC 387
39 4510-9003 shelve 600 x 120 ETAGERE en verre transparent de 600 x 120 mm
SG035 PC 19
40 4820-4026
security group,3/4", for hot water heater
GROUPE de sécurité 3/4" pour chauffe eau SFR N° 52550 PC 16
41 4820-2007 interior for valve braukmann INTERIEUR de vanne thermostatique
BRAUKMANN HONEYWELL V100 AA 3/8" - 1" PC 83
42 4510-3006
gasket GEBERIT 63 x 32 3, 816.418.00.1
JOINT de cloche 63 x 32 x 3 mm, GEBERIT N° 816.418.00.1 PC 86
43 4510-2007
sink white 60 cm D-CODE 23106000002
LAVABO blanc de 60 cm, DURAVIT D-CODE blanc 23106000002 PC 15
44 4730-3102
coupling GEBERIT 361.700.16.1
MANCHON de dilatation de 50 mm, en PE, GEBERIT N° 361.700.16.1 PC 14
45 4730-3084
coupling dia. 75,GEBERIT PE + 365.700.16.1
MANCHON de dilatation de 75 mm,en HDPE montage vert/horiz, GEBERIT N° 365.700.16.1 PC 15
46 4730-3056
coupling GEBERIT 612.505.001
MANCHON égal de 20 mm, GEBERIT MEPLA N° 622.505.00.1 PC 49
47 4730-3092
coupling GEBERIT 110, 367.771.16.1
MANCHON électrique de 110 mm, en PE, GEBERIT N° 367.771.16.1 PC 40
48 4730-3071
coupling GEBERIT 361.771.16.1
MANCHON électrique de 50 mm, en PE, GEBERIT N° 361.771.16.1 PC 57
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part I - Page 21 of 50
NATO UNCLASSIFIED
NR SHAPE Stock ID English Description French Description Issue
Unit Average Qty
Unit Price Total price
49 4730-3108
coupling dia. 56 mm GEBERIT 363.771.16.1
MANCHON électrique de 56 mm, en PE, GEBERIT N° 363.771.16.1 PC 37
50 4730-3074
coupling GEBERIT 365.771.16.1
MANCHON électrique de 75 mm, en PE, GEBERIT N° 365.771.16.1 PC 36
51 4730-3050
coupling PVC 110 GEBERIT 367.700.16.1
MANCHON long avec joint 110,PE, montage vertical/horizontal, GEBERIT N° 367.700.16.1 PC 22
52 4730-3089
expansion coupling 56 mm GEBERIT 363.700.16.1
MANCHON long avec joint de 56,HDPE montage vert./horiz. GEBERIT N° 363.700.16.1 PC 17
53 9340-1001
sanitary miror 40 x 60 cm ref 16345
MIROIR sanitaire de 40 x 60 cm, CRYSTAL N° 16345 PC 28
54 4510-1026 tap nozzle GROHE 13928 MOUSSEUR M 22 x 1" F, FRIEDRICH GROHE N°
13928 PC 31
55 4510-1065 tap nozzle GROHE 13927 MOUSSEUR silencieux M 28 x 1" mâle,
FRIEDRICH GROHE 13927 PC 10
56 4510-1013
nozzle tap GROHE 13929 M 22 x 1/2
MOUSSEUR, bec de robinet, M24 x 1/2"M, FRIEDRICH GROHE N° 13929 PC 150
57 4510-3054
part GEBERIT GIS 461.025.00.1
PLAQUE de plâtre, GEBERIT GIS 461.025.00.1 (en palette de 30 pièces) PC 187
58 4510-1N56 closing handle GROHE 47245 POIGNEE de fermeture avec ecostop, GROHE
47245 PC 16
59 4510-2N15 handle GROHE 47255 POIGNEE graduée, GROHE N° 47255 PC 13
60 4510-2012
shower head GROHE 28443000
POMME de douche chromée 1/2" femelle, HANSGROHE type CROMA 3 jet, réf. 28443000 PC 16
61 4510-3051
profile GEBERIT GIS 461.000.25.1
PROFILE GEBERIT GIS 32 x 32, 461.000.25.1 (en longueur de 5 mètres) MT 588
62 4510-9020 automatique air valve 3/8" PURGEUR automatique 3/8" FLAMCO Flexvent PC 53
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part I - Page 22 of 50
NATO UNCLASSIFIED
NR SHAPE Stock ID English Description French Description Issue
Unit Average Qty
Unit Price Total price
63 4510-4004 tap,drain cock BRAUKMAN PURGEUR EA 122AA, automatique à flotteur
démontable R1/8 + 3/8, BRAUKMAN PC 14
64 4730-7139
CONNECTION GEBERIT MEPLA 602.590.00.1
RACCORD 3 pièces 20 x 1/2 M, GEBERIT MEPLA N° 602.590.00.1 PC 41
65 4730-7140
connection GEBERIT MEPLA 603.590.00.1
RACCORD 3 pièces 26 x 3/4 M, GEBERIT MEPLA N° 603.590.00.1 PC 18
66 4730-7150
connector 1/2 GEBERIT N° 602.582.00.1
RACCORD à filetage intérieur, joint plat,20 x 1/2", GEBERIT N° 602.582.00.1 PC 13
67 4730-7135
Connection GEBERIT 612.535.00.1
RACCORD de 20 x 1/2"M avec filetage extérieur, GEBERIT MEPLA N° 612.535.00.1 PC 62
68 4730-7136
connection GEBERIT 26 x 34, 613.536.00.1
RACCORD de 26 x 3/4" avec filetage extérieur, GEBERIT MEPLA N° 613.536.00.1 PC 13
69 4520-3017
connection for radiator,brass 1/2 x 1/2
RACCORD de radiateur en chromé réglable, équerre 1/2" x 1/2", SCHELL 14.120.04.99 PC 18
70 4730-9A09 connection DI28 1"m ANBO RACCORD droit 4/4 M x 28 ANBO C1405 PC 18
71 4730-7151
connector 3/4 GEBERIT N° 602.583.00.1
RACCORD joint plat écrou libre 3/4"F x 20 x 5.2 long, GEBERIT MEPLA N° 602.583.00.1 PC 19
72 4820-4019 pressure reducer 1/2" REDUCTEUR de pression 1/2", BRAUKMANN,
type DO6F avec manomètre PC 14
73 4510-3012
water tank for WC GEBERIT 128.307.11.1 duobloc
RESERVOIR de chasse fixation sur cuvette, 9 lt, GEBERIT N° 128.307.11.1 PC 34
74 5640-5005
non-conducting lagging EUROBATEX 3/4"
REVETEMENT calorifuge ARMAFLEX SH-10x028-A dia 28 mm,prédécoupé auto-adhés (en longueur de 2 mètres)
MT 22
75 5640-5038
non-conducting lagging ARMAFLEX F 34
REVETEMENT calorifuge ARMAFLEX type SH-10x035-A dia 35 mm (en longueur de 2 mètres) LG 11
76 5640-5N16
non-conducting lagging ARMAFLEX SH-13X060-A
REVETEMENT calorifuge ARMAFLEX type SH-10X060-A dia 60 mm prédécoupé auto-adhésifs MT 13
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part I - Page 23 of 50
NATO UNCLASSIFIED
NR SHAPE Stock ID English Description French Description Issue
Unit Average Qty
Unit Price Total price
77 7230-1004
shower curtain grey 180 x 90 cm RIDEAU de douche blanc de 180 x 90 cm PC 10
78 7230-1N12
curtain for showers 120 x 200 cm white
RIDEAU de douche PVC luxe l:120 x h:200 cm blanc à anneaux PC 10
79 4510-1056
floating tap for wc, GEBERIT N° 240.704.00.1
ROBINET à flotteur complet pour WC, GEBERIT N° 240.704.00.1 (en boîte de 6 pièces) PC 77
80 4510-1030
tap,double use, chromium, 1/2, SHELL 1151 ROBINET double service chromé, 1/2", SEP 1151 PC 65
81 4510-1014 tap 1/2"-10, SHELL 04912 ROBINET équerre 1/2"-10, SCHELL N°
04.912.06.99 PC 51
82 4510-1010 tap SHELL 04.917.06.99 ROBINET équerre 1/2"-10, SCHELL N°
04.917.06.99 PC 71
83 4510-1006
tap, mixer, Ideal Standard, CONTURA 100 N° B4279AA
ROBINET mitigeur IDEAL STANDARD, pour lavabo, COERAPLAN NEW chromé, N° B4279AA PC 48
84 4510-1N60
thermostatic mixing valve GROHE 34276
ROBINET mitigeur thermostatique GROHE N° 34276, GROTHERM 3000 1/2, chromé (remplace le 34185)
PC 15
85 4510-1070
tap WT60 LIC, GEBERIT N° 116.255.21.01
ROBINET mitigeur WT60 LIC, GEBERIT N° 116.255.21.01 PC 10
86 4510-1009 tap 1/2", SHELL Nr 72113 ROBINET vidange complet, 1/2", SCHELL
13.932.00.99 PC 23
87 4510-1N78 part 47188 for GROHE 19605 ROSACE avec vis 47188 pour robinet GROHE
19605 PC 11
88 5640-5001
adhesive tape for POROLON pipe ARMAFLEX B1-AF
RUBAN auto-adhésif isolant calorifuge 3 mm ARMAFLEX B1-AF (en rouleau de 15 mètres) RL 14
89 4510-3027
toilet seat white PRES TIVOLI 316000 SIEGE de wc blanc, TIVOLI 316000 PC 87
90 4510-3025
toilet seat, black, TIVOLI 316001 SIEGE de wc noir, TIVOLI 316001 PC 11
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part I - Page 24 of 50
NATO UNCLASSIFIED
NR SHAPE Stock ID English Description French Description Issue
Unit Average Qty
Unit Price Total price
91 4510-2033
trap, chromium, 5/4", HANSGROHE 52053
SIPHON bouteille à culot démontable chromé, 5/4" x 5/4", HANSGROHE 52053000 PC 31
92 4510-2019 trap GEBERIT 151.014.00.1 SIPHON de 1" 1/4 x 32, GEBERIT N° 151.034.11.1 PC 13
93 4730-5030 te GEBERIT 622.310.00.1 TE égal de 20 mm, GEBERIT MEPLA N°
622.310.00.1 PC 45
94 4730-5N52
te 20 x 1/2 x 20 GEBERIT mepla 632.373.00.5
TE de 20 x 1/2 x 20, GEBERIT MEPLA N° 632.373.00.5 PC 15
95 4730-5029
te reduced 26 x 20 x 26 GEBERIT MEPLA N° 623.315.00.1
TE réduit de 26 x 20 x 26, GEBERIT MEPLA N° 623.315.00.1 PC 19
96 4510-1N34 faucte head GROHE 45869 TETE carbodur 1/2" à disque en céramique,
GROHE N° 45869 PC 12
97 4820-2021
thermostatic valve head BRAUKMAN T100 MI
TETE de vanne thermostatique HONEYWELL T7001WO N° HBC01122 PC 163
98 4510-1004 tap head GROHE 45346 1/2" TETE universelle de robinet 1/2" disques en
céramique, FRIEDRICH GROHE N° 45346 PC 11
99 6685-2011
thermometer 0 - 120, 1/2" dia. 100
THERMOMETRE à cadran de 0 à 120°, 1/2", Ø : 100, longueur de 65 N° 19211 PC 12
100 4710-2014
shell tube 10 - 800 mm nr 50.005.06.99 TUBE SCHELL de 10 - 800 mmm N° 50.005.06.99 PC 47
101 4710-2002 galvanized pipe 1/2" TUYAU acier galvanisé, 1/2", ISO M (en longueur
de 6 mètres) MT 57
102 4710-9N02 pipe ANBO dia 22 TUYAU acier mince ANBO diamètre 22 LEBU CV
(en longueur de 6 mètres) MT 50
103 4710-9N01 pipe ANBO dia 28 TUYAU acier mince ANBO diamètre 28 LEBU CV
(en longueur de 6 mètres) MT 54
104 4710-1014
pipe 20 mm, GEBERIT N° 602.100.00.1
TUYAU composite de 20 mm, MEPLA GEBERIT N° 602.100.00.1, (en longueur de 5 mètres) MT 213
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part I - Page 25 of 50
NATO UNCLASSIFIED
NR SHAPE Stock ID English Description French Description Issue
Unit Average Qty
Unit Price Total price
105 4710-1028
pipe dia 20 GEBERIT 602.130.00.1
TUYAU de 20 mm, GEBERIT MEPLA N° 602.130.00.1 (en rouleau de 50 mètres) MT 86
106 4710-1027
pipe GEBERIT 26 N° 603.100.00.1
TUYAU de 26 mm, GEBERIT MEPLA N° 603.100.00.1 (en longueur de 5 mètres) MT 86
107 4710-1015
pipe 32 GEBERIT 604.100.00.1
TUYAU de 32 m, GEBERIT MEPLA rigide N° 604.100.00.1 (en longueur de 5 mètres) MT 36
108 4710-1N43
pipe GEBERIT MEPLA 40 N°605.100.00.1 TUYAU de 40, GEBERIT MEPLA 605.100.00.1 MT 21
109 4710-5003 heating pipe 1" lenght of 6 m TUYAU de chauffage 1", DN 25, Ø 33.7/2.3 (en
longueur de 6 mètres) MT 97
110 4710-5004 heating pipe 1"1/4 TUYAU de chauffage 1"1/4, DN 32 Ø 42.4/2.6 (en
longueur de 6 mètres) MT 106
111 4710-5006 heating pipe 2" TUYAU de chauffage 2", DN 50 Ø 60.3/2.9 (en
longueur de 6 mètres) NBN A25-104 MT 27
112 4710-5027 heating pipe 2"1/2 TUYAU de chauffage, acier rouge, 2"1/2 (en
longueur de 6 mètres) MT 68
113 4510-1054 hose pipe for shower 28150 TUYAU flexible chromé 1/2 x 1/2 en 1250 mm,
FRIEDRICH GROHE N° 28150 PC 16
114 4510-1021
flexible chromed pipe 1/2 x 1/2, 2 m, GROHE 28155
TUYAU flexible chromé de 1/2 x 1/2, 2 m, GROHE N° 28155 PC 37
115 4710-2004
galvanized pipe 1" (in 6 mt lenght)
TUYAU galvanisé, 1", ISO M (en longueur de 6 mètres) MT 43
116 4710-2006 galvanized pipe 1"1/2 TUYAU galvanisé, 1"1/2, ISO M (en longueur de 6
mètres) MT 10
117 4710-2005 galvanized pipe 1"1/4 TUYAU galvanisé, 1"1/4, ISO M (en longueur de 6
mètres) MT 33
118 4710-2N04 galvanized pipe 2"1/2 TUYAU galvanisé, 2"1/2 (en longueur de 6 mètres) LG 13
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part I - Page 26 of 50
NATO UNCLASSIFIED
NR SHAPE Stock ID English Description French Description Issue
Unit Average Qty
Unit Price Total price
119 4710-1018
Plastic pipe GEBERIT 367.000.16.0
TUYAU HDPE de 110, GEBERIT N° 367.000.16.0 (en longueur de 5 mètres) MT 110
120 4710-1024
pvc pipe 125 GEBERIT 368.000.16.0
TUYAU HDPE de 125, GEBERIT N° 368.000.16.0 (en longueur de 5 mètres) MT 17
121 4710-1019
pipe 160, GEBERIT 369.000.16.0
TUYAU HDPE de 160, GEBERIT N° 369.000.16.0 (en longueur de 5 mètres) MT 40
122 4710-1020
pipe PE/HD dia. 50 GEBERIT 361.000.16.0
TUYAU HDPE de 50, GEBERIT N° 361.000.16.0 (en longueur de 5 mètres) MT 69
123 4710-1003
pipe PE 56 mm GEBERIT 363.000.16.0
TUYAU HDPE de 56, GEBERIT N° 363.000.16.0 (en longueur de 5 mètres) MT 73
124 4710-1005
pipe dia. 75 GEBERIT PE + 365.000.16.0
TUYAU HDPE de 75, GEBERIT N° 365.000.16.0 (en longueur de 5 mètres) MT 99
125 4710-1004
pipe dia. 90 GEBERIT 366.000.16.0
TUYAU HDPE de 90, GEBERIT N° 366.000.16.0 (en longueur de 5 mètres) MT 20
126 4710-1033
PIPE GEBERIT dia 200 mm N° 370.000.16.0
TUYAU PEHD de 200 mm, GEBERIT N° 370.000.16.0 (en longueur de 5 mètres) MT 29
127 4710-1N81
PIPE PEHD GEBERIT dia 250 mm N° 371.000.16.0
TUYAU PEHD de 250 mm, GEBERIT N° 371.000.16.0 (en longueur de 5 mètres) MT 11
128 4710-1010
plastic pipe 32 mm, 4 mt lenght EUPEN 7165212
TUYAU PVC de 32 x 1.5 mm EUPEN HT 7165212 (en longueur de 4 mètres) MT 54
129 4820-1026 square stop valve 1" VANNE à bille carrée 1" R910 PC 14
130 4820-1051 square stop valve 3/4" R910 VANNE à bille carrée 3/4" R910 PC 28
131 4820-1050 spheric stop valve 1/2" VANNE à bille carrée R910 1/2" GS PC 69
132 4820-2002
thermostatic valve Brauckman 1/2" VT 100
VANNE thermostatique droite 1/2" DN, BRAUKMANN V 200 UD K515 (sans tête) PC 22
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part I - Page 27 of 50
NATO UNCLASSIFIED
NR SHAPE Stock ID English Description French Description Issue
Unit Average Qty
Unit Price Total price
133 4730-8087
screw M10 x 110 GEBERIT 348.025.00.1
VIS pour collier M10 x 110, GEBERIT 348.025.00.1 (en boîte de 50 pièces) PC 139
134 4510-3045
screw GEBERIT GIS 461.030.00.1
VIS autoforante, GEBERIT GIS N° 461.030.00.1 (en boîte de 200 pièces) PC 5400
135 5305-4N01 screw for W.C 216.786.00.1 VIS pour fixation des réservoirs duobloc N°
216.786.00.1 (set de 2 vis) ST 60
136 4730-8005 sceuw for clamp 8 x 50
VIS à bois filetée WALRAVEN 8 x 50 sans butée,dock à visser 62638805 (en boîte de 100 pièces)
PC 65
137 4730-8006 screw for clamp 8 x 90 VIS à bois M 8 x 100, BIS WALRAVEN N°
626.3.810 type 980 (en boîte de 100 pièces) PC 170
GRAND TOTAL REVISION FORMULA that applies to the unit prices listed in the above SHAPE Core List in case of the exercise of the possible 4 one-year options: (to be indicated in by the Bidder) _______________________________________
(Bidder’s Signature) (Date)
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part I - Page 28 of 50
NATO UNCLASSIFIED
For items not listed in the “SHAPE core list”, the bidder proposes to apply to the following fixed percentage (%) discounts per brand to his Official Pricing List (catalogue):
Brand Name % discount Brand Name % discount
ABS GEBERIT
ALLIBERT GEKA
ALPEX GF
ANBO GIACOMINI
ARMSTRONG GRUNDFOSS
BIFIX H GROHE
BWT HAWLE
CERABOR HONEYWELL
DAL IDEAL STANDARD
DANFOSS MAESTRO
DEF NICOLL
DEMELKER PLASTIGI
DURAVIT SADARO
ESCO SCHELL
EUPEN SERTO
TORK NOVATECH
EUROBATEX VASCO
F GROHE WALRAVEN
FLAMCO ZAMAC
FRANKE ESCO
BULEX
The above fixed percentage (%) discount shall:
• apply to items NOT LISTED in the SHAPE "core list". • be effective through the whole duration of the contract, to include the four one-year
extension options, if granted;
(Bidder’s Name and Signature) (Date)
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part I - Page 29 of 50
NATO UNCLASSIFIED
Enclosure 6 to Part I Mailing Label
(The label below is to be completed by the bidder and affixed/glued to the exterior envelope or parcel of the Bid Package(s) mailed to SHAPE).
(Cut along the lines)
SEALED BID TO IFIB-ACO-SH-13-11
To be opened by the Contract Award Committee (CAC) only SENDER: …………………………….
…………….……………… …………….……………… …………….………………
TO: SHAPE J8 FINANCE DIVISION ACQUISITION MANAGEMENT BRANCH POST BOX 27/A B - 7010 SHAPE, BELGIUM
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part II - Page 30 of 50
NATO UNCLASSIFIED
SUPREME HEADQUARTERS ALLIED POWERS EUROPE
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities
PART II GENERAL PROVISIONS
IFIB-ACO-SH-13-11
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part II - Page 31 of 50
NATO UNCLASSIFIED
PART II
GENERAL PROVISIONS
1. DEFINITIONS
As used throughout the contract, the following terms shall have meanings as set forth below: a. “SHAPE” means the Supreme Headquarters Allied Powers Europe, located at B-7010
SHAPE, Belgium; b. “North Atlantic Treaty Organisation” is hereafter referred to as NATO; c. “Contracting Officer” means the person executing and managing the contract on behalf
of SHAPE. Only duly designated Contracting Officers have the authority to obligate SHAPE;
d. “Contracting Officer’s Technical Representative” or “COTR” means a person appointed by the Contracting Officer for the purpose of determining compliance with the technical requirements of the contract;
e. Ordering Officer means a staff member of SHAPE appointed in writing by the Contracting Officer to place orders on to the contractor
f. “Contractor” means the entity (firm or person) to whom the contract is awarded and on whose behalf duly authorised persons shall execute it;
g. Purchase Order means the contractual document used by SHAPE to order supplies and services;
h. “Days” shall be interpreted as meaning calendar days. i. “Force Majeure” means act of God, natural disaster, invasion or war (whether declared or
not) and other hostilities, revolution, rebellion or industrial disturbances, except whether solely restricted to the employees of the Contractor, insurrection or riot, commotion or other disorder, ionizing, radiation or contamination by regular activity from any nuclear fuel or waste, radio-active/toxic explosives or other hazardous properties of any explosives, nuclear assembly of nuclear components thereof, or other act, event or circumstance of a similar nature or force arising from circumstances beyond the control of the Parties which could not reasonably be expected to have been taken into account at the time of the conclusion of the Contract and which, or the consequences of which, the Parties could not reasonably have avoided or overcome..
2. APPLICABLE LAW AND REGULATIONS
2.1. Except as otherwise provided in the contract, the contract shall be governed, interpreted and construed in accordance with the Civil Law of the Kingdom of Belgium;
2.2. When performing at NATO Installations the Contractor and its personnel (including also the Sub-contractor’s personnel, if any) shall comply with all applicable laws of the host nation and all relevant official NATO and SHAPE/local installation Directives.
2.3. Both parties are under duty of good faith. The contract includes not only the specific terms, but also law and customary practice applicable in the place where the contract is to be carried out and to the Type of Trade to which the contract relates.
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part II - Page 32 of 50
NATO UNCLASSIFIED
3. ORDER OF PRECEDENCE
In the event of any inconsistency in the contract, unless otherwise provided herein, the inconsistency shall be resolved giving precedence in the following descending order:
- 1st The Part I of the Contract - 2nd The Special Provisions and Statement Of Work (Part III); - 3rd These General Provisions (Part II); - 4th The Contractor’s Bid or Proposal accepted by SHAPE; The above documents form entire part of the contract.
4. AUTHORITY
Any modifications, including changes, additions or deletions and instructions under the contract shall not be binding unless issued in writing by the Contracting Officer.
5. CONTRACTOR STATUS
The Contractor’s status shall be that of an independent Contractor and it is expressly understood that neither the Contractor (nor its personnel) nor Sub-contractors shall be considered in any respect as being employees, servants or agents of NATO.
6. CONSUMER PROTECTION
SHAPE is a non-profit international organisation that shall use the goods and services ordered through the contract for its own self-consumption and not for sale. Therefore, the Contractor agrees that SHAPE must be treated as a consumer for the purposes of the application of any benefits derived from prevailing regulations on consumer protection (e.g., all applicable EU directives on the matter). Specifically, the Contractor agrees to extend to SHAPE the same guarantees and protection applicable to consumers in accordance with any of the stated regulations.
7. CONTRACTOR RESPONSIBILITY
The Contractor shall be responsible for the execution of all terms of the contract. It may not delegate its rights or transfer its obligations without the prior permission of the Contracting Officer.
8. SECURITY
8.1. The Contractor shall comply with all security requirements prescribed by SHAPE and the National Security Authority or designated security Agency of the Kingdom of Belgium;
8.2. The Contractor is responsible for the safeguarding of NATO classified information or any other information labelled sensitive, entrusted to it or generated by it in connection with the performance of the Contract. It undertakes not to pass on to anyone outside its staff information provided for the performance of the Contract, or any information it may become privy to. It undertakes not to pass on such information or to use it for any purpose whatsoever. Similarly, all Contractor personnel employed at SHAPE shall be
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part II - Page 33 of 50
NATO UNCLASSIFIED
required not to disclose any information they may become aware of in the performance of the contract;
8.3. Any known or suspected breaches of security or other matters of security significance shall be immediately reported by the Contractor to the Contracting Officer and to the SHAPE Security Officer;
8.4. The Contractor ensures that its employees are informed that they may be searched when they enter or leave SHAPE's premises;
8.5. The Contractor shall place the Sub-contractor, if any, under security obligations no less stringent than those applied to its own Contract;
8.6. If requested, the Contractor undertakes to provide SHAPE Security Officer with an information sheet on all its employees, before they take up their duties, using the form provided by that Officer;
8.7. The Contractor accepts to terminate immediately the duties at SHAPE of any employee whose presence is deemed undesirable by SHAPE on the same day that such notification is given by the Contracting Officer or SHAPE Security Officer, without SHAPE being required to state the reasons. Furthermore, in no case may SHAPE be held responsible for the consequences of such a decision.
9. ACCESS CONTROL
Before commencing work on SHAPE’s premises, the Contractor’s personnel must be in possession of access cards, and all its vehicles must display access permits. The request for these documents must be submitted to the COTR and the contractor should plan 15 days to obtain these. The access cards and permits remain valid until the date indicated on them; any renewal must be requested at least 15 days before the expiration date. Time lost due to the failure of the Contractor to request in a timely manner access cards and access permits shall not entitle him to a claim for lost time or for an extension of the completion date for the performance of the Contract.
10. INSURANCE
10.1. The Contractor agrees to procure and maintain, without any cost to SHAPE, any workmen's compensation, employees’ liability or other type of insurance required by Belgian Law or other NATO countries, as applicable;
10.2. The Contractor agrees to procure and maintain, without any cost to SHAPE, a suitable
civil liability insurance to cover, on the one hand, damage which could be caused to SHAPE’s premises, e.g. by fire, and on the other hand, injury to persons.
11. HEALTH, SAFETY AND ACCIDENT PREVENTION
11.1. The Contractor shall comply with the European Union, Belgian laws and regulations (or other NATO countries laws and regulations, as applicable) on safety at work and with the Regulations in force at SHAPE workplace(s)/location(s) with regard to health and accident prevention, safety and hygiene;
11.2. If the Contracting Officer or the COTR notifies the Contractor in writing of any non-compliance in the performance of the contract, with regard to safety and health rules and requirements prescribed by applicable national or local laws, ordinances and
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part II - Page 34 of 50
NATO UNCLASSIFIED
codes, and the Contractor fails to take immediate corrective action, then the Contracting Officer may order the Contractor to stop all or part of the work until satisfactory corrective action has been taken. Such an order to stop work shall not entitle the Contractor to an adjustment of the Contract price or other reimbursement for resulting increased costs or losses;
11.3. At any time, SHAPE Safety Officer and Belgian labour inspection authorities will be
entitled to inspect any Contractor’s activities in order to guarantee that this clause is enforced.
12. LABOUR AND MATERIAL STANDARDS
All labour and materials shall comply with all applicable International/European Norms, Regulations and Standards.
13. PREFERRED CUSTOMER
13.1. The Contractor warrants that the prices set forth in the contract are as favourable as those extended to any Government, Agency, Company, Organisation or individual purchasing like quantities of goods and/or services covered by the Contract under similar conditions. In the event that prior to termination of the contract the Contractor offers any of such goods and/or services in substantially similar quantities to any customer at prices lower than those set forth herein, the Contractor shall so notify SHAPE and the prices of such goods and/or services shall be correspondingly reduced by an amendment to the contract;
13.2. Price in this sense means “Base Price” prior to applying any bonus, export tax reductions, turn-over tax exemptions and other reductions based on National Policies.
14. PRICES
Unless otherwise indicated in the Contract, all prices are firm and fixed.
15. TAXES AND CUSTOMS CHARGES
15.1. According to the agreements (Article VIII of the Paris Protocol dtd 28 Aug 1952, Article 15.10 of the EC Directive 77/388/CEE), goods and services under the contract are exempt from taxes, duties and similar charges. Where notwithstanding, these are imposed by national regulations, bidders shall enclose the list and the amounts of taxes, duties and similar charges which have been included in their bid, with a justification.
15.2. The contract price, including the prices in any sub-contracts hereunder, does not include any customs charges, taxes or other charges levied by the member nations of NATO, or any political subdivision thereof, on the work performed by the Contractor or his sub-contractors under this contract.
15.3. Payment for all such charges shall be made directly to the concerned member nations of NATO or any political subdivision thereof by SHAPE to the extent that SHAPE is not, by virtue of law, regulation or governmental agreement, exempt from such charges, and SHAPE shall hold the Contractor and his sub-contractors harmless therefrom. In the event such charges are levied against, and must be paid directly by, the Contractor to
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part II - Page 35 of 50
NATO UNCLASSIFIED
his sub-contractors, SHAPE shall reimburse the Contractor the full amount of the charges upon receipt of the Contractor's invoice and appropriate documentation.
16. CONTRACT EFFECTIVE DATE
The effective date of the Contract is the date of last signature by the Parties, or a specific date set forth in Part I hereof.
17. DURATION OF CONTRACT
The duration of the contract is stated in Part I hereof.
18. OPTIONS
SHAPE shall have the right to exercise any or all of the options, in whole or in part, at the terms and conditions set forth in the contract.
19. CHANGES
19.1. Any changes, modifications, additions or deletions and instructions under the contract shall not be binding unless issued in writing as formal amendments by the Contracting Officer and signed by both Parties in the same manner as the contract;
19.2. The Contracting Officer may at any time, by a written order, make changes, within the general scope of this contract;
19.3. If any such changes cause an increase or decrease in the cost of, or in the time required for the performance of any part of the work under the contract, an equitable adjustment shall be made to the contract price. Then the Contract shall be modified in writing accordingly;
19.4. Failure to agree to any adjustment shall be a dispute concerning a question of fact within the meaning of the Clause titled “DISPUTES” herein. However, nothing in this clause shall excuse the Contractor from proceeding with the Contract as changed.
20. CONTRACTOR’ S NOTICE OF DELAY
20.1. In the event the Contractor encounters difficulty in meeting performance requirements, or when it anticipates difficulty in complying with the Contract delivery schedule or date, it shall immediately notify the Contracting Officer in writing, giving pertinent details. This data shall be deemed to be information only in character and this provision shall not be construed as a waiver by SHAPE of any delivery schedule or date, or of any rights or remedies provided by law or under the contract;
20.2. When such delay has been caused by the occurrence of any cause constituting Force Majeure and as soon as possible, the Contractor shall give notice and full particulars in writing to the Contracting Officer of such occurrence, as well as its claim for a reasonable extension in time for completion of its obligations under the contract. If the Contractor, in despite of that extension, remains unable by reason of Force Majeure to perform its obligations and meet its responsibilities under the contract, SHAPE has the right to suspend or terminate the contract on the same terms and conditions as are provided for in the clause titled “DEFAULT” herein;
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part II - Page 36 of 50
NATO UNCLASSIFIED
21. LIQUIDATED DAMAGES
For each calendar day of delay in the performance of any relevant task or duty under the Contract, and in lieu of actual damage, the Contractor shall pay to SHAPE as fixed, agreed, and liquidated damages, 0.1% of the total contract price, less handling, transportation and taxes, to a maximum of 10% of the contract price. Alternatively, SHAPE may terminate the contract in whole or in part as provided in the first paragraph of the “DEFAULT” clause and in that event the Contractor shall be liable, in addition to the excess costs provided in second paragraph of the “DEFAULT” clause, for such liquidated damages accruing until such time as SHAPE may reasonably obtain delivery or performance of similar supplies or services. The Contractor shall not be charged with liquidated damages when the delay arises out of causes beyond the control and without the fault or negligence of the Contractor, as defined in third paragraph of the “DEFAULT” clause and in such event, subject to the “DISPUTES” clause, the Contracting Officer shall ascertain the facts and extent of the delay and shall extend the time for performance of the Contract when in its judgement the findings of fact justify an extension.
22. SHAPE DELAY OF WORK
22.1. If the performance of all or any part of the work is delayed or interrupted by an act of SHAPE in the administration of the contract, which act is not expressly or implicitly authorized by the contract, or by its failure to act within the time specified in the contract (or within a reasonable time if no time is specified), an adjustment shall be made for any increase in the cost of performance of the contract caused by such delay or interruption and the Contract modified in writing accordingly. Adjustment shall be made also in the delivery or performance dates and any other contractual provision affected by such delay or interruption. However, no adjustment shall be made under this clause for any delay or interruption (i) to the extent that performance would have been delayed or interrupted by any other cause, including the fault or negligence of the Contractor; or (ii) for which an adjustment is provided or excluded under any other provision of the contract;
22.2. No claim under this clause shall be allowed (i) for any costs incurred more than twenty (20) days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved; and (ii) unless the claim in an amount stated, is asserted in writing as soon as practicable after the termination of such delay or interruption, but not later than the date of final payment under the Contract;
22.3. No claim under this clause shall be allowed for any delay resulting from the restriction of access to SHAPE facilities as a consequence of the conduct of security or safety exercises provided that such restrictive measures do not exceed five (5) working days over a year period, and that the access restrictions are notified by the Contracting Officer, in writing, to the Contractor at least 10 days prior to their implementation.
23. DISPUTES
Disputes will be settled between the Contracting Officer and the Contractor by mutual agreement. In the case of failure to reach an amicable settlement, the court of Mons, Belgium shall have jurisdiction. Except as otherwise provided in this contract, this contract shall be governed, interpreted and construed in accordance with the private contract law of the Kingdom of Belgium.
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part II - Page 37 of 50
NATO UNCLASSIFIED
24. TERMINATION FOR DEFAULT
24.1. SHAPE may, subject to the provisions of paragraphs below, by Contracting Officer’s written notice of default to the Contractor, terminate the whole or any part of the contract in any one of the following circumstances:
a. if the Contractor fails to provide the goods and/or perform the services within the time and as specified herein or in any extension thereof; or
b. if the Contractor fails to perform any of the other provisions of the contract, or so
fails to make progress as to endanger performance of the contract in accordance with its terms
and in either of these two circumstances does not resolve such failure within a period of ten days (or such longer period as the Contracting Officer may authorise in writing) after receipt of notice from the Contracting Officer specifying such failure;
24.2. In the event that SHAPE terminates the contract in whole or in part as provided in the paragraph above, SHAPE may procure goods and/or services similar to those so terminated and the Contractor shall be liable to SHAPE for any excess costs for such similar goods and/or services . The Contractor shall continue the performance of the contract to the extent not terminated under the provisions of this Clause;
24.3. Except with respect to defaults of Sub-contractors, the Contractor shall not be liable for any excess costs if the failure to perform the Contract arises from causes beyond the control and without the fault or negligence of the Contractor. If the failure to perform is caused by the default of a Sub-contractor, and if such default arises from causes beyond the control of both the Contractor and Sub-contractor, without the fault or negligence of either of them, the Contractor shall not be liable for any excess costs for failure to perform unless the goods and/or services to be provided by the Sub-contractor were obtainable from other sources in sufficient time to permit the Contractor to perform the Contract;
24.4. If the contract is terminated as provided in the first paragraph of this clause, SHAPE, in addition to any other rights provided in the clause, may require the Contractor to transfer title and deliver to SHAPE in the manner and to the extent directed by the Contracting Officer:
a. any completed supplies and b. such partially completed supplies and materials, parts, tools, dies, jigs, fixtures,
plans, drawings, information and contract rights (hereinafter called "manufacturing materials") as the Contractor has specifically produced or specifically acquired for the performance of such part of the contract as has been terminated; and the Contractor shall, upon direction of the Contracting Officer, protect and preserve property in the possession of the Contractor in which SHAPE has an interest. Payment for completed supplies delivered to and accepted by SHAPE shall be at the contract price. Payment for manufacturing materials delivered to and accepted by SHAPE and for the protection and preservation of property shall be in an amount agreed upon by the Contractor and Contracting Officer; failure to agree such amount shall be a dispute concerning a question of fact within the meaning of the clause of the contract entitled "Dispute". SHAPE may withhold from amounts otherwise due the Contractor for such completed supplies or manufacturing materials such sum as the Contracting Officer determines to be necessary to protect SHAPE against loss because of outstanding liens or claims of former lien holders;
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part II - Page 38 of 50
NATO UNCLASSIFIED
24.5. If after notice of termination of the contract under the provisions of this Clause, it is determined for any reason that the Contractor was not in default under the provisions of this Clause, or that the default was excusable under the provisions of this Clause, the rights and obligations of the Parties shall, if the Contract contains a clause providing for termination for convenience of SHAPE, be the same as if the notice of termination had been issued pursuant to such Clause;
24.6. Both Parties are under duty of good faith. The Contract includes not only the specific terms, but also law and customary practices applicable in the place where the Contract is to be carried out and to the Type of Trade to which the Contract relates.
25. TERMINATION FOR CONVENIENCE OF SHAPE
25.1. The performance of work under the contract may be terminated by SHAPE in accordance with this Clause, in whole or in part, whenever the Contracting Officer shall determine that such termination is in the best interest of SHAPE. Any such termination shall be effected by delivery to the Contractor of a Notice of Termination specifying the extent to which performance of work under the Contract is terminated and the date upon which such termination becomes effective;
25.2. After receipt of a Notice of Termination and except as otherwise directed by the Contracting Officer, the Contractor shall:
a. stop work under the Contract on the date and to the extent specified in the Notice of Termination;
b. place no further orders or sub-contracts for material, services or facilities, except
as may be necessary for completion of such portion of the work under the Contract as is not terminated;
c. terminate all orders and sub-contracts to the extent that they relate to the
performance of work terminated by the Notice of Termination; d. settle all liabilities and all claims arising from such termination of orders and sub-
contracts, with the approval or ratification of the Contracting Officer, to the extent he may require, which approval or ratification shall be final for all the purposes of this Clause;
e. transfer title of property and deliver to SHAPE in the manner, at the times, and to
the extent, if any, directed by the Contracting Officer:
1. the fabricated parts, work in process, completed work, and 2. the completed or partially completed plans, drawings, information, and other
property which, if the contract has been completed, would have been required to be furnished to SHAPE;
f. complete performance of such part of the work as shall not have been terminated by the Notice of Termination;
25.3. After receipt of a Notice of Termination, the Contractor shall submit to the Contracting Officer its termination claim, in the form and with certification prescribed by the Contracting Officer. Such claim shall be submitted promptly but in no event later than three months from the effective date of termination. Upon failure of the Contractor to
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part II - Page 39 of 50
NATO UNCLASSIFIED
submit its termination claim within the time allowed, the Contracting Officer may determine, on the basis of information available to him, the amount, if any, due to the Contractor by reason of the termination and shall thereupon pay to the Contractor the amount so determined;
25.4. When such claim has been submitted, and the Contractor and the Contracting Officer agree upon the whole amount to be paid, the Contracting Officer shall thereupon pay to the Contractor the amount so determined. In the event of failure to agree upon that amount, the Contracting Officer shall pay to the Contractor the amount determined by him. The total sum to be paid to the Contractor under this paragraph shall not exceed the total Contract price as reduced by the amount of payments otherwise made and as further reduced by the contract price of work not terminated;
25.5. Unless otherwise provided for in the contract, or by applicable statute, the Contractor, from the effective date of termination and for a period of three years after final settlement under the contract, shall preserve and make available to SHAPE at all reasonable times at the office of the Contractor but without direct charge to SHAPE, all its books, records, documents and other evidence bearing on the costs and expenses of the Contractor under the contract and relating to the work terminated hereunder, or to the extent approved by the Contracting Officer, photographs, micro-photographs, or other authenticated reproductions thereof.
26. SPECIAL TERMINATION CLAUSE
26.1. If at any time, while the contract is in force, either party find itself in one of the following situations:
a. Death, supervened incapacity or extinction of its legal entity; b. Declaration of bankruptcy, reorganisation of debts, take over by a trusty, or any
other legal status implying lack of capacity to enter new financial liabilities, c. Change of activity in such a manner that it becomes incompatible with the purpose
of the contract,
then the other party shall be entitled to terminate the contract upon giving written notice of termination under the provisions of this clause to the other party. Such termination shall not be considered as termination for convenience and shall be effective on the date stated on that notice of termination;
26.2. However, notwithstanding the above, SHAPE may terminate the contract immediately without compensation or advance notice if it is unable by reason of Force Majeure to perform its obligations under the contract, or if NATO were to undergo a major reorganisation or cease to occupy the current premises in its actual location.
27. TECHNICAL BROCHURES AND MAINTENANCE PLANNING
Not applicable to this contract.
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part II - Page 40 of 50
NATO UNCLASSIFIED
28. MARKING AND LABELING
A label showing the SHAPE Contract number and the name of the Contractor shall be affixed in a visible place to each major item of equipment and independent component. The label shall resist rubbing and minor abrasion.
29. NOTICE OF SHIPMENT
29.1. At the time of delivery of any supplies to a carrier for transportation, the Contractor shall give notice of shipment to the Contracting Officer and to the C.O.T.R. or such other persons or installations as are designated by the Contracting Officer. If such instructions have not been received by the Contractor at least one working day prior to such delivery to a carrier, the Contractor shall request instructions from the Contracting Officer concerning notice of shipment to be given.
29.2. The following information shall be included in such notification: a. Contract Number b. Shipping address
• From: (Name and complete address of consignor) • To (Name and complete address of consignee)
c. Listing of supplies by Contract Items(s) d. Number of and marking on packages(s) e. Weight and dimensions of packages(s) f. Name and address of Carrier, mode and date of shipment with waybill number, g. Customs documents required by Contractor (if applicable).
30. SAFETY TESTS AND INSPECTIONS
30.1. Unless otherwise specifically provided for in the contract, all equipment, materials and articles incorporated in the work covered by this contract are to be new and of the most suitable grade of their respective kinds for the purposes intended. All workmanship shall be first class.
30.2. It is the Contractor’s responsibility to obtain, at no additional cost to SHAPE, the
suitable official certificates (Certificat d'Agréation Belge) for all parts, equipment and installations (such as tanks, generators, transformers, gas lines, etc,) that before putting into use and because of Belgian safety regulations require tests or inspections by formally recognised agencies or firms. The certificates, together with the validated test reports, shall be available and submitted to the COTR prior to the start of the acceptance testing by SHAPE. All new electrical and mechanical installations or modifications must be inspected and accepted by a certified inspection agency;
30.3. All supplies (which terms throughout this clause includes without limitation raw
materials, components, intermediate assemblies, and end products) shall be subject to inspection and test by SHAPE, to the extent practicable at all times and places including the period of manufacture, and in any event prior to acceptance;
30.4. If any inspection or test is made by SHAPE on the premises of the Contractor or Sub-
contractor, the Contractor without additional charge shall provide all reasonable facilities and assistance to SHAPE inspectors in the performance of their duties. If SHAPE inspection or test is made at a point other than the premises of the Contractor or a sub-contractor, it shall be at the expense of SHAPE except as otherwise provided
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part II - Page 41 of 50
NATO UNCLASSIFIED
in this contract. In case of rejection SHAPE shall not be liable for any reduction in value of samples used in connection with such inspection or test. SHAPE reserves the right to charge to the Contractor any additional cost of SHAPE inspection and test when supplies are not ready at the time such inspection, when test is requested by Contractor or when re-inspection or retest is necessitated by prior rejection. Failure to inspect supplies shall neither relieve the Contractor from responsibility for such supplies as are not in accordance with the contract requirements nor impose liability on SHAPE therefore;
30.5. In case any supplies are defective in material or workmanship or otherwise not in
conformity with the requirements of this contract, SHAPE shall have the right either to reject them (with or without instructions as to their disposition) or to require their correction or to accept them against reduction in price which is equitable under the circumstances.
30.6. In case of a disagreement between the COTR and the contractor concerning the
conformity of materials and equipment, tests may be called for by SHAPE, whereby in the event of failure of the item under test, all costs associated with the tests costs shall be at the contractor's expense.
28.7. The inspection and test by SHAPE of any supplies does not relieve the Contractor from
any responsibility regarding defects or other failures to meet the contract requirements which may be discovered prior to acceptance.
30.8. It is the Contractor’s responsibility to obtain, at no additional cost to SHAPE, the suitable official certificates for all parts, equipment and installations (such as tanks, generators, transformers, gas lines, etc,) that before putting into use and because of Belgian safety regulations require tests or inspections by formally recognised agencies or firms. The certificates, together with the validated test reports, shall be available and submitted to the C.O.T.R. prior to the start of the acceptance testing by SHAPE. In case of a disagreement between the C.O.T.R. and the contractor concerning the conformity of materials and equipment, tests may be called for by SHAPE, whereby in the event of failure of the item under test, all costs associated with the tests costs shall be at the contractor's expense.
31. VARIATION IN QUANTITY
No variation in the quantity of any item called for by this contract shall be accepted unless such variation has been caused by conditions of loading, shipping, or packaging, or allowances in manufacturing processes and then only to the extent, if any, specified elsewhere in contract.
32. ACCEPTANCE
32.1. Acceptance is the action by which SHAPE acknowledges that the Contractor has fully demonstrated that the deliveries are complete and operational.
32.2. Acceptance or rejection of supplies or works shall be made as promptly as practicable after delivery or completion, except as otherwise provided in the contract. For supplies, at the time and place of delivery, inspection will only be made on the exterior state of the packaging and its accompanying documents. Any damage will be noted on the delivery documents, dated and signed.
32.3. Acceptance will occur when the following requirements have been met:
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part II - Page 42 of 50
NATO UNCLASSIFIED
• Availability at final destination of all deliverables. • Successful completion of acceptance testing. • Satisfactory completion of all training or other services, if any, required by that
date.
32.3.1. Provisional Acceptance: Provisional Acceptance will occur when discrepancies exist. In this case: • The Contracting Officer and the Contractor shall agree and establish
a list of discrepancies with corresponding clearing dates. • SHAPE reserves the right to withhold from payment an amount
commensurate with the importance of these, which in any case will be less than 10% of the total contract price, excluding options, until all discrepancies are solved.
32.3.2. Final Acceptance: Final Acceptance will occur when either no discrepancies exist or the recorded discrepancies have been corrected. It shall be conclusive, except for latent defects, fraud, gross mistakes amounting to fraud, or otherwise stated in the Contract.
33. TITLE TO PROPERTY AND RISK OF LOSS
33.1. Unless this contract specifically provides for earlier passage of title, title to property of the supplies covered by this contract shall pass to SHAPE upon formal acceptance, regardless of when or where SHAPE takes physical possession;
33.2. Unless this contract specifically provides otherwise, risk of loss or of damage to supplies covered by this contract shall remain with the Contractor until, and shall pass to SHAPE upon:
a. delivery of the supplies to a carrier, if transportation is Ex Works (EXW); b. acceptance by SHAPE or delivery of the supplies to SHAPE at the destination
specified in this contract, whichever is later;
33.3. Notwithstanding 31.2. above, risk of loss of or damage to supplies which so fail to conform to the contract as to give a right of rejection shall remain with the Contractor until cure or acceptance by SHAPE;
33.4. The Contractor shall not be liable for loss of or damage to supplies caused by the negligence of officers, agents or employees of SHAPE acting within the scope of their employment.
34. WARRANTY
34.1. Notwithstanding inspection and acceptance by SHAPE of supplies furnished under the Contract or any provision of the contract concerning the conclusiveness thereof, the Contractor warrants that for a period of twenty-four (24) months following the date of acceptance all supplies furnished under the contract shall be free from defects in material or workmanship and shall conform with the specifications and all other requirements of the contract;
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part II - Page 43 of 50
NATO UNCLASSIFIED
34.2. The Contracting Officer shall give written notice to the Contractor of any breach of the warranties in the first paragraph of this clause within thirty (30) days after discovery of any defect;
34.3. Within a reasonable time after such notice, the Contracting Officer may either: a. by written notice require the prompt correction or replacement of any supplies or
part thereof (including preservation, packaging, packing and marking) that do not conform with requirements of the contract within the meaning of the first paragraph of this clause; or
b. retain such supplies, whereupon the contract price thereof shall be reduced by an
amount equitable under the circumstances and the Contractor shall promptly make appropriate payment;
34.4. When return, correction or replacement is required, the Contracting Officer shall return the supplies and transportation charges and responsibility for such supplies while in transit shall be borne by the Contractor. However, the Contractor's liability for such transportation charges shall not exceed an amount equal to the cost of transportation by the usual commercial method of shipment between the designated destination point under the contract and the Contractor's plant and return;
33.5. If the Contractor does not agree as to its responsibility to correct or replace the supplies delivered, he shall nevertheless proceed in accordance with the written request issued by the Contracting Officer per the third paragraph of this clause to correct or replace the defective or nonconforming supplies. In the event it is later determined that such supplies were not defective or nonconforming within the provisions of this clause, the contract price shall be equitably adjusted. Failure to agree to such an equitable adjustment of price shall be a dispute concerning a question of fact within the meaning of the clause of the contract entitled "DISPUTES";
34.6. Any supplies or parts thereof furnished in replacement pursuant to this clause shall also be subject to all the provisions of this clause to the same extent as supplies initially delivered. Corrected parts shall be warranted for a period not less than six (6) months starting at the time the part is received back at the user’s location;
34.7. In case of a provisional acceptance the warranty period starts at the date of provisional acceptance and ends twenty-four (24) months after the date of provisional acceptance;
34.8. Failure to agree upon any determination to be made under this clause shall be a dispute concerning a question of fact within the meaning of the "DISPUTES" clause of the contract;
34.9. The word "supplies" as used herein includes related services;
34.10. The rights and remedies of SHAPE provided in this clause are in addition to and do not limit any rights afforded to SHAPE by any other clause of the Contract;
35. SERVICE PARTS AND AVAILABILITY
Not applicable to this contract.
36. INVOICES
Invoices shall be prepared and submitted in one original unless otherwise specified and shall contain: contract number, item number, contract description of supplies or services, sizes,
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part II - Page 44 of 50
NATO UNCLASSIFIED
quantities, unit prices (exclusive of taxes or duties for which relief is available) and extended totals.
37. PAYMENTS
37.1. Payments for all supplies and services shall be made within the following month when properly supported and acceptable invoices submitted upon completion of delivery, or of the works, inspection, and acceptance, have been received;
37.2. No payment shall be made with respect to undelivered supplies, work not performed and/or services not rendered under the contract;
37.3. Payment shall be made in the currency or currencies of the Contract and the Contractor shall bear all related charges;
37.4. SHAPE shall not bear any cost related to financial guarantees, which the Contractor is required to provide under the contract.
38. ASSIGNMENT OF CLAIM
No assignment of claim shall be made by the Contractor without prior written authorisation from the Contracting Officer.
39. AUDIT
SHAPE audit personnel or any person designated by the Contracting Officer shall have the right to inspect or audit the Contractor's account books and to make such inspections or audits as may be considered necessary to verify and ensure strict compliance with all provisions of the contract and with the applicable SHAPE Directives.
40. CORRUPTION AND ILLICIT GRATUITIES
40.1. The Contractor certifies that neither it nor its agents or representatives have offered or given any gratuity whatsoever to any SHAPE personnel, with a view to securing a contract or favourable treatment with regard to the award, modification or execution of the contract;
40.2. SHAPE may, by registered letter, terminate the contract without notice if it is found, after an investigation instituted by SHAPE, that gratuities (in the form of entertainment, gifts or others) were offered or given by the Contractor to SHAPE personnel with respect to the award of the contract or to the taking of any decision regarding its execution.
41. RELEASE OF NEWS/INFORMATION
41.1. No news release (including photographs and films, public announcements, etc.) on any part of the subject matter of the contract shall be made by the Contractor without prior written approval by the Contracting Officer;
41.2. Furthermore the Contractor shall, in no other manner whatsoever use the name, emblem or official seal of NATO and/or SHAPE in connection with its business or otherwise.
NATO UNCLASSIFIED IFIB-ACO-SH-13-11
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities _________________________________________________________________________________________
Part II - Page 45 of 50
NATO UNCLASSIFIED
42. INCONSISTENCY BETWEEN ENGLISH VERSION AND TRANSLATION OF CONTRACT
In the event of inconsistency between any terms of the contract and any translation thereof into another language, the English language meaning shall prevail.
43. CONTRACT ADMINISTRATION AND COMMUNICATIONS
43.1. The Contractor shall direct all inquiries, notices and communications regarding the contract to the Contracting Officer;
43.2. All inquiries, notices and communications which may be personally delivered, mailed, or copied to the address indicated in Part I hereto;
43.3. All inquiries, notices and communications between the Contractor and SHAPE shall be written in English and in all correspondence the Contract number shall be mentioned;
43.4. Any discussion/negotiation between Contractor and Contracting Officers or Contracting Officer’s Technical Representatives shall be recorded in Minutes which shall be signed by authorised representatives of both Contractor and SHAPE. All minutes are considered to be a summary record of discussions and specific actions to be undertaken by the parties as a result of meeting.
43.5. If, however, it is considered by either party that certain discussions and decisions fall
outside the scope of the contract, then this fact should be recorded at the time and contract amendments will be necessary prior to any action. In this respect it is stated that any changes or instructions which are to be binding shall be given in writing only by the NATO Contracting Officer.
IFIB-ACO-SH-13-11 Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities
__________________________________________________________________________________
Part III - Page 46 of 50
NATO UNCLASSIFIED
SUPREME HEADQUARTERS ALLIED POWERS EUROPE
Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities
PART III SPECIAL PROVISIONS, TECHNICAL SPECIFICATIONS,
STATEMENT OF WORK
IFIB-ACO-SH-13-11
IFIB-ACO-SH-13-11 Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities
__________________________________________________________________________________
Part III - Page 47 of 50
NATO UNCLASSIFIED
PART III
SPECIAL PROVISIONS, TECHNICAL SPECIFICATIONS, SOW
1. PURPOSE
This is an Indefinite Delivery, Requirements type contract for the supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities located in Belgium.
2. DURATION OF THE CONTRACT
2.1. The contract will be effective on 1 January 2014 or upon award, whichever is later; 2.2. It will be in force for one (1) year with the possibility, subject to funds availability, of up to four
one-year extension options; 2.3. Renewal is also dependent upon certification of satisfactory performance, during the
previous year. Ratings reported through the Contractor’s Performance Evaluation System will play a key role in the award of the aforementioned extension options;
2.4. The Contracting Officer will provide notice of extension in writing not later than 15 days
before the expiration date of the contract or its subsequent extensions (as applicable).
3. NON-EXCLUSIVE RIGHTS
3.1. Subject to the availability of funds granted by NATO Military Budget Committee (MBC), orders will be placed with the Contractor;
3.2. For information purposes only and without any prejudice, total annual value of the
prospective contract is estimated in an amount of 150,000 EURO. 3.3. However, ACO cannot guarantee that the total value of the contract will reach any
minimum amount.
4. ORDERING OFFICER
4.1. Upon award, an Ordering Officer will be appointed by the Contracting Officer for the purpose of placing orders against the contract;
4.2. By this designation, the Ordering Officer is authorized to take any and all action which could
lawfully be taken by the Contracting Officer with respect to:
- Placing call orders to be fulfilled by the Contractor up to a total specified amount per call order;
- Maintaining of liaison and direct communication with the Contractor for every issue related to the call orders.
IFIB-ACO-SH-13-11 Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities
__________________________________________________________________________________
Part III - Page 48 of 50
NATO UNCLASSIFIED
4.3. The designation as Ordering Officer remain in effect through the life of the contract, unless sooner revoked/terminated by the Contracting Officer.
5. EXTENT OF OBLIGATION
Upon award of the contract, ACO will only be obligated to the extent of authorised purchases actually made against the contract by authorized Ordering Officer(s).
6. PRICE PROPOSAL
6.1. Bidders shall quote Unit Prices for the SHAPE Core List that shall apply from 1 January 2014 to 31 December 2014. For the 4 possible one-year extension options a revision formula shall be proposed in accordance with paragraph 7 hereunder.
6.2. Bidders shall also propose fixed percentages (%) discount per brand to his Official pricing List (catalogue), which shall:
• apply to items NOT LISTED in the SHAPE "core list". • be effective through the whole duration of the contract, to include the four one-year
extension options, if granted. 6.4. The Price Proposal shall be submitted in EURO currency on the attached PRICE
FORMAT (Enclosure 5 to Part I). Although bidders are authorised to adapt the format according to their needs, they must keep in mind that basic presentation must not change. Bidders must note that partial bidding is not authorised.
7. REVISION FORMULA
The bidders shall outline in their Price proposal (Enclosure 5 to Part I) the revision formula that they would apply to the unit prices listed in the SHAPE Core List in case of the exercise of the possible 4 one-year options.
8. PROCESSING OF ORDERS
8.1. Orders placed against the contract can be made either by telephone, fax, email or online. SHAPE preferred method of ordering is online ordering;
8.2. Orders may only be placed by duly authorized Ordering Officers within the limit of their authority;
8.3. Ordering officers will place orders stating the items and quantities being ordered;
8.4. The Supplier shall not deliver any supplies and services without an express written, dated, and approved order form;
8.5. Orders will be processed by the supplier immediately upon their receipt.
9. DELIVERY TERMS
9.1. All orders from SHAPE shall be “Delivered at Place” (DAP – Incoterm 2010) to the location specified on the actual task order
9.2. Supplies ordered through this contract shall normally be delivered within 5 working days from the date of issue. For urgent requirements, the delivery term will be 48 hours
IFIB-ACO-SH-13-11 Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities
__________________________________________________________________________________
Part III - Page 49 of 50
NATO UNCLASSIFIED
9.3. For urgent requirements, the delivery term will be 48 hours;
9.4. All supplies shall be delivered to the designated warehouse or delivery place stated on the order form;
9.5. Regular working delivery hours are Monday through Thursday from 0800-1200 and 1300-1700 hrs, Friday from 0800-1200 and 1300-1530 hrs;
9.6. If the contractor expects delay for delivery of some items he will advise the Ordering Officer of the expected delivery date. In such case, the Ordering Officer will be authorized to partially or totally cancel his order to obtain it from another source.
10. MARKING, LABELING, PACKAGING
10.1. As a minimum, all packages will be labelled with :
- the complete delivery address as indicated on the order form received;
- the contract number and
- the (call)order number.
10.2. All packages will be accompanied by a delivery ticket indicating, as a minimum, the description of the items contained with their respective quantity.
11. INSPECTION AND ACCEPTANCE OF GOODS
11.1. Packaging inspection will take place at the location and time of delivery: any damage will be recorded on the delivery note;
11.2. The SHAPE receiving authority is responsible for determining the quantitative and qualitative compliance of the items with the terms and conditions of the contract. Where it is not possible to test operation of supplies/equipment prior to receipt signature, acceptance shall be based on quantity only, with discovered discrepancies handled via applicable warranty clauses. Nonconforming supplies shall be immediately rejected. Unless otherwise provided in the contract, acceptance shall be conclusive except as regards latent defects, fraud, or such gross mistakes as amount to fraud.
12. PROCESSING OF INVOICES/PAYMENTS
12.1. Payments under the contract will be made in EURO;
12.2. Each invoice shall be addressed to SHAPE Accounts Payable at [email protected] and contain
- Its reference and issue date; - The Purchase Order number (if applicable); - The delivery tickets’ number; - The description of items supplied; - The quantities delivered; - The unit prices (exclusive of taxes and duties); - The discounts offered (if applicable); - The total amount to be paid; - The bank account details where the Contractor will receive the payment;
IFIB-ACO-SH-13-11 Supply and delivery of sanitary, heating and plumbing items/accessories for the SHAPE compound facilities
__________________________________________________________________________________
Part III - Page 50 of 50
NATO UNCLASSIFIED
12.3. The standard principle applied by ACO HQs is that payment will only be made upon full compliance with all contract terms by the contractor;
12.4. Payment of accurate, certified and validated invoices shall be made no later than thirty days after the date they are received.
12.5. Each party shall bear its own costs for Electronic Fund Transfers related to any and all payments in the execution of this contract.
13. CONSUMER PROTECTION
SHAPE is a non-profit international organisation that will use the goods and services ordered through this contract for its own self-consumption and not for sale. Therefore, the Supplier agrees that SHAPE must be treated as a consumer for the purposes of the application of any benefits derived from prevailing regulations on consumer protection (e.g., EU Directives like 1999/44/EC and 93/13/ECC). Specifically, the Supplier agrees to extend to SHAPE the same guarantees and protection applicable to consumers in accordance with any of the stated regulations.
14. LANGUAGES
14.1. The governing language of the prospective contract will be English.
14.2. The contractor’s representative must be able to conduct all business and correspondence in English and French.
14.3. Day-to-day business documents and dealings may be conducted either in English and/or French.