redevelopment of national stadium into a sports hub at kallang 26 jan 2005
TRANSCRIPT
REDEVELOPMENT OF NATIONAL STADIUM INTO A
SPORTS HUB AT KALLANG
26 JAN 2005
REDEVELOPMENT OF NATIONAL STADIUM INTO A
SPORTS HUB AT KALLANG
26 JAN 2005
• It is part of the Sports Industry Development Strategy to turn Singapore into a Sporting Nation
• To attract & host World Class Sports & Entertainment Events
• To promote Singapore as an attractive place for global talent to live & play
WHY DEVELOP A SPORTS HUB?
#1: A cluster of up-to-date and multi- functional venues to cater to World Class Sports & Entertainment Events
WHAT’S A SPORTS HUB?
#2: A Lifestyle Hub - To draw Singaporeans & tourists with a buzz of sports, leisure and entertainment activities on both event and non- event days.
#2: A Lifestyle Hub - To draw Singaporeans & tourists with a buzz of sports, leisure and entertainment activities on both event and non- event days.
#3: A National Architectural Icon#3: A National Architectural Icon
FEASIBILITY STUDY
• Jun - Dec 2002
• Consortium led by PricewaterhouseCoopers
Consortium (PWC)
• Feasibility Study- Site, Transport Network, Projected
Revenue on event days, Capital & operating cost etc
• Key result of the study
Sports Hub Project is commercially viable on
an operational basis. It is not possible to
fully recover the Development Cost
CAPITAL COST (S$m)CAPITAL COST (S$m)Facilities Cost (S$mil) Main Stadium (45,000 - 55,000 seats) with Visitor Centre, Warm Up track, including option for Retractable Roof ($30 mil)
274.30
Multi-purpose arena 44.40
Supporting Commercial Facilities (Sports Cluster/ Health & Fitness/ Leisure Activities Centre)
73.80
Aquatics Centre cum Water Leisure Park 28.00
Carpark (multi-storey parking) 81.80
Landscape 22.10
Demolition & on-site infrastructure 12.70
Associated Costs 50.49
Sub Total for Capital Cost 587.59
Contingencies (10%) 58.759
Grand Total 646.35 The cost per lot for basement carpark is about $38k and that for multi-storey carpark is about $25k.
COMPARISON OF COMPARISON OF CAPITAL COSTCAPITAL COST
Cost/seat (S$)
9216 8670 8351
6021
40002867
6100
Wembley StadiumAustralia
Stade deFrance
ManchesterStadium
HK Stadium KL Stadium ProposedSpore
Stadium* Based on 45,000 seats
REVENUEREVENUE
Facilities Revenue per annum(S$m)
New Stadium 9.83
Multi-purpose arena 3.56
Singapore Indoor Stadium 6.09
Health & Fitness Centre 1.2
Sports Cluster 6.45
Leisure Activities Centre (e.g Bowling, Snooker/billiards, retail and F&B)
5.15
Carpark 1.89
Total 34.17
Summation of the various potential revenue centres
Projected Revenue is estimated to be abt $34 mil per year
OPERATING COSTFacilities Operating Cost
per annum (S$m) New Stadium 5.54
Multi-purpose arena 1.82
Singapore Indoor Stadium 3.98
Health & Fitness Centre 0.6
Sports Cluster 3.5
Leisure Activities Centre 2.38
Carpark 2.06
Total 19.88
The operating cost is estimated to be abt $20 mil per year
REVENUES AND OPERATING COSTSREVENUES AND OPERATING COSTSIN STEADY STATE (S$mil)IN STEADY STATE (S$mil)
(S$m)
Revenues/ yr * 34.17
Operating Costs/ yr * 19.88
Profit/ yr
14.29
NPV over 30 yrs 118
* Revenues and costs shown are the average per year. In the actual model,these vary from year to year depending on whether there are major events or cyclical maintenance projected in that year.
FACILITIESFACILITIESNew Stadium New Stadium (45,000 - 55,000 seating capacity (45,000 - 55,000 seating capacity with adjacent 400m warm up track)with adjacent 400m warm up track)
Multi-purpose Indoor Arena Multi-purpose Indoor Arena (6,000 seating (6,000 seating capacity)capacity)
Supporting Commercial Facilities Supporting Commercial Facilities (GFA 34,000 m(GFA 34,000 m22))
Carpark - 3,275 lotsCarpark - 3,275 lots
Aquatics Centre cum Water Leisure Park*Aquatics Centre cum Water Leisure Park*
Existing Singapore Indoor StadiumExisting Singapore Indoor Stadium (Will be included as parts of Sports Hub and be managed by the same Sports (Will be included as parts of Sports Hub and be managed by the same Sports
Hub operator)Hub operator) *The Aquatics Centre was not included in the original feasibility study. Capital cost is estimated to be *The Aquatics Centre was not included in the original feasibility study. Capital cost is estimated to be
about S$30milabout S$30mil
Netball Centre
Tennis/ Squash Centre
Open Space
Cricket Field
Leisure
DromeKallang Theatre
SITESITE
35.6 ha
Indoor Stadium
Oasis Rest
New MRT Station
New KPE
Stadium Carpark
Practice Track
N
National Stadium
Kallang - Paya Lebar Expressway
Kallang - Paya Lebar Expressway
NEW TRANSPORT LINKSNEW TRANSPORT LINKS
Circle
Lin
e –
Bouleva
rd S
tatio
n
Circle
Lin
e –
Bouleva
rd S
tatio
n
Stadium
Boulevard
Stadium Walk /
Crescent
Tanjong Rhu Rd
ECP
Geylang River
Nicoll Highway
KPE Interchanges near Kallang site
Method of Procurement Method of Procurement
Public Private PartnershipPublic Private Partnership (PPP) (PPP) in the form of in the form of
DDesign, esign, BBuild, uild, FFinance, inance, TTransfer, ransfer, OOperate (DBFTO) modelperate (DBFTO) model
Ownership of Sports Hub will be transferred to the government Ownership of Sports Hub will be transferred to the government as soon as construction is completed and the PPP provider as soon as construction is completed and the PPP provider continue to have the exclusive rights to operate the facilitiescontinue to have the exclusive rights to operate the facilities
PPP Model PPP Model Government’s RoleGovernment’s Role
Own the Sports Hub land and buildingOwn the Sports Hub land and building
Lease the land to PPP providerLease the land to PPP provider
Annual payment (over 20-30 years) to cover:Annual payment (over 20-30 years) to cover:
- Development Cost of approx $650mil- Development Cost of approx $650mil
- Cost of Operations and Maintenance (Availability - Cost of Operations and Maintenance (Availability
Payment)Payment)
Entitled to x% of event days/yearEntitled to x% of event days/year
(To be set aside for govt use)(To be set aside for govt use)
What is PPP?
PPP Provider’s RolePPP Provider’s Role
DDesign, esign, BBuild, uild, FFinance and inance and OOperate the perate the
entire Sports Hub to meet the public entire Sports Hub to meet the public
sector’s requirementsector’s requirement
MarketMarket the Sports Hub and attract major the Sports Hub and attract major
events*events*
Ensure Ensure operationaloperational viabilityviability
PPP ModelPPP Model
* Market event days not taken by the govt and maximise revenues * Market event days not taken by the govt and maximise revenues by attracting eventsby attracting events
TimelineTimeline
Phase 1 (Jul 05 - Feb 07)Phase 1 (Jul 05 - Feb 07)
Tender Process Tender Process
- - Pre-qualificationPre-qualification
- Request for bid and concept design- Request for bid and concept design
- Best and Final Offer (BAFO)- Best and Final Offer (BAFO)
Phase 2 (Mar 07 - Dec 10)Phase 2 (Mar 07 - Dec 10)
Construction Construction