Road Impact Assessment CEB06438

Prepared for BMA via URS 25 September 2013

Red Hill Mining Lease EIS

Road Impact Assessment CEB06438

Page 2: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS ii

Document Information Prepared for BMA via URS Project Name Road Impact Assessment File Reference Appendix N_Roads and Transport_Rev F 2013 09 25 (Cardno).docx Job Reference CEB06438 Date 25 September 2013

Contact Information Cardno (Qld) Pty Ltd

ABN 57 051 074 992 Level 11 Green Square North Tower 515 St Paul’s Terrace Locked Bag 4006 Fortitude Valley Qld 4006 Telephone: 07 3369 9822 Facsimile: 07 3369 9722 International: +61 7 3369 9822 [email protected] www.cardno.com.au

Document Control Version Date Author Author

Initials Reviewer Reviewer

Initials

Final Rev F

25 Sept 2013 Jessica Peters JJP Jeffrey Baczynski JDB

© Cardno 2013. Copyright in the whole and every part of this document belongs to Cardno and may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or form or in or on any media to any person other than by agreement with Cardno.

This document is produced by Cardno solely for the benefit and use by the client in accordance with the terms of the engagement. Cardno does not and shall not assume any responsibility or liability whatsoever to any third party arising out of any use or reliance by any third party on the content of this document.

Page 3: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS iii

Executive Summary

BM Alliance Coal Operations Pty Ltd (BMA) proposes to convert the existing Red Hill Mining Lease Application (MLA 70421) to enable the continuation of mining operations associated with the existing Goonyella, Riverside and Broadmeadow (GRB) mine complex. Specifically, the mining lease conversion will allow for:

> An extension of three longwall panels (14, 15 and 16) of the existing Broadmeadow underground mine (BRM)

> An incremental expansion of the existing Goonyella Riverside Mine (GRM) > A future incremental underground expansion option (the Red Hill Mine (RHM)) on the Red Hill

Mining Lease.

As part of the Environmental Impact Statement (EIS) Cardno (Qld) Pty Ltd (Cardno) were commissioned to prepare a Road Impact Assessment to document the potential impacts of traffic associated with the Red Hill Mining Lease project components on the safety, efficiency and condition of the road network and, where appropriate, identify mitigation strategies.

This Road Impact Assessment is contained to the potential future GRM incremental expansion and the RHM underground expansion option. This assessment does not include the proposed extension to the BRM, as the extension will not intensify existing activities within BRM, the existing BRM workforce will complete the work associated with the extension and no additional infrastructure is proposed.

The timing for commencement, the rate of development and scale of future production for the GRM incremental expansion and RHM underground expansion option has not been determined and is subject to the owner’s approvals. At full production, the future RHM mine has the potential to produce up to 14 million tonnes per annum (mtpa) of high quality hard coking coal over a life of 20 to 25 years. Under this scenario, the potential capacity of the extended complex (GRB mine complex and RHM) would be up to approximately 32.5mtpa. For the purposes of the EIS, the RIA adopts a scenario whereby construction commences in 2020, operations commence in 2022 and the operations continue for approximately 23 years.

Access to the EIS study area is proposed to be achieved via the existing Riverside Access Road access and via a new access point on Red Hill Road. Red Hill Road will also provide connection to the development of an accommodation village to support the proposed workforce. The exact location of the access to the proposed Red Hill accommodation village from Red Hill Road is still to be resolved following detailed engineering investigations.

The construction phase is anticipated to commence in 2020 and be completed by 2024. An estimated 2,000 peak person workforce will be required for the construction phase. BMA has advised that the construction workforce will be up to 100% remote and will be housed in the proposed Red Hill accommodation village. The construction workforce will be transported using buses between the project mine and infrastructure areas, Red Hill accommodation village and Moranbah Airport. A conservative allowance has however also been made for the purposes of traffic modelling within the assessment for some workers to drive to Mackay and beyond. The operation phase is anticipated to commence in 2023 and last until approximately 2044. The operations phase is anticipated to require a 1,500 peak person workforce which will be up to 100% remote and housed in the proposed Red Hill accommodation village. The operation workforce will be transported using buses between the mine and infrastructure areas, Red Hill accommodation village and Moranbah Airport. A conservative allowance has also been made within the assessment for some workers to drive to Mackay and beyond.

An overlap between construction and operational workforces has been also been assessed. BMA advised that there may be an overlap between construction and operation phases, with a workforce of up to 3,000 persons during this overlap period. An accommodation village capacity of 3,000 is proposed to account for this peak workforce arising out of the potential overlap between construction and operation phases.

Historical crash data for the roads north of Moranbah has been reviewed. No clear trends were present within the reviewed data that would indicate the presence of significant existing safety issues. In addition, no fatal crashes were observed.

Page 4: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS iv

An intersection scoping assessment was undertaken in accordance with the methodology outlined in the Department of Transport and Main Road’s (TMR’s) Guidelines for the Assessment of Road Impacts of

Development (2006). This identified locations where associated traffic has the potential to have a significant impact. Detailed analysis of the performance of the scoped intersections and links was then undertaken to confirm if these road elements would continue to operate within standard performance thresholds at the assessed future design horizon years.

The analysis indicated the following road elements will continue to operate within standard thresholds for all design horizons with allowance for background growth including cumulative impacts:

> Goonyella Road/Riverside Access Road intersection > Goonyella Road/Red Hill Road intersection > Goonyella Road (between Red Hill Road and Railway Overpass) > Goonyella Road between Riverside Access Road and Red Hill Road > Riverside Access Road between Goonyella Road and the EIS study area.

The Goonyella Road/Curtin Street intersection is anticipated to have the potential to be significantly impacted, with the need for an intersection upgrade to accommodate projected traffic. The Goonyella Road/Moranbah Access Road/Mills Avenue and Peak Downs Highway/Moranbah Access Road intersections are likely to warrant upgrading regardless of the RHM underground expansion option and the GRM incremental expansion option proceeding. It is recommended that once the owner’s investment decision has been made and prior to the commencement of construction, BMA engage with Isaac Regional Council regarding its plans to upgrade these intersections, and make a proportionate contribution towards the cost of the upgrade works (i.e. not fully fund).

The proponent’s obligation towards pavement works has been assessed in accordance with TMR’s guidelines. The pavement loading impact has been classified as ‘insignificant’ and therefore no proponent funded contribution towards pavement maintenance or rehabilitation works is warranted. It is industry standard practice in Queensland to classify the pavement impacts as insignificant where project activities will impact existing conditions by less than 5%.

In summary, the Road Impact Assessment has determined that the project will not generate any traffic impacts on the state-controlled, council-controlled or private road networks that are so significant that they should preclude approval of the EIS. The proponent’s commitment to engage with the asset owners (prior to the commencement of construction) and establish proportionate contributions towards road capacity works are anticipated to fully offset all associated traffic impacts.

Page 5: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS v

Table of Contents Executive Summary iii

1 Introduction 1 1.1 Road Impact Assessment Context 1 1.2 Road Impact Assessment Methodology 3

2 Traffic Context 4 2.1 Existing Operations 4 2.2 Project Overview 4 2.3 Road Realignments 4 2.4 Site Access 4 2.5 Stock Routes 4 2.6 Red Hill Accommodation Village 4 2.7 Network Operation Assessment Scenarios 4

3 Existing Road Network 6 3.1 Peak Downs Highway 6 3.2 Moranbah Access Road 6 3.3 Goonyella Road 6 3.4 Red Hill Road 6 3.5 School Bus Routes 6 3.6 Road Crash History 7 3.7 Road Network Planning 7

4 Historic and Future Background Traffic Volumes 8 4.1 Existing Traffic Volumes 8 4.2 Traffic Growth Forecast 8

5 Project Traffic Generation 10 5.1 Construction Phase Traffic Generation 10 5.2 Operation Phase Traffic Generation 11 5.3 Overlap Scenario 12 5.4 Assessment Volumes 12

6 Network Performance Assessment 13

7 Intersection Design and Operation 14 7.1 Assessment Traffic Volumes 14 7.2 Intersection Assessment Scope 14 7.3 Intersection Operation Performance Thresholds 14 7.4 Intersection Operation Assessment 15

8 Pavement Impact Assessment 30 8.1 Pavement Impact Assessment Scoping 30

9 Cumulative Impacts 31

10 Sustainable Transport 32 10.1 Existing Infrastructure 32 10.2 Sustainable Transport Planning 32 10.3 Project Impacts 32

11 Haulage of Goods and Materials 33 11.1 Transport Operations (Road Use Management) Act 1995 33

Page 6: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS vi

11.2 Queensland Government Guidelines 33 12 Conclusion 34

Tables Table 3-1 Summary of Crash Statistics 7 Table 4-1 Moranbah Statistical Area Population Projections 8 Table 4-2 Adopted Traffic Growth Rates 8 Table 5-1 Construction Phase Project Workforce Movements 10 Table 5-2 Construction Phase Material Movements 11 Table 5-3 Operation Phase Project Workforce Movements 12 Table 5-4 Operation Phase Material Movements 12 Table 6-1 Level of Service Thresholds 13 Table 6-2 Level of Service Assessment Results Summary 13 Table 7-1 Goonyella Road/Riverside Access Road Intersection: SIDRA Analysis Summary - Existing Form 17 Table 7-2 Goonyella Road/Red Hill Road Intersection: SIDRA Analysis Summary – Existing Form 20 Table 7-3 Goonyella Road/Curtin Street Intersection: SIDRA Analysis Summary – Existing Form 23 Table 7-4 Goonyella Road/Curtin Street Intersection: SIDRA Analysis Summary – Upgraded Form 24 Table 7-5 Goonyella Road/Moranbah Access Road/Mills Avenue Intersection: SIDRA Analysis Summary –

Existing Form 26 Table 7-6 Goonyella Rd/Moranbah Access Rd/Mills Av Intersection: SIDRA Analysis Summary – Potential

Upgrade Form 27 Table 7-7 Peak Downs Highway/Moranbah Access Road Intersection: SIDRA Analysis Summary –

Existing Form 28 Table 7-8 Peak Downs Highway/Moranbah Access Road Intersection: SIDRA Analysis Summary –

Potential Upgrade Form 29 Table 8-1 Maintenance Impacts Summary – Peak Downs Highway 30

Figures Figure 4-1 Peak Downs Highway – Context of Adopted Growth Rate 9 Figure 4-2 Moranbah Access Road – Context of Adopted Growth Rate 9 Figure 7-1 Goonyella Road/Riverside Access Road Intersection: Northern Goonyella Road Approach –

Looking North 15 Figure 7-2 Goonyella Road/Riverside Access Road Intersection: Southern Goonyella Road Approach -

Looking South 16 Figure 7-3 Goonyella Road/Riverside Access Road Intersection: Western Riverside Access Road

Approach - Looking West 16 Figure 7-4 Goonyella Road/Riverside Access Road Intersection: Assessed SIDRA Layout – Existing Form 17 Figure 7-5 Goonyella Road/Red Hill Road Intersection: Northern Goonyella Road Approach - Looking

North 18 Figure 7-6 Goonyella Road/Red Hill Road Intersection: Eastern Red Hill Road Approach - Looking East 18 Figure 7-7 Goonyella Road/Red Hill Road Intersection: Southern Goonyella Road Approach - Looking

South 19 Figure 7-8 Goonyella Road/Red Hill Road Intersection: Assessed SIDRA Layout – Existing Form 19

Page 7: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS vii

Figure 7-9 Goonyella Road/Curtin Street Intersection: Northern Goonyella Road Approach - Looking North 21 Figure 7-10 Goonyella Road/Curtin Street Intersection: Eastern Curtin Street Approach - Looking East 21 Figure 7-11 Goonyella Road/Curtin Street Intersection: Southern Goonyella Road Approach - Looking South 22 Figure 7-12 Goonyella Road/Curtin Street Intersection: Assessed SIDRA Layout – Existing Form 22 Figure 7-13 Goonyella Road/Curtin Street Intersection: Intersection Layout – Upgraded Form 23 Figure 7-14 Goonyella Road/Moranbah Access Road Intersection: Northern Goonyella Road Approach -

Looking North 24 Figure 7-15 Goonyella Road/Moranbah Access Road/Mills Avenue Intersection: Eastern Mills Avenue

Approach - Looking East 25 Figure 7-16 Goonyella Road/Moranbah Access Road/Mills Avenue Intersection: Southern Moranbah Access

Road Approach - Looking South 25 Figure 7-17 Goonyella Road/Moranbah Access Road/Mills Avenue Intersection: Assessed SIDRA Layout –

Existing Form 26 Figure 7-18 Goonyella Road/Moranbah Access Road/Mills Avenue Intersection: Assessed SIDRA Layout –

Potential Upgrade Form 27 Figure 7-19 Peak Downs Highway/Moranbah Access Road Intersection: Assessed SIDRA Layout – Existing

Form 28 Figure 7-20 Peak Downs Highway/Moranbah Access Road Intersection: Assessed SIDRA Layout –Potential

Upgrade Form 29

Appendices Appendix A Project Maps Appendix B Crash Data Appendix C Assessment Traffic Volumes Appendix D Construction and Operation Assumptions Appendix E Bibliography Appendix F Glossary of Terms

Page 8: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 1

1 Introduction

1.1 Road Impact Assessment Context

Cardno (Qld) Pty Ltd (Cardno) has been commissioned by URS Australia Pty Ltd (URS) to prepare the Road Impact Assessment component of the Environmental Impact Statement (EIS) for the Red Hill Mining Lease. The EIS has been prepared on behalf of the mine operator BM Alliance Coal Operations Pty Ltd (BMA). This assessment has been completed with regards to the draft terms of reference (ToR) supplied by BMA August 2013 for the Red Hill Mining Lease.

The Red Hill Mining Lease is located approximately 230 km southwest of Mackay by road. It is connected to Mackay via Riverside Access Road, Goonyella Road, Red Hill Road, Moranbah Access Road and the Peak Downs Highway. Riverside Access Road, Red Hill Road and Goonyella Road also provide connectivity between the existing operations, the Red Hill Mining Lease area and Moranbah, the most significant township in the vicinity of the project. Refer to the locality plans provided in Appendix A.

The proposed project will include the following:

> The extension of Broadmeadow underground mine (BRM) longwall panels 14, 15, and 16 into MLA70421. Key aspects include: - No new mining infrastructure is proposed other than infrastructure required for drainage of

incidental mine gas (IMG) to enable safe and efficient mining - Management of waste and water produced from drainage of IMG will be integrated with the

existing BRM waste and water management systems - The mining of the BRM panel extensions is to sustain existing production rates of the BRM

mine and will extend the life of mine (LOM) by approximately one year - The existing BRM workforce will complete all work associated with the extensions.

> The incremental expansion of the Goonyella Riverside Mine (GRM). Key aspects include: - Underground mining associated with the RHM underground expansion option to target the

Goonyella Middle Seam (GMS) on ML 1763 - A new mine industrial area (MIA) - A coal, handling and processing plant (CHPP) adjacent to the Riverside MIA on MLA 1764

and ML 1900 − the Red Hill CHPP will consist of up to three 1,200 tonne per hour modules. - Construction of a drift for mine access - A conveyor system linking RHM to the Red Hill CHPP - Associated coal handling infrastructure and stockpiles - A new conveyor linking product coal stockpiles to a new rail load-out facility located on

ML 1900 - Means for providing flood protection to the mine access and MIA, potentially requiring a levee

along the west bank of the Isaac River. > A potential new Red Hill underground mine expansion option to the east of the GRB mine

complex, to target the GMS on MLA 70421. The proposed mine layout consists of a main drive extending approximately west to east with longwall panels ranging to the north and south. Other key aspects include: - A network of bores and associated surface infrastructure over the underground mine footprint

for mine gas pre-drainage and management of goaf methane drainage to enable the safe extraction of coal

- A ventilation system for the underground workings - A bridge across the Isaac River for all-weather access. This will be located above the main

headings, and will also provide a crossing point for other mine related infrastructure including water pipelines and power supply

- A new accommodation village (Red Hill accommodation village) for the up to 100% remote construction and operational workforces with capacity for up to 3,000 workers

- Potential production capacity of 14mtpa of high quality hard coking coal over a life of 20 to 25 years.

Page 9: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 2

To inform this Road Impact Assessment, an inspection of the existing road network was undertaken in February 2011. In addition to the inspection, data pertaining to the existing condition of various roads has been sourced from the Department of Transport and Main Roads (TMR) and Isaac Regional Council (IRC). This includes data relating to existing traffic volumes, the existing pavement condition, existing school bus routes and historic crashes, as well as information pertaining to planned future road works. To supplement the information received from the road authorities, traffic counts were also independently undertaken at a number of intersections in May 2013 .

Information pertaining to the traffic generating activities likely to be associated with the GRM incremental expansion and the RHM underground expansion option was sourced from BMA. This Road Impact Assessment addresses the impacts of road-based transport associated with these two project elements. Impacts associated with other transport modes (i.e. rail, air and sea) do not form part of this technical study.

Page 10: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 3

1.2 Road Impact Assessment Methodology

This study has been carried out in accordance with the ToR, specifically utilising TMR’s Guidelines for

Assessment of Road Impacts of Development (2006) which identify the procedure for assessing the road impacts of a development in Queensland. The objective of the assessment documented herein is to identify the impact on the state-controlled, council-controlled and private road networks (open to the public) and, where appropriate, identify mitigation strategies.

The road impacts assessed as part of this study include any significant impacts on the performance of external road links or intersections, pavement loading impacts or road safety impacts. Traffic operation impacts have been assessed up to the ten year design horizon following commencement of the operation phase. Pavement impacts have been assessed during the construction and operation phases (i.e. 2020 to approximately 2044). To identify the road impacts, the following tasks were undertaken:

> Inspection of the road network including a broad safety assessment of Moranbah Access Road, Goonyella Road, Red Hill Road and Riverside Access Road

> Collation of data describing the existing road conditions from various road authorities > Interrogation of the crash data provided for Goonyella Road, Red Hill Road and Riverside Access

Road > Review of historic traffic growth patterns and future population projections for the Isaac region > Forecast traffic volume growth across the road network in the absence of the proposed activities > Source details from the proponent regarding the traffic generating activities likely to be associated

with the proposed activities > Forecast the likely traffic generation during both its construction phase and operation phase > Identify the spatial extents over which associated traffic has the potential to significantly impact

network performance > Assess the future operation of all intersections and links classified as potentially being

significantly impacted by associated traffic > Identify strategies to avoid, minimise and mitigate any significant road network performance

impacts associated with traffic generation > Identify the potential for significant pavement maintenance or rehabilitation impacts associated

with traffic generation > Identify the potential impact on the existing sustainable transport (i.e. pedestrian, cycle and public

transport) infrastructure > Identify the regulations and guidelines likely to govern associated project material movements.

The following items which have been identified in the ToR have not been specifically addressed within this Road Impact Assessment:

> The construction of any related plant and utilities within or impacting on the jurisdiction of any transport authority

> Likely heavy, oversize and indivisible loads (volume, composition, timing and routes) highlighting any vulnerable bridges and structures along proposed routes.

It is considered that the above items can be conditioned and be better addressed in a Road Use Management Plan following approval of the EIS when the project owners determine to proceed with the project and undertake detailed design, award construction contracts and finalise quantities and logistics. It is therefore anticipated that the proponent would be required to prepare a Road Use Management Plan addressing these items at the detailed design stage.

Page 11: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 4

2 Traffic Context

2.1 Existing Operations

BMA operates the existing GRB mine complex. The GRB mine complex is currently producing at a rate of approximately 14.5 million tonnes per annum (mtpa) based on a life of mine (LOM) of 57 years with an existing approval to increase the rate of mining to a maximum of 18.5 mtpa of product coal.

The existing GRM is an open-cut operation. The existing BRM is a punch longwall underground mine which has been developed off an existing highwall of the open-cut operation. Following processing on-site, the product coal is currently transported by rail to the BMA owned Hay Point Coal Terminal south of Mackay from which it is shipped to overseas markets.

2.2 Project Overview

BMA proposes to expand its current coal mining operations with the development of a new greenfield underground mine called the RHM and associated incremental expansion of GRM. The development of the RHM has the potential to increase BMA’s approved production capacity by 14mtpa to approximately 32.5 mtpa.

2.3 Road Realignments

Separate to any planning approvals required, realignment of Red Hill Road may be required to allow for the progression of mining from west to east. The design of any road realignments will be in accordance with the guidelines, standards and thresholds appropriate for the function and use of the roads.

2.4 Site Access

The GRB mine complex currently achieves access to the external road network at three locations: Goonyella Road (to the Goonyella Industrial Area); Riverside Access Road (to the Riverside Industrial Area); and Red Hill Road (to the Broadmeadow Underground Administration Area). The majority of additional traffic will use Red Hill Road. In addition, some increased traffic will be expected on the Riverside Access Road to support the construction and operation of the new Red Hill CHPP, depicted in Appendix A.

2.5 Stock Routes

The stock route alignment will need ongoing management as mining progresses in an easterly direction. BMA has undertaken consultation with the Department of Natural Resources and Mines (NRM) and landowner to agree an appropriate alignment for the stock route. The potential realignments are detailed at Appendix A.

2.6 Red Hill Accommodation Village

Connection to the proposed accommodation village is planned via Red Hill Road, as shown at Appendix A. . The exact location of the supporting access to the Red Hill accommodation village is still to be resolved following detailed engineering investigations. The traffic analysis has assumed that all workforce movements will occur to or from this location.

2.7 Network Operation Assessment Scenarios

Traffic volumes and patterns associated with the construction phase will be experienced from 2020 to 2023 while traffic volumes and patterns associated with the operation phase will be experienced from 2022 to approximately 2044. Consistent with typical practice within Queensland, the future performance of the road network has been assessed for the first year of the construction phase, the first year of the operation phase and the ten year design horizon following the commencement of operations. In addition, an overlap scenario during 2023 has been considered where construction is occurring while operations have commenced.

The years adopted for the Road Impact Assessment are therefore:

Page 12: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 5

> 2013 Traffic survey year (provides validation of road performance models) > 2020 First year of construction phase > 2023 Overlap scenario (final year of construction phase) > 2024 First year of exclusive operations activities phase > 2034 Ten year horizon following commencement of operation.

Pavement impacts on the state-controlled road network have been considered for the full potential life of construction and operations between 2020 and approximately 2044. The future performance of the road network is documented in Sections 6 and 7.

Page 13: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 6

3 Existing Road Network

3.1 Peak Downs Highway

The Peak Downs Highway is a state-controlled road which extends approximately 276 km from Mackay to Clermont. It functions as a major link within the IRC area, providing the primary road connection between a number of townships and mines within Central Queensland and the regional hub of Mackay.

The Peak Downs Highway between Nebo and Moranbah Access Road typically comprises a sealed, undivided, two lane cross-section with a seal width of approximately 9 m. The Annual Average Daily Traffic (AADT) volume on the subject section of the Peak Downs Highway is typically in the range of 3,000 vehicles per day (vpd) in the vicinity of Moranbah Access Road. The Peak Downs Highway generally has a posted speed limit of 100 km/h although the limit decreases in proximity to urban areas.

The Peak Downs Highway and other key roads servicing the development are shown in Appendix A.

3.2 Moranbah Access Road

Moranbah Access Road is a council-controlled road. It extends approximately 12 km north from the Peak Downs Highway to its intersection with Mills Avenue in Moranbah, providing the only route between the township and the Peak Downs Highway. Moranbah Access Road is an undivided, sealed, two lane road with sealed shoulders. There are no overtaking lanes on this road. The AADT volume on Moranbah Access Road south of Moranbah typically ranges between 4,800 vpd and 6,000 vpd.

The posted speed limit is generally 100 km/h, although it reduces in proximity to Moranbah.

3.3 Goonyella Road

Goonyella Road extends approximately 26 km north from Mills Avenue in Moranbah to the GRB mine complex providing the only route between the mine and town. Goonyella Road is an undivided, sealed, two lane road with no overtaking lanes. Goonyella Road is a council-controlled road between Mills Avenue and the Railway Overpass (Blair Athol Railway line crossing). North of the railway line, the road is controlled and maintained by BMA.

The posted speed limit is generally 100 km/h although this decreases in proximity to major intersections, the Goonyella Industrial Area and Moranbah.

3.4 Red Hill Road

Red Hill Road is predominately a council-controlled road, however BMA controls and maintains a short section through the mining lease area. It extends approximately 35 km north from its intersection with Goonyella Road to its intersection with Suttor Developmental Road. Between Goonyella Road and the Broadmeadow Mine Access Road, Red Hill Road is an undivided, sealed, two lane road. From the Broadmeadow Mine Access Road north to Suttor Developmental Road, Red Hill Road is unsealed. There are no overtaking lanes on Red Hill Road and in addition, unfenced livestock are present. The posted speed limit is generally 100 km/h.

3.5 School Bus Routes

School bus routes currently use the Peak Downs Highway and Moranbah Access Road to service schools in Moranbah. School start and end times do not however, correspond with the start and end of mine shifts (i.e. the peak traffic generation period) and the volumes of goods deliveries during school bus times is typically relatively low and not expected to significantly impact on the safety and operations of the school bus routes.

Page 14: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 7

3.6 Road Crash History

Crash data has been obtained from the TMR for the following time periods dependant on crash severity:

> Fatal: 1 January 2006 to 30 April 2013 > Hospitalisation: 1 January 2006 to 31 December 2012 > Non serious crashes: 1 January 2006 to 31 December 2010

The location and severity of the crashes north of Moranbah is summarised at Appendix B. Due to mining activity north of Moranbah, there have been changes to the alignment of various roads over time, including Goonyella Road. Some of the data received from TMR misidentified crash locations on the former alignment of Goonyella Road and Red Hill Road. Advice from TMR officers was to estimate the crash location based upon the existing alignment of Goonyella Road and Red Hill Road and the crash description.,

Table 3-1 provides a summary of the severity of crashes for the road network in the vicinity of EIS study area as depicted in Appendix B.

Table 3-1 Summary of Crash Statistics

Crash Severity Number of Crashes

%

Fatal (1 Jan 06 to 30 Apr 2013) 0 0%

Hospitalisation (1 Jan 06 to 31 Dec 12) 5 28%

Medical treatment (1 Jan 06 to 31 Dec 10) 5 28%

Minor injury (1 Jan 06 to 31 Dec 10) 3 16%

Property damage (1 Jan 06 to 31 Dec 10) 5 28%

TOTAL 18 100%

3.7 Road Network Planning

TMR’s Queensland Transport and Roads Investment Program 2012-2013 to 2015-2016 (QTRIP) has allocated $24 million over the next financial year to improvements to roadside delineation along the Peak Downs Highway between Clermont and Nebo.

An upgrade of the Peak Downs Highway/Moranbah Access Road intersection to include a “seagull treatment” (where separate lanes for both right and left turns are provided) is understood to be close to completion at the time of report preparation. This treatment provides additional capacity for the right turn movement out of Moranbah Access Road.

Cardno is not aware of any formalised planning undertaken by IRC in relation to the upgrade of either Goonyella Road/Curtin Street or Goonyella Road/Moranbah Access Road/Mills Avenue intersections, the future operation of which is documented later in this report.

Page 15: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 8

4 Historic and Future Background Traffic Volumes

4.1 Existing Traffic Volumes

Surveys of existing intersection traffic volumes were undertaken by Austraffic during June 2013. Survey data is included in Appendix C.

4.2 Traffic Growth Forecast

Various data sources were considered when forecasting likely baseline traffic growth over the assessment period. The review included consideration of data detailing historic traffic growth as well as consideration of population predictions for Moranbah Statistical Area (Level 2 - ASGS Code 312011341) (OESR 2011a, b) as documented in Table 4-1.

Table 4-1 Moranbah Statistical Area Population Projections

Series Rate Time Span Source

Projected FTE population 8.4% 7 years (2011-2018) OESR 2011a

Projected population – medium series 3.6% 20 years (2011-2031) OESR 2011b

Furthermore the traffic assessments prepared for other nearby projects were considered including Isaac Plains South (previously known as Integrated Isaac Plains Project), Eagle Downs, Caval Ridge and Grosvenor.

Table 4-2 summarises the baseline traffic growth rates adopted by Cardno based upon review of the various summarised data sources. The adopted growth rates compared to historical observed traffic growth on each road is shown in Figures 4-1 and 4-2.

Table 4-2 Adopted Traffic Growth Rates

Road Rate Time Span Rate Time Span

Peak Downs Highway 8% 2012 to 2020 4% 2020 to 2034

Moranbah Access Road and Goonyella Road (Mills Avenue to Curtin Street) 6% 2012 to 2020 3% 2020 to 2034

Goonyella Road (north of Curtin Street) 1% 2012 to 2020 1% 2020 to 2034

Page 16: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 9

Figure 4-1 Peak Downs Highway – Context of Adopted Growth Rate

Source: TMR (2013)

Figure 4-2 Moranbah Access Road – Context of Adopted Growth Rate

Source: IRC (2012)

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

2032

2033

2034

AA

DT

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

10,000

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

2032

2033

2034

AA

DT

Observed Inferred Forecast

Observed Inferred Forecast

Page 17: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 10

5 Project Traffic Generation

The additional traffic generation has been forecast separately for both the construction phase and the operation phase. The additional traffic generated by the two phases is documented in Sections 5.1 and 5.2 respectively.

5.1 Construction Phase Traffic Generation

The construction phase is anticipated to commence in 2020 and be completed by the end of 2023. Most construction activities will occur 24 hours per day, seven days per week across two shifts daily of 12 hours duration each.

Activities undertaken during the three general stages of construction are planned to include:

> Site preparation including the removal of existing structures, establishment of power supplies and the construction of a site office, emergency facilities and gas drainage infrastructure.

> Provision of supporting civil works including earthworks, drainage installation, road re-alignment and construction, trenching and laying of reticulated services, ramps and hardstand construction.

> Construction of MIA buildings and the Red Hill CHPP. Where practical and cost-effective, these facilities will consist of modularised units.

5.1.1 Construction Phase Workforce Movements

A peak construction workforce of up to 2,000 persons will be required during the construction phase based on current assumptions. BMA has advised that the construction workforce will be up to 100% remote, likely working a three weeks-on/one week-off roster and will be accommodated at the purpose built Red Hill accommodation village. Based on the assessed shift and rostering arrangements, approximately 37.5% of the construction phase workforce will be working onsite at any time, resulting in approximately 750 personnel arriving and 750 personnel departing the EIS study area at shift change-over.

While BMA has advised that the majority of the workforce will arrive via Moranbah Airport, allowance has been made for an estimated 75% of the construction workforce to transit through Moranbah Airport at the start and end of the three weeks-on/one week-off roster while 25% are assumed to transit through Mackay. Based on the assessed roster, it is assumed that 71 personnel arrive and 71 personnel depart the Red Hill accommodation village each day. Those travelling via Moranbah Airport have been assumed to utilise chartered bus services (20 person occupancy) to travel between the Red Hill accommodation village and Moranbah Airport. Those travelling to Mackay or beyond have been assumed to use light vehicles (single-occupant).Table 5-1 summarises the trips estimated for construction phase workforce movements.

Table 5-1 Construction Phase Project Workforce Movements

Trip Type

One-way Trips per Peak Hour

Buses (20 person occupancy)

Light Vehicles (Single Occupant)

Red Hill accommodation village ↔ EIS study area Start/end shift trips

76 -

Red Hill accommodation village ↔ Moranbah Airport Start/end roster trips

6 -

Red Hill accommodation village ↔ Mackay Start/end roster trips

- 18

Total 82 18

For traffic modelling purposes, a factor of safety allowance has been made for a nominal 75 trips each way during peak hour from Moranbah to the EIS study area during the construction phase. It is stressed that this factor of safety allowance has been made for traffic modelling purposes only.

Page 18: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 11

5.1.2 Construction Phase Material Movements

The quantum of traffic movements associated with the delivery and removal of materials and wastes during the construction phase has been forecast. This is based on the material quantity estimates and origins supplied by BMA and their design team. Table 5-2 summarises the additional daily material movements to and from the EIS study area during the 28 month construction phase used for design purposes.

Table 5-2 Construction Phase Material Movements

Movement Origin/Destination Daily Return Trips

Mackay 2

Moranbah 17

Total 19

The assessed project material demands as forecast by the design team are summarised in Appendix D.

For the operational assessment, a nominal allowance has been made for ten trips during the morning (AM) and afternoon (PM) peak hour. It is anticipated that the majority of deliveries would occur outside peak times, so this nominal allowance caters for any deliveries that may occur during peak times.

5.2 Operation Phase Traffic Generation

The operation phase is anticipated to commence in 2023 and continue until approximately 2044. The majority of traffic movements generated during this phase are anticipated to be associated with workforce movements and material deliveries.

5.2.1 Operation Phase Workforce Movements

A total operation workforce of 1,500 persons beyond the existing workforce associated with the existing operation of the mine will be required based on current assumptions. BMA has advised that the additional operation workforce will be up to 100% remote, working a seven days-on/seven days-off roster and will be accommodated at a purpose built Red Hill accommodation village. Based on the assessed shift and rostering arrangements, approximately 25% of the operation phase workforce will be working onsite at any time, resulting in approximately 375 personnel arriving and 375 personnel departing the EIS study area at shift change-over.

While BMA has advised that the majority of the workforce will arrive via Moranbah Airport, allowance has been made for an estimated 75% of the construction workforce to transit through Moranbah Airport at the start and end of the assessed seven days-on/seven days-off roster while 25% are assumed to transit through Mackay. Based on the assessed roster, it is assumed that 107 personnel arrive and 107 personnel depart the Red Hill accommodation village each day. Those travelling via Moranbah Airport have been assumed to utilise chartered bus services (20 person occupancy) to travel between the Red Hill accommodation village and Moranbah Airport. Those travelling to Mackay or beyond have been assumed to use light vehicles (single-occupant).

Page 19: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 12

Table 5-3 Operation Phase Project Workforce Movements

Trip Type

One-way Trips per Peak Hour

Buses (20 person Occupancy)

Light Vehicles (Single Occupant)

Red Hill accommodation village ↔ EIS study area Start/end shift trips

38 -

Red Hill accommodation village ↔ Moranbah Airport Start/end roster trips

8 -

Red Hill accommodation village ↔ Mackay Start/end roster trips

- 27

Total 46 27

For traffic modelling purposes, a factor of safety allowance has been made for a nominal 75 trips each way during peak hour from Moranbah to the EIS study area during the construction phase. It is stressed that this factor of safety allowance has been made traffic modelling purposes only.

5.2.2 Operation Phase Material Movements

The quantum of traffic movements associated with the delivery and removal of materials and wastes during the operation phase has been forecast based on the material quantity estimates and origins supplied by BMA and their design team. Table 5-4 summarises the average additional daily material movements to and from the EIS study area during the operation phase between 2023 and approximately 2044.

Table 5-4 Operation Phase Material Movements

Movement Origin/Destination Daily Return Trips

Mackay 2

Moranbah 1

Total 3

The assessed project material demands as forecast by the design team are summarised at Appendix D.

For the operational assessment, a nominal allowance has been made for ten trips during the AM and PM peak hour. It is anticipated that the majority of deliveries would occur outside peak times, so this nominal allowance caters for any deliveries that may occur during peak times.

5.3 Overlap Scenario

Based on advice from BMA, an overlap scenario has also been considered where the construction workforce overlaps with operations staff as operation activities start to commence and construction activities ramp down. For the purposes of the traffic assessment, the overlap scenario has been assumed to include the 2,000 peak construction workforce as well as 1,000 persons from the operations workforce. This results in a potential overlap workforce of 3,000.

5.4 Assessment Volumes

Traffic volume forecasts for 2022, 2023, 2024 and 2034 with and without project traffic are shown at Appendix C.

Page 20: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 13

6 Network Performance Assessment

A link level of service (LOS) assessment has been undertaken on the key road sections of Goonyella Road north of the rail overpass and Riverside Access Road. This assessment has been undertaken in accordance with the Austroads (1988) Guide to Traffic Engineering Practice Part 2: Roadway Capacity manual. The assessed road sections represent those that are rural in nature and are hence dictated by the LOS of the road link rather than the associated intersections.

In accordance with the guide, the level of service has been determined for each assessed link section based on design peak hour volumes. Typically, LOS C is the worst accepted level for rural roads not affected by recreational peaks. The adopted threshold limits for LOS are shown in Table 6-1, while Table 6-2 shows a summary of the LOS assessment for each of the assessment scenarios. The vehicles per hour volumes include both light and heavy vehicles.

Table 6-1 Level of Service Thresholds

LOS LOS Description Peak Hour Traffic

Volumes (vph)

A Free flow conditions where drivers are unaffected by the presence of others in the traffic stream. < 241

B Stable flow where drivers still have reasonable freedom to select their desired speed and to manoeuvre within the traffic stream. < 480

C Stable flow, but most drivers are restricted to some extent in their freedom to select their desired spend and to manoeuvre. < 793

D Close to the limit of stable flow and is approaching unstable flow. Drivers are severely restricted to select their speed and manoeuvre. < 1,347

E Traffic volumes are at or close to capacity and there is virtually no freedom to select desired speeds or to manoeuvre. < 2,285

F Forced flow. Traffic approaching the point under consideration exceeds that which can pass it. Flow breakdown occurs. ≥ 2,285

Table 6-2 Level of Service Assessment Results Summary

Road Section Survey 2020 BKG

2023 BKG

2024 BKG

2034 BKG

Goonyella Road Red Hill Road - Railway Overpass B B C C C

Goonyella Road Riverside Access Road - Red Hill Road B B B B B

Riverside Access Road Goonyella Road - Mine B B B B B

Road Section 2020 + Const

2023 + Overlap

2024 + Ops

2034 + Ops

Goonyella Road Red Hill Road - Railway Overpass - C C C C

Goonyella Road Riverside Access Road - Red Hill Road - B B B B

Riverside Access Road Goonyella Road - Mine - B B B B

Note: ‘BKG’ = Background; ‘Const’ = Construction; and ‘Ops’ = Operations

The results presented in Table 6-2 indicate that Goonyella Road, from the EIS study area to Red Hill Road, operates appropriately (i.e. LOS C and better) for all assessed scenarios.

Page 21: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 14

7 Intersection Design and Operation

A traffic operation assessment has been undertaken to determine the impact of the GRM incremental expansion and the RHM underground expansion option on the performance of the state, council and privately controlled intersections.

7.1 Assessment Traffic Volumes

For the purposes of this assessment, it has conservatively been assumed that the road network peak periods and project’s peak traffic generation periods will coincide. This assumption is conservative and provides TMR and IRC assurance that, irrespective of eventual shift times adopted, the performance of the road network should be no worse than that reported herein.

7.2 Intersection Assessment Scope

TMR’s (2006) Guidelines for the Assessment of Road Impacts of Development states that traffic operations need to be considered for all state-controlled assets where the construction or operation traffic generated by a proposed development equals or exceeds 5% of the existing AADT, for any intersection movement or mid-block volume. This stipulated methodology has also been utilised to determine the assessment scope for council-controlled assets consistent with the advice historically provided by IRC officers.

In accordance with the scoping guidelines, the impact on the following intersections has been considered:

> Goonyella Road/Riverside Access Road intersection > Goonyella Road/Red Hill Road intersection > Goonyella Road/Curtin Street intersection > Goonyella Road/Moranbah Access Road/Mills Avenue intersection > Peak Downs Highway/Moranbah Access Road intersection

This assessment scope includes all major intersections at which construction or mining operation phases are anticipated to increase any movement volume by 5% or more beyond existing (2013) survey volumes. The use of existing volumes as opposed to future background volumes to define the extent of investigations ensures that the assessment scope is independent of the assumed background growth rate. The use of existing volumes for scoping is also consistent with TMR’s assessment guidelines. The scoping assessment is summarised at Appendix C.

Traffic conditions have been assessed for the years:

> 2013 Traffic survey year (provides validation of road performance models) > 2020 First year of construction phase > 2023 Overlap scenario (final year of construction phase) > 2024 First year of exclusive operations activities phase > 2034 Ten year horizon following commencement of operations

For all assessment years, analysis has been completed both with and without project associated traffic scenarios. This is so the marginal impact on the safe and efficient operation of the state and council-controlled road networks can be determined.

7.3 Intersection Operation Performance Thresholds

The traffic operation of each study intersection has been analysed with and without projected traffic using SIDRA Intersection 5.1 (referred to herein as SIDRA). This program is a micro-analytical traffic evaluation tool that estimates the capacity, and in turn, the performance of intersections based on input parameters, including geometry and traffic volumes. As an output, SIDRA provides estimates of an intersection’s degree of saturation (DOS), queues and delays.

Page 22: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 15

In the Guidelines for Assessment of Road Impacts of Development (2006), TMR defines the following standard DOS thresholds:

> Priority-controlled intersections 0.80 > Roundabouts 0.85 > Signalised intersections 0.90.

The TMR guidelines note that a DOS exceeding these values indicates that an intersection is nearing its practical capacity and upgrade works may be required. Above these threshold values, users of the intersection are likely to experience rapidly increasing delays and queuing.

7.4 Intersection Operation Assessment

7.4.1 Goonyella Road/Riverside Access Road Intersection

The Goonyella Road/Riverside Access Road intersection is currently a priority-controlled T-intersection with a formalised right turn bay on the northern Goonyella Road approach. Figure 7-1 to Figure 7-3 show each leg of the existing intersection.

Figure 7-1 Goonyella Road/Riverside Access Road Intersection: Northern Goonyella Road Approach – Looking North

Page 23: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 16

Figure 7-2 Goonyella Road/Riverside Access Road Intersection: Southern Goonyella Road Approach - Looking South

Figure 7-3 Goonyella Road/Riverside Access Road Intersection: Western Riverside Access Road

Approach - Looking West

Page 24: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 17

Intersection Operation

Figure 7-4 shows the existing intersection form as output by SIDRA with summary results provided in Table 7-1

Figure 7-4 Goonyella Road/Riverside Access Road Intersection: Assessed SIDRA Layout – Existing Form

Table 7-1 Goonyella Road/Riverside Access Road Intersection: SIDRA Analysis Summary - Existing Form

Scenarios

AM Peak PM Peak

DOS Critical Delay

95th

%le Queue

DOS Critical Delay

95th

%le Queue

2013 Survey 0.25 14 8 0.23 14 7

2020 Without Project 0.26 14 9 0.25 14 7

2023 Without Project 0.27 14 9 0.26 14 8

2024 Without Project 0.28 14 9 0.26 14 8

2034 Without Project 0.30 14 11 0.29 14 9

2020 With Construction Phase 0.27 14 9 0.26 14 8

2023 With Overlap 0.28 14 10 0.27 14 8

2024 With Operation Phase 0.28 14 10 0.27 14 8

2034 With Operation Phase 0.31 14 11 0.30 14 9

The summarised SIDRA analysis results presented in Table 7-1 indicate that the subject intersection will perform acceptably at all design horizons irrespective of the RHM underground expansion option and associated GRM incremental expansion proceeding. No intersection upgrades are therefore warranted based on capacity considerations.

7.4.2 Goonyella Road/Red Hill Road Intersection

The Goonyella Road/Red Hill Road intersection is a priority-controlled intersection with a formalised right turn lane on the southern Goonyella Road approach. Figure 7-5 to Figure 7-7 show each leg of the existing intersection.

Page 25: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 18

Figure 7-5 Goonyella Road/Red Hill Road Intersection: Northern Goonyella Road Approach - Looking North

Figure 7-6 Goonyella Road/Red Hill Road Intersection: Eastern Red Hill Road Approach - Looking

East

Page 26: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 19

Figure 7-7 Goonyella Road/Red Hill Road Intersection: Southern Goonyella Road Approach - Looking South

Intersection Operation

Figure 7-8 shows the existing intersection form as output by SIDRA with summary results provided in Table 7-2.

Figure 7-8 Goonyella Road/Red Hill Road Intersection: Assessed SIDRA Layout – Existing Form

Page 27: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 20

Table 7-2 Goonyella Road/Red Hill Road Intersection: SIDRA Analysis Summary – Existing Form

Scenarios

AM Peak PM Peak

DOS Critical Delay

95th

%le Queue

DOS Critical Delay

95th

%le Queue

2013 Survey 0.18 14 3 0.12 13 3

2020 Without Project 0.19 14 3 0.13 13 4

2023 Without Project 0.20 15 3 0.13 13 4

2024 Without Project 0.20 15 3 0.13 13 4

2034 Without Project 0.22 15 3 0.14 13 4

2020 With Construction Phase 0.20 16 5 0.22 14 7

2023 With Overlap 0.20 16 5 0.22 14 7

2024 With Operation Phase 0.20 16 5 0.23 14 7

2034 With Operation Phase 0.22 17 6 0.24 14 8

The summarised SIDRA analysis results presented in Table 7-2 indicate that the subject intersection will perform acceptably at all design horizons irrespective of the RHM underground expansion option and associated GRM incremental expansion proceeding. No intersection upgrades are therefore warranted based on capacity considerations.

Page 28: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 21

7.4.3 Goonyella Road/Curtin Street Intersection

The Goonyella Road/Curtin Street intersection is a priority-controlled T-intersection with a formalised right turn bay on the southern Goonyella Road approach.

Curtin Street functions as a northern access point between Moranbah town centre and Goonyella Road via Belyando Avenue. Vehicle demands at this intersection are currently moderate. It is anticipated however, that this intersection will become increasingly utilised, as the alternative Mills Avenue/Goonyella Road/Moranbah Access Road intersection becomes increasingly busier with expected traffic growth. Figure 7-9 to Figure 7-11 show each leg of the existing intersection.

Figure 7-9 Goonyella Road/Curtin Street Intersection: Northern Goonyella Road Approach - Looking North

Figure 7-10 Goonyella Road/Curtin Street Intersection: Eastern Curtin Street Approach - Looking

East

Page 29: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 22

Figure 7-11 Goonyella Road/Curtin Street Intersection: Southern Goonyella Road Approach - Looking South

Intersection Operation

Figure 7-12 shows the existing intersection form as output by SIDRA with summary results provided in Table 7-3.

Figure 7-12 Goonyella Road/Curtin Street Intersection: Assessed SIDRA Layout – Existing Form

Page 30: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 23

Table 7-3 Goonyella Road/Curtin Street Intersection: SIDRA Analysis Summary – Existing Form

Scenarios

AM Peak PM Peak

DOS Critical Delay

95th

%le Queue

DOS Critical Delay

95th

%le Queue

2013 Survey 0.54 19 25 0.30 17 9

2020 Without Project 0.62 21 30 0.38 23 11

2023 Without Project 0.65 21 33 0.41 24 13

2024 Without Project 0.66 22 35 0.42 25 13

2034 Without Project 0.77 26 48 0.54 30 18

2020 With Construction Phase 0.83 33 53 0.53 32 16

2023 With Overlap 0.88 37 61 0.58 34 19

2024 With Operation Phase 0.91 42 70 0.61 36 20

2034 With Operation Phase 1.07 81 141 0.79 52 30

The analysis results presented in Table 7-3 indicate that the RHM underground expansion option and associated GRM incremental expansion is likely to have significant impacts on the Goonyella Road/Curtin Street intersection as modelling indicates it will perform outside the typically accepted performance threshold.

A potential upgrade solution has therefore been assessed incorporating signalisation of the intersection. Figure 7-13 shows the potential signalised intersection form with the corresponding SIDRA results documented at Table 7-4. This form demonstrates that there is a potential intersection layout that can accommodate the projected traffic.

Figure 7-13 Goonyella Road/Curtin Street Intersection: Intersection Layout – Upgraded Form

Page 31: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 24

Table 7-4 Goonyella Road/Curtin Street Intersection: SIDRA Analysis Summary – Upgraded Form

Scenarios

AM Peak PM Peak

DOS Average

Delay 95

th %le

Queue DOS

Average Delay

95th

%le Queue

2034 With Operation Phase 0.74 21 sec 94m 0.81 34 sec 255m

The results presented in Table 7-4 indicate that the potential signalised form will perform within the typically adopted DOS performance thresholds for signalised intersections (i.e. DOS less than 0.90) for the worst case scenario.

Given the timing for delivery of the RHM underground expansion option and associated GRM incremental expansion is not yet known, it would be unreasonable to condition the implementation of an upgrade at the time of approval. It would instead be reasonable for the proponent to commit to engaging with IRC and determining a proportionate contribution towards upgrade costs prior to the commencement of construction, once the owners have made a decision to proceed with the project

It is also noted that the intersection forms part of the trunk road network and therefore it is anticipated that IRC, through its headworks charges scheme, already has an established mechanism for funding the upgrade of this intersection. The timing for consultation with IRC regarding their proposed upgrade solution and any contribution by the proponent would need to occur prior to the commencement of construction, once the project owners have made a commitment to proceed with the project, determined the proposed staging and finalised its proposed workforce numbers and associated traffic volumes in line with the final staging for execution determined by the project owners.

7.4.4 Goonyella Road/Moranbah Access Road/Mills Avenue Intersection

The Goonyella Road/Moranbah Access Road/Mills Avenue intersection is a priority-controlled T-intersection with a formalised right turn bay on the southern Goonyella Road approach. The projected traffic will generate additional through and turning traffic at this intersection. Figure 7-14 to Figure 7-16 show each leg of the existing intersection.

Figure 7-14 Goonyella Road/Moranbah Access Road Intersection: Northern Goonyella Road Approach - Looking North

Page 32: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 25

Figure 7-15 Goonyella Road/Moranbah Access Road/Mills Avenue Intersection: Eastern Mills Avenue Approach - Looking East

Figure 7-16 Goonyella Road/Moranbah Access Road/Mills Avenue Intersection: Southern Moranbah

Access Road Approach - Looking South

Page 33: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 26

Intersection Operation

Figure 7-17 shows the existing intersection form as output by SIDRA with summary results provided in Table 7-5.

Figure 7-17 Goonyella Road/Moranbah Access Road/Mills Avenue Intersection: Assessed SIDRA Layout – Existing Form

Table 7-5 Goonyella Road/Moranbah Access Road/Mills Avenue Intersection: SIDRA Analysis Summary – Existing Form

Scenarios

AM Peak PM Peak

DOS Critical Delay

95th

%le Queue

DOS Critical Delay

95th

%le Queue

2013 Survey 0.44 14 sec 17m 0.36 21 sec 14m

2020 Without Project 0.82 26 sec 55m 0.92 72 sec 42m

2023 Without Project 0.93 37 sec 84m 1.14 140 sec 85m

2024 Without Project 0.97 43 sec 99m 1.23 175 sec 105m

2034 Without Project 1.42 219 sec 385m 2.57 786 sec 309m

2020 With Construction Phase 1.14 97 sec 208m 1.71 371 sec 256m

2023 With Overlap 1.27 152 sec 301m 2.08 542 sec 324m

2024 With Operation Phase 1.35 186 sec 350m 2.29 640 sec 355m

2034 With Operation Phase 1.94 452 sec 681m 4.46 1,642 sec 556m

The analysis results presented in Table 7-5 indicate that irrespective of the RHM underground expansion option and associated GRM incremental expansion proceeding the Goonyella Road/Moranbah Access Road/Mills Avenue intersection will perform outside the typically accepted performance threshold (i.e. DOS less than 0.80) .

A potential upgrade solution has therefore been assessed incorporating signalisation of the intersection. Figure 7-18 shows the potential upgraded intersection form with SIDRA results documented at Table 7-6.

Page 34: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 27

Figure 7-18 Goonyella Road/Moranbah Access Road/Mills Avenue Intersection: Assessed SIDRA Layout – Potential Upgrade Form

Table 7-6 Goonyella Rd/Moranbah Access Rd/Mills Av Intersection: SIDRA Analysis Summary – Potential Upgrade Form

Scenarios

AM Peak PM Peak

DOS Average

Delay 95

th %le

Queue DOS

Average Delay

95th

%le Queue

2034 With Operation Phase 0.83 42 sec 286m 0.83 30 sec 147m

The results presented in Table 7-6 indicate that the potential signalised form will perform within the typically adopted DOS performance thresholds for signalised intersections (i.e. DOS less than 0.90) for the worst case scenario.

The Goonyella Road/Moranbah Access Road/Mills Avenue intersection may require upgrading irrespective of the RHM underground expansion option and associated GRM incremental expansion proceeding. As such, it would be unreasonable to condition the implementation of an upgrade as the requirement for the upgrade is not a direct result of traffic associated with the RHM underground expansion option and associated GRM incremental expansion. It would instead be reasonable for the proponent to commit to engaging with IRC and determining a proportionate contribution towards upgrade costs consistent with the extent of intersection capacity consumed by the projected project traffic.

Again, it is stressed that the analysis indicates that the identified intersection upgrade is likely to be required even in the absence of the RHM underground expansion option and associated GRM incremental expansion proceeding. It is therefore reasonable for the proponent to make a proportionate contribution towards upgrade costs (i.e. not fully fund) once the project owners have determined that the project will proceed and have determined the final staging for execution. Furthermore, the intersection forms part of the trunk road network and therefore it is anticipated that IRC, through its headworks charges scheme, already has an established mechanism for funding the upgrade of this intersection. Consultation with IRC regarding their proposed upgrade solution for the intersection should occur. The timing for consultation with IRC regarding their proposed upgrade solution and any contribution by the proponent would need to occur prior to the commencement of construction. This will happen after the project owners have made a commitment to proceed with the project, determined the proposed staging and finalised the proposed workforce numbers and associated traffic volumes in line with the final staging for execution.

Page 35: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 28

7.4.5 Peak Downs Highway/Moranbah Access Road Intersection

The Peak Downs Highway/Moranbah Access Road intersection is understood to have been or about to be upgraded to a seagull T-intersection with formalised right and left turn bays on the Peak Downs Highway and an acceleration lane for right turning traffic. The intersection form assessed is consistent with plans supplied by TMR for the upgrade.

Intersection Operation

Figure 7-19 shows the existing intersection form as output by SIDRA with summary results provided in Table 7-7.

Figure 7-19 Peak Downs Highway/Moranbah Access Road Intersection: Assessed SIDRA Layout – Existing Form

Table 7-7 Peak Downs Highway/Moranbah Access Road Intersection: SIDRA Analysis Summary – Existing Form

Scenarios

AM Peak PM Peak

DOS Critical Delay

95th

%le Queue

DOS Critical Delay

95th

%le Queue

2013 Survey 0.48 14 19 0.25 18 8

2020 Without Project 0.70 17 69 0.45 22 20

2023 Without Project 0.75 18 89 0.51 24 23

2024 Without Project 0.77 18 97 0.53 25 25

2034 Without Project 0.95 30 246 0.82 39 54

2020 With Construction Phase 0.72 17 73 0.48 23 22

2023 With Overlap 0.77 19 94 0.54 25 26

2024 With Operation Phase 0.79 20 105 0.58 26 29

2034 With Operation Phase 0.97 36 269 0.88 44 68

The analysis results presented in Table 7-7 indicate that irrespective of the RHM underground expansion option and associated GRM incremental expansion proceeding, the Peak Downs Highway/Moranbah Access Road Intersection will perform outside the typically accepted performance threshold (i.e. DOS less than 0.80) .

Page 36: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 29

A potential upgrade solution has therefore been assessed incorporating an upgrade to a roundabout Figure 7-20 shows the potential upgraded intersection form with SIDRA results documented at Table 7-8.

Figure 7-20 Peak Downs Highway/Moranbah Access Road Intersection: Assessed SIDRA Layout –Potential Upgrade Form

Table 7-8 Peak Downs Highway/Moranbah Access Road Intersection: SIDRA Analysis Summary – Potential Upgrade Form

Scenarios

AM Peak PM Peak

DOS Critical Delay

95th

%le Queue

DOS Critical Delay

95th

%le Queue

2034 With Operation Phase 0.70 23 sec 73m 0.78 20 sec 100m

The results presented in Table 7-8 indicate that the potential roundabout form will perform within the typically adopted DOS performance thresholds for a roundabout (i.e. DOS less than 0.85) for the worst case scenario.

The Goonyella Road/Moranbah Access Road/Mills Avenue intersection is likely to require upgrading irrespective of the RHM underground expansion option and associated GRM incremental expansion. As such, it would be unreasonable to condition the implementation of an upgrade as the requirement for the upgrade is not a direct result of traffic associated with the RHM underground expansion option and associated GRM incremental expansion. It would instead be reasonable for the proponent to commit to engaging with TMR and determining a proportionate contribution towards upgrade costs consistent with the extent of intersection capacity consumed by the projected project traffic.

Again, it is stressed that the analysis indicates that the identified intersection upgrade is likely to be required even in the absence of the RHM underground expansion option and associated GRM incremental expansion proceeding. It is therefore reasonable for the proponent to make a proportionate contribution towards upgrade costs (i.e. not fully fund). Given the uncertain timeframe for the delivery, the proponent should be conditioned to undertake reassessment in consultation with TMR following a decision to proceed with the RHM underground expansion option and associated GRM incremental expansion.

7.4.6 Red Hill Accommodation Village Access

As identified in Section 2.4, an accommodation village is planned with connection to be provided via Red Hill Road. The exact location of the supporting access to the Red Hill accommodation village is still to be resolved following detailed engineering investigations. Irrespective of the location ultimately selected the Red Hill accommodation village access intersection should include a channelised right turn treatment and auxiliary left turn treatment in accordance with the TMR (2006b) Road Planning and Design Manual. The proposed access form will provide an appropriate level of safety and capacity given likely traffic volumes.

Page 37: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 30

8 Pavement Impact Assessment

8.1 Pavement Impact Assessment Scoping

The spatial extent of the pavement impact assessment undertaken for the state-controlled road network has been defined in accordance with the scoping methodology outlined in TMR’s (2006) Guidelines for Assessment of Road Impacts of Development. That is, all surrounding state-controlled roads have been considered to identify any road sections where the proposed increase in traffic activity may result in an increase of 5% or more beyond existing ESA levels. Cardno has considered the construction, operations and construction phases with respect to heavy vehicle movements.

The proponent’s obligation towards routine maintenance of the state-controlled road network has been calculated based on the percentage increase in ESAs on each road segment as a result of the likely increased haulage activity.

The results presented at Table 8-1 indicate that the increased haulage activity will not have an impact, classified as significant, on maintenance activities on the state-controlled road network. That is, while associated traffic will slightly increase the need for pavement maintenance works on the state-controlled road network this increase is forecast to be less than 5% on any road section and therefore does not warrant a proponent contribution for any sections.

Table 8-1 Maintenance Impacts Summary – Peak Downs Highway

Road Direction

Section

Construction Impact (%)

Operation Impact (%)

Overlap Impact (%)

33A G Moranbah Access Road to Nebo Shire Boundary 0.3% 0.4% 0.6%

A Nebo Shire Boundary to Moranbah Access Road 1.6% 1.4% 2.5%

33A G Nebo Shire Boundary to East of Coppabella 0.3% 0.4% 0.6%

A East of Coppabella to Nebo Shire Boundary 1.6% 1.4% 2.5%

33A G East of Coppabella to Fitzroy Dev Road 0.3% 0.3% 0.5%

A Fitzroy Dev Road to East of Coppabella 1.5% 1.3% 2.4%

33A G Fitzroy Dev Road to Oxford Downs 0.3% 0.3% 0.5%

A Oxford Downs to Fitzroy Dev Road 1.3% 1.2% 2.1%

33A G Oxford Downs to Reynolds Street 0.3% 0.3% 0.5%

A Reynolds Street to Oxford Downs 1.5% 1.3% 2.3%

It is noted that reassessment may potentially be warranted should the estimated material movements change significantly.

Page 38: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 31

9 Cumulative Impacts

The baseline traffic conditions assessed in Section 7 of the report include allowance for high background growth between 2013 and 2020. As previously identified in Section 4.2, the adopted growth rate includes allowance for traffic generated by other known projects in the vicinity of the EIS study area. The results presented in Section 7 of this report therefore account for the potential cumulative impacts of the identified projects proposed within the vicinity of Moranbah. The previously reported results therefore enable TMR and IRC to make an informed assessment regarding the likely future operation of the road network assuming the identified projects proposed in the vicinity of Moranbah proceed (i.e. enable an assessment of the cumulative traffic impacts of the identified projects).

Page 39: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 32

10 Sustainable Transport

Sustainable transport incorporates travel modes other than private vehicles including public transport, pedestrian and cyclist modes.

10.1 Existing Infrastructure

In the vicinity of the EIS study area, the majority of sustainable transport infrastructure, including pedestrian paths, is located within the Moranbah urban area. There is also an off-road path on the eastern side of Goonyella Road that provides a connection between the Moranbah urban areas with the riverfront area, approximately one kilometre south of the town.

There is currently no public transport provision within Moranbah. There are passenger bus services that travel between Mackay and Emerald that stop in Moranbah, which are operated by Paradise Coaches and Greyhound Australia. Paradise Coaches services operate daily, with Greyhound Australia providing services four days a week. Each company operates one service in each direction (i.e. to and from Mackay).

10.2 Sustainable Transport Planning

A review of IRC and regional planning documents identified the following sustainable transport vision, goals and strategies:

> Develop an integrated system of bicycle and pedestrian paths within urban centres to encourage the use of public transport, walking and cycling

> Provide for and encourage greater use of pedestrian and cycling transport systems, including more bicycle end of trip facilities within the region

> Identify, develop and manage environmentally sustainable pedestrian and cycle recreation trails in environmental and natural resource management programs and plans.

The IRC does not appear to have any specific sustainable transport plans for areas outside of the urban Moranbah area that will be affected.

10.3 Project Impacts

The RHM underground expansion option and associated GRM incremental expansion are not anticipated to significantly increase demands on the existing pedestrian and cyclist infrastructure, nor is it likely to warrant the provision of additional public transport infrastructure such as bus stops. A proponent contribution towards such infrastructure is therefore considered unwarranted.

Page 40: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 33

11 Haulage of Goods and Materials

The state government has a number of regulations and guidelines that apply to the movement of goods and materials by road. Key documents and legislative requirements that will apply to the transport of materials, goods and equipment are discussed in the following sections.

It is the responsibility of the haulage operator to obtain the necessary permits for the movement of equipment and materials.

11.1 Transport Operations (Road Use Management) Act 1995

The Transport Operations (Road Use Management – Mass, Dimensions and Loading) Regulation 2005, which is part of the Transport Operations (Road Use Management) Act 1995, outlines the maximum allowable dimensions for vehicles using the public road network without the need of any permits. These dimensions include the width, height, length and mass of vehicles and trailers.

If the vehicles being used to transport goods, materials and equipment to and from the mine comply with the limits detailed in this regulation, then no permits will be required. If however, any of these criteria (width, height, mass or length) exceed the allowable maximum, then a permit will need to be obtained from the TMR.

The permit may detail information including:

> Times, roads and maximum speeds that the vehicle or type of vehicle is allowed to be driven > The maximum permissible dimensions for the vehicle or type of vehicle (including load) > The maximum permissible mass of the vehicle, the type of vehicle or part of the vehicle with the

load > Requirements for pilot vehicles or escort vehicles and when they are required > Any necessary vehicle modifications > Any other matters relevant to the safe movement of vehicles.

The permit may also be subject to conditions that relate to the payment of costs for the repair and rehabilitation of road transport infrastructure. This may be required to be paid up-front as a bond, which may be returned following the completion of haulage.

11.2 Queensland Government Guidelines

The Queensland Government has developed a number of Guidelines that identify alternative means of complying with the Transport Operations (Road Use Management) Act 1995. In addition to these guidelines, the TMR also issue Information Bulletins which outline key features of the various guidelines.

Some of the relevant guidelines that may be applicable include:

> Form Number 4: Guideline for Excess Dimension – Vehicles Carrying Indivisible Articles and Special Purpose Vehicles in Queensland;

> Form Number 6: Guideline for Excess Dimension –Special Purpose Vehicles and Vehicles Carrying Indivisible Articles Requiring Pilots/Escorts;

> Form Number 10: Guideline for Higher Mass Limits for Vehicles with Road Friendly Suspensions in Queensland; and

> Form Number 11: Guideline for Operation of Excess Mass – Special Purpose Vehicles to 40 tonnes and Vehicles Carrying an Indivisible Item to 59.5 tonnes.

If the criteria detailed in the applicable guidelines are able to be achieved, then additional permits are not required for the haulage of materials, equipment and goods.

Page 41: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 34

12 Conclusion

In accordance with the TMR’s Guidelines for the Assessment of Road Impacts of Development, an intersection scoping assessment was undertaken to identify locations where associated traffic has the potential to have an impact classified as significant. Detailed analysis of the performance of the scoped intersections and links was then undertaken to confirm if these road elements would continue to operate within standard performance thresholds at the assessed future design horizon years.

The analysis indicated the following road elements will continue to operate within standard thresholds for all design horizon years:

> Goonyella Road/Riverside Access Road intersection > Goonyella Road/Red Hill Road intersection > Goonyella Road (between Red Hill Road and Railway Overpass) > Goonyella Road between Riverside Access Road and Red Hill Road > Riverside Access Road between Goonyella Road and the EIS study area.

The analysis indicates that the Goonyella Road/Curtin Street, Goonyella Road/Moranbah Access Road/Mills Avenue and Peak Downs Highway/Moranbah Access Road intersections will have the potential to be impacted by the project and operate outside typically accepted performance thresholds.

Goonyella Road/Curtin Street is anticipated to have the potential to be significantly impacted by the RHM underground expansion option and associated GRM incremental expansion, with the potential for an intersection upgrade to accommodate traffic. The Goonyella Road/Moranbah Access Road/Mills Avenue and Peak Downs Highway/Moranbah Access Road intersections are likely to warrant upgrading regardless of the RHM underground expansion option and associated GRM incremental expansion. It is recommended that BMA engage with IRC and TMR regarding its potential plans to upgrade these intersections and make a proportionate contribution towards the cost of the upgrade works (i.e. not fully fund). The timing for consultation with TMR and IRC regarding their proposed upgrade solution and any contribution would need to occur prior to the commencement of construction once the project owners have made a commitment to proceed with the project, determined the proposed staging and finalised its proposed workforce numbers and associated traffic volumes.

The proponent’s obligation towards pavement works has been assessed in accordance with the TMR guidelines. The pavement loading impact has been classified as ‘insignificant’ and therefore no proponent funded contribution towards pavement maintenance or rehabilitation works is warranted. It is industry standard practice in Queensland to classify the pavement impacts of a project as insignificant where the project will impact existing conditions by less than 5%. It is noted that reassessment may potentially be warranted should the estimated material movements change significantly.

It is identified that certain items not covered by this RIA, but required under the TOR, are able to be conditioned and are better addressed in a Road Use Management Plan following approval of the EIS when the project owners determine to proceed with the project and undertake detailed design, award construction contracts and finalise quantities and logistics. It is therefore anticipated that the proponent would be required to prepare a Road Use Management Plan addressing these items at the detailed design stage.

In summary, the Road Impact Assessment has identified that the RHM underground expansion option and associated GRM incremental expansion will not generate any traffic impacts on the state-controlled, council-controlled or private road networks that are so significant that they should preclude approval of the EIS. The proponent’s commitment to engage with the asset owners (prior to the commencement of construction), establish proportionate contributions towards road capacity works and prepare Road Use Management Plans are anticipated to fully offset all significant associated traffic impacts.

Page 42: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 35

Road Impact Assessment

APPENDIX A PROJECT MAPS

Page 43: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438
Page 44: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

610,000E

610,000E605,000E

7,59

0,00

0N

7,590,000N

600,000E590,000E 595,000E

7,605,000N7,600,000N

7,59

5,00

0N

7,595,000N

7,60

0,00

0N7,

605,

000N

605,000E

590,000E 595,000E 600,000E7,585,000N

7,58

0,00

0N

7,580,000N

7,58

5,00

0N

ApprovedRoad Closure

Goonyella

Cree

k

Isaa

c R

iver

12 Mile Gully

Red H

ill Rd

Mabbin Rd

Isa

ac

River

Creek

ProposedRed Hill RoadStock RouteRealignment

Eureka

Creek

ExistingMabbin RoadRealignment

Platypus

Goonyella Rd

Go

ony e

llaA

cces

s

Riv

ersi

de

CreekFisher

Acce

ss R

dR

d

Pasha Rd

Figure:CEB06179

TRANSPORT AND ACCESS

Rev:AApproved:

File No: A442627136-g-2089.worA2

Client Project

Job No:

Date:Drawn: VH JB

Title

EIS Study Boundary

0 1.25

Scale

2.5km

Datum: GDA94, MGA Zone 55

Scale 1:140 000 (A4) ML & MLA Lease Boundary

RED HILL MINING LEASEROAD IMPACT ASSESSMENT

23-08-2013

URS

Whilst every care is taken by URS to ensure the accuracy of the digital data, URS makes no representation or warranties about its accuracy, reliability, completeness, suitability for any particular purpose and disclaims all responsibility and liability (including without limitation, liability in negligence) for any expenses,losses, damages (including indirect or consequential damage) and costs which may be incurred as a result of data being inaccurate in any way for any reason. Electronic files are provided for information only. The data in these files is not controlled or subject to automatic updates for users outside of URS.

Source: © Mapinfo Australia Pty Ltd and PSMA Australia Ltd., © Copyright Commonwealth of Australia (Geoscience Australia) 2006 , © Copyright The State of Queensland (Department of Natural Resources and Water) 2008, © The State of Queensland (Department of Mines and Energy) 2006-2008, © The State of Queensland (Department of Environment and Resource Management) 2010, Bing Maps © Microsoft Corporation and its data suppliers, Images from Client Oct 2011

Existing Stockroute (U831)

Mine Access Road (BMA)

RealignmentsRoad Closure

Constructed Roads

Page 45: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Goonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch RailwayGoonyella Branch Railway

ProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignment

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

Isaa

c Rive

r

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Red

Hill

Roa

d

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Eun

gella

Wat

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

Mackay R

egional Pow

er

132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line132kV Power Line

RiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiver

EU

RE

KA

EU

RE

KA

ST

H

GO

ON

YE

LL

A

BR

OA

DM

EA

DO

W

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

c

ISA

AC

CL

EA

NS

KI N

DE

NH

AM

MIT

SU

I

RIV

ER

SID

E

DA

MP

IER

Rejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1RS 1

Rejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamRejects DamGS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1GS1

TH

IES

S

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

CreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreek

AIR

ST

RIP

Bur

deki

n W

ater

B

urde

kin

Wat

er

Bur

deki

n W

ater

B

urde

kin

Wat

er

Bur

deki

n W

ater

B

urde

kin

Wat

er

Bur

deki

n W

ater

B

urde

kin

Wat

er

Bur

deki

n W

ater

B

urde

kin

Wat

er

Bur

deki

n W

ater

B

urde

kin

Wat

er

Bur

deki

n W

ater

B

urde

kin

Wat

er

Bur

deki

n W

ater

B

urde

kin

Wat

er

Bur

deki

n W

ater

B

urde

kin

Wat

er

Bur

deki

n W

ater

B

urde

kin

Wat

er

Bur

deki

n W

ater

B

urde

kin

Wat

er

Bur

deki

n W

ater

B

urde

kin

Wat

er

Bur

deki

n W

ater

B

urde

kin

Wat

er

Bur

deki

n W

ater

B

urde

kin

Wat

er

Bur

deki

n W

ater

B

urde

kin

Wat

er

Bur

deki

n W

ater

B

urde

kin

Wat

er

Bur

deki

n W

ater

B

urde

kin

Wat

er

Bur

deki

n W

ater

B

urde

kin

Wat

er

Bur

deki

n W

ater

B

urde

kin

Wat

er

Bur

deki

n W

ater

B

urde

kin

Wat

er

Bur

deki

n W

ater

B

urde

kin

Wat

er

Bur

deki

n W

ater

B

urde

kin

Wat

er

Bur

deki

n W

ater

B

urde

kin

Wat

er

Bur

deki

n W

ater

B

urde

kin

Wat

er

Bur

deki

n W

ater

Mabbin Rd

Mabbin Rd

Mabbin Rd

Mabbin Rd

Mabbin Rd

Mabbin Rd

Mabbin RdMabbin Rd

Mabbin Rd

Mabbin Rd

Mabbin Rd

Mabbin Rd

Mabbin Rd

Mabbin RdMabbin Rd

Mabbin Rd

Mabbin Rd

Mabbin Rd

Mabbin Rd

Mabbin Rd

Mabbin RdMabbin Rd

Mabbin Rd

Mabbin Rd

Mabbin Rd

Mabbin Rd

Mabbin RdMabbin Rd

Mabbin Rd

Mabbin Rd

Mabbin Rd

Mabbin Rd

Mabbin Rd

Mabbin RdMabbin Rd

Mabbin Rd

Mabbin Rd

Mabbin Rd

Mabbin Rd

Mabbin Rd

Mabbin RdMabbin Rd

Mabbin Rd

Mabbin Rd

Mabbin Rd

Mabbin Rd

Mabbin Rd

Mabbin Rd

Mabbin Rd

RE

D H

ILL

L INT

ON

ExistingMabbin RoadRealignment

ApprovedRoad Closure

FisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisher

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Pasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha RdPasha Rd

Eureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationEureka AccommodationVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillageVillage

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

CreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreek

Eun

g el la Wa te

r E

ung el la W

a ter

Eun

g el la Wa te

r E

ung el la W

a ter

Eun

g el la Wa te

r E

ung el la W

a ter

Eun

g el la Wa te

r E

ung el la W

a ter

Eun

g el la Wa te

r E

ung el la W

a ter

Eun

g el la Wa te

r E

ung el la W

a ter

Eun

g el la Wa te

r E

ung el la W

a ter

Eun

g el la Wa te

r E

ung el la W

a ter

Eun

g el la Wa te

r E

ung el la W

a ter

Eun

g el la Wa te

r E

ung el la W

a ter

Eun

g el la Wa te

r E

ung el la W

a ter

Eun

g el la Wa te

r E

ung el la W

a ter

Eun

g el la Wa te

r E

ung el la W

a ter

Eun

g el la Wa te

r E

ung el la W

a ter

Eun

g el la Wa te

r E

ung el la W

a ter

Eun

g el la Wa te

r E

ung el la W

a ter

Eun

g el la Wa te

r E

ung el la W

a ter

Eun

g el la Wa te

r E

ung el la W

a ter

Eun

g el la Wa te

r E

ung el la W

a ter

Eun

g el la Wa te

r E

ung el la W

a ter

Eun

g el la Wa te

r E

ung el la W

a ter

Eun

g el la Wa te

r E

ung el la W

a ter

Eun

g el la Wa te

r E

ung el la W

a ter

Eun

g el la Wa te

r E

ung el la W

a ter

Eun

g el la Wa te

r

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

No rth Q

ue en sl an d Ga s P

ipel i ne

7,595,000 mN

7,600,000 mN

605,000 mE 610,000 mE

7,585,000 mN

7,590,000 mN

610,000 mE605,000 mE7,605,000 m

N

7,58

5,00

0 m

N

595,000 mE 600,000 mE

7,59

0,00

0 m

N

595,000 mE 600,000 mE

7,59

5,00

0 m

N7,

600,

000

mN

7,60

5,00

0 m

N

Riverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIA

Goonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIA

Broadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIA

Figure:

RED HILL MINING LEASEROAD IMPACT ASSESSMENT

URS

EXISTING OPERATIONS

Rev:AApproved:

File No: A442627136-g-2090.worA3

Client Project Title

Job No:

Date: 21-06-2012Drawn: VH JB

Whilst every care is taken by URS to ensure the accuracy of the digital data, URS makes no representation or warranties about its accuracy, reliability, completeness,suitability for any particular purpose and disclaims all responsibility and liability (including without limitation, liability in negligence) for any expenses, losses, damages(including indirect or consequential damage) and costs which may be incurred as a result of data being inaccurate in any way for any reason. Electronic files areprovided for information only. The data in these files is not controlled or subject to automatic updates for users outside of URS.

Source: © Mapinfo Australia Pty Ltd and PSMA Australia Ltd., © Commonwealth of Australia (Geoscience Australia) 2006, © The State of Queensland (Department of Environment and Resource Management) 2010, © The State of Queensland (Department of Mines and Energy) 2006-2008, © The State of Queensland (Department of Environment and Resource Management) 2010, Bing Maps © Microsoft Corporation and its data suppliers, Images from Client Oct 2011

CEB06179

ML and MLA Lease Boundaries

Broadmeadow Existing Underground Mine

Existing Open-Cut Mine

Mine Industrial Area

0 1.25

Scale

2.5km

Scale 1:110 000 (A4)

Projection: GDA 94, MGA Zone 55

Broadmeadow Approved Future Underground Mine

Gas Pipeline

Water Pipeline

EIS Study Boundary

Approved Future Open-Cut Mine Pits

Powerline

Road Closure

Road Realignment

Page 46: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

7,595,000 mN

7,600,000 mN

605,000 mE 610,000 mE

7,585,000 mN

7,590,000 mN

610,000 mE605,000 mE7,605,000 m

N

7,58

5,00

0 m

N

595,000 mE 600,000 mE

7,59

0,00

0 m

N

595,000 mE 600,000 mE

7,59

5,00

0 m

N7,

600,

000

mN

7,60

5,00

0 m

N

ProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedProposedRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadRed Hill RoadStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteStock RouteRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignmentRealignment

Broadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundBroadmeadow UndergroundMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine ExtensionMine Extension

Existing 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power LineExisting 132kV Power Line

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

Goonyella

GoonyellaC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reekC

reek

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Isaa

c R

iver

Red H

ill Roa

d

Existing 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub StationExisting 132kV Sub Station

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

12 Mile Gully

Red HillMIA

UG CoalClearance Drift

Red HillAccommodation Village

Red HillUnderground MineExpansion Option

Proposed Bridge

EUR

EKA

Existing Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water PipelineExisting Eungella Water Pipelineto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocatedto be relocated

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

cIs

aac

Isaa

c

RiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiverRiver

UG CoalTransfer

Conveyor

EUR

EKA S

TH

BRO

AD

ME

ADO

W

GO

ON

YELLA

Red Hill Raw CoalStockpile

ISAAC

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

CreekCreek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

BroadmeadowUnderground Mine

AIRSTR

IP

DAM

PIER

Expansion Heavy VehicleWorkshop

Raw WaterSupply

CLEAN

SK IN

MI TSU

I

RI VE

RSI D

E

T HI E

S S

DE N

HA M

Mabbin Rd

RED

HI LL

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Eureka

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

CreekCreek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

Creek

EurekaAccomodation

Village

Red Hill CHPP

Train Load Out

Raw WaterSupply

FisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisherFisher

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Platypus

Pasha Rd

Super LoopTrain Load Out

ExistingSubstation

Goonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIAGoonyella MIA

Riverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIARiverside MIA

Broadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIABroadmeadow MIA

Figure:

RED HILL MINING LEASEROAD IMPACT ASSESSMENT

CEB06179

PROPOSED INFRASTRUCTUREEXPANSION COMPONENTS

Rev:AApproved:

File No: A442627136-g-2091.worA4

Client Project Title

Job No:

Date: 21-06-2013Drawn: VH GC

Whilst every care is taken by URS to ensure the accuracy of the digital data, URS makes no representation or warranties about its accuracy, reliability, completeness,suitability for any particular purpose and disclaims all responsibility and liability (including without limitation, liability in negligence) for any expenses, losses, damages(including indirect or consequential damage) and costs which may be incurred as a result of data being inaccurate in any way for any reason. Electronic files areprovided for information only. The data in these files is not controlled or subject to automatic updates for users outside of URS.

Source: © Mapinfo Australia Pty Ltd and PSMA Australia Ltd., © Commonwealth of Australia (Geoscience Australia) 2006, © The State of Queensland (Department of Environment and Resource Management) 2010, © The State of Queensland (Department of Mines and Energy) 2006-2008, © The State of Queensland (Department of Environment and Resource Management) 2010, Bing Maps © Microsoft Corporation and its data suppliers, Images from Client Oct 2011

0 1.25

Scale

2.5km

Datum: GDA 94, MGA Zone 55

Scale 1:110 000 (A4)

Proposed Broadmeadow Underground Mine Extension

Existing Broadmeadow Underground Mine

Existing Open-Cut Footprint

Mine Lease Boundary

Approved Future Broadmeadow Underground Mine

MIA - Existing

Proposed Accommodation Village & MIA

Approved Future Open-Cut

Gas Pipeline

Powerline

Water Pipeline

Proposed Broadmeadow Underground MineExtension Footprint

Proposed Red Hill Underground Mine

EIS Study Boundary

URS

Page 47: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Refer to Insert B

Moranbah A

ccess Road

Peak Downs Highway/MoranbahAccess Road Intersection

Peak

Dow

ns H

ighw

ay

Railway Overpass

Red

Hi ll

Roa

d

Goonyella R

oad

Pasha Road

Refer to Insert A

Goonyella Access Rd

Figure:

RED HILL MINING LEASEROAD IMPACT ASSESSMENT

CEB06179

INTERSECTION ANDROAD LOCATIONS

Rev:AApproved:

File No: A442627136-g-2192.worA5

Client Project Title

Job No:

Date: 29-07-2013Drawn: VH GC

Whilst every care is taken by URS to ensure the accuracy of the digital data, URS makes no representation or warranties about its accuracy, reliability, completeness,suitability for any particular purpose and disclaims all responsibility and liability (including without limitation, liability in negligence) for any expenses, losses, damages(including indirect or consequential damage) and costs which may be incurred as a result of data being inaccurate in any way for any reason. Electronic files areprovided for information only. The data in these files is not controlled or subject to automatic updates for users outside of URS.

Source: © Mapinfo Australia Pty Ltd and PSMA Australia Ltd., © Commonwealth of Australia (Geoscience Australia) 2006, © The State of Queensland (Department of Environment and Resource Management) 2010, © The State of Queensland (Department of Mines and Energy) 2006-2008, © The State of Queensland (Department of Environment and Resource Management) 2010, Bing Maps © Microsoft Corporation and its data suppliers, Images from Client Oct 2011

URS

Riverside

Road

Access

Insert A

Go

onye

lla A

cces

s R

oad

Goonyella Road/RiversideAccess Road Intersection

Red Hill Road

Goonyella Road/Red Hill Road Intersection

Moranbah Acces

Road

Mills

Ave

Road

Belyando Ave

Moranbah

Curtin S

t

Insert B

Goonyella Road/Curtin Street Intersection

Goonyella Road/Moranbah AccessRoad/Mills Avenue Intersection

Goonyella

EIS Study Boundary

Intersections Exceeding Capacity*

Intersections With Sufficient Capacity

0 2.5

Scale

5km

*Note: Intersections where capacityis exceeded (with or without the project)

Page 48: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 36

Road Impact Assessment

APPENDIX B CRASH DATA

Page 49: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Rd

Goonyella R

oad

Riverside Mine Rd

Goonyella Mine Access Rd

Pasha Road

Red

Hill

Rd

Figure:CEB06179

ROAD CRASHESNORTH OF MORANBAH

JANUARY 2006 - JUNE 2013

Rev:AApproved:

File No: A442627136-g-2221.worB1

Client Project

Job No:

Date:Drawn: VH/RG JB

Title

RED HILL MINING LEASEROAD IMPACT ASSESSMENT

29-07-2013

URS

Whilst every care is taken by URS to ensure the accuracy of the digital data, URS makes no representation or warranties about its accuracy, reliability, completeness, suitability for any particular purpose and disclaims all responsibility and liability (including without limitation, liability in negligence) for any expenses,losses, damages (including indirect or consequential damage) and costs which may be incurred as a result of data being inaccurate in any way for any reason. Electronic files are provided for information only. The data in these files is not controlled or subject to automatic updates for users outside of URS.

Source: © Mapinfo Australia Pty Ltd and PSMA Australia Ltd., © Copyright Commonwealth of Australia (Geoscience Australia) 2006 , © Copyright The State of Queensland (Department of Natural Resources and Water) 2008, © The State of Queensland (Department of Mines and Energy) 2006-2008,© The State of Queensland (Department of Environment and Resource Management) 2010, Bing Maps © Microsoft Corporation and its data suppliers, Images from Client Oct 2011

RoadRailway

HospitalisationMedical TreatmentMinor Injury

Property Damage

Road data supplied by Isaac Regional Council.Rail data supplied by Department of Environment and Resource Management.Crash data supplied by Department of Transport and Main Roadswith modification to locations.

Source:

EIS Study Boundary

0 1.25 2.5km

Proposed QRN Missing Link Railway

Reporting Periods:Fatal: 1 January 2006 - 30 April 2013Hospitalisation: 1 January 2006 - 31 December 2012Non-serious: 1 January 2006 - 31 December 2010

Page 50: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 37

Road Impact Assessment

APPENDIX C ASSESSMENT TRAFFIC VOLUMES

Page 51: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease

Surveyed Volumes

Legend

00 AM Peak

(00) PM Peak

L Left turn (17) (15) () ()

T Through (174) (4) 34 L 3 1 () 0 L 0 0

R Right turn 65 (170) 31 R R T () 0 R R T

Year of Survey 267 L T L T

(79) 264 24 0 0

(62) (5) 2013 () ()

(67) 288 32 (185) () 0 0 ()

(65) 288 32 (186) (19) 124 27 (104)

Goonyella Road (182) (4)

23 9

T L Red Hill Road

T R R 4 (4)

284 115 L 23 (100)

(61) (15) 2013

(76) 399 46 (282)

(257) 613 97 (494)

Goonyella Road (280) (214)

65 32

T L Curtin Street

T R R 269 (106)

344 16 L 199 (78)

(151) (122) 2013

(273) 360 264 (358)

(283) 323 273 (340)

Goonyella Road (108) (232)

243 30

T L Mills Avenue

T R R 235 (90)

88 45 L 323 (176)

(193) (404) 2013

(597) 133 566 (284)

() 0 0 ()

Moranbah Access Road () ()

0 0

T L

T R R 0 ()

0 0 L 0 ()

() ()

() 0 0 ()

(519) 99 558 (175)

(107) (68)

(407) (371) 58 L 393 165 2013 (104)

Peak Downs Highway 77 (36) 19 T R L 184 Peak Downs Highway

to Clermont 487 R 41 (148) 135 to Mackay

(156) T 94 (49) (197)

Moranbah Access Road

Riverside Access

Road

PROJECT AREA

ACCOM

VILLAGE

MORANBAH

MORANBAH AIRPORT

G:\CEB06438 - Red Hill Mining Lease Project EIS\6438 Analysis\Traffic Volumes\6438 Traffic Gen JJP 2013 07 19.xlsx 6/09/2013 Survey

Page 52: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease

2020 Background

Legend

00 AM Peak

(00) PM Peak

L Left turn (18) (16) () ()

T Through (186) (4) 36 L 3 1 () 0 L 0 0

R Right turn 70 (182) 33 R R T () 0 R R T

286 L T L T

(85) 282 26 0 0

(66) (5) () ()

(72) 308 34 (198) () 0 0 ()

(70) 308 34 (199) (20) 133 29 (107)

Goonyella Road (195) (4)

25 10

T L Red Hill Road

T R R 4 (4)

304 123 L 25 (107)

(65) (16)

(81) 427 49 (302)

(275) 656 104 (529)

Goonyella Road (300) (229)

70 34

T L Curtin Street

T R R 288 (113)

368 23 L 283 (111)

(162) (173)

(335) 391 352 (410)

(402) 459 388 (483)

Goonyella Road (153) (329)

345 43

T L Mills Avenue

T R R 334 (128)

125 64 L 459 (250)

(274) (574)

(848) 189 804 (403)

() 0 0 ()

Moranbah Access Road () ()

0 0

T L

T R R 0 ()

0 0 L 0 ()

() ()

() 0 0 ()

(737) 141 792 (249)

(152) (97)

(583) (527) 82 L 558 234 (153)

Peak Downs Highway 112 (56) 30 T R L 264 Peak Downs Highway

to Clermont 705 R 58 (210) 205 to Mackay

(228) T 147 (76) (287)

Riverside Access

Moranbah Access Road

Road

PROJECT AREA

ACCOM

VILLAGE

MORANBAH

MORANBAH AIRPORT

G:\CEB06438 - Red Hill Mining Lease Project EIS\6438 Analysis\Traffic Volumes\6438 Traffic Gen JJP 2013 07 19.xlsx 6/09/2013 2020 BKG

Page 53: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease

2023 Background

Legend

00 AM Peak

(00) PM Peak

L Left turn (19) (17) () ()

T Through (191) (4) 37 L 3 1 () 0 L 0 0

R Right turn 72 (187) 34 R R T () 0 R R T

294 L T L T

(87) 290 26 0 0

(68) (6) () ()

(74) 317 35 (204) () 0 0 ()

(72) 317 35 (205) (21) 136 30 (110)

Goonyella Road (200) (4)

25 10

T L Red Hill Road

T R R 4 (4)

312 127 L 25 (110)

(67) (17)

(84) 439 51 (310)

(283) 674 107 (543)

Goonyella Road (308) (235)

72 35

T L Curtin Street

T R R 296 (117)

378 24 L 300 (118)

(166) (184)

(350) 403 372 (426)

(427) 488 412 (513)

Goonyella Road (163) (350)

367 45

T L Mills Avenue

T R R 355 (136)

133 68 L 488 (266)

(291) (610)

(901) 201 855 (429)

() 0 0 ()

Moranbah Access Road () ()

0 0

T L

T R R 0 ()

0 0 L 0 ()

() ()

() 0 0 ()

(784) 149 843 (264)

(162) (103)

(621) (560) 88 L 593 249 (163)

Peak Downs Highway 120 (60) 32 T R L 281 Peak Downs Highway

to Clermont 751 R 62 (223) 220 to Mackay

(244) T 158 (82) (306)

Riverside Access

Moranbah Access Road

Road

PROJECT AREA

ACCOM

VILLAGE

MORANBAH

MORANBAH AIRPORT

G:\CEB06438 - Red Hill Mining Lease Project EIS\6438 Analysis\Traffic Volumes\6438 Traffic Gen JJP 2013 07 19.xlsx 6/09/2013 2023 BKG

Page 54: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease

2024 Background

Legend

00 AM Peak

(00) PM Peak

L Left turn (19) (17) () ()

T Through (193) (4) 38 L 3 1 () 0 L 0 0

R Right turn 72 (189) 34 R R T () 0 R R T

296 L T L T

(88) 293 27 0 0

(69) (6) () ()

(74) 320 36 (205) () 0 0 ()

(72) 320 36 (206) (21) 138 30 (111)

Goonyella Road (202) (4)

26 10

T L Red Hill Road

T R R 4 (4)

315 128 L 26 (111)

(68) (17)

(84) 443 51 (313)

(285) 680 108 (548)

Goonyella Road (311) (238)

72 36

T L Curtin Street

T R R 299 (118)

382 25 L 306 (120)

(168) (188)

(355) 406 379 (431)

(436) 497 420 (524)

Goonyella Road (166) (357)

374 46

T L Mills Avenue

T R R 362 (139)

136 69 L 497 (271)

(297) (622)

(919) 205 872 (437)

() 0 0 ()

Moranbah Access Road () ()

0 0

T L

T R R 0 ()

0 0 L 0 ()

() ()

() 0 0 ()

(799) 152 859 (270)

(165) (105)

(633) (571) 89 L 605 254 (167)

Peak Downs Highway 122 (62) 33 T R L 287 Peak Downs Highway

to Clermont 767 R 63 (228) 225 to Mackay

(249) T 162 (84) (312)

Riverside Access

Moranbah Access Road

Road

PROJECT AREA

ACCOM

VILLAGE

MORANBAH

MORANBAH AIRPORT

G:\CEB06438 - Red Hill Mining Lease Project EIS\6438 Analysis\Traffic Volumes\6438 Traffic Gen JJP 2013 07 19.xlsx 6/09/2013 2024 BKG

Page 55: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease

2034 Background

Legend

00 AM Peak

(00) PM Peak

L Left turn (21) (18) () ()

T Through (211) (5) 41 L 4 1 () 0 L 0 0

R Right turn 79 (206) 38 R R T () 0 R R T

323 L T L T

(96) 319 29 0 0

(75) (6) () ()

(81) 348 39 (224) () 0 0 ()

(79) 348 39 (225) (23) 150 33 (121)

Goonyella Road (220) (5)

28 11

T L Red Hill Road

T R R 5 (5)

344 139 L 28 (121)

(74) (18)

(92) 483 56 (341)

(311) 742 117 (598)

Goonyella Road (339) (259)

79 39

T L Curtin Street

T R R 325 (128)

416 29 L 366 (144)

(183) (224)

(407) 446 445 (482)

(521) 594 502 (626)

Goonyella Road (199) (427)

447 55

T L Mills Avenue

T R R 432 (166)

162 83 L 594 (324)

(355) (743)

(1098) 245 1041 (523)

() 0 0 ()

Moranbah Access Road () ()

0 0

T L

T R R 0 ()

0 0 L 0 ()

() ()

() 0 0 ()

(955) 182 1027 (322)

(197) (125)

(759) (683) 107 L 723 304 (201)

Peak Downs Highway 147 (76) 40 T R L 344 Peak Downs Highway

to Clermont 922 R 75 (272) 275 to Mackay

(301) T 199 (104) (376)

Moranbah Access Road

PROJECT AREA

ACCOM

VILLAGERiverside Access

Road

MORANBAH

MORANBAH AIRPORT

G:\CEB06438 - Red Hill Mining Lease Project EIS\6438 Analysis\Traffic Volumes\6438 Traffic Gen JJP 2013 07 19.xlsx 6/09/2013 2034 BKG

Page 56: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease

Construction Phase - All Trips

Legend

00 AM Peak

(00) PM Peak

L Left turn () () (38) (70)

T Through (10) () 0 L 0 0 (38) 38 L 38 70

R Right turn 10 (10) 10 R R T (12) 12 R R T

10 L T L T

(10) 10 0 12 70

(10) () (12) (70)

(10) 10 10 (10) (82) 82 82 (82)

(10) 10 10 (10) (82) 82 82 (82)

Goonyella Road (10) ()

10 0

T L Red Hill Road

T R R 0 ()

10 82 L 82 (82)

(10) (82)

(92) 92 92 (92)

(92) 92 92 (92)

Goonyella Road (92) ()

92 0

T L Curtin Street

T R R 0 ()

92 0 L 0 ()

(92) ()

(92) 92 92 (92)

(92) 92 92 (92)

Goonyella Road (17) (75)

17 75

T L Mills Avenue

T R R 75 (75)

17 0 L 0 ()

(17) ()

(17) 17 17 (17)

(17) 17 17 (17)

Moranbah Access Road (14) (3)

14 3

T L

T R R 3 (3)

14 0 L 0 ()

(14) ()

(14) 14 14 (14)

(14) 14 14 (14)

() (14)

() () 0 L 0 14 (14)

Peak Downs Highway 0 () 0 T R L 14 Peak Downs Highway

to Clermont 0 R 14 (14) 14 to Mackay

() T 0 () (14)

Riverside Access

Moranbah Access Road

Road

PROJECT AREA

ACCOM

VILLAGE

MORANBAH

MORANBAH AIRPORT

G:\CEB06438 - Red Hill Mining Lease Project EIS\6438 Analysis\Traffic Volumes\6438 Traffic Gen JJP 2013 07 19.xlsx 6/09/2013 Construction

Page 57: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease

Overlap Phase - All Trips

Legend

00 AM Peak

(00) PM Peak

L Left turn () () (50) (70)

T Through (10) () 0 L 0 0 (50) 50 L 50 70

R Right turn 10 (10) 10 R R T (23) 23 R R T

10 L T L T

(10) 10 0 23 70

(10) () (23) (70)

(10) 10 10 (10) (93) 93 93 (93)

(10) 10 10 (10) (93) 93 93 (93)

Goonyella Road (10) ()

10 0

T L Red Hill Road

T R R 0 ()

10 93 L 93 (93)

(10) (93)

(103) 103 103 (103)

(103) 103 103 (103)

Goonyella Road (103) ()

103 0

T L Curtin Street

T R R 0 ()

103 0 L 0 ()

(103) ()

(103) 103 103 (103)

(103) 103 103 (103)

Goonyella Road (28) (75)

28 75

T L Mills Avenue

T R R 75 (75)

28 0 L 0 ()

(28) ()

(28) 28 28 (28)

(28) 28 28 (28)

Moranbah Access Road (23) (5)

23 5

T L

T R R 5 (5)

23 0 L 0 ()

(23) ()

(23) 23 23 (23)

(23) 23 23 (23)

() (23)

() () 0 L 0 23 (23)

Peak Downs Highway 0 () 0 T R L 23 Peak Downs Highway

to Clermont 0 R 23 (23) 23 to Mackay

() T 0 () (23)

Moranbah Access Road

PROJECT AREA

ACCOM

VILLAGERiverside Access

Road

MORANBAH

MORANBAH AIRPORT

G:\CEB06438 - Red Hill Mining Lease Project EIS\6438 Analysis\Traffic Volumes\6438 Traffic Gen JJP 2013 07 19.xlsx 6/09/2013 Overlap

Page 58: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease

Operation Phase - All Trips

Legend

00 AM Peak

(00) PM Peak

L Left turn () () (19) (70)

T Through (10) () 0 L 0 0 (19) 19 L 19 70

R Right turn 10 (10) 10 R R T (17) 17 R R T

10 L T L T

(10) 10 0 17 70

(10) () (17) (70)

(10) 10 10 (10) (87) 87 87 (87)

(10) 10 10 (10) (87) 87 87 (87)

Goonyella Road (10) ()

10 0

T L Red Hill Road

T R R 0 ()

10 87 L 87 (87)

(10) (87)

(97) 97 97 (97)

(97) 97 97 (97)

Goonyella Road (97) ()

97 0

T L Curtin Street

T R R 0 ()

97 0 L 0 ()

(97) ()

(97) 97 97 (97)

(97) 97 97 (97)

Goonyella Road (22) (75)

22 75

T L Mills Avenue

T R R 75 (75)

22 0 L 0 ()

(22) ()

(22) 22 22 (22)

(22) 22 22 (22)

Moranbah Access Road (18) (4)

18 4

T L

T R R 4 (4)

18 0 L 0 ()

(18) ()

(18) 18 18 (18)

(18) 18 18 (18)

() (18)

() () 0 L 0 18 (18)

Peak Downs Highway 0 () 0 T R L 18 Peak Downs Highway

to Clermont 0 R 18 (18) 18 to Mackay

() T 0 () (18)

Riverside Access

Moranbah Access Road

Road

PROJECT AREA

ACCOM

VILLAGE

MORANBAH

MORANBAH AIRPORT

G:\CEB06438 - Red Hill Mining Lease Project EIS\6438 Analysis\Traffic Volumes\6438 Traffic Gen JJP 2013 07 19.xlsx 6/09/2013 Operation

Page 59: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease

2020 Background + Construction

Legend

00 AM Peak

(00) PM Peak

L Left turn (18) (16) (38) (70)

T Through (196) (4) 36 L 3 1 (38) 38 L 38 70

R Right turn 80 (192) 43 R R T (12) 12 R R T

296 L T L T

(95) 292 26 12 70

(76) (5) (12) (70)

(82) 318 44 (208) (82) 82 82 (82)

(80) 318 44 (209) (102) 214 110 (189)

Goonyella Road (205) (4)

35 10

T L Red Hill Road

T R R 4 (4)

314 205 L 106 (189)

(75) (98)

(173) 519 141 (393)

(367) 748 195 (620)

Goonyella Road (391) (229)

161 34

T L Curtin Street

T R R 288 (113)

460 23 L 283 (111)

(253) (173)

(426) 482 444 (502)

(493) 550 479 (574)

Goonyella Road (170) (404)

362 118

T L Mills Avenue

T R R 409 (203)

142 64 L 459 (250)

(291) (574)

(864) 205 820 (420)

(17) 17 17 (17)

Moranbah Access Road (14) (3)

14 3

T L

T R R 3 (3)

14 0 L 0 ()

(14) ()

(14) 14 14 (14)

(751) 155 806 (262)

(152) (110)

(583) (527) 82 L 558 248 (167)

Peak Downs Highway 112 (56) 30 T R L 278 Peak Downs Highway

to Clermont 705 R 72 (224) 219 to Mackay

(228) T 147 (76) (301)

Riverside Access

Moranbah Access Road

Road

PROJECT AREA

ACCOM

VILLAGE

MORANBAH

MORANBAH AIRPORT

G:\CEB06438 - Red Hill Mining Lease Project EIS\6438 Analysis\Traffic Volumes\6438 Traffic Gen JJP 2013 07 19.xlsx 6/09/2013 2020 BKG+Con

Page 60: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease

2023 Background + Overlap

Legend

00 AM Peak

(00) PM Peak

L Left turn (19) (17) (38) (70)

T Through (201) (4) 37 L 3 1 (38) 38 L 38 70

R Right turn 82 (197) 44 R R T (12) 12 R R T

304 L T L T

(97) 300 26 12 70

(78) (6) (12) (70)

(84) 327 45 (214) (82) 82 82 (82)

(82) 327 45 (215) (103) 218 111 (192)

Goonyella Road (210) (4)

35 10

T L Red Hill Road

T R R 4 (4)

322 208 L 107 (192)

(77) (98)

(175) 531 142 (402)

(374) 766 198 (635)

Goonyella Road (400) (235)

163 35

T L Curtin Street

T R R 296 (117)

470 24 L 300 (118)

(258) (184)

(442) 494 464 (517)

(519) 579 504 (605)

Goonyella Road (180) (425)

384 120

T L Mills Avenue

T R R 430 (211)

149 68 L 488 (266)

(308) (610)

(918) 217 871 (445)

(17) 17 17 (17)

Moranbah Access Road (14) (3)

14 3

T L

T R R 3 (3)

14 0 L 0 ()

(14) ()

(14) 14 14 (14)

(798) 163 857 (278)

(162) (117)

(621) (560) 88 L 593 263 (177)

Peak Downs Highway 120 (60) 32 T R L 295 Peak Downs Highway

to Clermont 751 R 76 (237) 234 to Mackay

(244) T 158 (82) (320)

Moranbah Access Road

PROJECT AREA

ACCOM

VILLAGERiverside Access

Road

MORANBAH

MORANBAH AIRPORT

G:\CEB06438 - Red Hill Mining Lease Project EIS\6438 Analysis\Traffic Volumes\6438 Traffic Gen JJP 2013 07 19.xlsx 6/09/2013 2023 BKG+Overlap

Page 61: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease

2024 Background + Operations

Legend

00 AM Peak

(00) PM Peak

L Left turn (19) (17) (19) (70)

T Through (203) (4) 38 L 3 1 (19) 19 L 19 70

R Right turn 82 (199) 44 R R T (17) 17 R R T

306 L T L T

(98) 303 27 17 70

(79) (6) (17) (70)

(84) 330 46 (215) (87) 87 87 (87)

(82) 330 46 (216) (109) 225 117 (198)

Goonyella Road (212) (4)

36 10

T L Red Hill Road

T R R 4 (4)

325 215 L 113 (198)

(78) (104)

(182) 540 148 (410)

(383) 778 205 (646)

Goonyella Road (408) (238)

170 36

T L Curtin Street

T R R 299 (118)

479 25 L 306 (120)

(265) (188)

(453) 504 476 (528)

(533) 595 518 (621)

Goonyella Road (189) (432)

397 121

T L Mills Avenue

T R R 437 (214)

158 69 L 497 (271)

(320) (622)

(942) 227 894 (460)

(22) 22 22 (22)

Moranbah Access Road (18) (4)

18 4

T L

T R R 4 (4)

18 0 L 0 ()

(18) ()

(18) 18 18 (18)

(818) 171 878 (288)

(165) (123)

(633) (571) 89 L 605 272 (185)

Peak Downs Highway 122 (62) 33 T R L 305 Peak Downs Highway

to Clermont 767 R 82 (246) 243 to Mackay

(249) T 162 (84) (331)

Riverside Access

Moranbah Access Road

Road

PROJECT AREA

ACCOM

VILLAGE

MORANBAH

MORANBAH AIRPORT

G:\CEB06438 - Red Hill Mining Lease Project EIS\6438 Analysis\Traffic Volumes\6438 Traffic Gen JJP 2013 07 19.xlsx 6/09/2013 2024 BKG+Op

Page 62: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease

2034 Background + Operations

Legend

00 AM Peak

(00) PM Peak

L Left turn (21) (18) (19) (70)

T Through (221) (5) 41 L 4 1 (19) 19 L 19 70

R Right turn 89 (216) 48 R R T (17) 17 R R T

333 L T L T

(106) 329 29 17 70

(85) (6) (17) (70)

(91) 358 49 (234) (87) 87 87 (87)

(89) 358 49 (235) (110) 237 120 (208)

Goonyella Road (230) (5)

38 11

T L Red Hill Road

T R R 5 (5)

354 227 L 115 (208)

(84) (106)

(189) 580 153 (439)

(408) 839 215 (695)

Goonyella Road (436) (259)

176 39

T L Curtin Street

T R R 325 (128)

514 29 L 366 (144)

(280) (224)

(505) 543 542 (580)

(618) 692 600 (723)

Goonyella Road (221) (502)

470 130

T L Mills Avenue

T R R 507 (241)

184 83 L 594 (324)

(378) (743)

(1121) 267 1064 (545)

(22) 22 22 (22)

Moranbah Access Road (18) (4)

18 4

T L

T R R 4 (4)

18 0 L 0 ()

(18) ()

(18) 18 18 (18)

(973) 201 1045 (340)

(197) (144)

(759) (683) 107 L 723 322 (220)

Peak Downs Highway 147 (76) 40 T R L 362 Peak Downs Highway

to Clermont 922 R 94 (291) 293 to Mackay

(301) T 199 (104) (395)

Riverside Access

Moranbah Access Road

Road

PROJECT AREA

ACCOM

VILLAGE

MORANBAH

MORANBAH AIRPORT

G:\CEB06438 - Red Hill Mining Lease Project EIS\6438 Analysis\Traffic Volumes\6438 Traffic Gen JJP 2013 07 19.xlsx 6/09/2013 2034 BKG+Op

Page 63: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 38

Road Impact Assessment

APPENDIX D CONSTRUCTION AND OPERATION ASSUMPTIONS

Page 64: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS

Table 1 - Broad Project Assumptions

Item Value

Output Increase 14.0 MT/paConstruction Start 2020Construction Period 4.0 yearsOperation Start 2022Operation Period 23.0

Table 2 - Project Construction Assumptions (Total Construction Period)

Building Materials and Fuel Mackay 40,087 t Single Articulated 25 t 1603 deliveries 401 deliveries/paBase and Sub-base materials Moranbah 939,000 t 27m B-Double 50 t 18,780 deliveries 4,695 deliveries/paConcrete Moranbah 60,480 t Concrete Transit Vehicle 12 t 5,040 deliveries 1,260 deliveries/paPrefabricated Buildings - Offices Mackay 600 t Single Articulated 10 t 60 deliveries 15 deliveries/paStructural Steel Mackay 8,909 t Single Articulated 20 t 445 deliveries 111 deliveries/paMechanical Steel Mackay 2,100 t Single Articulated 20 t 105 deliveries 26 deliveries/paPipe work - Steel Mackay 1,410 t Single Articulated 20 t 71 deliveries 18 deliveries/paPipe work - Steel with Lining Mackay 2,103 t Single Articulated 20 t 105 deliveries 26 deliveries/paPipe work - PE Mackay 2,204 t Single Articulated 20 t 110 deliveries 28 deliveries/paElectrical Reticulation Cable Mackay 341 t Single Articulated 20 t 17 deliveries 04 deliveries/paElectrical Reticulation - (Poles 208 No.) Mackay 1,782 t Single Articulated 20 t 35 deliveries 09 deliveries/paConveyor Belts Mackay 858 t Single Articulated 20 t 43 deliveries 11 deliveries/paRotating Equipment -Pumps & Compressors Mackay 3,564 t Single Articulated 20 t 70 deliveries 18 deliveries/paProcess Equipment Mackay 1,527 t Single Articulated 20 t 30 deliveries 08 deliveries/paOther Equipment Mackay 3,055 t Single Articulated 20 t 60 deliveries 15 deliveries/paAsphalt Mackay 1,527 t Single Articulated 20 t 76 deliveries 19 deliveries/paBulk Bitumen - Polymer Modified Mackay 718 t Single Articulated 20 t 36 deliveries 09 deliveries/paMiscellaneous Mackay 546 t Single Unit Truck 5t 109 deliveries 27 deliveries/paTotal - ~1,070,810 - 26,796 deliveries 6,699 deliveries/pa

Waste (Oil + Sludge, Hydraulic Fluid, metal, etc) Mackay 71 t Single Articulated 10 t 7 deliveries 2 deliveries/paGeneral and Recyclable Waste Moranbah 4182 t Single Articulated 10 t 418 deliveries 105 deliveries/paSeptic Moranbah m^3 Single Articulated 20 m^3 0 deliveries 0 deliveries/paTotal - ~4,253 - - 425 deliveries 106 deliveries/pa

Total Input / Output - ~1,075,063 - 27,221 deliveries 6,805 deliveries/pa

Table 3 - Project Operation Assumptions (Annual Assumptions)

Fuel & Additives Mackay 3,536 t Tri - Semi 34 t 104 deliveries 0 deliveries/paExplosives Moranbah 00 t Single Articulated 20 t 0 deliveries 0 deliveries/paGeneral freight Mackay 10,400 t Single Articulated 20 t 520 deliveries 1 deliveries/paOil Mackay 90 t 27m B-Double 30,000 l 3 deliveries 0 deliveries/paTotal ~13,936 627 deliveries/pa 2 deliveries/average day

Waste (Oil + Sludge, Hydraulic Fluid, metal, Filters) Mackay 1,040 t Single Articulated 20 t 52 deliveries 0 deliveries/paGeneral and Recyclable Waste Moranbah 560 t Single Articulated 20 t 28 deliveries 0 deliveries/paSeptic Moranbah 00 t Single Articulated 20 m^3 0 deliveries 0 deliveries/paTotal ~1,600 80 deliveries/pa 1 deliveries/average day

Total Input / Output ~15,536 707 deliveries/pa 3 deliveries/average day

ItemOrigin or

Destination

Quantity (Total Construction

Period)Delivery Vehicle

Ou

tpu

ts

Assumed Load

Size

Total Construction Period

Deliveries

Average Deliveries/PA during

Construction Period

Inp

uts

Assumed Load

SizeDeliveries Per Annum Deliveries/Average DayItem

Origin or

DestinationQuantity (Annual) Delivery Vehicle

Inp

uts

Ou

tpu

ts

G:\CEB06438 - Red Hill Mining Lease Project EIS\6438 Analysis\PIA Scoping\6438 Deliveries 2013 07 19 (from 6179).xlsx 19/07/2013

Page 65: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 39

Road Impact Assessment

APPENDIX E BIBLIOGRAPHY

Page 66: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 40

In undertaking this road impact assessment the following material has been reviewed:

> Australian Bureau of Statistics 2011, Road and Bridge Construction – Queensland Index (Series

A2333727L), Australian Bureau of Statistics, Canberra. > Austroads 1988, Guide to the Traffic Engineering Practice Part 2: Roadway Capacity, Austroads,

Sydney. > Austroads 2009, Guide to Road Design Part 3: Geometric Design, Austroads, Sydney. > ARRB 2009, Unsealed roads manual: Guidelines to good practice, ARRB. > Department of Infrastructure and Planning 2008, Terms of Reference for an Environmental

Impact Statement - Bowen Basin Coal Growth Project November 2008, Department of Infrastructure and Planning, Queensland.

> Coordinator-General 2010, Coordinator-General’s evaluation report for an environmental impact

statement August 2010, Coordinator-General, Queensland. > Department of Transport and Main Roads 2012, Road Implementation Program 2012-13 to 2015-

16: Mackay/Whitsunday Region, Department of Transport and Main Roads, Queensland. > Department of Transport and Main Roads 2012, Traffic Analysis and Reporting System: Annual

Volume Report – Peak Downs Hwy 150m of Isaac River, Department of Transport and Main Roads, Queensland.

> Department of Transport and Main Roads 2008, Assessment of Road Impacts of Development

Proposals – Notes for Contribution Calculations – Main Roads Central District (Rockhampton), Department of Transport and Main Roads, Rockhampton.

> Department of Transport and Main Roads 2006a, Guidelines for Assessment of Road Impacts of

Development, Department of Transport and Main Roads, Queensland. > Department of Transport and Main Roads 2006b, Road Planning and Design Manual – Chapter

13 Intersection at Grade, Department of Transport and Main Roads, Queensland. > Isaac Regional Council 2012, Traffic Counts - 8201 Moranbah Access Road, Isaac Regional

Council, Moranbah, Queensland. > Isaac Regional Council 2012, Traffic Counts - 8202 Peak Downs Mine Road, Isaac Regional

Council, Moranbah, Queensland. > Office of Economic and Statistical Research 2011, Projected population by local government

area, Queensland, 2006 to 2031, Queensland Treasury. > Roads and Traffic Authority 2002, Guide to Traffic Generating Developments, Roads and Traffic

Authority, Sydney. > Transport Operations (Road Use Management) Act 1995, (Queensland). > Transport Operations (Road Use Management – Mass, Dimensions and Loading) Regulation

2005 (Queensland).

Page 67: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 41

Road Impact Assessment

APPENDIX F GLOSSARY OF TERMS

Page 68: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 42

Term Definition

95%ile Queue The length of vehicles in a queue that is exceeded only 5% of the time. A typical design parameter for intersections to estimate turning bay lengths.

Access The location where vehicles move between private property and the public road network.

Annual Average Daily Traffic (AADT)

The volume of traffic over a day as averaged from a complete years’ worth of traffic counts.

Austroads The association of Australian and New Zealand road transport and traffic authorities that aims to promote improved road transport outcomes and produces nationally accepted guidelines.

Average Daily Traffic (ADT)

The volume of traffic over a day as averaged from an incomplete year’s worth of traffic counts.

Background Traffic The expected volume of traffic at a particular point without the addition of the traffic associated with the Project under consideration.

Chainage The distance in kilometres along a road from a defined starting point.

Crash Data Recorded road crashes along a particular section of public road.

Critical delay The highest average traffic delay experienced by any traffic movement at an intersection.

Critical Movement In the context of critical traffic delays intersections, it is the traffic movement which experiences the highest average delay of any of the movements at that intersection.

Degree of Saturation (DOS)

The ratio of the number of vehicles requiring entry to an intersection in a specified period to the number which could enter if an approach was fully saturated (i.e. at capacity) during that period.

Department of Main Roads (DMR)

The former Queensland Government body responsible for operating and maintaining the state-controlled road network, now part of the Department of Transport and Main Roads.

Equivalent Standard Axles The number of standard axle loads that are equivalent in damaging effect on a pavement to a given vehicle or axle loading.

External Road Network The road network outside the direct control and ownership of a development project. The external road network is usually controlled by either the Department of Transport and Main Roads or a local council.

Growth Rate The annual percentage change in the number of vehicles passing a given point on a road.

Heavy Vehicles A heavy vehicle is defined as any vehicle with three or more axles or with dual tyres on the rear axle.

High entry angle left turn treatment

A left turn intersection treatment where the terminating road intersects at an angle close to 90o (generally between 70o and 110o). This treatment produces optimal sight angles.

Intersection Capacity The maximum sustainable traffic flow rate at which vehicles can reasonably be expected to traverse a point or uniform segment of a lane or roadway under given roadway, geometric, traffic, environmental and control conditions; usually expressed as vehicles per hour.

Intersection Movement A traffic path through an intersection with a discrete origin and destination.

Level of Service (LOS) A qualitative measure describing traffic operational conditions within a traffic stream, and their perception by motorists and/or passengers. These conditions are generally described in terms of speed and travel time, freedom to manoeuvre, traffic interruptions, comfort, convenience and safety.

Light Vehicles A light vehicle is defined as any vehicle with two axles and without dual tyres on the rear axle.

Mid-Block The section of road between intersections.

Network Peak The period usually hour long during which traffic volumes on the road network are at the highest level.

Pavement Impact Pavements are designed to carry a pre-determined level of traffic load, measured in ESAs, after which the pavement is likely to require structural improvements. New developments can generate increased heavy vehicle traffic which may adversely impact the structure or condition of a pavement.

Page 69: Red Hill Mining Lease EIS - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/Red Hill Mining Lease/EIS/Appendix N_Road… · Red Hill Mining Lease EIS Road Impact Assessment CEB06438

Red Hill Mining Lease EIS Road Impact Assessment

CEB06438 Cardno 25 September 2013 Prepared for BMA via URS Page 43

Term Definition

Pavement Markings Any painted lines, raised pavement markers, traffic domes and the like placed on the road to direct and control the movement or parking of traffic.

Peak Period Typically the one hour period that has the highest traffic demands.

Priority-Controlled Intersection

An intersection where the movement of vehicles is controlled by road rules and traffic control devices as opposed to traffic signals or a roundabout

Protected acceleration lane An intersection treatment where left turning vehicles typically accelerate to the design speed of the intersecting road prior to completing a merge manoeuvre.

Right turn bay A lane allocated for use exclusively by right turning vehicles.

Road Impact Assessment (RIA)

A study of a development project’s impact on the efficiency and safety of the road network. Impacts may result from the presence of the development and the movement of vehicles to and from the development during its construction and operation.

Road and Traffic Authority (RTA)

The State Road Authority in New South Wales which is the State Government Agency responsible for the state road network.

Roundabout A channelised intersection at which all traffic moves clockwise around a central traffic island.

Seagull Intersection An intersection where a triangular island is used to separate turning traffic from through traffic in the same carriageway.

Seal Width The width of the carriageway sealed to protect and waterproof the underlying pavement inclusive of sealed shoulders.

Sensitivity Analysis Testing the relative change in a calculation based on a range of values for an input parameter.

SIDRA Traffic analysis software developed by SIDRA SOLUTIONS which provides estimates of capacity and performance statistics for isolated intersections.

Signalised Intersection An intersection at which the movement of vehicles and pedestrians is generally controlled by traffic signals.

State-Controlled Road A road declared to be controlled by the Department of Transport and Main Roads, including all AusLink National Roads in Queensland.