Rebuilds in/to Packaging Paper Machines
Barcelona, 2018-03-05
1
Prerequisites for a Successful Rebuild Project
1. Vision for the future
2. Solid analysis of the existing production line
3. Experienced partner for rebuilds
4. Machinery supplier with top performing products
2Rebuild in/to packaging paper production | Barcelona | 2018-03-05 | Bernhard Kohl
Vision: Conversion from Newsprint to TestlinerRenkum PM2
3Rebuild in/to packaging paper production | Barcelona | 2018-03-05 | Bernhard Kohl
Evaluation of IdeasIdea
max. speed[m/min]
max. production [t/d]
investspec. invest[€/t]
A 1.170 1.168 100,0% 236
B 1.200 1.239 104,5% 238
C 1.200 1.239 102,4% 234
D 1.200 1.239 105,0% 240
E 1.300 1.346 109,8% 230
F 1.300 1.346 107,0% 224
4
Idea A
Idea B = new winder
Idea C = use winder PM1
Idea D = new reel
Idea E = new reel + 2 dryers
Idea F = rebuild reel + 2 dryers
Rebuild in/to packaging paper production | Barcelona | 2018-03-05 | Bernhard Kohl
Solid analysis of the existing production lineIdea A consumption
water ... l/minSteam ... t/hGas ... Nm³/hPower ... MWh/dEffluent ... l/min
5
Effluent
Water
Gas
power
steam
Rebuild in/to packaging paper production | Barcelona | 2018-03-05 | Bernhard Kohl
Renkum PM2
Wire widthmm
Productiont/year
Papergrades
Basis weight g/m²
Designspeedm/min
Start-up
Renkum PM 2Parenco N.V (NL)
9 180 380.000 Testliner, Corrugating
70 - 160 1 200 Aug2016
Rebuild in/to packaging paper production | Barcelona | 2018-03-05 | Bernhard Kohl 6
Renkum PM2
Wire widthmm
Productiont/year
Papergrades
Basis weight g/m²
Designspeedm/min
Start-up
Renkum PM 2Parenco N.V (NL)
9 180 380.000 Testliner, Corrugating
70 - 160 1 200 Aug2016
Rebuild in/to packaging paper production | Barcelona | 2018-03-05 | Bernhard Kohl 7
Vision: Conversion from Newsprint to TL / CM / WTTLLeipa Schwedt PM5
• Testliner
• Corrugating Medium
• White Top Testliner
Rebuild in/to packaging paper production | Barcelona | 2018-03-05 | Bernhard Kohl 8
Rebuild in/to packaging paper production | Barcelona | 2018-03-05 | Bernhard Kohl
Schwedt PM5
Wire widthmm
Productiont/year
Papergrades
Basis weight g/m²
Designspeedm/min
Start-up
Leinfelder GmbH & Co KGSchwedt PM5
9 200 450 000 CM/TL/WTTL 80 – 140 1 400 March 2018
9
Rebuild in/to packaging paper production | Barcelona | 2018-03-05 | Bernhard Kohl
Schwedt PM5
Wire widthmm
Productiont/year
Papergrades
Basis weight g/m²
Designspeedm/min
Start-up
Leinfelder GmbH & Co KGSchwedt PM5
9 200 450 000 CM/TL/WTTL 80 – 140 1 400 March 2018
10
Prerequisites for a Successful Rebuild Project
1. Vision for the future
2. Solid analysis of the existing production line
3. Experienced partner for rebuilds
4. Machinery supplier with top performing products
11Rebuild in/to packaging paper production | Barcelona | 2018-03-05 | Bernhard Kohl
Recent Grade Change Projects
12Rebuild in/to packaging paper production | Barcelona | 2018-03-05 | Bernhard Kohl
Netherlands Newsprint TestlinerGermany Newsprint White Top Testliner
Recent Grade Change Projects
13
USA Newsprint TestlinerChina Newsprint Corrugating MediumChina Newsprint Corrugating MediumMorocco Newsprint Corrugating MediumIndonesia Woodfree Uncoated Corrugating mediumChina Testliner W’free UncoatedThailand Testliner High Performance TestlinerKorea Woodfree Uncoated Label PaperSweden Newsprint Super CalenderedIndonesia Woodfree Uncoated Corrugating MediumChina Newsprint W’free Uncoated China White Top Testliner Folding Box boardNetherlands Newsprint TestlinerGermany Newsprint White Top Testliner
Rebuild in/to packaging paper production | Barcelona | 2018-03-05 | Bernhard Kohl
Prerequisites for a Successful Rebuild Project
1. Vision for the future
2. Solid analysis of the existing production line
3. Experienced partner for rebuilds
4. Machinery supplier with top performing products
14Rebuild in/to packaging paper production | Barcelona | 2018-03-05 | Bernhard Kohl
XcelLineXcellent Performance
Rebuild in/to packaging paper production | Barcelona | 2018-03-05 | Bernhard Kohl 15
Proven Voith technology meets the requirements ofpapermakers
Advanced Technology
Best Value for MoneyFull Line Supply
Fast Start-upIntegrated Solutions
Xcellent Performance
Rebuild in/to packaging paper production | Barcelona | 2018-03-05 | Bernhard Kohl 16
Smooth installation with plug and play units. Fast reach of production and quality parameters through smart pre-testing. Best ROI at the lowest risk thanks to a new start-up and optimization approach.
Fast Start-up
17
Best ROI at the lowest riskZoucheng PM 31
More production thanks to fewer web breaks
Design production reached within
Instant payback
After 6 months: Averaging 1 web break every 4 days
1st month
0
1
2
3
4
1 2 3 4 5 6 7
Rebuild in/to packaging paper production | Barcelona | 2018-03-05 | Bernhard Kohl 18
Smooth installation and fast production startExample – MasterReel Central Europe
In only 6 months from order to paper on reel
100% in-house pre-tested equipment
Maximum availability right from the start
Plug and play
Rebuild in/to packaging paper production | Barcelona | 2018-03-05 | Bernhard Kohl 19
Significant reduction of specific steam, water and energy consumption. Bulk and fiber savings. Achieved by superior components.
Best Value for Money
20
Wider paper web at same cylinder length
Significant annual
Steel cylinders are the future of dryingEvoDry steel dryers
10% better heat transfer
Reduced building footprint
Higher paper quality through homogeneous surface temperature
More safety due to ductile material
electricity savings
Conventional dryer section
Dryer section with EvoDry steel dryers
Rebuild in/to packaging paper production | Barcelona | 2018-03-05 | Bernhard Kohl 21
higher heat recovery15% less supply & exhaust air quantities
less steam consumption
High efficiency dryer section hoodEcoHood 65
less power consumption
20% higher water condensation from exhaust air at heat recovery to reduce water demand
65°C
33% 15%
Operating dew point up to15%
Rebuild in/to packaging paper production | Barcelona | 2018-03-05 | Bernhard Kohl 22
3% bulk savings
Significant bulk savings and fast ROIEcoCal Plus
4% better smoothness
Low operatingcost
High runnability with easy web run arrangement
Flexible operation modes according to requirements
Inductive heating system
Heated roll
MoisturizerDeflection compensation roll
PP
S
180°C w/o moisturizer180°C with moisturizer
250°C w/o moisturizer250°C with moisturizer
Your potential of bulk saving and quality optimization
Bulk
Rebuild in/to packaging paper production | Barcelona | 2018-03-05 | Bernhard Kohl 23
Predictive paper quality, best profiles, energy-efficient curl control. More profitable papermaking by connecting leading-edge technologies, products and processes.
Advanced Technology
24
Case study – Gap Former Central Europe
ROI< 6 monthsSignificant energy savings at stable quality and production
Control of process variation and
best dewatering settings bycontinuous dryness measurement
Optimization of any forming sectionFormingSens
Safe operation with low power high precision microwave
Fixed sensor, no hand-held
Rebuild in/to packaging paper production | Barcelona | 2018-03-05 | Bernhard Kohl 25
Compact design, low space requirements
Saving money with lowest operating costs and energy consumption
26
Clean process with suspension in overflow is passing approach flow screen.
High quality profilesNew internal pulsation damper IntraDamp
MasterJet Prowith IntraDamp
Rebuild in/to packaging paper production | Barcelona | 2018-03-05 | Bernhard Kohl 26
Excellent performance over the entire life cycle of the paper machine due to the perfect interplay of consulting, products and processes, technologies and services.
Integrated Solutions
Rebuild in/to packaging paper production | Barcelona | 2018-03-05 | Bernhard Kohl 27
Best results, more project safety and smooth project execution with Voith delivering everything from a single source – from fiber to finished paper.
Full Line Supply
28
Rebuild in/to packaging paper production | Barcelona | 2018-03-05 | Bernhard Kohl
“ From the very first sales negotiation through to commissioning, we worked together in a spirit of fairness and partnership. Voith was committed to our goals and developed solutions to meet our needs.”Armin Vetter, Managing Director at Schoellershammer
29
Challenge of the Future
Past
• increase capacity
• improve runnability
• improve quality
Future
• reduce operating cost
• maintain quality
• cope with poorer furnish
• safe fibers
• increase flexibility
• cope with less qualified operators
30Rebuild in/to packaging paper production | Barcelona | 2018-03-05 | Bernhard Kohl
Ensure Successful Operation
• Innovative integrated solution of- equipment- process- consumables- Papermaking 4.0
• Low operating cost- raw material,- energy, water, chemicals- consumables
At this point you start earning back your investment
31Rebuild in/to packaging paper production | Barcelona | 2018-03-05 | Bernhard Kohl
Contact:Bernhard KohlVP Sales PROJECTS in EMEATel. +49 171 676 [email protected]
Rebuild in/to packaging paper production | Barcelona | 2018-03-05 | Bernhard Kohl 32