PRESENTATION ON
“REALIZING THE STRATEGIC
LOCATION OF PAKISTAN THROUGH
CONNECTIVITY”
2
Country Profile
Area: 796,095 sq.kms (Divisions: 26, Districts: 105)
Population : 184 million Census: 2013 (Tentative)
Literacy rate: 57%
Major Exports: Rice, Cotton, Textile goods, Leather items,
Carpets, Sports goods, Handicrafts, Fisheries
Major Imports: Industrial equipment, Vehicles, Iron ore,
Petroleum, Edible oil
GDP: US$ 231.2 billion (Growth rate: 3.6%)
GNP: 543.6 billion PPP dollars
PSDP 2013-14: US$ 5.1 billion (NHA: US$ 594 million)
Road density: 0.32 Km/sq.kms
Coastline: 1,200 Km
Deep Seaports: Karachi, Bin Qasim, Gwadar.
PAKISTAN’S GEO-STRATEGIC SIGNIFICANCE
K A Z A K H S T A N
UZBEKISTAN
TURKMENISTAN
I R A N
C H I N A
KYRGYZSTAN
TAJIKISTAN
RUSSIA
B L A C K S E A
T U R K E Y
URALSK
GURYEV
DZHURALY
ARAL SEA
JAMMU &
KASHMIR DISPUTED
TERRITORY
SHEVCHENKO
ARABIAN S E A
Ajmer
Amratsar
DEHLI
Persian Gulf
IRAQ
KUWAIT
OMAN
UAE
QA
TA
R
SAUDI ARABIA
SYRIA
PA
LE
ST
INE
R
ED
SE
A
EGYPT
MEDITERRANEAN SEA
GREECE
BULGARIA
GEORGIA
UKRAINE
MOLDAVIA
ROMANIA
AZARBIJAN
RUSSIA
I N D I A
Mumbai
MANGOLIA
ROAD NETWORK
Area = 796,096 Sq- km
Total Road Network = 260,000 Kms
National Highways & Motorways = 12,131 Kms
Roads have dominant share in both transport of passengers
(90%) and the Goods (95%) followed by rail.
Total Number of Vehicles more than 8 million
55.4% are two Wheelers and 44% four Wheelers (including
Cars)
Annual growth rate is 9 %
DISPUTED
TERRITORY
Karimabad
Chilas
Sazin
Mansehra
N-15 Malakand
Chitral
Torkham
PESHAWAR
Rawalpindi ISLAMABAD
Kharian
LAHORE
Okara
Bahawalpur
Rahimyar Khan
Mastung
Kalat
Surab
Taftan
Nok Kundi Dalbandin
Nushki
QUETTA
Chaman
N-2
5
Dadhar
DeraMuradJamali
Shikarpur
Jacobabad
Sukkur
Kuchlak QilaSaifullah
Zhob
DI Khan
Loralai DG Khan
Muzaffargarh
Skardu Dambu
Naran
Dadu
Larkana
Rajanpur
Moro
Ghotki
Ubauro
Mianchannu
Mughal Kot
Retra
Parachinar
KhushalGarh
Murree Kohala N-75
M-1
M-3
Pindi Bhattian
Faisalabad
Khairpur
Sahiwal
Gujranwala
M-8 Kararo
S-2
Besima
Nag
Punjgur
Kohat
S-3
Wazirabad
Khanewal
Chakothi
Kalam
Besham
Gujrat
Jhelum
Taunsa
Karakoram Pass
5575m
Abbotabad
Hasanabdal
Sust
GILGIT
N-35
NATIONAL HIGHWAYS & MOTORWAYS
Lodhran
Ratodero
Muzaffarabad
Jalkhad
Leh
Karak
Jalalabad K A S H M I R
Khuzdar
Wad
Sibi
Naushero Firoz
Chakdara
Dir
Drosh
Saidu
Multan
K2 8611m
Khunjrab Pass
Sambarial
Kotri Kabir Ranipur
J A M U &
Liari
Bela
Uthal
Ormara
Kotri
Thatta ARABIAN SEA
Hoshab
Gabd
Pleri
S I N D
Turbat
Hyderabad
Hala
KARACHI
Pasni Gwadar Jiwani
Awaran
Duregi
Kakkar
• Total roads = 260,000 Km • NHA network = 12,131 Km (4 %)
• Carries 80% of commercial traffic
• N-5 carries 65% of this load
Province Km %age
Punjab 2731 22.51
Sindh 2204 18.17
Khyber Pakhtunkhwa 1878 15.48
Balochistan 4565 37.63
Gilgit-Baltistan 0658 5.42
AJK 0095 0.78
Total 12131 100.00
Gharo
Keti Bandar
N-110
N-120 Mirpurkhas
Umarkot
Khokhropar
RAIL
ROAD RAIL
95% 90%
2% 0% 5% 8%
0 10 20 30 40
50 60 70
80 90
100
%
Fre
ight
Tra
ffic
Passenger
Tra
ffic
9590
200.58
0
10
20
30
40
50
60
70
80
90
100
%
Freight Traffic
Passenger Traffic
ROAD AIR
National Highways
Motorways
Planned
VISION
Achieving national cohesion and integration through development of sustainable communication infrastructure for socio-economic uplift of the country by providing enabling environment to facilitate movement of people, goods and services in minimum time and cost.
REGIONAL CONNECTIVITY
To achieve the goals of regional connectivity, following
are the essential requirements :
Improvement of Road, Rail and Ports Infrastructure
Regulatory Framework (Regional, Bilateral and
Multilateral Transit Transport Agreements)
OBJECTIVES OF REGIONAL CONNECTIVITY
The objectives of developing regional linkages are:
Achievement of regional integration
Promotion of multimodal transport
Enhancement of trade and tourism
Reduction in trade and transportation costs
Security and peace in the region
TARGETS
Develop Pakistan as a hub of sub regional connectivity between high
growth East Asia & resource rich Middle East
Improve regional connectivity (links with China, Afghanistan / CARs, Iran,
India etc.)
Establish efficient and well integrated transport system to achieve
competitive economy
Reduce transport costs and enhance affordability
Increase road density from 0.32 to 0.64 Km / Km2
50% reduction in travel time
10% decrease in road transport costs
50% decrease in transportation losses
70% reduction in road fatalities
10
Karimabad
GILGIT
Chilas Sazin
Mansehra
Dasu
Malakand
Dir
Drosh
Chitral
Torkham PESHAWAR
Nowshera
ISLAMABAD
Kharian
LAHORE
Okara
Multan
Bahawalpur
Rahimyar Khan
Hyderabad
Liari
Bela
Wad
Mastung
Kalat
Surab
Khuzdar
Uthal
Jiwani Ormara Pasni
Taftan
Nok Kundi Dalbandin
Nushki
QUETTA
Chaman
Dadhar
Sibi
Jacobabad
Qila Saifullah
Zhob
Dera Ismail Khan
Loralai
Skardu
Jalkhad
Naran
Kotri
Rajanpur
Bannu
Kotri Kabir
Moro
Hala
Ubauro
Mianchannu
Mughal Kot
Retra
Malana
Kashmir (Disputed Territory)
Muzaffarabad
Murree N-75
Thatta
N-5
M-9
M-1
M-3
ARABIAN SEA
Kuchlak D. G.
Khan
Sehwan
Sarai
Gambila
Wahga
IRAN
CHINA
M-7
M-4
Sust
Gabd
Nuttal
Awaran Turbat Hoshab
panjgur
Nag
Basima
KARACHI
DADU
RATODERO
SHIKARPUR
SUKKUR
PINDI BHATTIAN
FAISALABAD
KHANEWAL
Gwadar
Khunjerab
Pass
TAJIKISTAN
Khokhrapar
Durah
Pass
N
Besham
Kalam
REGIONAL INTEGRATION
NHA NETWORK
IRAN
ARABIAN SEA
INDIA
CHINA
10
KHUNJERAB PASS
Karimabad
GILGIT
Chilas
Sazin
Mansehra
Dasu
Malakand
Dir
Drosh
Chitral
Torkham
PESHAWAR
Nowshera
Rawalpindi ISLAMABAD
Kharian
LAHORE
Okara
Multan
Bahawalpur
Rahimyar Khan
Hyderabad
Liari
Bela
Wadh
Mastung
Kalat
Surab
Khuzdar
Uthal
Jiwani Ormara
Pasni
Nok Kundi Dalbandin
Nushki
QUETTA
Dadhar
Sibi
Ratodero
Jacobabad
Qila Saifullah
Zhob
Dera Ismail Khan
Loralai
Skardu
Jalkhad
Naran
Kotri
Dadu
Rajanpur
Bannu
Kotri Kabir
Moro
Hala
Ubauro
Mianchannu
Mughal Kot
Retra
Malana
Kashmir (Disputed Territory)
Parachinar
Muzaffarabad
Murree N-75
Thatta
N-5
M-9
M-1
M-3
Pindi
Bhattian
Faisalabad
ARABIAN SEA
Kuchlak D. G.
Khan
Sehwan
Sarai
Gambila
IRAN
INDIA
CHINA
M-7
M-4
Sust
Gabd
Nuttal
Awaran Turbat
Hoshab
Panjgur
Nag
Basima
Kalam
Chakdara
Besham
Kwazakhela
N-30
M-10
Kararo
Burhan
)km042 ,1( TORKHAM-KHUNJERAB
N-35, M-1, N-5 (CHINA-AFGHAN)
WAHGA
TORKHAM
CHAMAN
TAFTAN
GWADAR
KARACHI
km)949 ,1( CHAMAN-KHUNJERAB
N-35, N-5, M-1, N-55, N-50, N-25 (CHINA-AFGHAN)
km)559 ,2( TAFTAN-KHUNJERAB
N-35, N-5, M-1, N-55, N-50, N-25, N-40 (CHINA-IRAN)
km)270 ,1( WAHGA-KHUNJERAB
N-35, N-5, M-1, M-2, PR (CHINA-INDIA)
km)337 ,2( KARACHI-KHUNJERAB
N-35, N-5, M-1, M-2, M-3, M-4. N-55, M-7 (SEA PORT)
km)943 ,2( GWADAR-KHUNJERAB
N-35, N-5, M-1, M-2, M-3, M-4. N-55, M-8, N-30, N-85 (SEA PORT)
REGIONAL INTEGRATION NHA NETWORK N
DURAH PASS
Fetehjang
Mianwali
)km020 ,1( DURAH PASS-KHUNJERAB
N-35, N-90, N-95, N-45 (CHINA-AFGHAN)
km)519 ,2( TAFTAN-KHUNJERAB
N-35, N-5, N-80, PR, N-55, N-50, N-25, N-40 (CHINA-IRAN)
km)724 ,2( GWADAR-KHUNJERAB
N-35, N-5, M-1, N-55, N-50, N-25, N-85, M-8, N-10
(SEA PORT)
Sukkur
Talajang
km)655 ,2( TAFTAN-KHUNJERAB
N-35, N-5, M-1, M-2, M-3, M-4 N-70, N-50, N-25, N-40
(CHINA-IRAN)
11
PAKISTAN - CHINA LINKS
Routes Distance
in km
1. Karachi - Khanewal - Hasanabdal (N-5) - Mansehra -
Sazin - Chillas - Gilgit – Khunjerab (N-35)
2300
2. Gwadar - Turbat - Ratodero (M-8) - DG Khan – Khohat
(N-55) - Tarnol – (N-80) Hasanabdal - Mansehra -
Sazin - Chillas - Gilgit – Khunjerab (N-35)
2850
Relatively Shorter Option via N-15
3. Karachi - Khanewal (N-5)- Hasanabdal - Mansehra (N-
35)- Naran - Chillas (N-15)- Gilgit – Khunjerab
2220
4. Gwadar - Turbat - Ratodero - DG Khan - Khohat (N-
55) – Tarnaol- Hasanabdal - Mansehra - Naran -
Chillas (N-15)- Gilgit – Khunjerab
2780
PAKISTAN - AFGHANISTAN LINKS Karachi / Gwadar - Chaman / Torkham km
1. Karachi - Kalat - Quetta – Chaman (N-25) 816
2. Gwadar - Turbat - Sorab (N-85) - Quetta – Chaman (N-25) 1036
3. Karachi - Sukkur - Khanewal - Hasanabdal - Peshawar – Torkham (N-5) 1819
4. Karachi - Sehwan - DG Khan - DI Khan - Kohat - Peshawar – Torkham (N-
55)
1447
5. Gwadar - Turbat – Ratodero (M-8) - DG Khan - DI Khan - Kohat - Peshawar
– Torkham (N-55)
1936
6. Gwadar - Turbat (N-85) - Sorab - Quetta (N-25) - Zhob - Mughalkot - DI Khan
(N-50)- Kohat - Peshawar (N-55)– Torkham
1831
7. Karachi - Sorab - Quetta (N-25)- Zhob - Mughalkot - DI Khan (N-50)- Kohat -
Peshawar – Torkham (N-55)
1611
8. Karachi - Khanewal (N-5)- Faisalabad (M-4)- Rashakai (M-1)- Chitral -
Durah Pass (N-45) (4554 m, 15000 ft) (Proposed link For Tajikistan)
2000
9. Gwadar - Turbat - Ratodero (M-8)- DG Khan - Khanewal - Faisalabad – (M-
4) Rashakai (M-1)- Chitral - Durah Pass (N-45) (4554 m, 15000 ft) (Proposed
Link For Tajikistan)
2050
Route Cost
(Mill US $)
• Chitral to Durah Pass Tunnel 76
(82 Km in Pakistan)
• Tunnel under Durah Pass (6.5 Km) 76
(2.5 Km in Pakistan,4.0 Km in Afghanistan)
• Afghan Boarder to Tajikistan Boarder (118 Km) 112
• Cross Border Facilities & road side facilities 12
TOTAL: 276
ESTIMATED COST OF PROPOSED ROAD LINK
BETWEEN PAKISTAN & TAJIKISTAN VIA
AFGHANISTAN
PAKISTAN - IRAN LINKS
Route Distance in km
1. Karachi - Kalat - Lakpass (N-25) - Noushki –
Dalbandin – Nokundi - Taftan (N-40)
1290
2. Karachi - Lyari - Ormara - Gwadar - Pleri - Gabd
(N-10)
714
PAKISTAN - INDIA LINKS
Route Distance in km
1. Karachi – Sukkur - Bawalpur – Khanewal –
Sahiwal – Lahore – (N-5) - Wagha
1600
2. Karachi – Hyderabad (M-9)- Mipurkhas – Umer Kot
- Khokrapar (N-120)
370
Hafeez
ASIAN HIGHWAY
NETWORK
ROAD TO TAJIKISTAN
ROAD TO TAJIKISTAN
CountryRoute
No.Itinerary Length (km)
Pakistan AH1Wahgah – Lahore – Rawalpindi (– Islamabad)
– Hassanabdal – Peshawar – Torkham 607.0
Pakistan AH2Wahgah – Lahore – Multan – Rohri – Quetta –
Taftan 1,828.0
Pakistan AH4
Khunjerab – Hassabdal – Rawalpindi (–
Islamabad) – Lahore – Multan – Rohri –
Hyderabad – Karachi
1,289.0
Pakistan AH7 Chaman – Quetta – Karachi 816.0
Pakistan AH51 Peshawar – Dera Ismail Khan – Quetta 837.0
Pakistan Total 5,377.0
CHINA
KASHMIR
IRAN
DISPUTED TERRITORY
ASIAN HIGHWAY ROUTES IN PAKISTAN
ARABIAN SEA
AFGHANISTAN
Khunjrab
Torkham
Hassanabdal
Multan
Kar
ach
i
Chaman
Taftan
Wahgah
Gwadar
Quetta
Retodero
Peshawar
ISLAMABAD
Rawalpindi
Hyderabad
Kotri
Lahore
DI Khan
Sukkur
Gilgit
Rohri
India-Pakistan-Afghanistan
(AH-1, 520 Km) Wagah – Lahore –
Rawalpindi – Peshawar - Torkham
China
Central Asia
Pakistan-Afghanistan
(AH-51), 862 Km
Quetta-DI Khan-
Peshawar-Torkham
AH4
AH1 AH1
AH1
AH1 AH51
AH2
AH2
AH2
AH2
AH7
AH4
Pakistan-Afghanistan
(AH-7), 816 Km
Karachi-Kalat-Quetta-Chaman
India-Pakistan-Iran
(AH-2), 1763 Km
Wagah-Lahore-Multan-Sukkur
Lakpass-Nokundi-Taftan
Pakistan-China
(AH-4), 2391 Km
Karachi-Lahore-Hasanabdal
-Gilgit-Khunjerab
AH-1: Torkham – Peshawar – Islamabad – Lahore - Wahgah Border (India)
Asian Highway 1 ( AH 1)
Wagah Border (India)-Lahore-Peshawar-Torkham
Length = 520 Km
Total length: 20,557 Kms
Route: Tokoyo-(Ferry)-Seoul-Beijing
-Bangkok- Poipet (Cambodia)-
Yangon (Myanamar)-Dhaka-New
Delhi-Lahore-Islamabad-Peshawar-
Torkham-Kabul-Kandar-Tehran-
Tabriz-Ankara-Istanbul
AH-1: 520 Km (Pakistan)
Road Section Status
Wagah Border-Lahore Provincial road in good condition.
Lahore-Islamabad Motorway 6-lane motorway in operation
Islamabad-Peshawar Motorway 6-lane motorway in operation
Peshawar Northern Bypass (29
Km)
Under construction through GOP, Cost Rs 9,003
million, Completion in three years (2015).
Peshawar-Torkham Section (46
Km) National Highway N-5
2-lane highway exists. Up-gradation in progress with
USAID. (US$ 57 million), Completion in 2014
AH-2: Lahore – Sahiwal – Multan – Rohri – Sukkur – (Quetta) Sariab- Lakpass – Nokundi - Taftan (Iran)
Total length: 13,177 Kms
Route: Denpasar-Jakarta-(Ferry)-Singapore-
Bangkok-Tamu (Myanamar)-Nagaon-
(Bhuttan)-Dhaka-Siliguri (India-Nepal
Border) Kakabhitta(Nepal)-New Delhi-Lahore-
Multan-Rohri-Quetta-Taftan-Zahedan-Yazd
(Tehran)-Hamadan-Khosravi.
AH-2: 1763 Km (Pakistan)
Asian Highway 2 ( AH 2)
Lahore - Quetta - Taftan (Pak-Iran Border)
Length = 1763 Km
Road Section Status
Lahore-Sukkur (775 Km) N-5 4-lane dual carriageway in good condition
Sukkur-Sariab Section of N-
65 (385 Km)
Single carriageway with 6m width exists. 140 Km upgraded. Sukkur-
Jaccobabad Dualization (78 Km) with ADB in progress, completion
by 2014 (Rs 6000 million)
Sibi-Sariab (160 Km) Up-gradation planned with GOP financing (Rs
6360 million).
Lakpass – Taftan, N-40 (610
Km)
330 Kms in good condition except Dalbandin-Noshki (167 Km) and
Lakpass-Noshki (113 Km) which are planned for reconstruction in
2014 (Cost Rs 14,000 million)
AH-4: Novosibirsk (Russia)-(Mongolia) -Urumqi (China)- Khunjerab-Islamabad-Lahore-Multan-Karachi
Total length: 6,024 Kms
Route: Novosibirsk (Russia)-Ulaanbashint
(Mangolia, Russia Border)-Hovd
(Mongolia)-Urumqi (China)-Kashi-
Khunjerab-Islamabad-Lahore-Multan-
Karachi.
AH-4: 1391 Km (Pakistan)
Asian Highway 4 ( AH 4)
Karachi - Lahore - Khunjrab (Pak-China Border)
Length = 1391 Km
Road Section Status
Karachi-Lahore-Hasanabdal Entire road is a good quality dual carriageway
Hasanabdal-Abottabad-
Mansehra Section N-35
2-lane road in good condition. An expressway on new alignment
(110 Km) with the ADB/China assistance planned at an estimated
cost Rs 50 billion, completion by 2017.
Manshera – Sazin Section (258
Km) of N-35
2-lane exists. 25 Km improved. Thakot – Sazin improvement in
progress under Chinese grant, completion in 3 years( 100MUSD).
Relocation of KKH from Sazin
(Dam Site) to Raikot (120 Km)
Will be relocated at an estimated cost of 282MUSD. Out of 140 Km
relocated length, work on 34 Km Shatial Bypass is in progress.
Raikot-Khunjrab Section of
KKH (335 Km) N-35
Existing road has been upgraded with the Chinese assistance except
Attabad lake which is in progress with completion by 2015
AH-7: Yekaterinburg (Russia)-Kaerak (Kazakhstan)-Kara Balta (Kyrgyzstan)-Tashkent (Uzbekistan)-Dushanbe (Tajikistan) -Shirkhan (Afghanistan)-Chaman-Quetta-Kalat-Karachi
Total length: 5,868 Km
Route: Yekaterinburg (Russia)- Kaerak
(Kazakhstan)-Astana-Burubaital-Merke-
Kara Balta (Kyrgyzstan) –Tashkent
(Uzbekistan)-Dushanbe (Tajikistan)-
Shirkhan (Afghanistan)-Kabul-Kandahar-
Spinboldak-Chaman-Quetta-Kalat-Karachi
AH-7: 816 Km (Pakistan)
Asian Highway 7 ( AH 7)
Karachi - Quetta - Chaman (Pak-Afghan Border)
Length = 816 Km
Road Section Status
Kalat-Quetta-Chaman Section
(247 Km) National Highway N-25
2-lane existing road is being upgraded to 7.3m wide carriageway,
completion in 2015. (Cost Rs 6771 million) (US$ 112.8 million).
Kararo-Wad Section (96 Km)
National Highway N-25
Work on upgradation of 2-lane road has been completed with
Japanese Grant of Rs 2 Billion
AH-51: Quetta – D.I. Khan – Peshawar (862 Km)
Total length: 862 Km
Route: Peshawar-D.I. Khan-Quetta
AH-7: 862 Km (Pakistan)
Asian Highway 51 ( AH 51)
Peshawar – D.I. Khan - Quetta
Length = 862 Km
Road Section Status
D.I. Khan - Mughalkot Section (124
Km) of (N-50)
Improved to 2-Lane 7.3m wide carriageway.
Mughal Kot-Zhob Section N-50 (78 Km) Up-gradation planned with ADB assistance at a cost of 8.0
Billion (2014-17). Six (06) Bridges have also been constructed
Zhob-Muslim Bagh Section N-50 (211
Km)
Up-gradation planned under ADB assistance. Zhob-Qila
Saifullah (150 Km) in progress whereas Qila Saifullah-Muslim
Bagh (50Km) is complete. Completion by 2014.
Muslim Bagh – Khanozai (50 Km) Upgraded to 2-lane 7.3m wide carriageway.
Khanozai - Kuchlac Section (23 Km) Upgraded to 2-lane 7.3m wide carriageway.
N-55, D.I. Khan –Sara e Gambila
Section (117 Km)
Work on Additional Carriageway with the assistance of ADB
is complete.
Badabher-Dara Adam Khel (29 Km)
Section of (N-55)
Work on the project with the financial assistance of ADB is
complete.
CAREC CORRIDORS • CAREC: Central Asia Regional Economic Cooperation
• Partnership of 10 countries and 6 multilateral institutions
• Ten CAREC countries are; Afghanistan, Azerbaijan, People's
Republic of China, Kazakhstan, Kyrgyz Republic,
Mongolia, Tajikistan, Uzbekistan, Turkmenistan and
Pakistan.
• Six multilateral partners are; Asian Development Bank
(ADB), European Bank for Reconstruction and
Development (EBRD), International Monetary Fund (IMF),
Islamic Development Bank (IDB), United Nations
Development Programme (UNDP) and World Bank (WB).
• All Working to promote development through cooperation,
leading to accelerated economic growth and poverty reduction.
26
CAREC CORRIDOR
ASTANA
BAKU
TASHKENT
ASHKABAT
ISLAMABAD
DUSHANBE
KABUL
ULANBATAR
HOHHOT
URUMQI
GWADAR KARACHI
Government also plans to develop North-South Corridor from Khunjrab
to Gwadar Port via Thahkot-Mansehra-Abbottabad-Havelian-Burhan –
Pindigheb – Bhakkar – DG Khan-Sui- Jacobabad – Basima and Khuzdar
in next four years period.
In view of the targets set-forth by the Government, following are the
three road corridors recommended by the Government of Pakistan to be
incorporated/integrated with CAREC Road Network:
Khunjrab (Pak-China Border)– Thahkot-Mansehra-Abbottabad-
Havelian-Burhan – Pindigheb – Bhakkar – DG Khan- Sui- Jacobabad
– Khuzdar – Gwadar (2395 km)
Chaman (Pak-Afghan Border)– Quetta – Kalat- Basima – Hoshab –
Gwadar (825 km)
Torkham (Pak-Afghan Border)– Peshawar – Burhan – Pindi Bhattian
– Faisalabad – Khanewal – Multan – Sukkur – Dadu – Karachi (1540
km)
CAREC CORRIDORS RECOMMENDED BY PAKISTAN
No. Country IP… Project Title Donor/
Funding
Source
Cost
($ million)
Implementation
Period
1 PAK Khunjrab – Raikot (N-35, 335 km) Chinese 510 Completed
2 PAK Attaabad Barrier Lake (N-35, 24 km) Chinese 270 2012-14
3 PAK Raikot – Chilas (N-35, 110 km) FERP 167 2013-17
4 PAK Chilas – Thakot (N-35, 225 km) FERP 100 2013-16
5 PAK Thakot – Mansehra (N-35, 97 km) Not Firmed 194 2015-18
6 PAK Mansehra – Burhan (E-35, 110 km) ADB 650 2013-17
7 PAK Torkham-Peshawar (N-5) 46 Km USAID 150 2012-14
8 PAK Faisalabad – Gojra (M-4) ADB 150 2011-14
9 PAK Gojra – Khanewal (M-4, 126 km) ADB 504 2015-18
10 PAK Khanewal – Multan (M-4, 57 km) IDB 150 2011-14
11 PAK Multan – Sukkur (M-5, 390 km) Not Firmed 1600 2014-17
12 PAK Sukkur – Dadu (M-6, 166 km) Not Firmed 665 2014-17
13 PAK Dadu – Hub – Karachi (M-7, 250 km) Not Firmed 1080 2014-17
14 PAK Burhan – DG Khan – Khuzdar –
Basima (New alignment 912 km)
Not Firmed 3648 2014-18
15 PAK Gwadar – Hoshab (M-8, 227 km) GOP 550 2016-20
16 PAK Hoshab – Kalat (N-85 & N-25) GOP 420 2016-20
LIST OF PRIORITY INVESTMENT & TECHNICAL ASSISTANCE PROJECTS
OF PAKISTAN
WAY FORWARD FOR IMPROVEMENT OF
REGIONAL CONNECTIVITY
Improvement in the regional connectivity requires
adoption of the following measures:
Accession to International Conventions related to
trade and transport
Improvement of sea ports, road and rail
infrastructure;
Harmonization of trade and transport regulatory
framework to remove barriers to trade;
N-40
N-70
N-10
M-8
DISPUTED TERRITORY
INDIA
AFGHANISTAN
IRAN
ARABIAN SEA
SKARDU
PESHAWAR
LAHORE FAISALABAD
MULTAN
QUETTA
SUKKUR
KARACHI
Pak – China Economic Corridor
PCEC
Legend
KHYBER
FATEHJHANG
TAUNSA
MIANWALI
SUI
DERA BUGTI
LARKANA
ISA KHEL
PINDIGHEB
LAYYAH
RATODERO NAG PANJGUR
HOSHAB TURBAT
Jiwani
DARYA KHAN
KUNDIAN
ATTABA
D JAGLOT
PARI
GOR CHILAS
BESHAM
QILA
MUZAFFARABA
D
MANSEHR
A ABBOTTABAD HARIPUR
MUSA KHEL
JAMPUR
RAJANPUR
DERA ALLAH YAR
GILGIT
ISLAMABAD
DG KHAN
KHUZDAR
JACOBABAD
GWADAR
KHUNJERAB
Length (Approx) 2,395 Km
Terrain Mountainous, Rolling,
Flat
Lanes 2-6
Lane width 3.65 m
Shoulder width 2 – 3 m (outer)
1 – 2 m (Inner)
Design Speed 70 – 120 Kph
Bridges, Tunnels
and Avalanche
Galleries
2 - 4 lanes
Status
Feasibility study is to
be undertaken
Karachi - Lahore Motorway
LKM
Legend
NANKANA SAHIB
SAHIWAL
JARANWALA
TANDLIANWALA
MAMUNKAJAN
PIR MEHAL ABDUL
HAKEEM KHANEWAL
SHUJABAD
JALALPUR PIRWALA UCH SHARIF
TARINDA MUHAMMAD PANAH ZAHIR PIR
RAHIM YAR KHAN GHOTKI
PANUAQIL
KANDIARO
DADU
DUREJI
LAHORE
KARACHI
RAHIM YAR KHAN
PIRJO GOTH
JOHI
MULTAN Length (Appox) 1,148 Km
Terrain Flat, Mountainous,
Rolling
Lanes 6
Lane width 3.65 m
Shoulder width 3 m (outer) 1m
(Inner)
Design Speed 120 Kph
Tunnel To be determined
after feasibility study
Bridges
(Tentative)
6 Lanes over Indus,
Ravi and Sutlej
Status Feasibility study is to
be undertaken
Estimated Cost Rs. 458 Billion
DG KHAN
JACOBABAD
SUKKUR
HYDERABAD
33
Muzaffarabad Mangla Mirpur (MMM) Expressway
MUZAFFARABAD
CHATTAR KALAS
KOHALA BRIDGE
BURHA JUNGLE
MANGLA / MIRPUR RAMKOT
DOLAI
AZAD PATTAN PONA
THAR BALATHI
DINA MMM
Legend
FATEHJHANG
PINDIGHEB
ISLAMABAD
Length (Approx) 196 Km
Terrain Mountainous, Rolling
Lanes 4
Lane width 3.65 m
Shoulder width 3 m (outer)
1 m (Inner)
Design Speed 120 Kph
Bridges,
Tunnels and
Avalanche
Galleries
4 Lanes
Status
Feasibility study is to
be undertaken
Estimated Cost Rs. 75 Billion
34
NHA’s PORTFOLIO PSDP 2013-14
(Million Rs.)
Sr. No. Description No. of Projects Estimated Cost Throw-forward PSDP
2013-14 Allocation
A
GoP Projects 51 279,227 139,115 23,859
On-Going Projects 44 228,207 88,096 22,205
New Schemes 7 51,020 51,020 1,654
B
Foreign Aided Projects 21 299,093 176,853 36,306
On-Going Projects 15 263,577 141,337 32,983
New Schemes 6 35,515 35,515 3,324
C
Deposit Work Projects 11 36,888 15,226 2,873
On-Going Projects 11 36,888 15,226 2,873
New Schemes 0 0 0 0
TOTAL (A+B+C) 83 615,208 331,195 63,039