  • Report run on: March 22, 2013 10:15 AM

    RECAPP Facility Evaluation Report

    Catherine Nichols Gunn Elementary SchoolB2569ACalgary

    Calgary School District #19

  • Report run on: March 22, 2013 10:15 AM Page 2 of 31

    B2569ABuilding Id:

    Catherine Nichols Gunn ElemBuilding Name:

    CalgaryLocation:6625 - 4 Street N. E. Address:

    3,548.30Gross Area (sq. m): $10,447,000Replacement Cost:1972Construction Year:

    Evaluation Date: December 3 2012

    Williams Engineering Canada Inc. -WEC

    Evaluation Company:

    WEC - Jennifer Lavier JankovicEvaluator Name:

    Catherine Nichols Gunn is a single storey school constructed in 1972, and 3548.3 sqm in size. A portable classroom islocated on the North side of the school. This portable is not CBE and is occupied by the Thorncliffe Club and operatedby the Boys and Girls Clubs of Calgary.

    General Summary:

    Structural Summary:School foundation consists of cast in place concrete foundations, and reinforced concrete slab on grade. Roof is metaldeck on timber beams and columns. Various cement masonry units are loadbearing.

    Overall, the structure is in acceptable condition.

    Envelope Summary:The building envelope is a combination of brick, and prefinished metal siding. The roof is SBS membrane. The doorsare painted metal, windows aluminum with a hopper type operator.

    Overall, the envelope is in acceptable condition.

    Interior Summary:Flooring is an assortment of tile, maple sports floor, carpet, painted concrete, vinyl tile, and vinyl sheet flooring. Wallsare painted masonry units, and demountable partitions. Aside from the gymnasium, and mechanical room the ceilingsare generally suspended T-bar. Interior doors are a combination of solid core painted wood, and painted metal inpainted pressed steel frame.

    Overall, the interiors are in acceptable condition.

    Mechanical Summary:The heating system consists of two hot water boilers with perimeter radiation. Two ventilation systems, main systemserves classroom and office spaces, consist of spray humidification and air conditioning. Gymnasium air handler isstrictly heat/vent unit.

    Overall, the mechanical system is in good condition.

    Electrical Summary:The main electrical service is a Westinghouse 800 amp, 120/208 volt, 3 phase, 4 wire panel. There are 8 sub-panelsinstalled in the mechanical room and corridors to provide power for lighting and equipment. The interior of the buildingis lit with a combination of T12 fluorescent and incandescent fixtures. The exterior is lit with wall mounted HighPressure Sodium fixtures. The building has 5 emergency battery packs, 19 remote heads and 15 exit signs. Thebuilding has a Notifier fire alarm control panel and heat detectors, smoke detectors, pull-stations and bell/strobesthroughout. The building is equipped with a Silent Knight intrusion, supernet, clock and telephone systems.

    Overall, the electrical systems are in acceptable condition.

    18.83%5 year Facility Condition Index (FCI):

    Facility Details Evaluation Details

    Total Maintenance Events Next 5 years: $1,966,734

    Calgary - Catherine Nichols Gunn Elementary School (B2569A)

  • Report run on: March 22, 2013 10:15 AM Page 3 of 31

    A1010 Standard Foundations*

    A1030 Slab on Grade*

    B1010.02 Structural Interior Walls Supporting Floors (or Roof)*

    B1020.01 Roof Structural Frame*

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    1972

    1972

    1972

    1972

    Installed

    Installed

    Installed

    Installed

    0

    0

    0

    0

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-13

    MAR-13

    MAR-13

    MAR-13

    Updated

    Updated

    Updated

    Updated

    Calgary - Catherine Nichols Gunn Elementary School (B2569A)

    S1 STRUCTURAL

    Cast in place concrete foundations.

    Reinforced concrete slab on grade.

    Combination of cement masonry unit walls and timber columns.

    Primarily timber beams on columns.

    Condition Rating Performance1 - Critical Unsafe, high risk of injury or critical system failure.2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.

    3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.

    Rating Guide

    5 - Good Meets all present requirements. No deficiencies.6 - Excellent As new/state of the art, meets present and foreseeable requirements.

  • Report run on: March 22, 2013 10:15 AM Page 4 of 31

    B2010.01.02.01 Brick Masonry: Ext. Wall Skin*

    B2010.01.06.03 Metal Siding**

    B2010.01.09 Expansion Control: Ext. Wall*

    B2010.01.11 Joint Sealers (caulking): Ext. Wall**

    B2010.02.03 Masonry Units: Ext. Wall Const.*

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    Rating

    1972

    2004

    1972

    2004

    1971

    Installed

    Installed

    Installed

    Installed

    Installed

    0

    40

    0

    20

    0

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-13

    MAR-13

    MAR-13

    MAR-13

    MAR-13

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace metal siding (90 sqm)

    Replace caulking (80 meters)

    Lifecycle Replacement

    Lifecycle Replacement

    2044

    2024

    $12,380

    $2,444

    Unassigned

    Unassigned

    Calgary - Catherine Nichols Gunn Elementary School (B2569A)S2 ENVELOPE

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-13

    MAR-13

    Brick cladding over concrete masonry.

    Prefinished metal siding panels at window locations, and above entries.

    Control joints in brick c/w elastomeric sealant.

    Caulking around windows replaced along with new windows in 2004.

    Cement masonry units behind brick veneer.

  • Report run on: March 22, 2013 10:15 AM Page 5 of 31

    B2010.02.99 Other Exterior Wall Construction* - Non Loadbearing metal studs

    B2010.03 Exterior Wall Vapour Retarders, Air Barriers, and Insulation*

    B2010.06 Exterior Louvers, Grilles, and Screens*

    B2010.09 Exterior Soffits*

    B2020.01.01.02 Aluminum Windows (Glass & Frame)**

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    Rating

    1972

    1972

    1972

    2004

    2004

    Installed

    Installed

    Installed

    Installed

    Installed

    0

    0

    0

    0

    40

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-13

    MAR-13

    MAR-13

    MAR-13

    MAR-13

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace windows (20)

    Lifecycle Replacement 2044 $20,160 Unassigned

    Calgary - Catherine Nichols Gunn Elementary School (B2569A)

    Event:

    Type Year Cost Priority

    Updated: MAR-13

    Metal studs on exterior wall at window locations.

    Cannot observe. No issues reported therefore assumed acceptable.

    Various exterior louvers located in metal siding.

    Soffits over recessed entries. Fitted with prefinished metal panel.

    Aluminium windows incorporates a hopper type operator.

  • Report run on: March 22, 2013 10:15 AM Page 6 of 31

    B2030.01.11 Metal Entrance Door**

    B3010.01 Deck Vapour Retarder and Insulation*

    B3010.04.04 Modified Bituminous Membrane Roofing (SBS)**

    B3020.02 Other Roofing Openings (Hatch, Vent, etc)*

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    1972

    1972

    1999

    1972

    Installed

    Installed

    Installed

    Installed

    0

    0

    25

    0

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-13

    MAR-13

    MAR-13

    MAR-13

    Updated

    Updated

    Updated

    Updated

    Replace metal entrance doors (11)

    Replace SBS Roofing (3,548 sqm)

    Lifecycle Replacement

    Lifecycle Replacement

    2016

    2024

    $9,748

    $651,945

    Unassigned

    Unassigned

    Calgary - Catherine Nichols Gunn Elementary School (B2569A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-13

    MAR-13

    All exterior doors are metal.

    CBE documents indicated re-roofed in 1999. Cannot observe because of snowcover. No issues reported thereforeassumed acceptable.

    Documents received from CBE suggest that the school was re-roofed in 1999.

    Single roof hatch in acceptable condition.

  • Report run on: March 22, 2013 10:15 AM Page 7 of 31

    C1010.01 Interior Fixed Partitions* - Cement masonry

    C1010.02 Interior Demountable Partitions*

    C1010.03 Interior Operable Folding Panel Partitions**

    C1010.05 Interior Windows*

    C1010.07 Interior Partition Firestopping*

    C1020.01 Interior Swinging Doors (& Hardware)*

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    Rating

    Rating

    1972

    1972

    1972

    1972

    1972

    1972

    Installed

    Installed

    Installed

    Installed

    Installed

    Installed

    0

    0

    30

    0

    0

    0

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-13

    MAR-13

    MAR-13

    MAR-13

    MAR-13

    MAR-13

    Updated

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace the folding partition (120 sqm)

    Lifecycle Replacement 2016 $143,892 Unassigned

    Calgary - Catherine Nichols Gunn Elementary School (B2569A)S3 INTERIOR

    Event:

    Type Year Cost Priority

    Updated: MAR-13

    Concrete masonry interior walls are located throughout the facility.

    A combination of painted and vinyl covered demountable wall partitions.

    Stage to Gymnasium door folding panel type.

    Display "window" in library and corridor.

    Last Recapp noted a code repair required. No outstanding issues to report at time of latest assessment.

    Combination of solid core painted wood and metal doors in painted metal frames.

  • Report run on: March 22, 2013 10:15 AM Page 8 of 31

    C1020.03 Interior Fire Doors*

    C1020.04 Interior Sliding and Folding Doors*

    C1030.01 Visual Display Boards**

    C1030.02 Fabricated Compartments (Toilets/Showers)**

    C1030.06 Handrails*

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    Rating

    1972

    2005

    1972

    1972

    1972

    Installed

    Installed

    Installed

    Installed

    Installed

    0

    0

    20

    30

    0

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-13

    MAR-13

    MAR-13

    MAR-13

    MAR-13

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace Visual Display Boards (50)

    Replace Metal Toilet Partitions (16)

    Lifecycle Replacement

    Lifecycle Replacement

    2016

    2016

    $34,388

    $19,656

    Unassigned

    Unassigned

    Calgary - Catherine Nichols Gunn Elementary School (B2569A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-13

    MAR-13

    Last Recapp noted a concern with the fire doors. No outstanding issues to report at time of latest assessment.

    Gymnasium has flexible partition installed.

    Display boards generally consist of whiteboards and tackboards.

    Prefinished metal toilet partitions.

    Wall mounted wooden handrails on stairs leading to stage area.

  • Report run on: March 22, 2013 10:15 AM Page 9 of 31

    C1030.08 Interior Identifying Devices*

    C1030.12 Storage Shelving*

    C1030.14 Toilet, Bath, and Laundry Accessories*

    C3010.04 Gypsum Board Wall Finishes (Unpainted)*

    C3010.09 Acoustical Wall Treatment**

    C3010.11 Interior Wall Painting*

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    Rating

    Rating

    1972

    1972

    1972

    1972

    1972

    2002

    Installed

    Installed

    Installed

    Installed

    Installed

    Installed

    0

    0

    0

    0

    20

    0

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    FEB-08

    FEB-08

    FEB-08

    MAR-13

    MAR-13

    MAR-13

    Updated

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace acoustic wall treatment (45 sqm)

    Lifecycle Replacement 2016 $10,631 Unassigned

    Calgary - Catherine Nichols Gunn Elementary School (B2569A)

    Event:

    Type Year Cost Priority

    Updated: MAR-13

    Limited interior signage in generally acceptable condition.

    Variety of shelving types in generally acceptable condition.

    Paper Towel dispensers, toilet tissue dispensers, soap dispensers in generally acceptable condition.

    Very limited number of gypsum board wall finishes. Located at window locations over metal studs.

    Acoustic treatment in gymnasium is typical 1220 x 1220 masonite faced panels with insulation behind.

    Painted concrete masonry walls. Various demountable wall partitions are also painted.

  • Report run on: March 22, 2013 10:15 AM Page 10 of 31

    C3010.12 Wall Coverings*

    C3020.01.02 Painted Concrete Floor Finishes*

    C3020.02 Tile Floor Finishes**

    C3020.04 Wood Flooring**

    4 - Acceptable

    4 - Acceptable

    3 - Marginal

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    1972

    1972

    1972

    2009

    Installed

    Installed

    Installed

    Installed

    0

    0

    50

    30

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-13

    MAR-13

    MAR-13

    MAR-13

    Updated

    Updated

    Updated

    Updated

    Repair damaged tile (2 sqm)

    Replace tile floors (200 sqm)

    Replace maple sports floor (400 sqm)

    Repair

    Lifecycle Replacement

    Lifecycle Replacement

    2012

    2022

    2039

    $1,000

    $35,070

    $107,100

    Low

    Unassigned

    Unassigned

    Some tile damage in boys washroom.Concern:

    Replace damaged portions.Recommendation:

    Calgary - Catherine Nichols Gunn Elementary School (B2569A)

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-13

    MAR-13

    MAR-13

    Vinyl wall coverings on demountable partitions in various locations.

    Painted concrete floor finishes in mechanical room.

    Tile flooring in washrooms, and in main entry area.

    Gymnasium and stage flooring is maple sports floor. Refinished in 2009.

    Consequences of Deferral:Sharp edges.

  • Report run on: March 22, 2013 10:15 AM Page 11 of 31

    C3020.07 Resilient Flooring** - VCT 1972

    C3020.07 Resilient Flooring** - VCT 2000

    C3020.07 Resilient Flooring** - Vinyl Sheet

    C3020.08 Carpet Flooring**

    4 - Acceptable

    4 - Acceptable

    5 - Good

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    1972

    2000

    2010

    2002

    Installed

    Installed

    Installed

    Installed

    20

    20

    20

    15

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-13

    MAR-13

    MAR-13

    MAR-13

    Updated

    Updated

    Updated

    Updated

    Replace VCT (900 sqm)

    Replace VCT (1,300 sqm)

    Replace vinyl sheet floring (200 sqm)

    Replace carpet flooring (300 sqm)

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    2016

    2020

    2030

    2017

    $48,119

    $69,506

    $16,802

    $22,913

    Unassigned

    Unassigned

    Unassigned

    Unassigned

    Calgary - Catherine Nichols Gunn Elementary School (B2569A)

    Event:

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Type

    Year

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    Updated:

    MAR-13

    MAR-13

    MAR-13

    MAR-13

    Various areas still fitted with original VCT.

    Various areas have had original VCT replaced with newer.

    Vinyl sheet flooring located in staff room, and in one classroom.

    Carpet in one classroom, library and computer/ resource room, and portion of stage.

  • Report run on: March 22, 2013 10:15 AM Page 12 of 31

    C3030.04 Gypsum Board Ceiling Finishes (Unpainted)*

    C3030.06 Acoustic Ceiling Treatment (Susp. T-Bar)**

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    1972

    1972

    Installed

    Installed

    0

    25

    Design Life

    Design Life

    MAR-13

    MAR-13

    Updated

    Updated

    Replace acoustical tile, dropped ceiling, existinggrid left in place (2,900 sqm)

    Replace ceiling tiles (30 sqm)

    Lifecycle Replacement

    Repair

    2016

    2012

    $141,745

    $1,466

    Unassigned

    Low

    Ceiling tiles damaged in boys washroom.Concern:

    Replace.Recommendation:

    Calgary - Catherine Nichols Gunn Elementary School (B2569A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-13

    MAR-13

    Very limited gypsum board ceilings are in acceptable condition.

    Aside from the gymnasium, and mechanical room the ceilings are generally suspended T-bar.

    Consequences of Deferral:Aesthetic appeal.

  • Report run on: March 22, 2013 10:15 AM Page 13 of 31

    D2010.04 Sinks**

    D2010.05 Showers**

    D2010.08 Drinking Fountains/Coolers**

    D2010.09 Other Plumbing Fixtures*

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    1972

    1972

    1972

    1972

    Installed

    Installed

    Installed

    Installed

    30

    30

    35

    0

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-13

    MAR-13

    MAR-13

    MAR-13

    Updated

    Updated

    Updated

    Updated

    Replace sinks (7 sinks with valve sets)

    Replace valve sets (2)

    Replace fountains (6)

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    2016

    2016

    2016

    $12,600

    $1,100

    $9,900

    Unassigned

    Unassigned

    Unassigned

    Calgary - Catherine Nichols Gunn Elementary School (B2569A)S4 MECHANICAL

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-13

    MAR-13

    MAR-13

    Stainless steel general purpose sinks.

    Not operational.

    Wall hung Vitreous China.

    Wall hung cast iron Janitor Service Sinks.

  • Report run on: March 22, 2013 10:15 AM Page 14 of 31

    D2010.10 Washroom Fixtures (WC, Lav, Urnl)**

    D2020.01.01 Pipes and Tubes: Domestic Water*

    D2020.01.02 Valves: Domestic Water**

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    1972

    1972

    1972

    Installed

    Installed

    Installed

    35

    0

    40

    Design Life

    Design Life

    Design Life

    MAR-13

    MAR-13

    MAR-13

    Updated

    Updated

    Updated

    Replace WC with flush valves (18), Urnl with FVs(8) and Lav with valve sets (20)

    Replace 1 1/2" valves (20)

    Lifecycle Replacement

    Lifecycle Replacement

    2016

    2016

    $82,100

    $6,000

    Unassigned

    Unassigned

    Calgary - Catherine Nichols Gunn Elementary School (B2569A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-13

    MAR-13

    Wall hung Vitreous China Lav's

    Exposed flush valve Vitreous China WC's

    Floor mounted Vitreous China recessed Urinals

    100mm incoming service from municipal service. 50mm domestic water meter.

    Soldiered copper.

  • Report run on: March 22, 2013 10:15 AM Page 15 of 31

    D2020.01.03 Piping Specialties (Backflow Preventers)**

    D2020.01.08 Hose Bibbs*

    D2020.02.02 Plumbing Pumps: Domestic Water**

    D2020.02.06 Domestic Water Heaters**

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    5 - Good

    Rating

    Rating

    Rating

    Rating

    2000

    1972

    2000

    2012

    Installed

    Installed

    Installed

    Installed

    20

    0

    20

    20

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-13

    MAR-13

    MAR-13

    MAR-13

    Updated

    Updated

    Updated

    Updated

    Replace backflow preventers 2" (4) and 1/2" (1)

    Replace 0.16 HP pump (1)

    Replace Domestic Water Heater (1)

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    2020

    2020

    2032

    $13,500

    $2,000

    $6,714

    Unassigned

    Unassigned

    Unassigned

    Calgary - Catherine Nichols Gunn Elementary School (B2569A)

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-13

    MAR-13

    MAR-13

    Backflow protection on all services.

    Exterior hose bibbs.

    Grundfos D.H.W.R. Pump fractional HP.

    A.O Smith condensing hot water tank approx. BTH-150.

    9.4Capacity Size

    kWCapacity Unit

  • Report run on: March 22, 2013 10:15 AM Page 16 of 31

    D2030.01 Waste and Vent Piping*

    D2030.02.04 Floor Drains*

    D2040.01 Rain Water Drainage Piping Systems*

    D2040.02.04 Roof Drains*

    D3010.02 Gas Supply Systems*

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    Rating

    1972

    0

    1972

    1972

    1972

    Installed

    Installed

    Installed

    Installed

    Installed

    0

    0

    0

    0

    0

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-13

    MAR-13

    MAR-13

    MAR-13

    MAR-13

    Updated

    Updated

    Updated

    Updated

    Updated

    Determine source of gas odor

    Preventative Maintenance 2013 $3,000 Medium

    Smell of gas noticed in gas meter room.Concern:

    Find source of gas odor.

    Do not use meter room as storage area.

    Recommendation:

    Calgary - Catherine Nichols Gunn Elementary School (B2569A)

    Event:

    Type Year Cost Priority

    Updated: MAR-13

    Sanitary sewers to municipal system.

    3" diameter floor drains located where required.

    Storm sewers to municipal system.

    Roof drains with dome covers missing and no flow control.

    Indoor gas meter off of boiler room.

    Consequences of Deferral:Dangerous accumulation of gas in meter room.

    Storage items blocking maintenance access to equipment.

  • Report run on: March 22, 2013 10:15 AM Page 17 of 31

    D3020.02.01 Heating Boilers and Accessories: H.W.**

    D3020.02.02 Chimneys (& Comb. Air): H.W. Boiler**

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    1972

    1972

    Installed

    Installed

    35

    35

    Design Life

    Design Life

    MAR-13

    MAR-13

    Updated

    Updated

    Replace boilers (2 1/2 @ 2500 MBH)

    Code Upgrade (combustion air ducting with skirt)

    Replace stack assembly (12m)

    Lifecycle Replacement

    Code Upgrade

    Lifecycle Replacement

    2016

    2013

    2016

    $141,000

    $6,500

    $8,300

    Unassigned

    Low

    Unassigned

    The present combustion air ducting has a (approx 30"x40")duct terminated through goose neck upwards at high level ofboiler room. The gas code specifies requirement andtermination heights for low level combustion air with smallerhigh level ventilation opening which is contrary to existingducting.

    Concern:

    The existing grill opening above window would require highlevel duct offset to come down near floor with duct skirt whereclothes dryer is presently located in boiler room. A ventilationair grill should be provided off duct at high level.

    Recommendation:

    Calgary - Catherine Nichols Gunn Elementary School (B2569A)

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-13

    MAR-13

    MAR-13

    2- hot water boilers- Bryan water tube Model L-18 Serial 38288 @ 3200 MBH input

    2 separate boiler chimneys up to roof.Combustion air ducting is not in accordance to code.

    Consequences of Deferral:Ducting arrangement not meeting code.

  • Report run on: March 22, 2013 10:15 AM Page 18 of 31

    D3020.02.03 Water Treatment: H. W. Boiler*

    D3030.06.02 Refrigerant Condensing Units**

    D3040.01.01 Air Handling Units: Air Distribution**

    D3040.01.03 Air Cleaning Devices: Air Distribution*

    D3040.01.04 Ducts: Air Distribution*

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    Rating

    1972

    1972

    1972

    1972

    1972

    Installed

    Installed

    Installed

    Installed

    Installed

    0

    25

    30

    0

    0

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-13

    MAR-13

    MAR-13

    MAR-13

    MAR-13

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace 15 ton roof mounted air cooled condenserunit (1)

    Replace AHU (1 @ 60,000 cfm)

    Lifecycle Replacement

    Lifecycle Replacement

    2016

    2016

    $25,000

    $121,000

    Unassigned

    Unassigned

    Calgary - Catherine Nichols Gunn Elementary School (B2569A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-13

    MAR-13

    Chemical Pot Feeder.

    Roof mounted air cooled condenser unit.

    Main air handling unit serves classrooms and auxiliary spaces. Supply and return fans, mixed air control, sprayedhumidifier, DX cooling coil and zone reheat coils.

    Gymnasium is fed from this system by underground ducts with reheat coils.

    Fiberglass filters in AHU filter section.

    Galvanized sheet metal to SMACNA standards.

  • Report run on: March 22, 2013 10:15 AM Page 19 of 31

    D3040.01.07 Air Outlets & Inlets: Air Distribution*

    D3040.03.01 Hot Water Distribution Systems**

    D3040.04.01 Fans: Exhaust**

    D3040.04.03 Ducts: Exhaust*

    D3040.04.05 Air Outlets and Inlets: Exhaust*

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    Rating

    1972

    1972

    1972

    1972

    1972

    Installed

    Installed

    Installed

    Installed

    Installed

    0

    40

    30

    0

    0

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-13

    MAR-13

    MAR-13

    MAR-13

    MAR-13

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace hot water distribution system (3,548 sqmgfa)

    Replace roof top exhaust fans (3 @500 cfm)

    Lifecycle Replacement

    Lifecycle Replacement

    2016

    2016

    $352,300

    $4,000

    Unassigned

    Unassigned

    Calgary - Catherine Nichols Gunn Elementary School (B2569A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-13

    MAR-13

    Ceiling mounted square cone diffusers rectangular egg crate returns.

    Soldiered copper piping.

    3 washroom roof top roof exhausters located on roof.

    Galvanized sheet metal to SMACNA standards.

    Rectangular metal exhaust grilles.

  • Report run on: March 22, 2013 10:15 AM Page 20 of 31

    D3050.02 Air Coils**

    D3050.03 Humidifiers**

    D3050.05.03 Finned Tube Radiation**

    D3050.05.06 Unit Heaters**

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    1972

    1972

    1972

    1972

    Installed

    Installed

    Installed

    Installed

    30

    25

    40

    30

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-13

    MAR-13

    MAR-13

    MAR-13

    Updated

    Updated

    Updated

    Updated

    Replace air coils (1-10 ton coil)

    Replace sprayed humidifier in AHU (1)

    Replace finned tube radiation (3,548 sqm gfa)

    Replace unit heater (1 @ 106 kw)

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    2016

    2016

    2016

    2016

    $7,000

    $13,000

    $173,000

    $7,700

    Unassigned

    Unassigned

    Unassigned

    Unassigned

    Calgary - Catherine Nichols Gunn Elementary School (B2569A)

    Event:

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Type

    Year

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    Updated:

    MAR-13

    MAR-13

    MAR-13

    MAR-13

    DX coil in main AHU.

    Spray humidifier coil in main AHU.

    Perimeter finned tube radiation in cabinets throughout.

    Hydronic unit heater in boiler room used to warm combustion air into space.

  • Report run on: March 22, 2013 10:15 AM Page 21 of 31

    D3060.02.02 Pneumatic Controls**

    D3060.02.05 Building Systems Controls (BMCS, EMCS)**

    D4010 Sprinklers: Fire Protection*

    D4030.01 Fire Extinguisher, Cabinets and Accessories*

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    1972

    1972

    1972

    1972

    Installed

    Installed

    Installed

    Installed

    40

    20

    0

    0

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-13

    MAR-13

    MAR-13

    MAR-13

    Updated

    Updated

    Updated

    Updated

    Replace pneumatic controls (3,548 sqm gfa)

    Replace building system controls (3,548 sqm gfa)

    Lifecycle Replacement

    Lifecycle Replacement

    2016

    2016

    $54,200

    $97,600

    Unassigned

    Unassigned

    Calgary - Catherine Nichols Gunn Elementary School (B2569A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-13

    MAR-13

    Original pneumatic design, tied through DDC interface to allow control and monitoring from off-site location.

    Original pneumatic design, tied through DDC interface to allow control and monitoring from off-site location.

    Existing sprinklers in gymnasium stage.

    Hand extinguishers throughout building.

    40mm hose and cabinets tied to building service.

    No siamese connection.

    Street fire hydrant located adjacent to school.

  • Report run on: March 22, 2013 10:15 AM Page 22 of 31

    D5010.01.02 Main Electrical Transformers (Utility Owned)*

    D5010.03 Main Electrical Switchboards (Main Distribution)**

    D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)**

    D5010.07.02 Motor Starters and Accessories**

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    1972

    1972

    1972

    1972

    Installed

    Installed

    Installed

    Installed

    0

    40

    30

    30

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-13

    MAR-13

    MAR-13

    MAR-13

    Updated

    Updated

    Updated

    Updated

    Replace one Main Electrical Switchboard (MainDistribution)

    Replace original electrical sub-panels (8)

    Replace Motor Starters (11)

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    2016

    2016

    2016

    $35,000

    $40,000

    $16,500

    Unassigned

    Unassigned

    Unassigned

    Calgary - Catherine Nichols Gunn Elementary School (B2569A)S5 ELECTRICAL

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-13

    MAR-13

    MAR-13

    There is a transformer feeding the school located at the south of the building.

    The main electrical service is a Westinghouse 800 amp, 120/208 volt, 3 phase, 4 wire panel in the mechanical room.

    There are 8 Westinghouse 225A, 120/208V, 42 circuit sub-panels installed in the mechanical room and corridors toprovide power for lighting and equipment.

    11 motor starters are in mechanical and air handling unit rooms, they are Westinghouse & Allen Bradley.

    800Capacity Size

    ampsCapacity Unit

  • Report run on: March 22, 2013 10:15 AM Page 23 of 31

    D5020.01 Electrical Branch Wiring*

    D5020.02.01 Lighting Accessories: Interior (Lighting Controls)*

    D5020.02.02.01 Interior Incandescent Fixtures*

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    1972

    1972

    1972

    Installed

    Installed

    Installed

    0

    0

    0

    Design Life

    Design Life

    Design Life

    MAR-13

    MAR-13

    MAR-13

    Updated

    Updated

    Updated

    Relace incandescent bulbs (11)

    Energy Efficiency Upgrade 2013 $550 Low

    Incandescent fixtures though out the school still useincandescent bulbs. Incandescent bulbs are inefficient andcostly to maintain.

    Concern:

    Replace bulbs with compact fluorescent lamps.Recommendation:

    Calgary - Catherine Nichols Gunn Elementary School (B2569A)

    Event:

    Type Year Cost Priority

    Updated: MAR-13

    The electrical wiring in the building is standard copper in conduit. Flexible conduit and cabling is provided to most of themotors and other mechanical equipment.

    The lighting control is provided by line voltage local switches.

    Bare incandescent 150W bulbs found in mechanical and air handling unit rooms.

  • Report run on: March 22, 2013 10:15 AM Page 24 of 31

    D5020.02.02.02 Interior Fluorescent Fixtures**

    D5020.02.02.03 Interior Metal Halide Fixtures*

    D5020.02.03.02 Emergency Lighting Battery Packs** - 1972

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    1972

    1972

    1972

    Installed

    Installed

    Installed

    30

    0

    20

    Design Life

    Design Life

    Design Life

    MAR-13

    MAR-13

    MAR-13

    Updated

    Updated

    Updated

    Replace Interior Florescent Fixtures (860)

    Replace Interior Fluorescent lamps and ballasts(860)

    Replace Emergency Lighting Battery Packs (2)

    Lifecycle Replacement

    Energy Efficiency Upgrade

    Lifecycle Replacement

    2016

    2013

    2016

    $258,000

    $86,000

    $2,500

    Unassigned

    Medium

    Unassigned

    T12 lamps are no longer be produced after 2011. Lampburnouts and ballast failures may be more frequent.

    Concern:

    Keep existing fixtures and replace with new T8 lamps, ballastsand high efficiency reflectors to reduce energy consumptionmaintenance.

    Recommendation:

    Calgary - Catherine Nichols Gunn Elementary School (B2569A)

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-13

    MAR-13

    MAR-13

    Recess mounted fluorescent fixtures are installed in corridors, offices and classrooms, all using original T-12 lamps andmagnetic ballast technology.

    There are 18 suspended HID fixtures located in the Gymnasium.

    The building has 5 emergency battery packs and 19 remote heads. Battery packs have been replaced as they fail.

  • Report run on: March 22, 2013 10:15 AM Page 25 of 31

    D5020.02.03.02 Emergency Lighting Battery Packs** - 2006

    D5020.02.03.03 Exit Signs*

    D5020.03.01.03 Exterior Metal Halide Fixtures*

    D5020.03.01.04 Exterior H.P. Sodium Fixtures*

    D5020.03.02 Lighting Accessories: Exterior (Lighting Controls)*

    5 - Good

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    Rating

    2006

    1972

    1995

    1972

    1972

    Installed

    Installed

    Installed

    Installed

    Installed

    20

    0

    0

    0

    0

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-13

    MAR-13

    FEB-08

    FEB-08

    MAR-13

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace Emergency Lighting Battery Packs (3)

    Lifecycle Replacement 2026 $3,600 Unassigned

    Calgary - Catherine Nichols Gunn Elementary School (B2569A)

    Event:

    Type Year Cost Priority

    Updated: MAR-13

    The building has 5 emergency battery packs and 19 remote heads. Battery packs have been replaced as they fail.

    There are 15 exit signs throughout the building. They are incandescent lamping.

    Some wall packs upgraded to MH.

    Some original wall packs are HPS.

    Time clock and photo cell control exterior lighting.

  • Report run on: March 22, 2013 10:15 AM Page 26 of 31

    D5030.01 Detection and Fire Alarm**

    D5030.02.02 Intrusion Detection**

    D5030.03 Clock and Program Systems*

    D5030.04.01 Telephone Systems*

    D5030.04.05 Local Area Network Systems*

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    Rating

    2001

    1995

    1995

    1995

    1995

    Installed

    Installed

    Installed

    Installed

    Installed

    25

    25

    0

    0

    0

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-13

    MAR-13

    MAR-13

    MAR-13

    MAR-13

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace one fire alarm system (gfa 3,548 sqm)

    Replace one Intrusion Detection system (Basis onGross Floor Area 3548 m2)

    Lifecycle Replacement

    Lifecycle Replacement

    2026

    2020

    $50,000

    $35,000

    Unassigned

    Unassigned

    Calgary - Catherine Nichols Gunn Elementary School (B2569A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-13

    MAR-13

    The building has a Notifier fire alarm control panel and heat detectors, smoke detectors, pull-stations and bell/strobesthroughout. The whole system was upgraded in 2001.

    This building is protected by a Silent Knight security system with Regency 4660c panel and motion detectors throughout.

    Simplex Program/timer, for class change and select clocks.

    Nortel Norstar telephone system is installed in the school. Public address system is also tied in to telephone system.

    Supernet is provided for the school. Cat 5 cabling in conduit and wireless devices throughout.

  • Report run on: March 22, 2013 10:15 AM Page 27 of 31

    D5030.05 Public Address and Music Systems**

    4 - AcceptableRating

    1972Installed

    20Design Life

    MAR-13Updated

    Replace Public Address and Music Systems (1)

    Lifecycle Replacement 2016 $18,000 Unassigned

    Calgary - Catherine Nichols Gunn Elementary School (B2569A)

    Event:

    Type Year Cost Priority

    Updated: MAR-13

    Bogen MCP 35A, coordinating time clock, CD, Cassette. Tied into telephone system.

  • Report run on: March 22, 2013 10:15 AM Page 28 of 31

    E1090.04 Residential Equipment*

    E1090.07 Athletic, Recreational, and Therapeutic Equipment*

    E2010.02 Fixed Casework**

    E2010.03.01 Blinds**

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    1972

    1972

    1972

    1972

    Installed

    Installed

    Installed

    Installed

    0

    0

    35

    30

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-13

    FEB-08

    MAR-13

    MAR-13

    Updated

    Updated

    Updated

    Updated

    Replace fixed casework (130 meters)

    Replace blinds (20 sqm)

    Lifecycle Replacement

    Lifecycle Replacement

    2016

    2016

    $65,000

    $2,289

    Unassigned

    Unassigned

    Calgary - Catherine Nichols Gunn Elementary School (B2569A)S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-13

    MAR-13

    Residential style appliances in acceptable condition.

    Athletic and recreation equipment in acceptable condition. Basketball and climbing equipment in gymnasium.

    Wooden book shelves in library, millwork counter in library, main reception area. Cabinetry in staff room, vanities andcounters c/w sinks in various classrooms.

    Venetian type blinds in acceptable condition.

  • Report run on: March 22, 2013 10:15 AM Page 29 of 31

    K4010.01 Barrier Free Route: Parking to Entrance*

    K4010.02 Barrier Free Entrances*

    K4010.03 Barrier Free Interior Circulation*

    K4010.04 Barrier Free Washrooms*

    K4030.01 Asbestos*

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    Rating

    1972

    1972

    1972

    1972

    1972

    Installed

    Installed

    Installed

    Installed

    Installed

    0

    0

    0

    0

    0

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-13

    MAR-13

    FEB-08

    MAR-13

    MAR-13

    Updated

    Updated

    Updated

    Updated

    Updated

    Install Power Door Operators (1)

    Barrier Free Access Upgrade 2012 $5,000 Medium

    Difficult for those in a wheelchair to access entry.Concern:

    Install power operators.Recommendation:

    Calgary - Catherine Nichols Gunn Elementary School (B2569A)S8 SPECIAL ASSESSMENT

    Event:

    Type Year Cost Priority

    Updated: MAR-13

    Barrier Free sign mounted on fence. Stall is asphalt.

    Power door operators have not been provided.

    Lift has been installed to provide access to Stage area and Music Room.

    Designated barrier free washroom adjacent gymnasium. Barrier free stall in boys washroom.

    Previous Recapp noted an asbestos report was being undertaken. Asbestos report was not provided upon latest review.Assumed that condition is acceptable.

    Consequences of Deferral:Entrance is not barrier free.

  • Report run on: March 22, 2013 10:15 AM Page 30 of 31

    K4030.04 Mould*

    K4030.09 Other Hazardous Materials*

    K5010.01 Site Documentation*

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    1972

    1972

    2012

    Installed

    Installed

    Installed

    0

    0

    0

    Design Life

    Design Life

    Design Life

    MAR-13

    MAR-13

    MAR-13

    Updated

    Updated

    Updated

    Calgary - Catherine Nichols Gunn Elementary School (B2569A)

    No mould known or reported.

    No other hazardous materials were identified during the review.

    Site plan attached.

    Site Review conducted: December 3, 2012Prime Consultant: Williams Engineering Canada Inc.

    CNG siteplan.JPG

  • Report run on: March 22, 2013 10:15 AM Page 31 of 31

    K5010.02 Building Documentation*

    4 - AcceptableRating

    2012Installed

    0Design Life

    MAR-13Updated

    Calgary - Catherine Nichols Gunn Elementary School (B2569A)

    Floor plan attached.

    Site Review conducted: December 3, 2012Prime Consultant: Williams Engineering Canada Inc.

    CNG floorplan.JPG