React Environmental Professional Services Group, Inc. Brownfield Redevelopment: Our Piece of the Project

Upload: andydesanctis

Post on 02-Jul-2015

211 views

Category:

Business


1 download

TRANSCRIPT

Page 1: React Environmental Professional Services Group Inc Brownfield Case Study

React Environmental Professional Services Group, Inc.

Brownfield Redevelopment: Our Piece of the Project

Page 2: React Environmental Professional Services Group Inc Brownfield Case Study

Architects Can Lead the Way on Brownfield Projects

"The up-front work is facilitation, which is what architects do well, and the creativity architects bring to the process can open up the thinking in a room full of public officials and engineers.“

-- Martin Sell, president of RKETEK.COM, a design-build firm in Juneau, Wisconsin

Page 3: React Environmental Professional Services Group Inc Brownfield Case Study

What is a Brownfield? Legally, Literally, etc..

EPA Public Law 107-118 (H.R. 2869) - "Small Business Liability Relief and Brownfields Revitalization Act" signed into law January 11, 2002.:“With certain legal exclusions and additions, the term `brownfield site' means real property, the expansion, redevelopment, or reuse of which may be complicated by the presence or potential presence of a hazardous substance, pollutant, or contaminant.”

Page 4: React Environmental Professional Services Group Inc Brownfield Case Study

Legally (con’t)

NJ Definition: A Brownfield is defined under NJ state law (N.J.S.A.

58:10B-23.d) as "any former or current commercial or industrial site that is currently vacant or underutilized and on which there has been, or there is suspected to have been, a discharge of a contaminant.“

While this is the definition recognized in state legislation, there are many variations on this definition. Generally, Brownfields are properties that are abandoned or underutilized because of either real or perceived contamination.

Page 5: React Environmental Professional Services Group Inc Brownfield Case Study

Literally…

Page 6: React Environmental Professional Services Group Inc Brownfield Case Study

Literally…

Page 7: React Environmental Professional Services Group Inc Brownfield Case Study

Literally…

Page 8: React Environmental Professional Services Group Inc Brownfield Case Study

Etc…

Page 9: React Environmental Professional Services Group Inc Brownfield Case Study

Etc…

Page 10: React Environmental Professional Services Group Inc Brownfield Case Study

A. Harry Moore…

Page 11: React Environmental Professional Services Group Inc Brownfield Case Study

A. Harry Moore…

Page 12: React Environmental Professional Services Group Inc Brownfield Case Study

A. Harry Moore…

Page 13: React Environmental Professional Services Group Inc Brownfield Case Study

A. Harry Moore…

Page 14: React Environmental Professional Services Group Inc Brownfield Case Study

A. Harry Moore…

Page 15: React Environmental Professional Services Group Inc Brownfield Case Study

A. Harry Moore…

Page 16: React Environmental Professional Services Group Inc Brownfield Case Study

A. Harry Moore…

Page 17: React Environmental Professional Services Group Inc Brownfield Case Study

A. Harry Moore…

Page 18: React Environmental Professional Services Group Inc Brownfield Case Study

A. Harry Moore…

Page 19: React Environmental Professional Services Group Inc Brownfield Case Study

Controls

Engineering Control Summary

* Dense graded aggregate will satisfy NJDOT Specifications** Clean fill will satisfy New Jersey requirements for certified clean fill

Planting pit will be sized to radially surround rootballs (diam. 2’) with 2’ of backfill material for total 4’ clean material **about plant.

Trees and Shrubs

6” planting material to be underlain by 6’’ clean fill **Groundcover

SOIL CAP

Trenches will be filled with dense graded aggregate overlain by typical asphalt, concrete or soil cap profile. Bedding material for utility pipe will consist of minimum 6” dense graded aggregate *.

Utility Trenches

UTILITY TRENCHES

4" concrete slab underlain by compacted dense graded aggregate *.Concrete foundations for structures

4" concrete slab underlain by compacted dense graded aggregate *.Concrete sidewalks

CONCRETE CAP

2" surface coarse pavement underlain by 4" bituminous stabilized base course, 6" dense graded aggregate *.

Asphalt paved roads and drives

ASPHALT CAP

Page 20: React Environmental Professional Services Group Inc Brownfield Case Study

Controls

Page 21: React Environmental Professional Services Group Inc Brownfield Case Study

Dirt…Loading Out

Page 22: React Environmental Professional Services Group Inc Brownfield Case Study

Controls