reduction of energy consumption in our museum in 2013

15
Environmental Committee Environment February 2014

Upload: museu-nacional-dart-de-catalunya

Post on 03-Jun-2015

67 views

Category:

Environment


0 download

TRANSCRIPT

Page 1: Reduction of energy consumption in our museum in 2013

Environmental CommitteeEnvironmentFebruary 2014

Page 2: Reduction of energy consumption in our museum in 2013

Energy management

What have we done to improve the energy management?

•Timetable coordination between public opening times and work schedule.

•To install frequency variation control to reduce fans speed.

•To replace energy-saving light bulb by LED technology.

•To control air conditioning criteria.

•To change values of water temperature based on daily outdoor parameters.

•Stoppages of production hot and cold machinery according to four daily reviews of environmental parameters.

•Tests to stop air conditioning in exhibitions and reserves room by adjusting the operation periods of cheaper electricity rates and according to the thermal inertia of each zone.

Page 3: Reduction of energy consumption in our museum in 2013

����������� ����� ��������

������������������������

����

����

���� ���� ���� ���� ���� ����

Target-5%

Result-10%

Energy management

Active Energy Consumption (MWh)

Page 4: Reduction of energy consumption in our museum in 2013

������������������

�����

������

����

����

���

���� ���� ���� ���� ���� ����

Target-5%

Energy management

Result-11%

Gas consumption (MWh)

Page 5: Reduction of energy consumption in our museum in 2013

Emissions to the atmosphere

-511 Tn

=

763 trees

Energy management

Page 6: Reduction of energy consumption in our museum in 2013

Energy management

What will we do to continue improving the energy consumption?

•To contract an ESE (Energy Service Company).

•Training in environmental practices.

•Coordinating work schedules with programming operation of facilities.

•Replacing energy-saving lamps to LED technology.

•Control parameters of air.

•To change values of water temperature based on daily outdoor parameters.

•Stoppages of production hot and cold machinery according to four daily reviews of environmental parameters.

•Tests to stop air conditioning in exhibitions and reserves room.

Page 7: Reduction of energy consumption in our museum in 2013

Water management

What have we done to improve water management?

•Replacing taps toilets.

•Leak detection.

Page 8: Reduction of energy consumption in our museum in 2013

Water management

Target-5%

Result-14%

��������� ��������

������

�����

������

�����

����� �����

���� ���� ���� ���� ���� ����

Water consumption (m3)

Page 9: Reduction of energy consumption in our museum in 2013

Water management

What will we do to continue improving water consumption?

•Replacing toilets flush.

•Install saving taps in restaurants.

•Training courses in environmental practices.

•Leaks detection.

Page 10: Reduction of energy consumption in our museum in 2013

Result37%

������ �������� ���

�����

��

�����

����

���� ���� ���� ����

Waste management

Target50%

Waste segregation

Page 11: Reduction of energy consumption in our museum in 2013

Waste management

What will we do to improve waste management?

•Concessionaire control.

•To improve signage at Green Point and other points of interest.

•Training course for employees and suppliers (reduction and segregation).

•Reducing the use of paper and toner through document management and optimization of printersand copiers.

•Selective collection in public areas.

•Criteria for hiring, purchasing and responsible consumption.

Page 12: Reduction of energy consumption in our museum in 2013

������ �

��� ��������� �������

��� � ���������� � ��

�����

���� � ����

����� !������ ��""� ��

���� � ������

����

#�� � � �

�� �� �

���� �

����

Communication

Page 13: Reduction of energy consumption in our museum in 2013

Communication

Page 14: Reduction of energy consumption in our museum in 2013

Comunicació

Page 15: Reduction of energy consumption in our museum in 2013

Target 2014-2015

ENERGYReduction of energy consumption (electricity + gas) by 5% over 2013

WATERReduction of water consumption by 5% over 2013

WASTESegregate 50% of the waste produced, including the concessionaires.

COMMUNICATIONIncreased perception of environment work among employees through communication actions andverification surveys, reaching 55% share and an average of 6.7 points

Improvements 2014-2015