reconstruction of hhs courtyard
DESCRIPTION
Reconstruction of HHS Courtyard. Carson Edge Jeremy Chwastowski Ryan Landry Joel Griffith. Overview. Introduction. Objectives Visually pleasing More seating Increase everyday use Address special events Constrained to remove orange pad. Phase 1. Rounding of Paths. Lunchroom Paths. - PowerPoint PPT PresentationTRANSCRIPT
Reconstruction of HHS CourtyardCarson EdgeJeremy ChwastowskiRyan LandryJoel Griffith
OverviewIntroduction
Phase 1
Phase 2
Total Cost
Conclusion/Questions
Introduction•Objectives
▫Visually pleasing▫More seating▫Increase everyday use▫Address special events
•Constrained to remove orange pad
Phase 1
Rounding of Paths
Lunchroom Paths
New Eating Area
Terraced Plant Beds
Terraced Planting Beds Continued
Benches
Umbrella Tables
PA System
Art Area
Phase 1 Overview•Removal of two trees•Removal of four light poles•170 total seats•Cost - $71,000•Flexible design•Tables are path oriented•Removal of bushes
Phase 2
Pathways
Flooring
Tables
Phase 2 Overview•24 additional seats•Address special events• Dances• Luncheons• Ceremonies
Final Costs
Questions