Readiness of Forward Muon Arms for W Detection

Itaru NakagawaFor the PHENIX Muon Trigger

Upgrade Collaboration

Page 2: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

22

1. Muon Tracking Chambers– 3 stations of Cathode strip

chambers– Each station has multiple planes

for redundancy– Slow read out -> No trigger

2. Muon Identifier– 5 layers of Iarocci tubes in x and y– 80 cm of steel plate absorber

(total)– Provides trigger p > 2 GeV

St#1

St#2

St#3

MuTr

Same configuration in SouthSame configuration in South

MuID

B

Current Muon System

Page 3: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

3

Observed in Run9 pp

B

p,k

n

mfake High PT m

Study done by Yoshinori Fukao (RIKEN)

Page 4: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

4

Efficiency Measurement with Cosmic Ray

cosmic High Efficiency underClean Circumstance!

Study done by Yoshinori Fukao (RIKEN)

Page 5: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

MuTRG System Run09 performance

5

•MuID Algorithm•Track Matching w/ MuID•Timing cut w/ RPC•Track Matching w/ RPC•Neutron Backgrounds• Yoshimitsu Imazu’s Talk

•etc ..

MuTrg-FEE x MuID

Study done by Yoshinori Fukao (RIKEN)

Page 6: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

6

Rate Dependence of MuID Rejection Power

•Can RPC substitute MuID?•Does RPC give better Rejection Power?

Page 7: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

7

Road Map to Run11 Production Run

MuTRGMuTRG

RPC3

Run11

RPC3

absorber

Page 8: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

Completed Installation of Absorbers

8

North Station-1

New Hadron Absorber

North South

35cm thickSUS310(2 interaction Length)

Page 9: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

9

Final Muon Trigger Configuration

MuTRGMuTRG

RPC3

Run12

RPC3

absorber

RPC1

Page 10: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

10

MuTr X-Talk

Page 11: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

11

MuTr Cross Talk

HV (1800 V)

1 MWAnode wire

1 MW

100 pF ....

Cathode strips (96 strip)

~0.1 pF/strip

Rise time of anode signal ~ 10 nsec

Removed to reduce HV trips

Anode Readout

100mV

3V

Serious Issue for Big Pulse

Pointed out by Tsutomu Mibe@KEK

Decap

Doesn’t exist.

Page 12: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

12

ADC

MIP

MIP

Event Display of ADC Distribution 

Strip

Gap 1Stereo

Gap 2Stereo

Gap 3Stereo

Gap 1NonStereo

Gap 2NonStereo

Gap 3NonStereo

Origin of Big Pulse -> Neutrons?

Page 13: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

13

Can be serious issue at high rate

x2 (Run 11?) x5 (design)

Current set up

Recap (1/10? cross talk)

Luminosity

Rate

per

strip

(kH

z)

Run 9, 500 GeV data

10ms Pileup at 100kHz

Page 14: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

14

SolutionHV (1800 V)

1 MWAnode wire

100 pF ....

Cathode strips (96 strip)

~0.1 pF/strip

Rise time of anode signal ~ 10 nsec

R<<1M W1 MW

Additional Circuit to let anode current escape to ground.

Page 15: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

15

Pads for surface mount capacitorsLeft over Solder + Coating

To Anode Wire

MuTr Station-3 Anode Card

Capacitor (Removed)

Page 16: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

16

North Station-3 Anode Gap

25mm28mm

Geometrical Constraint

Anode cards are only accessible from their back. Front pattern can only be visible using an inspection mirror.

Page 17: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

17

Recap Clamp PrototypesR&D byYoshinori Fukao (RIKEN) Yoshimitsu Imazu (RIKEN)Kentaro Watanabe (Rikkyo)

Page 18: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

18

Effect of Recap

Page 19: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

19

Test Bench Setup

90Sr Source

Anode wire

Strip

#22

w/ and w/o Clamp

Page 20: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

20

Comparison w/ .vs w/o Terminator

22

27

17

Trigger

w/o Clamp

Strip#

22

27

17

w/ Clamp w/ Clamp

Trigger

w/o Clamp

Page 21: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

Comparison w/ .vs w/o Clamp

w/o Clamp

With Clamp

Strip Number

Aver

age

ADC

[cha

nnel

]Conductive Rubber

21

Page 22: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

22

Neutron Absorber

Page 23: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

23

The full muon arm again• Only 1/20 of all PYTHIA

events• Only MuTr St1• Y-scale is from old macro• Only neutrons from

upstream of St1

Neutrons in St1 Current setup SS310 absorber +SWX207HD5 Only SWX207

Page 24: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

Thermal Neutron

• Origin of Big Pulse

• Thermal Neutron Absorber

Thermal Neutron photonAbsorber Borated Poly 2.5cm Pb 1cm + Fe 1cm

Attenuation ~10-2 ~5x10-2

11B + n→7Li* +α7Li*→7 Li + γ (478keV )

A + n(thermal) → (A +1) + γ(≤ 8MeV )

478keV

B 25mm Pb 1cm MuTr

25meV neutron

(e,g)

Fe 1cm 24

Page 25: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

25

Summary• High Momentum Muon Trigger (MuTrig-FEE &

RPC3) is to be commissioned in Run11• Sufficient Rejection Power can be achieved, but

trade off of efficiency.• 99% Efficiency with Cosmic at High PT • Thermal Neutron is suspect degrades MuTr

performance– Neutron Absorber Partial Install– Recapacitation Clamp Prototypes to be tested in Run11

Page 26: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

26

Backup Slides

Page 27: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

27

Towards Successful Installation

Page 28: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

28Fiber Scope

Alignment

Spacer determines Transversedirection within ~ 300mm.

Possible misalignment can be found by visual inspection using a fiber scope

Fiber scope shot

Page 29: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

29

Electrical Contact

Readout socket

Readout BoardElectrical Contact will be confirmedby measuring Voltage using temporaryreadout tool.

To be removed after the measurement.

Page 30: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

30

Installation Proposal

To be installed North Bottom Octants

Page 31: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

31

Clamp Coating Max Current Average Current

w/o w/ <1uA <1uA

w/ w/o >100uA Tripped after 2 min.

w/ w/ 1uA 1uA

w/ w/o >100uA Tripped after 1min.

w/ w/ 2uA 2uA

Extreme Breathing Test

HV=1900VDuration 2min

Page 32: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

32

MuTr Station-3

Page 33: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

33

Recapacitation (Station-3)

Capacitorはすべて取り外し済み。Station-3 Chamberを取り出すの実質的に難しい。簡易的に取り付けられるクリップでグラウンドに落とす。

Page 34: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

34

Coating

Anode CardParylene CPrint Kote

remover

Takes time, but removable

化学的に溶かすには 175℃でクロロナフタレンに反応して溶解(1時間以上)。事実上ムリ。

De-Capacitation(コンデンサーの取り外し)の際にパリレンが溶けてるのでは?

Page 35: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

35

DAQによる測定

ADC>1000ch以上の事象

ADC>1000以上の大きなパルスを観測したとき、周辺のストリップには逆電価のシグナルが観測される。

…,13,14 31,32,……21,22,23…

90Sr線源

ストリップ番号

ストリップ番号

ストリップ番号AD

C [c

hann

el]

ADC

[cha

nnel

]

Anode wireを共有していない

Anode wireを共有していない

線源直下のストリップ

Page 36: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1

36

Low energy neutrons• Low energies• Fluctuation before

SWX needs investigation

• Suppression of very low energies might depend on input neutrons

behind SWX207HD5

before SWX207HD5